Barriers and issues with the creation of calibrated models
Presenter: Daniel Coakley
Wednesday, 18 November 2015
Introduction
• Introduction
– Building Energy Simulation (BES) Models
– Issues with BES Models
– Model Calibration
• Barriers to model calibration (and how they can,
and are being overcome)
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Building Energy Simulation (BES)
Design
• Design assessment and performance evaluation;
• Compliance modelling (e.g. LEED, Part-L Building Regs etc.);
• Building design and system optimisation, Renewables integration etc.
Operation
• Commissioning and retro-commissioning of building systems and controls;
• Fault detection and diagnosis (FDD);
• Simulation-assisted building control.
Retrofit
• Technical and economical evaluation of Energy Conservation Measures (ECM’s);
• Measurement and Verification (M&V) of retrofit savings (IPMVP).
Issues with BES Models
Main Issues
• Performance Gap: Discrepancy
between design performance
and actual performance;
• Uncertainty Quantification:
Need to clearly state the
prediction confidence, and
provide models which are fit for
purpose.
Model Calibration
 Building Model Calibration is the process of improving
the accuracy of simulation models to reflect the as-
built status and actual operating conditions
 Calibration is widely acknowledged as a complex task
(Over-specified and Under-determined)
 Most current approaches require significant expert
knowledge and numerous manual interventions using
different tools/methods to achieve high levels of
accuracy
CALIBRATION ISSUES
Barriers to BES Calibration
Standards Expense Complexity Inputs Controls
Faults Uncertainty Identification Integration Automation
Standards
• No standard approach for model development and calibration;
• Insufficient standards for calibration criteria;
• Current guidelines only specify nominal acceptable error ranges at
whole-building level, but do not account for input uncertainty,
meter accuracy, or sub-model discrepancies;
• Concept of a ‘calibrated model’ varies significantly;
• Need for transparent evidence-based model development guidelines;
• Need for accountability within guidelines for model uncertainty and
inaccuracies, and inclusion as part of model outputs;
• Need for standard terminologies around model calibration, and
clearer communication to building stakeholders;
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Expense (Time + Costs)
• Time and resources needed to obtain the required hourly sub-
metered data, system information, etc. can be prohibitive;
• Real system data is often unavailable or difficult to access without
extensive effort on the part of the modeler / consultant;
• Lack of data retention and interchange across building life-cycle;
• Cost of metering is continuously decreasing, as is cost of data storage;
• Clients need to be made aware of the value and importance of their
building data and system information, as their requirements will drive
changes in how information is handled, tagged and retained;
• Better integration between tools, building communication platforms
etc. will all help reduce calibration time and expense;
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Model Complexity
• Calibration problem is over-specified and under-determined;
• May be thousands of model inputs but relatively few measurable
outputs with which to assess model accuracy;
• Increased risk of error in configuring the model, and lack of
transparency and ability to validate inputs appropriately;
• Solutions which help simplify the model can reduce noise from
unimportant variables, and focus attention on important or influential
parameters (e.g. grey-box modelling, free-form profiles);
• Model simplification can reduce time and expense in both model
development and calibration;
• Need to maintain model accuracy & outputs which are fit for purpose;
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Input Specification
• Lack of availability of high-quality input data for detailed models;
• Inputs often do not take in to account real building operation or
system profiles, which can differ significantly from design information
(due to changes in operation over time);
• Leads to lack of confidence in model results (GIGO);
• Use of real building inputs, in place of modelled or assumed profiles,
where appropriate, can help reduce model development time, reduce
noise, and improve model accuracy;
• Availability of stock information from real buildings (i.e. building input
library, BIM manufacturer databases etc.) could help improve accuracy
of model inputs, and hence confidence over model outputs;
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Controls
• Difference between methods of specifying controls within the
simulation environment vs. real building control logic;
• Simulation programs generally geared towards zone-level design load
calculations, while control logic focuses on component level operation
(e.g. valve and damper positions);
• Ideal scenario offers seamless transition from the design environment to
controller (i.e. design -> simulation -> controller);
• Possibility of integration with third-party software, or vendor control
modules offers opportunity to exploit strengths of combined tools.
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Faults
• Faults in building systems, sensors or components can cause
misleading discrepancies between measured and simulated data;
• Faults may be present in physical components or control algorithms;
• Leads to misdirection during model calibration, and can actually
exacerbate model discrepancies if user attempts to mask problem;
• Data gathering phase should incorporate a detailed system audit to
identify and rectify (where possible) any pre-existing faults;
• Confidence over model results – do not automatically assume the
simulation outputs are incorrect and need re-adjustment –
question sources of discrepancies;
• Methods for simulating faults or system degradation over time.
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Prediction Uncertainty
• Very few calibration studies account for model
uncertainty (various sources);
• Uncertainty is unavoidable in the field of
system modelling, particularly in complex
systems which are subject to external scenario
influences (e.g. occupant behaviour, weather);
• Need to account for model uncertainty, and
provide an expression of the degree of
uncertainty associated with model predictions;
• Use of prediction ranges as opposed to
traditional expression of explicit numerical
values for energy consumption.
Specification
Modelling
Numerical
Scenario
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Identification
• Due to model complexity and possibility of inherent faults, it is often
difficult to accurately diagnose the underlying cause of discrepancies;
• Lack of appropriate analysis tools for the purpose of calibration;
• Adjustments are often based on ad-hoc manual interventions based
on user judgement, rather than scientific reasoning;
• Need to reduce complexity of calibration problem where possible
by splitting problem into tiers for example, thus reducing noise;
• Provide suitable statistical and graphical calibration tools within
the simulation environment to improve calibration workflow;
• Use techniques such as sensitivity and uncertainty analysis to
provide more structured calibration framework.
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Integration
• Issues in integrating data across the BLC (Design-Simulation-Control)
• Design-Simulation: Translation from BIM to BES models is a complex
task in itself, with results varying between users and translation tools
for identical geometries;
• Industry standard file formats (e.g. IFC, gbXML) are improving but do
not provide consistent results, particularly for complex geometries.
• Improvement of overall integration across the BLC is needed to
improve data integrity and accuracy of simulation inputs;
• Standard tools and workflows required for file translation from
BIM to BEM to ensure consistent results;
• Focus on full BLC integration – from design to simulation to control
environment, and back to design. (Close the loop)
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Automation
• Complexity of the calibration task, requiring inputs from various
sources and stakeholders, makes the task time-consuming and cost-
prohibitive in many cases;
• Lack of a calibration workflow to help guide and automate steps
where possible.
• Need for an end-to-end workflow using best available tools and
methods appropriate to the calibration problem;
• Use mathematical and statistical optimisation tools, where appropriate,
to find parameter solutions, and guide calibration workflow.
• Balance between mathematical methods and user intervention.
Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
Barriers to BES Calibration
Standards Expense Complexity Inputs Controls
Faults Uncertainty Identification Integration Automation
Thank You!
Daniel Coakley
daniel.coakley@iesve.com

More Related Content

PDF
Development of Calibrated Operational Models for Real-Time Decision Support a...
PPT
Investigation of Geometric Process Control
PPTX
Environmental Management - Energy Audit & Features
PDF
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
PDF
2: Introduction to Energy Audit Methods in Water Supply
PDF
Introduction to energy audit part 2
PPTX
Episode 31 : Project Execution Part (2)
PPT
technical audit in murugappa group - toward converting the audit from cost ...
Development of Calibrated Operational Models for Real-Time Decision Support a...
Investigation of Geometric Process Control
Environmental Management - Energy Audit & Features
2012 ICONE20 Power Conference Developing Nuclear Power Plant TPMS Specificati...
2: Introduction to Energy Audit Methods in Water Supply
Introduction to energy audit part 2
Episode 31 : Project Execution Part (2)
technical audit in murugappa group - toward converting the audit from cost ...

What's hot (19)

PPTX
Episode 32 : Project Execution Part (3)
PDF
Baf 2013 abc of jv3_ken thomson
PPTX
Modernization Lessons Learned - Part 1
PPTX
Energy Management functional areas
PDF
2015 WhitePaper Metering RhNo
PDF
Controlling a DC Motor through Lypaunov-like Functions and SAB Technique
PDF
Reasdfg
PDF
Process Education on Demand
DOCX
Green Building Awareness HVAC
PDF
EIS Overview & Case Studies Presentation EIS 2016
PPT
Metrics Sirisha
PPTX
Solar Power Plant Procurements
PDF
Building tune ups for commercial buildings
PPT
Improving continuous process operation using data analytics delta v applicati...
PDF
Anand2020
PPT
Maximizing the return on your control investment meet the experts sessions part2
PDF
Foucher2002
PPTX
Energy audit
Episode 32 : Project Execution Part (3)
Baf 2013 abc of jv3_ken thomson
Modernization Lessons Learned - Part 1
Energy Management functional areas
2015 WhitePaper Metering RhNo
Controlling a DC Motor through Lypaunov-like Functions and SAB Technique
Reasdfg
Process Education on Demand
Green Building Awareness HVAC
EIS Overview & Case Studies Presentation EIS 2016
Metrics Sirisha
Solar Power Plant Procurements
Building tune ups for commercial buildings
Improving continuous process operation using data analytics delta v applicati...
Anand2020
Maximizing the return on your control investment meet the experts sessions part2
Foucher2002
Energy audit
Ad

Viewers also liked (16)

PPTX
Brand genetics
PPS
Behappy
KEY
Visit colorado
PDF
Winter Collection MMIX
PDF
Atmereian Lightscript 1
PDF
Everything You Need To Know About AngularJS
PPTX
Orotariko euskal hiztegia (oeh)
PPT
Vantran0205 sample presentation
PPT
A3.unit1
PPTX
Artificial
PDF
Top 10 reasont_to_upgrade_to_share_point_2010_presentation
KEY
Advanced Java I
PDF
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
PPTX
3 1sunstar
PDF
Fifa and Freebies
Brand genetics
Behappy
Visit colorado
Winter Collection MMIX
Atmereian Lightscript 1
Everything You Need To Know About AngularJS
Orotariko euskal hiztegia (oeh)
Vantran0205 sample presentation
A3.unit1
Artificial
Top 10 reasont_to_upgrade_to_share_point_2010_presentation
Advanced Java I
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
3 1sunstar
Fifa and Freebies
Ad

Similar to Barriers and issues with the creation of calibrated models (20)

PPTX
Bim adoption
PPTX
module 1.pptx
PPTX
Questions for successful test automation projects
PPT
Formal Specifications in Formal Methods
PPTX
EMBEDDED AND REAL TIME SYSTEMS-Unit-4_6703.pptx
PDF
An Integrated Simulation Tool Framework for Process Data Management
PDF
Using Benchmarking to Quantify the Benefits of Software Process Improvement
PPTX
Unit 7 verification & validation
PDF
Siemens-PLM-Quality-Planning-Environment-br-X29
PDF
PPTX
Optimizing Parameters
PPT
Applicability of Activity-Based Costing and Related Management Tools: The c...
PPTX
Project Estimation
PPTX
'Applying System Science and System Thinking Techniques to BIM Management'
PDF
International Journal of Engineering Research and Development
PPTX
PPTX
Ece engineering embedded ppt -unit 2.pptx
PPTX
An intro to building an architecture repository meta model and modeling frame...
PDF
Software archiecture lecture08
PDF
Token engineering presentation 5 13-18
Bim adoption
module 1.pptx
Questions for successful test automation projects
Formal Specifications in Formal Methods
EMBEDDED AND REAL TIME SYSTEMS-Unit-4_6703.pptx
An Integrated Simulation Tool Framework for Process Data Management
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Unit 7 verification & validation
Siemens-PLM-Quality-Planning-Environment-br-X29
Optimizing Parameters
Applicability of Activity-Based Costing and Related Management Tools: The c...
Project Estimation
'Applying System Science and System Thinking Techniques to BIM Management'
International Journal of Engineering Research and Development
Ece engineering embedded ppt -unit 2.pptx
An intro to building an architecture repository meta model and modeling frame...
Software archiecture lecture08
Token engineering presentation 5 13-18

Recently uploaded (20)

PPTX
additive manufacturing of ss316l using mig welding
PPTX
Construction Project Organization Group 2.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
DOCX
573137875-Attendance-Management-System-original
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPTX
Lecture Notes Electrical Wiring System Components
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
PPT on Performance Review to get promotions
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
Current and future trends in Computer Vision.pptx
additive manufacturing of ss316l using mig welding
Construction Project Organization Group 2.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
Automation-in-Manufacturing-Chapter-Introduction.pdf
Safety Seminar civil to be ensured for safe working.
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
573137875-Attendance-Management-System-original
R24 SURVEYING LAB MANUAL for civil enggi
Lecture Notes Electrical Wiring System Components
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
Operating System & Kernel Study Guide-1 - converted.pdf
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPT on Performance Review to get promotions
CYBER-CRIMES AND SECURITY A guide to understanding
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Current and future trends in Computer Vision.pptx

Barriers and issues with the creation of calibrated models

  • 1. Operational Energy Management of the Built Environment Barriers and issues with the creation of calibrated models Presenter: Daniel Coakley Wednesday, 18 November 2015
  • 2. Introduction • Introduction – Building Energy Simulation (BES) Models – Issues with BES Models – Model Calibration • Barriers to model calibration (and how they can, and are being overcome) Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 3. Building Energy Simulation (BES) Design • Design assessment and performance evaluation; • Compliance modelling (e.g. LEED, Part-L Building Regs etc.); • Building design and system optimisation, Renewables integration etc. Operation • Commissioning and retro-commissioning of building systems and controls; • Fault detection and diagnosis (FDD); • Simulation-assisted building control. Retrofit • Technical and economical evaluation of Energy Conservation Measures (ECM’s); • Measurement and Verification (M&V) of retrofit savings (IPMVP).
  • 4. Issues with BES Models Main Issues • Performance Gap: Discrepancy between design performance and actual performance; • Uncertainty Quantification: Need to clearly state the prediction confidence, and provide models which are fit for purpose.
  • 5. Model Calibration  Building Model Calibration is the process of improving the accuracy of simulation models to reflect the as- built status and actual operating conditions  Calibration is widely acknowledged as a complex task (Over-specified and Under-determined)  Most current approaches require significant expert knowledge and numerous manual interventions using different tools/methods to achieve high levels of accuracy
  • 7. Barriers to BES Calibration Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 8. Standards • No standard approach for model development and calibration; • Insufficient standards for calibration criteria; • Current guidelines only specify nominal acceptable error ranges at whole-building level, but do not account for input uncertainty, meter accuracy, or sub-model discrepancies; • Concept of a ‘calibrated model’ varies significantly; • Need for transparent evidence-based model development guidelines; • Need for accountability within guidelines for model uncertainty and inaccuracies, and inclusion as part of model outputs; • Need for standard terminologies around model calibration, and clearer communication to building stakeholders; Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 9. Expense (Time + Costs) • Time and resources needed to obtain the required hourly sub- metered data, system information, etc. can be prohibitive; • Real system data is often unavailable or difficult to access without extensive effort on the part of the modeler / consultant; • Lack of data retention and interchange across building life-cycle; • Cost of metering is continuously decreasing, as is cost of data storage; • Clients need to be made aware of the value and importance of their building data and system information, as their requirements will drive changes in how information is handled, tagged and retained; • Better integration between tools, building communication platforms etc. will all help reduce calibration time and expense; Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 10. Model Complexity • Calibration problem is over-specified and under-determined; • May be thousands of model inputs but relatively few measurable outputs with which to assess model accuracy; • Increased risk of error in configuring the model, and lack of transparency and ability to validate inputs appropriately; • Solutions which help simplify the model can reduce noise from unimportant variables, and focus attention on important or influential parameters (e.g. grey-box modelling, free-form profiles); • Model simplification can reduce time and expense in both model development and calibration; • Need to maintain model accuracy & outputs which are fit for purpose; Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 11. Input Specification • Lack of availability of high-quality input data for detailed models; • Inputs often do not take in to account real building operation or system profiles, which can differ significantly from design information (due to changes in operation over time); • Leads to lack of confidence in model results (GIGO); • Use of real building inputs, in place of modelled or assumed profiles, where appropriate, can help reduce model development time, reduce noise, and improve model accuracy; • Availability of stock information from real buildings (i.e. building input library, BIM manufacturer databases etc.) could help improve accuracy of model inputs, and hence confidence over model outputs; Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 12. Controls • Difference between methods of specifying controls within the simulation environment vs. real building control logic; • Simulation programs generally geared towards zone-level design load calculations, while control logic focuses on component level operation (e.g. valve and damper positions); • Ideal scenario offers seamless transition from the design environment to controller (i.e. design -> simulation -> controller); • Possibility of integration with third-party software, or vendor control modules offers opportunity to exploit strengths of combined tools. Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 13. Faults • Faults in building systems, sensors or components can cause misleading discrepancies between measured and simulated data; • Faults may be present in physical components or control algorithms; • Leads to misdirection during model calibration, and can actually exacerbate model discrepancies if user attempts to mask problem; • Data gathering phase should incorporate a detailed system audit to identify and rectify (where possible) any pre-existing faults; • Confidence over model results – do not automatically assume the simulation outputs are incorrect and need re-adjustment – question sources of discrepancies; • Methods for simulating faults or system degradation over time. Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 14. Prediction Uncertainty • Very few calibration studies account for model uncertainty (various sources); • Uncertainty is unavoidable in the field of system modelling, particularly in complex systems which are subject to external scenario influences (e.g. occupant behaviour, weather); • Need to account for model uncertainty, and provide an expression of the degree of uncertainty associated with model predictions; • Use of prediction ranges as opposed to traditional expression of explicit numerical values for energy consumption. Specification Modelling Numerical Scenario Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 15. Identification • Due to model complexity and possibility of inherent faults, it is often difficult to accurately diagnose the underlying cause of discrepancies; • Lack of appropriate analysis tools for the purpose of calibration; • Adjustments are often based on ad-hoc manual interventions based on user judgement, rather than scientific reasoning; • Need to reduce complexity of calibration problem where possible by splitting problem into tiers for example, thus reducing noise; • Provide suitable statistical and graphical calibration tools within the simulation environment to improve calibration workflow; • Use techniques such as sensitivity and uncertainty analysis to provide more structured calibration framework. Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 16. Integration • Issues in integrating data across the BLC (Design-Simulation-Control) • Design-Simulation: Translation from BIM to BES models is a complex task in itself, with results varying between users and translation tools for identical geometries; • Industry standard file formats (e.g. IFC, gbXML) are improving but do not provide consistent results, particularly for complex geometries. • Improvement of overall integration across the BLC is needed to improve data integrity and accuracy of simulation inputs; • Standard tools and workflows required for file translation from BIM to BEM to ensure consistent results; • Focus on full BLC integration – from design to simulation to control environment, and back to design. (Close the loop) Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 17. Automation • Complexity of the calibration task, requiring inputs from various sources and stakeholders, makes the task time-consuming and cost- prohibitive in many cases; • Lack of a calibration workflow to help guide and automate steps where possible. • Need for an end-to-end workflow using best available tools and methods appropriate to the calibration problem; • Use mathematical and statistical optimisation tools, where appropriate, to find parameter solutions, and guide calibration workflow. • Balance between mathematical methods and user intervention. Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation
  • 18. Barriers to BES Calibration Standards Expense Complexity Inputs Controls Faults Uncertainty Identification Integration Automation