SlideShare a Scribd company logo
Benefits and Better Business
Cases
Alan Brown
Stefan Sanchez
Presentation:
•The business case and benefits in practice
•Are we being too scientific about benefits
management?
•What is the relationship between the business
case process and programme/project
management?
What is a Better Business Case?
• A flexible, pragmatic and common sense approach for supporting
business decisions in a wide range of contexts
• The Better Business ‘Five Case Model’ jointly developed by HM
Treasury and Welsh Government
• Investments £5m+ a Three stage process
• Strategic outline case (SOC)
• Outline Business Case (OBC)
• Full Business Case (FBC)
• Provides decision makers with confidence and assurance that they
are making the right decisions (business assurance) and in the
correct way (programme and project assurance)
Better Business Cases ask 5 Key Questions
Better Business Cases ask 5 Key Questions
High level benefits identified
Detailed quantification of
benefits
Refinement of benefits through
market testing
Balance sheet impact and
timing of cash releasing benefits
Management of benefits
delivery
Practical Application
About the Programme
• £1.4 billion investment programme
2014-2019
• Funding split 50% WG / 50% LA’s
• All 22 Welsh LA’s participating
• Reduce Surplus Capacity
• Improve Educational Outcomes
• Reduce overall running and lifetime
costs
150+ New / improved Schools
The business case and benefits
in practice
Programme
Business Case
(PBC)
Outline Business Cases (OBC) and Full
Business Cases (FBC)
Programme
delivery
Identify
Refine &
prioritise
Quantify and
profile
Deliver and
manage
Programme
Business Case
(PBC)
Outline Business Cases (OBC) and Full
Business Cases (FBC)
Programme
delivery
Identify
Refine &
prioritise
Quantify and
profile
Deliver and
manage
Clear identification of
high level direct and
indirect benefits
Priority benefits
identified (20% that
represent 80% of value)
Approach to
quantification
Benefits
strategy
content
Strategy reviewed and
updated as appropriate
Strategy reviewed and
updated as appropriate
Programme
Business Case
(PBC)
Outline Business Cases (OBC) and Full
Business Cases (FBC)
Programme
delivery
Identify
Refine &
prioritise
Quantify and
profile
Deliver and
manage
Clear identification of
high level direct and
indirect benefits
Priority benefits
identified (20% that
represent 80% of value)
Approach to
quantification
Benefits
strategy
content
Benefits
action
plan
content
Stakeholder engagement
plan to commence
‘benefits discussion’
Apply metrics to direct
and indirect benefits
Approach to direct and
indirect benefits (%
claim)
Continued stakeholder
liaison and build
compelling narrative
Profile priority benefits
Record benefits profiles
in economic analysis
(and financial analysis
where appropriate)
Clear delivery plans set
up with SMART actions
and clear
ownership/responsibility
for benefits realisation
Articulation of benefits
review cycle and likely
changes to action plan
over time
Strategy reviewed and
updated as appropriate
Strategy reviewed and
updated as appropriate
Programme
Business Case
(PBC)
Outline Business Cases (OBC) and Full
Business Cases (FBC)
Programme
delivery
Identify
Refine &
prioritise
Quantify and
profile
Deliver and
manage
Clear identification of
high level direct and
indirect benefits
Priority benefits
identified (20% that
represent 80% of value)
Approach to
quantification
Benefits
strategy
content
Benefits
action
plan
content
Stakeholder engagement
plan to commence
‘benefits discussion’
Apply metrics to direct
and indirect benefits
Approach to direct and
indirect benefits (%
claim)
Continued stakeholder
liaison and build
compelling narrative
Profile priority benefits
Record benefits profiles
in economic analysis
(and financial analysis
where appropriate)
Clear delivery plans set
up with SMART actions
and clear
ownership/responsibility
for benefits realisation
Articulation of benefits
review cycle and likely
changes to action plan
over time
Strategy reviewed and
updated as appropriate
Strategy reviewed and
updated as appropriate
CRB
cash releasing
benefits
nCRB
Financial non-
cash
releasing
benefits
QB
Quantifiable
benefits
nQB
Non-
quantifiable
benefits
Cannot be counted or valued (£)
Valued (£) but not ‘hard cash’
Can be counted but not valued (£)
‘Hard cash’ (£)
Reflected in:
bottom line/balance sheet
(financial case)
Economic analysis (economic
case
Reflected in:
NPC/V Economic analysis
(economic case)
Reflected in:
Economic analysis
(economic case)
Main Stakeholder
beneficiaries
Benefit
no.
Main Benefit Criteria
Benefit
category
Learners
B1 Improved learning outcomes QB
B2
Appropriate pupil-teacher ratio and reduced age ranges
within individual classes
QB
B3 Improved social and sporting opportunities Qual
B4 Improved appropriate and flexible learning environment QB
Community
B5 Increased community engagement Qual
B6
Opportunity to raise awareness of the Welsh language and
Welsh-medium provision in the locality
Qual
B7 Sustainable primary education in the area Qual
Staff
B8 increased staff morale and wellbeing Qual
B9
Improved professional development opportunities and job
security for teachers
Qual
B10
Reduced age range of learners and reduction in current
range of abilities
QB
B11 Improved leadership and governance Qual
Local Authority
B12 Reduction in backlog maintenance Non-CRB
B13 Reduction in staffing costs CRB
B14 Reduction in premises running costs CRB
B15 Less administrative burden, servicing reduced governance Non-CRB
B16 Reduction (and/or mitigation) of pupil transportation costs CRB
B17
Meeting best practice and regulatory standards for learning
environments
Qual
No. Benefit criteria
weight
Option
1
Option 2 Option 3 Option 4 Option 5
score
W x S
score
W x S
score
W x S
score
W x S
score
W x S
B1 Improved learning outcomes 19 0 0 8 152 9 171 9 171 9 171
B2 Appropriate pupil – teacher ratio and reduced age
ranges within individual classes
12 0 0 7 84 7 84 7 84 7 84
B3 Improved social and sporting opportunities
8 0 0 4 32 5 40 5 40 5 40
B4 Improved appropriate and flexible learning
environment
9 0 0 7 63 9 81 9 81 9 81
B5 Increased community engagement 6 0 0 3 18 6 36 6 36 6 36
B6 Opportunity to raise awareness of the Welsh language
and Welsh-medium provision in the locality
6 0 0 5 30 5 30 5 30 5 30
B7 Sustainable primary education in the area 12 0 0 7.5 90 8.5 102 9 108 9 108
B8 increased staff morale and wellbeing 9 0 0 8.5 76.5 9 81 9 81 9 81
B9 Improved professional development opportunities and
job security for teachers
7 0 0 6 42 7 49 7 49 7 49
B10 Reduced age range of learners and reduction in
current range of abilities
- - - - - - - - - - -
B11 Improved leadership and governance 12 0 0 5 60 6.5 78 6.5 78 6.5 78
TOTAL 100 0 647.5 752 758 758
BENEFITS
Direct
Indirect
Are we being too scientific about
benefits management?
• Quantify and claim the 20% of benefits that represent 80% of
the value
• Is this the right approach?
Can we legitimately claim the indirect benefits with the
highest values?
Invest in
Public Health
smoking
cessation
campaign
Reduced
number of
smokers
Leads to Leads to
Improved
health of x
people
Leads to
Less GP
visits (£)
Less
treatment
of smoking
related
diseases
(££)
Improved
public
knowledge of
the dangers
of smoking
Leads to
Reduction
in work
lost time
(££££)
Can we claim these
benefits?
Measure
public
knowledge
before and
after –
reasonable
to assume
majority of
increase due
to the
campaign
Assumes
increased
knowledge
translates
into changed
behaviour –
tenuous to
assume this
is due to the
campaign
Assumes health
improvement
due to smoking
cessation but
could be due to:
• The campaign
• Reduction in
disposable
income
• Tax increase
on cigarettes
• Increased
physical
activity
Assumes £
benefits due to
improved
health but
could be due
to:
• Busier at
work
• More
effective
treatments
• Improved
economy and
work
availability
Solution?
• Focus on paying for the scheme with direct benefits (anything
over and above this is a bonus)
• Work with stakeholders to develop a convincing narrative for
the large indirect benefits
• Encourage investment decisions to be taken with the full
understanding that indirect benefits cannot be controlled
• Measure programme/project success on delivery of clearly
articulated outcomes (spending objectives)
Thank you
Questions?

More Related Content

PPTX
Benefits-led portfolio management: maximising capital investment returns, by ...
PPTX
Workshop D, Benefits for whom? by Ben Pinches
PPTX
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
PDF
"Benefits management: a core theme in management research and education?" con...
PDF
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
PDF
APM Benefits Summit 2017 - In scoping programmes, is using the T word a const...
PDF
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
PDF
APM Benefits Summit 2017 - Portfolio and benefits management framework develo...
Benefits-led portfolio management: maximising capital investment returns, by ...
Workshop D, Benefits for whom? by Ben Pinches
Workshop F, A healthy respect for benefits by David Waller and Hugo Minney
"Benefits management: a core theme in management research and education?" con...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
APM Benefits Summit 2017 - In scoping programmes, is using the T word a const...
APM Benefits Summit 2017 - From ambition to delivery: Don't just do something...
APM Benefits Summit 2017 - Portfolio and benefits management framework develo...

What's hot (20)

PPT
Building better business cases - Nick Wensley
PDF
Developing Compelling Business Cases: a product and a process- Webinar
PDF
APM Portfolio Management SIG survey 2020 results
PDF
Taking and making hard decisions in the portfolio office - Andrew Britton, MS...
PDF
DVLA-BRM Challenges and Lesson Learnt, case study, Suzanne Richards, London, ...
PDF
Portfolio management in the government sector....the ONS journey by Nicky Blo...
PDF
Change portfolio management office - Julia Hodkin
PDF
APM Benefits Summit 2017 - Pessimists, realists, and liars: why benefits fore...
PDF
The importance of people, Miles Shepherd, 16th June 2016
PPT
APM Presents - Benefits Management
PDF
Sequencing work for maximum economic benefit using the Scaled Agile Framework...
PDF
The power of being understood by Mike Ward - Shaping your portfolio to realis...
PDF
APM Benefits Summit 2017 - Value and benefits management: Optimising benefits...
PDF
Presentation on 'Why cant people estimate' event, 23rd June 2016
PDF
The Benefits of Benefits Management exercise
PDF
APM Benefits Summit 2017 - Using risk information to enhance partner relation...
DOCX
Principles of Economics - Outputs vs. Outcomes
PPT
Project Selection
PPT
Example Project: Strategic Project Selection and Accelerated Development by J...
PPT
Pm Session 2
Building better business cases - Nick Wensley
Developing Compelling Business Cases: a product and a process- Webinar
APM Portfolio Management SIG survey 2020 results
Taking and making hard decisions in the portfolio office - Andrew Britton, MS...
DVLA-BRM Challenges and Lesson Learnt, case study, Suzanne Richards, London, ...
Portfolio management in the government sector....the ONS journey by Nicky Blo...
Change portfolio management office - Julia Hodkin
APM Benefits Summit 2017 - Pessimists, realists, and liars: why benefits fore...
The importance of people, Miles Shepherd, 16th June 2016
APM Presents - Benefits Management
Sequencing work for maximum economic benefit using the Scaled Agile Framework...
The power of being understood by Mike Ward - Shaping your portfolio to realis...
APM Benefits Summit 2017 - Value and benefits management: Optimising benefits...
Presentation on 'Why cant people estimate' event, 23rd June 2016
The Benefits of Benefits Management exercise
APM Benefits Summit 2017 - Using risk information to enhance partner relation...
Principles of Economics - Outputs vs. Outcomes
Project Selection
Example Project: Strategic Project Selection and Accelerated Development by J...
Pm Session 2
Ad

Viewers also liked (17)

PPTX
Importance of program health checks
ODP
Sonar - Software Qualitätsmanagement ohne Schmerzen
PDF
The Real Value of Oracle Health Checks
PDF
Social Media Tools (BAW-Vorlesung Juli 2012)
PPTX
OpenStrategies: A simple system for Strategic Planning and Benefits Realisation
PDF
BPM Benefits Realisation Framework
PDF
Addressing the common challenges of benefits realisation management, workshop...
PPTX
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PDF
Project health check updated and improved
PDF
Scrum im Marketing
PDF
DevDay 2016: Peter Lehmann - Testautomatisierungsframework Xeta
PPTX
Pm audit and assessment approach final
PDF
Project Health Check
PDF
Project Manager Toolkit in Powerpoint & Excel
PDF
SCOR Project Workshop - Sales & Operations Planning (S&OP) Health Check - How...
PPTX
Sotf interactive e portfolios
PDF
Investor Pitch Template | by ex-Deloitte & McKinsey consultants
Importance of program health checks
Sonar - Software Qualitätsmanagement ohne Schmerzen
The Real Value of Oracle Health Checks
Social Media Tools (BAW-Vorlesung Juli 2012)
OpenStrategies: A simple system for Strategic Planning and Benefits Realisation
BPM Benefits Realisation Framework
Addressing the common challenges of benefits realisation management, workshop...
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
Project health check updated and improved
Scrum im Marketing
DevDay 2016: Peter Lehmann - Testautomatisierungsframework Xeta
Pm audit and assessment approach final
Project Health Check
Project Manager Toolkit in Powerpoint & Excel
SCOR Project Workshop - Sales & Operations Planning (S&OP) Health Check - How...
Sotf interactive e portfolios
Investor Pitch Template | by ex-Deloitte & McKinsey consultants
Ad

Similar to Benefits and better business cases_Alan Brown and Stefan Sanchez (20)

PPTX
The study of Program Management part one
PPTX
Managing benefits from projects - the NHS way
PDF
Managing benefits from projects - the NHS way - 23rd Sept 2015
PDF
Oba Leaflet 4.3.11
PPTX
Measuring the impact and return on investment on community/social investment ...
PPTX
Motivating Staff using Benefits management to align values
PDF
Responsibility Deal health at work network - Partnership Forum - Wednesday 21...
PPTX
Determining Impact and Return of Community Investment and Development - 2011
PDF
Getting The Benefits
PDF
Benefits Management in Health and Care part 1: Identify and map target benefits
PDF
Managing benefits nhs way
PPT
Practical Guide to Benefits Driven Change
PPTX
Impact investment index© - overview of process and contextual background
PDF
Benefits realisation is about more than just project delivery
PPTX
Making the case webinar
PPTX
Benefit Realisation Management
PPT
Business Cases And Benefits Management
PPTX
Cost-Benefit-Analysis-Presentation.pptx
DOCX
Cost benefit analysis
The study of Program Management part one
Managing benefits from projects - the NHS way
Managing benefits from projects - the NHS way - 23rd Sept 2015
Oba Leaflet 4.3.11
Measuring the impact and return on investment on community/social investment ...
Motivating Staff using Benefits management to align values
Responsibility Deal health at work network - Partnership Forum - Wednesday 21...
Determining Impact and Return of Community Investment and Development - 2011
Getting The Benefits
Benefits Management in Health and Care part 1: Identify and map target benefits
Managing benefits nhs way
Practical Guide to Benefits Driven Change
Impact investment index© - overview of process and contextual background
Benefits realisation is about more than just project delivery
Making the case webinar
Benefit Realisation Management
Business Cases And Benefits Management
Cost-Benefit-Analysis-Presentation.pptx
Cost benefit analysis

More from Association for Project Management (20)

PDF
How using AI in construction planning boosts efficiency and production
PDF
APM North East Network: Micro P3 Express – A framework for all small projects
PDF
Leveraging Projects and PMOs to drive Sustainability, 2 July 2025
PDF
IET_APM_Midlands Network_Demystifying Earned - Value_B Sarani Edit.pdf
PDF
Transforming Tomorrow Managing Change in the Public Sector.pdf
PPTX
1155 Teri Okoro.pptx APM People Interest Network Presents: A People-Centric A...
PPTX
1100 Kate Howes.pptx The Value of Education and Training: Developing a Learni...
PPTX
0815 Matt Gitsham APM Conf 2025-Professor of Sustainable Development and Acad...
PPTX
1510 Rami Deen Turning Fools Gold to Sustainable Gold v0.9.pptx
PPTX
1100 Suzanne Maxted & Ellie Cady APM Sustainability Interest Network presents...
PPTX
1510 day 2 Hall 5 Arun Khuttan Building a project business case using the UN ...
PPTX
1155 Helen Clayton_Tasha Clark - ESG Slides - Final - APM Conference 25.pptx
PPTX
1100 Mark & Andrew APM Enabling Change IN Slides.pptx
PPTX
0945 APM presentation from Gabrielle Walker.pptx
PDF
How you can use behavioural insights on your projects and pitfalls to be awar...
PPTX
Sadie B Okiji - Head of projects, NHS Sussex
PPTX
Cyara Buchuck-Wilsenach.pptx Embedding DEI into Sustainable Project Managemen...
PPTX
APM 2025 Tayyab Jamil Slide Deck_Rethinking Technology Projects For Sustaina...
PPTX
1155 Robbie Warwick - Chaos to Clarity V1.0.pptx
PPTX
Daniel O’Neill Director of Project Delivery, Tevalis and Felicity Peart Count...
How using AI in construction planning boosts efficiency and production
APM North East Network: Micro P3 Express – A framework for all small projects
Leveraging Projects and PMOs to drive Sustainability, 2 July 2025
IET_APM_Midlands Network_Demystifying Earned - Value_B Sarani Edit.pdf
Transforming Tomorrow Managing Change in the Public Sector.pdf
1155 Teri Okoro.pptx APM People Interest Network Presents: A People-Centric A...
1100 Kate Howes.pptx The Value of Education and Training: Developing a Learni...
0815 Matt Gitsham APM Conf 2025-Professor of Sustainable Development and Acad...
1510 Rami Deen Turning Fools Gold to Sustainable Gold v0.9.pptx
1100 Suzanne Maxted & Ellie Cady APM Sustainability Interest Network presents...
1510 day 2 Hall 5 Arun Khuttan Building a project business case using the UN ...
1155 Helen Clayton_Tasha Clark - ESG Slides - Final - APM Conference 25.pptx
1100 Mark & Andrew APM Enabling Change IN Slides.pptx
0945 APM presentation from Gabrielle Walker.pptx
How you can use behavioural insights on your projects and pitfalls to be awar...
Sadie B Okiji - Head of projects, NHS Sussex
Cyara Buchuck-Wilsenach.pptx Embedding DEI into Sustainable Project Managemen...
APM 2025 Tayyab Jamil Slide Deck_Rethinking Technology Projects For Sustaina...
1155 Robbie Warwick - Chaos to Clarity V1.0.pptx
Daniel O’Neill Director of Project Delivery, Tevalis and Felicity Peart Count...

Recently uploaded (20)

PDF
Types of control:Qualitative vs Quantitative
PDF
Laughter Yoga Basic Learning Workshop Manual
PPTX
Amazon (Business Studies) management studies
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
A Brief Introduction About Julia Allison
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Deliverable file - Regulatory guideline analysis.pdf
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Training And Development of Employee .pdf
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
MSPs in 10 Words - Created by US MSP Network
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PPTX
Business Ethics - An introduction and its overview.pptx
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Types of control:Qualitative vs Quantitative
Laughter Yoga Basic Learning Workshop Manual
Amazon (Business Studies) management studies
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Reconciliation AND MEMORANDUM RECONCILATION
Belch_12e_PPT_Ch18_Accessible_university.pptx
Euro SEO Services 1st 3 General Updates.docx
A Brief Introduction About Julia Allison
WRN_Investor_Presentation_August 2025.pdf
Unit 1 Cost Accounting - Cost sheet
Deliverable file - Regulatory guideline analysis.pdf
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Ôn tập tiếng anh trong kinh doanh nâng cao
Training And Development of Employee .pdf
HR Introduction Slide (1).pptx on hr intro
MSPs in 10 Words - Created by US MSP Network
New Microsoft PowerPoint Presentation - Copy.pptx
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Business Ethics - An introduction and its overview.pptx
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh

Benefits and better business cases_Alan Brown and Stefan Sanchez

  • 1. Benefits and Better Business Cases Alan Brown Stefan Sanchez
  • 2. Presentation: •The business case and benefits in practice •Are we being too scientific about benefits management? •What is the relationship between the business case process and programme/project management?
  • 3. What is a Better Business Case? • A flexible, pragmatic and common sense approach for supporting business decisions in a wide range of contexts • The Better Business ‘Five Case Model’ jointly developed by HM Treasury and Welsh Government • Investments £5m+ a Three stage process • Strategic outline case (SOC) • Outline Business Case (OBC) • Full Business Case (FBC) • Provides decision makers with confidence and assurance that they are making the right decisions (business assurance) and in the correct way (programme and project assurance)
  • 4. Better Business Cases ask 5 Key Questions
  • 5. Better Business Cases ask 5 Key Questions High level benefits identified Detailed quantification of benefits Refinement of benefits through market testing Balance sheet impact and timing of cash releasing benefits Management of benefits delivery
  • 6. Practical Application About the Programme • £1.4 billion investment programme 2014-2019 • Funding split 50% WG / 50% LA’s • All 22 Welsh LA’s participating • Reduce Surplus Capacity • Improve Educational Outcomes • Reduce overall running and lifetime costs 150+ New / improved Schools
  • 7. The business case and benefits in practice
  • 8. Programme Business Case (PBC) Outline Business Cases (OBC) and Full Business Cases (FBC) Programme delivery Identify Refine & prioritise Quantify and profile Deliver and manage
  • 9. Programme Business Case (PBC) Outline Business Cases (OBC) and Full Business Cases (FBC) Programme delivery Identify Refine & prioritise Quantify and profile Deliver and manage Clear identification of high level direct and indirect benefits Priority benefits identified (20% that represent 80% of value) Approach to quantification Benefits strategy content Strategy reviewed and updated as appropriate Strategy reviewed and updated as appropriate
  • 10. Programme Business Case (PBC) Outline Business Cases (OBC) and Full Business Cases (FBC) Programme delivery Identify Refine & prioritise Quantify and profile Deliver and manage Clear identification of high level direct and indirect benefits Priority benefits identified (20% that represent 80% of value) Approach to quantification Benefits strategy content Benefits action plan content Stakeholder engagement plan to commence ‘benefits discussion’ Apply metrics to direct and indirect benefits Approach to direct and indirect benefits (% claim) Continued stakeholder liaison and build compelling narrative Profile priority benefits Record benefits profiles in economic analysis (and financial analysis where appropriate) Clear delivery plans set up with SMART actions and clear ownership/responsibility for benefits realisation Articulation of benefits review cycle and likely changes to action plan over time Strategy reviewed and updated as appropriate Strategy reviewed and updated as appropriate
  • 11. Programme Business Case (PBC) Outline Business Cases (OBC) and Full Business Cases (FBC) Programme delivery Identify Refine & prioritise Quantify and profile Deliver and manage Clear identification of high level direct and indirect benefits Priority benefits identified (20% that represent 80% of value) Approach to quantification Benefits strategy content Benefits action plan content Stakeholder engagement plan to commence ‘benefits discussion’ Apply metrics to direct and indirect benefits Approach to direct and indirect benefits (% claim) Continued stakeholder liaison and build compelling narrative Profile priority benefits Record benefits profiles in economic analysis (and financial analysis where appropriate) Clear delivery plans set up with SMART actions and clear ownership/responsibility for benefits realisation Articulation of benefits review cycle and likely changes to action plan over time Strategy reviewed and updated as appropriate Strategy reviewed and updated as appropriate
  • 12. CRB cash releasing benefits nCRB Financial non- cash releasing benefits QB Quantifiable benefits nQB Non- quantifiable benefits Cannot be counted or valued (£) Valued (£) but not ‘hard cash’ Can be counted but not valued (£) ‘Hard cash’ (£) Reflected in: bottom line/balance sheet (financial case) Economic analysis (economic case Reflected in: NPC/V Economic analysis (economic case) Reflected in: Economic analysis (economic case)
  • 13. Main Stakeholder beneficiaries Benefit no. Main Benefit Criteria Benefit category Learners B1 Improved learning outcomes QB B2 Appropriate pupil-teacher ratio and reduced age ranges within individual classes QB B3 Improved social and sporting opportunities Qual B4 Improved appropriate and flexible learning environment QB Community B5 Increased community engagement Qual B6 Opportunity to raise awareness of the Welsh language and Welsh-medium provision in the locality Qual B7 Sustainable primary education in the area Qual Staff B8 increased staff morale and wellbeing Qual B9 Improved professional development opportunities and job security for teachers Qual B10 Reduced age range of learners and reduction in current range of abilities QB B11 Improved leadership and governance Qual Local Authority B12 Reduction in backlog maintenance Non-CRB B13 Reduction in staffing costs CRB B14 Reduction in premises running costs CRB B15 Less administrative burden, servicing reduced governance Non-CRB B16 Reduction (and/or mitigation) of pupil transportation costs CRB B17 Meeting best practice and regulatory standards for learning environments Qual
  • 14. No. Benefit criteria weight Option 1 Option 2 Option 3 Option 4 Option 5 score W x S score W x S score W x S score W x S score W x S B1 Improved learning outcomes 19 0 0 8 152 9 171 9 171 9 171 B2 Appropriate pupil – teacher ratio and reduced age ranges within individual classes 12 0 0 7 84 7 84 7 84 7 84 B3 Improved social and sporting opportunities 8 0 0 4 32 5 40 5 40 5 40 B4 Improved appropriate and flexible learning environment 9 0 0 7 63 9 81 9 81 9 81 B5 Increased community engagement 6 0 0 3 18 6 36 6 36 6 36 B6 Opportunity to raise awareness of the Welsh language and Welsh-medium provision in the locality 6 0 0 5 30 5 30 5 30 5 30 B7 Sustainable primary education in the area 12 0 0 7.5 90 8.5 102 9 108 9 108 B8 increased staff morale and wellbeing 9 0 0 8.5 76.5 9 81 9 81 9 81 B9 Improved professional development opportunities and job security for teachers 7 0 0 6 42 7 49 7 49 7 49 B10 Reduced age range of learners and reduction in current range of abilities - - - - - - - - - - - B11 Improved leadership and governance 12 0 0 5 60 6.5 78 6.5 78 6.5 78 TOTAL 100 0 647.5 752 758 758
  • 16. Are we being too scientific about benefits management? • Quantify and claim the 20% of benefits that represent 80% of the value • Is this the right approach?
  • 17. Can we legitimately claim the indirect benefits with the highest values?
  • 18. Invest in Public Health smoking cessation campaign Reduced number of smokers Leads to Leads to Improved health of x people Leads to Less GP visits (£) Less treatment of smoking related diseases (££) Improved public knowledge of the dangers of smoking Leads to Reduction in work lost time (££££) Can we claim these benefits? Measure public knowledge before and after – reasonable to assume majority of increase due to the campaign Assumes increased knowledge translates into changed behaviour – tenuous to assume this is due to the campaign Assumes health improvement due to smoking cessation but could be due to: • The campaign • Reduction in disposable income • Tax increase on cigarettes • Increased physical activity Assumes £ benefits due to improved health but could be due to: • Busier at work • More effective treatments • Improved economy and work availability
  • 19. Solution? • Focus on paying for the scheme with direct benefits (anything over and above this is a bonus) • Work with stakeholders to develop a convincing narrative for the large indirect benefits • Encourage investment decisions to be taken with the full understanding that indirect benefits cannot be controlled • Measure programme/project success on delivery of clearly articulated outcomes (spending objectives)