Assignment Objectives for Unit 5:
Influence Processes
You have been encouraged by a colleague to write an article
about "CEOs and presidents" for a management journal. You
have decided to compare the leadership styles of three leaders.
Using the Library, the Internet, and your course materials, write
a 8-10 page report that elaborates on the following:
In your article, provide the following:
· An introduction to the concept of influence processes
· An explanation of the role of influence in contemporary
leadership
· A discussion of the various types of influence processes and
the factors that can affect them
· The methodology used to identify and research the leaders
selected for this report
· An analysis of the influence processes used by the three
leaders. Identify the processes that the leaders and top
management team are using or have used to impact their
organization.
· A discussion of the strengths and weaknesses of the influence
processes used by the three leaders relative to current and future
challenges facing leaders in global organizations.
· A summary of the key attributes of the influence processes
employed by these leaders to effect positive organizational
change or improved performance.
Assignment Details:
This assignment has 4 parts (REFER TO ASSIGNMENT
DETAILS FOR UNIT 5).
1. What questions do you have about the overarching Unit 5
assignment? Although not due until the end of the class, it is
important that you begin planning for this project early in the
course. What are your initial thoughts about how you will
approach this assignment? Explain.
2. How do cross-cultural differences affect the use of or
response to power in organizations?
3. What are some examples of individual and organizational
sources of power and their consequences for followers and
organizations?
4. What are some examples of the abuse of power in
organizations and how might they have been prevented from
occurring? For assistance with your assignment, please use your
text, Web resources, and all course materials. In your own
words, please post a response to the Discussion Board and
comment on other postings. You will be graded on the quality of
your postings.
Deliverable Length: 400 words (minimum)
Instructor feed back
Wk1 - In this assignment you were asked to write a business
case for the new HWE Accessories website. You appropriately
included the major components of the problem statement;
analysis of the situation; cost-benefit analysis; feasibility study;
TCO; ROI; solution options; and recommendations. Calculating
the TCO and ROI can be complex and difficult to understand,
but leadership needs to have a clear understanding so they can
make informed decisions on your recommendations. You did a
good job with the ROI. You followed appropriate APA format.
Great job.
Wk2 - In this assignment you were asked to create a project
plan and risk matrix. Overall, you covered all tasks to include
developing a project plan that included (1) 10 to 15 tasks. (2) at
least 3 sub-tasks for each task, and an explanation of the project
plan. You also appropriately created a risk matrix based on the
project plan. As we learned this week, without a project plan,
the project becomes nothing more than a list of tasks. It is
crucial for the organization to have a professional project
management office that develops and follows a strong project
plan. Excellent job!
Wk3 - In this assignment you were asked to continue working as
IT manager on the business plan for the new HWE Accessories
website with a contract plan and accompanying project
milestones. Overall you did a good job meeting the tasks. You
appropriately completed the contract plan template, which
included the evaluation and selection process, contract
management principles, vendor risks, and software licensing.
You also updated the project milestones and dependencies as
appropriate. It is important to maintain an accurate milestones
chart with clear dates and dependencies as it is one of the
primary tools for communication and understanding where the
risks are with respect to the project. The IT project manager
must always know if the project is on track with respect to the
tasks.
WK4 - In this assignment you were asked to, as the IT manager
on the business plan for the new HWE Accessories website, to
(1) identify the control objectives and techniques that will
ensure the completeness, accuracy, validity, and authorization
of transactions and data for the new HWE Accessories website
and (2) create a system testing document for the system. Overall
you did a great job. You appropriately justified your decisions.
However, you needed to explain how the system will be tested
that included: (-25):
· Black box testing
· White box testing
· Functional testing
· Environment
· Security testing
· User acceptance testing (UAT)
· Unit testing
WK5 - In this assignment you were asked to, as IT manager,
write a 2- to 4-page implementation plan for the HWE
Accessories website. Overall, you did a good job. You included
the change over approach, data insertion/migration,
configuration management, and the release process for updating
the system. As you discovered this week, these components
must work together to ensure a solution is implemented that
meets the customer's requirements and expectations. The
configuration control board is crucial throughout the life cycle
of the system; through to the system's eventual
decommissioning. Great job!
BSA/515 v5
Contract Plan Template
BSA/515 v5
Page 2 of 3
Contract Plan Template
Complete the template below to create a contract plan to use a
third party for the new HWE Accessories website. Customize
the template as needed.Background and Objectives
A. Statement of Need:Introduce the plan with a brief statement
of need. Summarize the technical and contractual history.
Discuss feasible contract alternatives, prior contracts, and any
related in-house efforts.
B. Applicable Conditions: State all significant conditions
affecting the system, such as requirements for compatibility
with existing or future systems or programs; and any known
cost, schedule, and compatibility or performance constraints.
C. Costs and Period of Performance: The projected expenditure
for the proposed system based upon the Independent
Government Cost Estimate (IGCE) in the table below:
Period
Cost
Period of Performance
Base Year
$0.00
MM/DD/YYYY through MM/DD/YYYY
1st Option Year
$0.00
MM/DD/YYYY through MM/DD/YYYY
3rd Option Year
$0.00
MM/DD/YYYY through MM/DD/YYYY
4th Option Year
$0.00
MM/DD/YYYY through MM/DD/YYYY
Total
$0.00
D. Capability or Performance: Specify the required capabilities
or performance characteristics of the supplier, or the
performance standards of the services; and how they relate to
the need.
E. Delivery or Performance Period Requirements:Describe the
basis for establishing delivery or performance period
requirements. Explain and provide reasons for any urgency, or
justification for not providing for full and open competition.
F. Trade-Offs:Discuss the expected consequences of tradeoffs
among the various cost, capability, or performance and schedule
goals.
G. Risks:Discuss the technical, cost, and schedule risks and
describe what efforts are being planned to reduce risk and the
consequences of failure to achieve goals.
1. Technical:
2. Cost:
3. Schedule:Plan of Action
A. Product or Service Description:Explain the choice of product
or service description types (including performance-based
contracting descriptions) to be used in the plan.
B. Potential Sources:Address/detail the following:
1. Prospective Offerors: Describe how prospective offerors will
be identified.
2. Market Research: Identify who conducted the market
research.
3. Address the extent and results of the market research and
indicate their impact on the various elements of the plan.
C. Competition: Specify if the proposed plan will be solicited
on a competitive or noncompetitive basis.
D. If full and open competition is not contemplated, explain the
basis for that decision.
E. Source Selection Procedures:Address/detail the following:
1. Evaluation Procedures: Explain how offers will be evaluated,
and the relationship of the evaluation procedures to the
technical factors/standards, technical evaluation team, and
solicitation requirements.
Example: Proposals will be evaluated pursuant to the “Best
Value Continuum” Source Selection Process, with emphasis
placed on past performance, management capabilities and
personnel qualifications, price, and on the contractor’s quality
control plan as risk factors in determining overall technical
acceptability. Past performance data and management
capabilities and personnel qualifications and the contractor’s
quality control plan will be evaluated in accordance with FAR
15.305. A team of qualified business personnel will evaluate
technical proposals in accordance with the requisite source
selection plan, and the solicitation. Price proposals will be
evaluated independently of technical evaluations. Award will be
made to the technically acceptable offeror(s) whose proposal,
being responsive to all solicitation requirements, offers the best
value to the business. Award will further be contingent upon
determinations of contractor responsibility and price
reasonableness.
2. Evaluation Factors:
3. Evaluation Factor Standards:
F. Contracting Considerations: Address/detail the following:
1. Contract Type: (Example: Firm, Fixed-Price, or Requirements
Contract)
2. Options: Specify any options to be used. For example,
“Option to Extend Services” or “Option to Extend the Term of
the Contract” may be included as unilateral authority to extend
services based upon continued need and funds availability. If
options will not be used, provide a brief explanation.
3. Special Contract Clauses, Provisions, or Deviations: Specify
the special contract clauses, provisions, or deviations, if any.
4. Contracting Method: Detail the contracting method, including
any negotiated procedures being used.
Example: It has been determined that use of negotiated
procedures for the proposed system is most conducive to the
business needs. The flexibility to hold discussions with
potential offerors significantly enhances the business’ ability to
maximize competition and obtain quality services at fair and
reasonable pricing.
5. Contract Administration: Who will administer the contract?
G. Budgeting and Funding: Address/detail the following:
1. Derivation of Budgeting Estimates:
2. Funding Availability: Subject to Availability of Funds or
FYXX funds are available.
3. Currency Used: U.S. Dollar
H. Management Information Requirements: Discuss, as
appropriate, what management system will be used to monitor
the contractor’s effort (a Quality Assurance Surveillance Plan, a
Management Plan, a Work Plan (construction), etc.).
I. Logistics Considerations:Describe the distribution of
commercial items; the reliability, maintainability, and quality
assurance requirements, including any planned use of
warranties; the requirements for contractor data (including
repurchase data) and data rights, their estimated cost, and the
use to be made of the data; and standardization concepts,
including the necessity to designate, in accordance with agency
procedures, technical equipment as “standard” so that future
purchases of the equipment can be made from the same
manufacturing source.
J. Business-Furnished Equipment: Indicate any property to be
furnished to contractors (including material, facilities, office
equipment, etc.), and discuss any associated considerations,
such as its availability or the schedule for its acquisition.
K. Business-Furnished Information:Discuss any business
information, such as maps or drawings to be provided to
prospective offerors and contractors.
L. Safety and Security Considerations:Discuss how adequate
security will be established, maintained, and monitored. This
might include requiring the contractor to obtain security
clearances and building badges/passes (include additional or
other requirements as needed).
M. Milestones for System Cycle:Insert the appropriate
milestone chart.
Copyright© 2018 by University of Phoenix. All rights reserved.
Copyright© 2018 by University of Phoenix. All rights reserved.

More Related Content

DOCX
Human Resource PlanProject NameTable of Contents2Introdu.docx
DOCX
Mgmt404 project management whole course
DOCX
Mgmt404 project management whole course
DOCX
Mgmt404 project management whole course
DOCX
Mgmt404 project management whole course
DOCX
Mgmt404 project management whole course
DOCX
Mgmt404 project management whole course
DOCX
Mgmt404 project management whole course
Human Resource PlanProject NameTable of Contents2Introdu.docx
Mgmt404 project management whole course
Mgmt404 project management whole course
Mgmt404 project management whole course
Mgmt404 project management whole course
Mgmt404 project management whole course
Mgmt404 project management whole course
Mgmt404 project management whole course

Similar to Assignment Objectives for Unit 5Influence ProcessesYou have.docx (20)

DOCX
IMPORTANT label each projects title page as follow Project 1P.docx
DOCX
Devry university mgmt404 complete course
DOCX
Devry university mgmt404 complete course
DOCX
Devry university mgmt404 complete course
DOCX
Devry university mgmt404 complete course
DOCX
Devry university mgmt404 complete course
DOCX
Devry university mgmt404 complete course
DOCX
Devry university mgmt404 complete course
DOCX
week 1Question BDescribe a situation where you or your superviso.docx
DOCX
Mgmt404 entire class course project + all 7 weeks i labs devry university
DOCX
Mgmt404 entire class course project + all 7 weeks i labs devry university
DOCX
Mgmt404 entire class course project + all 7 weeks i labs devry university
DOCX
Mgmt404 entire class course project + all 7 weeks i labs devry university
DOCX
Mgmt404 entire class course project + all 7 weeks i labs devry university
DOCX
Mgmt404 entire class course project + all 7 weeks i labs devry university
DOCX
Mgmt404 entire class course project + all 7 weeks i labs devry university
DOCX
THIS IS A 10 PART ASSIGNMENT POST, THE BID AMOUNT IS FOR THE ENTIRE .docx
DOCX
Hello Class- This is a very rough draft of the assignment. I have
DOCX
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
DOCX
This assignment has several different pieces that complete a proje.docx
IMPORTANT label each projects title page as follow Project 1P.docx
Devry university mgmt404 complete course
Devry university mgmt404 complete course
Devry university mgmt404 complete course
Devry university mgmt404 complete course
Devry university mgmt404 complete course
Devry university mgmt404 complete course
Devry university mgmt404 complete course
week 1Question BDescribe a situation where you or your superviso.docx
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
THIS IS A 10 PART ASSIGNMENT POST, THE BID AMOUNT IS FOR THE ENTIRE .docx
Hello Class- This is a very rough draft of the assignment. I have
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
This assignment has several different pieces that complete a proje.docx
Ad

More from howard4little59962 (20)

DOCX
assignment mental health disordersA 38-year-old woman presen.docx
DOCX
Assignment Marking Criteria and FeedbackStrengths of this as.docx
DOCX
Assignment Linux ForensicsResearch information about Linux .docx
DOCX
Assignment Legislation Grid and TestimonyAdvocacy Statement.docx
DOCX
Assignment Legislation Comparison Grid and TestimonyAdvocacy State.docx
DOCX
Assignment Leadership Style What Do People Do When They Are Leadin.docx
DOCX
Assignment Legislation Comparison Grid and TestimonyAdvocacy S.docx
DOCX
Assignment Leadership and Strategic PlanningIn this assignm.docx
DOCX
Assignment Lab Assignment Assessing the Genitalia and Rectum.docx
DOCX
Assignment Keys Black The requirements of that .docx
DOCX
Assignment Journal Entry – Media and SexismMany marketing effor.docx
DOCX
Assignment IT Infrastructure PoliciesLearning Objectives and Ou.docx
DOCX
Assignment IT Infrastructure PoliciesLearning Objectives and .docx
DOCX
Assignment is dues Tuesday 27th of August by 1200 pm eastern ti.docx
DOCX
Assignment is due Wednesday by 3pm ZERO Plagiarism include reference.docx
DOCX
Assignment is due by Today by 6pm ZERO Plagiarism include references.docx
DOCX
Assignment Interview Question on Patriotism and Military Histor.docx
DOCX
Assignment Interview PreparationPart IUse the Internet to loc.docx
DOCX
Assignment International trade and interprises··Impor.docx
DOCX
Assignment is due by 600 PM Eastern Time (about 8 hours from now).docx
assignment mental health disordersA 38-year-old woman presen.docx
Assignment Marking Criteria and FeedbackStrengths of this as.docx
Assignment Linux ForensicsResearch information about Linux .docx
Assignment Legislation Grid and TestimonyAdvocacy Statement.docx
Assignment Legislation Comparison Grid and TestimonyAdvocacy State.docx
Assignment Leadership Style What Do People Do When They Are Leadin.docx
Assignment Legislation Comparison Grid and TestimonyAdvocacy S.docx
Assignment Leadership and Strategic PlanningIn this assignm.docx
Assignment Lab Assignment Assessing the Genitalia and Rectum.docx
Assignment Keys Black The requirements of that .docx
Assignment Journal Entry – Media and SexismMany marketing effor.docx
Assignment IT Infrastructure PoliciesLearning Objectives and Ou.docx
Assignment IT Infrastructure PoliciesLearning Objectives and .docx
Assignment is dues Tuesday 27th of August by 1200 pm eastern ti.docx
Assignment is due Wednesday by 3pm ZERO Plagiarism include reference.docx
Assignment is due by Today by 6pm ZERO Plagiarism include references.docx
Assignment Interview Question on Patriotism and Military Histor.docx
Assignment Interview PreparationPart IUse the Internet to loc.docx
Assignment International trade and interprises··Impor.docx
Assignment is due by 600 PM Eastern Time (about 8 hours from now).docx
Ad

Recently uploaded (20)

PPTX
Lesson notes of climatology university.
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PDF
Complications of Minimal Access Surgery at WLH
PPTX
Presentation on HIE in infants and its manifestations
PDF
A systematic review of self-coping strategies used by university students to ...
PDF
RMMM.pdf make it easy to upload and study
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
Computing-Curriculum for Schools in Ghana
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PPTX
Cell Types and Its function , kingdom of life
Lesson notes of climatology university.
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Chinmaya Tiranga quiz Grand Finale.pdf
Pharmacology of Heart Failure /Pharmacotherapy of CHF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
Complications of Minimal Access Surgery at WLH
Presentation on HIE in infants and its manifestations
A systematic review of self-coping strategies used by university students to ...
RMMM.pdf make it easy to upload and study
202450812 BayCHI UCSC-SV 20250812 v17.pptx
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Anesthesia in Laparoscopic Surgery in India
Supply Chain Operations Speaking Notes -ICLT Program
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
Computing-Curriculum for Schools in Ghana
STATICS OF THE RIGID BODIES Hibbelers.pdf
Final Presentation General Medicine 03-08-2024.pptx
human mycosis Human fungal infections are called human mycosis..pptx
O5-L3 Freight Transport Ops (International) V1.pdf
Cell Types and Its function , kingdom of life

Assignment Objectives for Unit 5Influence ProcessesYou have.docx

  • 1. Assignment Objectives for Unit 5: Influence Processes You have been encouraged by a colleague to write an article about "CEOs and presidents" for a management journal. You have decided to compare the leadership styles of three leaders. Using the Library, the Internet, and your course materials, write a 8-10 page report that elaborates on the following: In your article, provide the following: · An introduction to the concept of influence processes · An explanation of the role of influence in contemporary leadership · A discussion of the various types of influence processes and the factors that can affect them · The methodology used to identify and research the leaders selected for this report · An analysis of the influence processes used by the three leaders. Identify the processes that the leaders and top management team are using or have used to impact their organization. · A discussion of the strengths and weaknesses of the influence processes used by the three leaders relative to current and future challenges facing leaders in global organizations. · A summary of the key attributes of the influence processes employed by these leaders to effect positive organizational change or improved performance. Assignment Details: This assignment has 4 parts (REFER TO ASSIGNMENT DETAILS FOR UNIT 5). 1. What questions do you have about the overarching Unit 5 assignment? Although not due until the end of the class, it is important that you begin planning for this project early in the course. What are your initial thoughts about how you will
  • 2. approach this assignment? Explain. 2. How do cross-cultural differences affect the use of or response to power in organizations? 3. What are some examples of individual and organizational sources of power and their consequences for followers and organizations? 4. What are some examples of the abuse of power in organizations and how might they have been prevented from occurring? For assistance with your assignment, please use your text, Web resources, and all course materials. In your own words, please post a response to the Discussion Board and comment on other postings. You will be graded on the quality of your postings. Deliverable Length: 400 words (minimum) Instructor feed back Wk1 - In this assignment you were asked to write a business case for the new HWE Accessories website. You appropriately included the major components of the problem statement; analysis of the situation; cost-benefit analysis; feasibility study; TCO; ROI; solution options; and recommendations. Calculating the TCO and ROI can be complex and difficult to understand, but leadership needs to have a clear understanding so they can make informed decisions on your recommendations. You did a good job with the ROI. You followed appropriate APA format. Great job. Wk2 - In this assignment you were asked to create a project plan and risk matrix. Overall, you covered all tasks to include developing a project plan that included (1) 10 to 15 tasks. (2) at least 3 sub-tasks for each task, and an explanation of the project plan. You also appropriately created a risk matrix based on the project plan. As we learned this week, without a project plan,
  • 3. the project becomes nothing more than a list of tasks. It is crucial for the organization to have a professional project management office that develops and follows a strong project plan. Excellent job! Wk3 - In this assignment you were asked to continue working as IT manager on the business plan for the new HWE Accessories website with a contract plan and accompanying project milestones. Overall you did a good job meeting the tasks. You appropriately completed the contract plan template, which included the evaluation and selection process, contract management principles, vendor risks, and software licensing. You also updated the project milestones and dependencies as appropriate. It is important to maintain an accurate milestones chart with clear dates and dependencies as it is one of the primary tools for communication and understanding where the risks are with respect to the project. The IT project manager must always know if the project is on track with respect to the tasks. WK4 - In this assignment you were asked to, as the IT manager on the business plan for the new HWE Accessories website, to (1) identify the control objectives and techniques that will ensure the completeness, accuracy, validity, and authorization of transactions and data for the new HWE Accessories website and (2) create a system testing document for the system. Overall you did a great job. You appropriately justified your decisions. However, you needed to explain how the system will be tested that included: (-25): · Black box testing · White box testing · Functional testing · Environment · Security testing · User acceptance testing (UAT)
  • 4. · Unit testing WK5 - In this assignment you were asked to, as IT manager, write a 2- to 4-page implementation plan for the HWE Accessories website. Overall, you did a good job. You included the change over approach, data insertion/migration, configuration management, and the release process for updating the system. As you discovered this week, these components must work together to ensure a solution is implemented that meets the customer's requirements and expectations. The configuration control board is crucial throughout the life cycle of the system; through to the system's eventual decommissioning. Great job! BSA/515 v5 Contract Plan Template BSA/515 v5 Page 2 of 3 Contract Plan Template Complete the template below to create a contract plan to use a third party for the new HWE Accessories website. Customize the template as needed.Background and Objectives A. Statement of Need:Introduce the plan with a brief statement of need. Summarize the technical and contractual history. Discuss feasible contract alternatives, prior contracts, and any related in-house efforts. B. Applicable Conditions: State all significant conditions affecting the system, such as requirements for compatibility with existing or future systems or programs; and any known cost, schedule, and compatibility or performance constraints. C. Costs and Period of Performance: The projected expenditure for the proposed system based upon the Independent
  • 5. Government Cost Estimate (IGCE) in the table below: Period Cost Period of Performance Base Year $0.00 MM/DD/YYYY through MM/DD/YYYY 1st Option Year $0.00 MM/DD/YYYY through MM/DD/YYYY 3rd Option Year $0.00 MM/DD/YYYY through MM/DD/YYYY 4th Option Year $0.00 MM/DD/YYYY through MM/DD/YYYY Total $0.00 D. Capability or Performance: Specify the required capabilities or performance characteristics of the supplier, or the performance standards of the services; and how they relate to the need. E. Delivery or Performance Period Requirements:Describe the basis for establishing delivery or performance period requirements. Explain and provide reasons for any urgency, or justification for not providing for full and open competition. F. Trade-Offs:Discuss the expected consequences of tradeoffs among the various cost, capability, or performance and schedule goals. G. Risks:Discuss the technical, cost, and schedule risks and describe what efforts are being planned to reduce risk and the consequences of failure to achieve goals. 1. Technical: 2. Cost: 3. Schedule:Plan of Action
  • 6. A. Product or Service Description:Explain the choice of product or service description types (including performance-based contracting descriptions) to be used in the plan. B. Potential Sources:Address/detail the following: 1. Prospective Offerors: Describe how prospective offerors will be identified. 2. Market Research: Identify who conducted the market research. 3. Address the extent and results of the market research and indicate their impact on the various elements of the plan. C. Competition: Specify if the proposed plan will be solicited on a competitive or noncompetitive basis. D. If full and open competition is not contemplated, explain the basis for that decision. E. Source Selection Procedures:Address/detail the following: 1. Evaluation Procedures: Explain how offers will be evaluated, and the relationship of the evaluation procedures to the technical factors/standards, technical evaluation team, and solicitation requirements. Example: Proposals will be evaluated pursuant to the “Best Value Continuum” Source Selection Process, with emphasis placed on past performance, management capabilities and personnel qualifications, price, and on the contractor’s quality control plan as risk factors in determining overall technical acceptability. Past performance data and management capabilities and personnel qualifications and the contractor’s quality control plan will be evaluated in accordance with FAR 15.305. A team of qualified business personnel will evaluate technical proposals in accordance with the requisite source selection plan, and the solicitation. Price proposals will be evaluated independently of technical evaluations. Award will be made to the technically acceptable offeror(s) whose proposal, being responsive to all solicitation requirements, offers the best value to the business. Award will further be contingent upon determinations of contractor responsibility and price reasonableness.
  • 7. 2. Evaluation Factors: 3. Evaluation Factor Standards: F. Contracting Considerations: Address/detail the following: 1. Contract Type: (Example: Firm, Fixed-Price, or Requirements Contract) 2. Options: Specify any options to be used. For example, “Option to Extend Services” or “Option to Extend the Term of the Contract” may be included as unilateral authority to extend services based upon continued need and funds availability. If options will not be used, provide a brief explanation. 3. Special Contract Clauses, Provisions, or Deviations: Specify the special contract clauses, provisions, or deviations, if any. 4. Contracting Method: Detail the contracting method, including any negotiated procedures being used. Example: It has been determined that use of negotiated procedures for the proposed system is most conducive to the business needs. The flexibility to hold discussions with potential offerors significantly enhances the business’ ability to maximize competition and obtain quality services at fair and reasonable pricing. 5. Contract Administration: Who will administer the contract? G. Budgeting and Funding: Address/detail the following: 1. Derivation of Budgeting Estimates: 2. Funding Availability: Subject to Availability of Funds or FYXX funds are available. 3. Currency Used: U.S. Dollar H. Management Information Requirements: Discuss, as appropriate, what management system will be used to monitor the contractor’s effort (a Quality Assurance Surveillance Plan, a Management Plan, a Work Plan (construction), etc.). I. Logistics Considerations:Describe the distribution of commercial items; the reliability, maintainability, and quality assurance requirements, including any planned use of warranties; the requirements for contractor data (including repurchase data) and data rights, their estimated cost, and the use to be made of the data; and standardization concepts,
  • 8. including the necessity to designate, in accordance with agency procedures, technical equipment as “standard” so that future purchases of the equipment can be made from the same manufacturing source. J. Business-Furnished Equipment: Indicate any property to be furnished to contractors (including material, facilities, office equipment, etc.), and discuss any associated considerations, such as its availability or the schedule for its acquisition. K. Business-Furnished Information:Discuss any business information, such as maps or drawings to be provided to prospective offerors and contractors. L. Safety and Security Considerations:Discuss how adequate security will be established, maintained, and monitored. This might include requiring the contractor to obtain security clearances and building badges/passes (include additional or other requirements as needed). M. Milestones for System Cycle:Insert the appropriate milestone chart. Copyright© 2018 by University of Phoenix. All rights reserved. Copyright© 2018 by University of Phoenix. All rights reserved.