SlideShare a Scribd company logo
The Bandra-Worli Sealink
Bandra worli sea link introduction...ppt
The Bandra- Worli Sea Link
• INAUGURATION June 30, 2009
• Landmark for Mumbai city
• Among the most complex & advanced
construction projects ever in India
• Major project in Mumbai metropolitan region
after Mumbai-Pune expressway
Bandra worli sea link introduction...ppt
Project
• Sea link project conceived in the 1990s
• Plagued by PILs- fishermen & environmentalists
• 2004- Work started
• But drastic changes to 80% of the bridge design
• Cost escalation from Rs 350 crore to Rs 1,306
crore to Rs 1,634 crore
• MSRDC project
• Executed by Hindustan Construction Company
• Illumination by Bajaj Electricals, Rs 9 crore
Bandra worli sea link introduction...ppt
Bandra worli sea link introduction...ppt
Location
• Built over the Mahim Bay
• Connects Bandra(suburb) to Worli(central Mumbai)
• 8-lane-wide
• Sea link length- 5.6-km, 3.8 km over the sea
Bandra worli sea link introduction...ppt
Facts
• Height of the cable-stayed tower = 43-storey
building
• Weight= 50,000 African elephants
• Steel wire used= circumference of the earth
• Cement used- 90,000 tons
• 16 lanes toll plaza, at the Bandra end
•
Bandra worli sea link introduction...ppt
How the Sea-Link Helps
• Additional connectivity from city to suburbs
• Reduces travel time from 1 hour+ to only 7
minutes
• Decongests Mahim Causeway- 125,000 vehicles
a day
• Avoids 29 traffic lights
• Save Rs 100 crore a year in vehicle operating
costs
Bandra worli sea link introduction...ppt
Problems Perceived
• Major traffic snarls at Worli, no solution figured
out
• Additional congestion on SV road and across
Lilavati Hospital
• Toll proposed- Rs 50 oneway, may dissuade a
few
•
Bandra worli sea link introduction...ppt
Landmark
• Hot tourist spot
• Key destination in 'Mumbai Darshan' package
• Special open BEST buses between BKC & Worli
sea face
• 8-lane bridge, with 2 dedicated bus lanes
Bandra worli sea link introduction...ppt
Mini-UN
• Engineering team from
• China, Egypt, Canada, Britain, Serbia,
Switzerland, Singapore, Thailand, Hong
Kong, Indonesia and Philippines worked
on the project
Bandra worli sea link introduction...ppt
FORWARD THIS TO AS MANY
MUMBAIKARS AS YOU CAN

More Related Content

PPS
Bandra worli sealink
PPS
Bandra Worli Sealink
PPS
Bandra worli sealink
PPS
Bandra Worli Sealink
PPS
Bandra Worli Sealink
PPT
Bandra Worli sea link
PPS
Bandra worli sealink
PPS
Bandra Worli Sealink
Bandra worli sealink
Bandra Worli Sealink
Bandra worli sealink
Bandra Worli Sealink
Bandra Worli Sealink
Bandra Worli sea link
Bandra worli sealink
Bandra Worli Sealink

Similar to Bandra worli sea link introduction...ppt (18)

PPT
Bandra Worli Sealink
PPTX
Bandra worli sea link case study
PPT
Mmmodified copy
PPTX
Bandra Worli Sea Link
PPTX
Bandra worli sea link jay
PPTX
Bandra worli sea link
PPTX
Bandra worli sealink
PPTX
Bandra+worli+sea+link
PDF
Sea link CASE STUDY
PPTX
Bandra worli sea link,Mumbai,Maharashtra,India
DOCX
Bandra worli sealink pdf
PPTX
Bandra - Worli sea link
PDF
Sewri-Navi Mumbai Sea Link.pdf
PPT
Mthl( Mumbai Transe Harbour link)
PDF
Mumbai Trans Harbour Link.pdf
PDF
Mumbai Western Freeway Sealink Project
PPTX
HPC Roll No. 14.pptx case studies on HPC
DOCX
Sea link (2)
Bandra Worli Sealink
Bandra worli sea link case study
Mmmodified copy
Bandra Worli Sea Link
Bandra worli sea link jay
Bandra worli sea link
Bandra worli sealink
Bandra+worli+sea+link
Sea link CASE STUDY
Bandra worli sea link,Mumbai,Maharashtra,India
Bandra worli sealink pdf
Bandra - Worli sea link
Sewri-Navi Mumbai Sea Link.pdf
Mthl( Mumbai Transe Harbour link)
Mumbai Trans Harbour Link.pdf
Mumbai Western Freeway Sealink Project
HPC Roll No. 14.pptx case studies on HPC
Sea link (2)
Ad

More from prem506102 (7)

PPT
1.7 Project Management basics and techniques.ppt
PPTX
presntation micro algae. production.pptx
PPT
Tears of a woman educational ppt for knowldege
PPTX
hydrogenenergy-151008090050-lva1-app6892.pptx
PPTX
ppt_3.pptx
PPTX
ppt_2.pptx
PPTX
ppt.pptx
1.7 Project Management basics and techniques.ppt
presntation micro algae. production.pptx
Tears of a woman educational ppt for knowldege
hydrogenenergy-151008090050-lva1-app6892.pptx
ppt_3.pptx
ppt_2.pptx
ppt.pptx
Ad

Recently uploaded (20)

PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
Current and future trends in Computer Vision.pptx
PDF
PPT on Performance Review to get promotions
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPT
introduction to datamining and warehousing
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
UNIT 4 Total Quality Management .pptx
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
86236642-Electric-Loco-Shed.pdf jfkduklg
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Current and future trends in Computer Vision.pptx
PPT on Performance Review to get promotions
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
introduction to datamining and warehousing
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Safety Seminar civil to be ensured for safe working.
Automation-in-Manufacturing-Chapter-Introduction.pdf
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Fundamentals of safety and accident prevention -final (1).pptx
UNIT 4 Total Quality Management .pptx
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
86236642-Electric-Loco-Shed.pdf jfkduklg
Visual Aids for Exploratory Data Analysis.pdf
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF

Bandra worli sea link introduction...ppt

  • 3. The Bandra- Worli Sea Link • INAUGURATION June 30, 2009 • Landmark for Mumbai city • Among the most complex & advanced construction projects ever in India • Major project in Mumbai metropolitan region after Mumbai-Pune expressway
  • 5. Project • Sea link project conceived in the 1990s • Plagued by PILs- fishermen & environmentalists • 2004- Work started • But drastic changes to 80% of the bridge design • Cost escalation from Rs 350 crore to Rs 1,306 crore to Rs 1,634 crore • MSRDC project • Executed by Hindustan Construction Company • Illumination by Bajaj Electricals, Rs 9 crore
  • 8. Location • Built over the Mahim Bay • Connects Bandra(suburb) to Worli(central Mumbai) • 8-lane-wide • Sea link length- 5.6-km, 3.8 km over the sea
  • 10. Facts • Height of the cable-stayed tower = 43-storey building • Weight= 50,000 African elephants • Steel wire used= circumference of the earth • Cement used- 90,000 tons • 16 lanes toll plaza, at the Bandra end •
  • 12. How the Sea-Link Helps • Additional connectivity from city to suburbs • Reduces travel time from 1 hour+ to only 7 minutes • Decongests Mahim Causeway- 125,000 vehicles a day • Avoids 29 traffic lights • Save Rs 100 crore a year in vehicle operating costs
  • 14. Problems Perceived • Major traffic snarls at Worli, no solution figured out • Additional congestion on SV road and across Lilavati Hospital • Toll proposed- Rs 50 oneway, may dissuade a few •
  • 16. Landmark • Hot tourist spot • Key destination in 'Mumbai Darshan' package • Special open BEST buses between BKC & Worli sea face • 8-lane bridge, with 2 dedicated bus lanes
  • 18. Mini-UN • Engineering team from • China, Egypt, Canada, Britain, Serbia, Switzerland, Singapore, Thailand, Hong Kong, Indonesia and Philippines worked on the project
  • 20. FORWARD THIS TO AS MANY MUMBAIKARS AS YOU CAN