BFP(Stage-1, 200 MW , KSTPS)
Specification
No-3 nos(2X 50%)
Type-Motor driven
Motor-6.6 KV
Motor speed -1485 rpm, 3500 Kw
Booster p/p-single stage centrifugal
Main p/p-8 stage centrifugal p/p
Deliver Your Presentation
Broadcast and compress for seamless delivery
MOTOR
To D/A
Suction v/v
Strainer
R/C v/v
NRV
Discharge v/v
Transfer line
Booster
Pump
Main
Pump
Gear box
&
Hydraulic
coupling
D/A
To BFP Discharge
Transfer line vent
Booster p/p casing vent
Suction Line
drain
R/C line vent
R/C line drain
Main p/p
casing drain
Disc. Line
drain
BFP Line Diagram
BP
casing
drain
Booster Pump (Specifications)
Single Stage Centrifugal Type
Manufacturer- Wier P/P’s Ltd.
Speed- 1485 rpm.
Motor (Specifications)
6.6 KV, Induction Motor
Power- 3.5 MW, Current- 360 Amp.
Speed- 1485 rpm.
Lub oil p/p
Working oil p/p
Lube oil tank
Hydraulic coupling
Speed output- 4750 rpm
Slip % - 3.9
1 2
3
4 5 6 7 8 9
10
Scoop tube
Step-up Gear Unit
Gear ratio- 1:3.3
Gear box & Hydraulic Coupling
• BFP Main pump (Specifications)
• 8- Stage, Cartridge Type, Centrifugal
• Weir Co. made - FK8D30.
• Speed- 4750 rpm.
Main pump
The weir type FK8D30 pressure stage pump
is an eight stage horizontal centrifugal
pump of the barrel casing design.
The pump internals are designed as a
cartridge, which can be easily removed for
maintenance without disturbing the suction
and discharge pipe work, or the alignment
of the pump and the turbo coupling.
BFP Main pump Drawing
BFP BARREL & CARTRIDGE
BFP CARTRIDGE
BFP CARTRIDGE ASSEMBLY COMPRISES OF THE FOLLOWING
SALIENT PARTS :
 SHAFT
 IMPELLERS
 DIFFUSERS
 RING SECTIONS
 SUCTION GUIDE
 DISCHARGE COVER
 BEARING HOUSINGS
 BEARING BRACKETS
 JOURNAL BEARINGS
 THRUST BEARING
 MECHANICAL SEALS
IN OTHER WORDS BFP CARTRIDGE IS A COMPLETE PUMP EXCEPTING
BARREL (PUMP CASING).
BFP CARTRIDGE
ADVANTAGES :
 IN CASE OF A BREAK DOWN OF RUNNING PUMP, SPARE
CARTRIDGE CAN REPLACE IT TOTALLY.
 DOWN TIME FOR CHANGE OVER WILL BE MINIMUM (ONE OR
TWO SHIFTS)
 SPARE CARTRIDGE RESTORES THE ORIGINAL EFFICIENCY OF
THE PUMP
 SEMI SKILLED TECHNICIANS CAN CARRY OUT THE
REPLACEMENT.
 It houses the hydraulic components of Pumps.
 It prevents the leakage and guides the liquid in a
proper direction.
 It is closed by Suction Guide at it’s suction side and
Discharge
 Cover at it’s discharge side.
PUMP CASING
It rotates the mass of fluid with the peripheral speed
of its vane tips, thereby determining the head
developed or the Pump working pressure.
IMPELLER
 It converts Kinetic energy of the fluid into Pressure Energy.
INTER-STAGE DIFFUSER END-DIFFUSER
DIFFUSER
 It consists of Ring Sections located one to another.
 Each Ring Section houses one Impeller and one Diffuser.
 Ring Sections along with Diffusers form the passage of liquid from
 the Impeller outlet of one stage to the Impeller inlet of the next
stage.
RING-SECTION ASSEMBLY
It consists of Shaft, Impellers, Balance Drum, Thrust Collar,
rotating parts of Mechanical Seals and the Pump Half Coupling.
ROTATING ASSEMBLY
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
 They locate the rotor axially & take residual axial thrust.
 They are fitted in the NDE Bearing Housing.
 They have 8 white metal lined tilting pads held in a split Carrier
 Ring positioned on each side of the Thrust Collar.
 Carrier Rings are prevented from rotating with the Shaft by dowel
pins in each ring which engage in slots in the Bearing Housing top
half.
THRUST BEARING
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
Main pump & Booster pump Sealing
The pump shaft is sealed at the drive end and non-
drive end by Crane mechanical seals, each seal
being flushed by water in a closed circuit and the
water is circulated by the action of the seal
retaining ring.
The flushing water is cooled by passing through
seal coolers, (two coolers per seal, one working and
one standby), and each seal cooler being circulated
with clarified cooling water.
The rotating assembly is supported by plain white
metal lined journal bearings and axially located by
a Glacier double tilting pad thrust bearing.
Sealing system
Mechanical seals are used in MP & BP
Clarified water used for seal cooling
Mechanical seal cooling arrangement in main p/p
Mechanical seal cooling arrangement in main p/p
Mechanical seal
cooler
DM water running in closed ckt
Hot DM
cooling water
Cold DM cooling water
Clarified water used
for cooling of DM water
Clarified o/l
MECHANICAL SEAL
P/p shaft
O ring
Carbon steel(static)
Tungsten
carbide
(rotating)
P/p casing
 It consists of two highly polished surfaces, one surface connected to the Shaft and the
other to the stationary part of the Pump.
 Both the surfaces are of dissimilar materials held in continuous contact by a spring.
 These wearing surfaces are perpendicular to the axis of Shaft.
 A thin film of working fluid between these faces provides cooling & lubrication.
MECHANICAL SEAL
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
Hydraulic Thrust balancing Drum.
Due to differential pressures acting on the impeller the
rotating assembly is subjected to axial thrusts. The balance
drum located at the non-drive end is designed to keep these
forces neutralised and only the residual thrust remains, which
is taken up by thrust bearing.
The main components of hydraulic balancing arrangement are
the balance chamber machined in discharge cover, the balance
drum secured to the shaft and balance drum bush fitted in the
bore of discharge cover.
The thrust caused by the suction pressure acting on the area
inside the wear ring on inlet side of each impeller is overcome
by much greater thrust caused by the discharge pressure
acting on the equivalent area on the outlet side of each
impeller.
The resultant thrust is therefore towards drive end of pump.
Thrust force varies with load on the pump but hydraulic
balance arrangement will reduce its effect enabling residual
thrust to be taken by fitting pads of thrust bearing.
Thrust balancing
Balancing disc is provided in main p/p
Balance leak off pr-16 ksc.
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
BP ASSEMBLY
BOOSTER PUMP
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
Booster Pump Drawing
BFP Lub oil system
Main p/p -- DE side-journal brg
– NDE side-journal & trust bearing
Booster p/p-p/p- DE side-journal brg
– NDE side-journal & trust bearing
– Hydraulic coupling-10 bearings(4 thrust
bearings, rest-journal bearings)
Lub oil system-2 source
1)MOP-shaft driven
2)AOP-motor driven
Lub oil scheme
2 no lub oil cooler
AOP
AOP motor
MOP(connected to gear box)
Lub oil filter
Oil header
Booster p/p bearings
NRV
Motor bearings
Main p/p brg
Return from bearing
Oil tank
Raw water from
ARCW discharge
When BFP is in S/B condition motor driven AOP is
in service. Pr is around 3 ksc.
When we give start command to BFP motor driven
cut out in auto at 2.3 ksc pr(gear driven MOP will
supply lub. oil to bearings
Bearings
Journal bearings
White metal liner(babbit metal)
Thickness-0.5 mm
shaft
Lub oil
Journal bearing
LUB OIL TANK
Regulation
control
Working oil
make up
drain
Hydraulic coupling
Hot working oil
Cold working oil
WC p/p
Cooling water
From ARCW P/P
Working oil scheme
Working oil cooler
(2 in numbers)
CW in
CW out
• Hydraulic Coupling of BFP
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
SCOOP TUBE ASSEMBELY
SCOOP TUBE WORKING MECHANISM
Motor cooler
BFP Motor cooling Arrangement
2 cooling fans are provided at the both ends of motor
Cooling air fans sucks cold air which cools motor stator
/rotor
Hot air is cooled by water in the cooler(2 no of cooler
provided)
Cooling water coming from Aux. Raw cooling water
p/p(ARCW p/p)discharge header
Motor cooler
Cold air
Hot air
Motor stator
Motor rotor
To WC
cooler
Cooling water
BCW
v/v
WHY Recirculation ?
For minimum FW flow.
To avoid churning
BFP discharge header
To D/A
A
B
180 kg
0 kg
180 kg
100kg
181kg
BFP parameter
UCB parameter Normal value
BFP current 290-300amp
BFP flow 340 ton/hr
BFP(MP) discharge pr 180 kg
D/A pr 6.5 ksc
BFP suction temp 167 degree
BFP suction strainer DP 0.07
Drum level +50 mm
Lub oil pr 3 ksc
Lub oil cooler in service normally one
Lub oil temp cooler I/l/O/L 60/40 degree
Local parameter
Local parameter Normal value
Working oil pr 1.4 ksc
Working oil cooler in service normally one
Working oil temp cooler I/l/O/L 120/75 degree
Hydraulic coupling max bearing temp 65 degree
Motor air temp 50 degree
Clarified water pr 3.5 ksc
Balance leak off pr 16 ksc
BP suction pr 8 kg
MP suction pr 16 ksc
BFP Start Permissives
1. Deareator level normal > 800 mm.
2. Lube oil pressure adequate > 1.5 ksc.
3. Main pump/Motor bearing temp. normal < 75 deg. C.
4. Suction valve full open.
5. Suction pressure of booster pump adequate > 2.0 Ksc.
6. Emergency push button released.
7. Discharge valve closed or any BFP running & header
pressure normal > 90 Ksc.
8. Recirculation valve open.
BFP Protections
Sr.
No.
Parameters
Alarm
Value
Trip Value /
Remarks
1 Motor [DE/NDE] bearing temperature 75ºC 85ºC
2 Main pump [DE/NDE] bearing temperature 75ºC 85ºC
3 Lube oil pressure low < 1.2 Ksc
< 0.8 Ksc
(Time delay – 5 sec)
4 Working oil temp Hi-Hi 90ºC > 130ºC
5
BFP running & Main pump suction pressure
low
< 12 Ksc < 8 Ksc
6 BFP Flow Hi-Hi 450 T/hr
450 T/hr
(Time delay – 55 sec)
7 Deaerator level low-low
550 mm 400 mm
8 Emergency Push Button Pressed
BFP Protections
1. Motor [DE/NDE] bearing temp. (Alarm: 75ºC, Trip: 85ºC)
In Unit-1 & 2 – Temperatures provided in Omniguard.
In Unit- 3 - Temperatures provided in DAS, Group-86 (2
RTD’s, Alarm through any one, Trip- 2/2 logic)
2. Main pump[DE/NDE] bearing temp. (Alarm:75ºC, Trip: 85ºC)
In Unit-1 & 2 – Temperatures provided in Omniguard.
In Unit- 3 - Temperatures provided in DAS, Group-86 (2
RTD’s, Alarm through any one, Trip- 2/2 logic)
3. Lube oil pressure low (Alarm:<1.2 Ksc,Trip:<0.8ksc,Td=5 sec)
AOP Cut in at – Lube oil press < 1.7 Ksc.
AOP Cut out at – Lube oil press > 2.9 Ksc.
BFP Protections
4. Working oil temp Hi-Hi. (Alarm:90ºC, Trip: >130ºC)
Alarm & Tripping through- Temp guage cum switch (in local)
5. BFP running & Main pump suction pressure low (< 8 KSC).
Through one pressure switch.
6. BFP Flow Hi-Hi. (Alarm: 450 T/hr,Trip>450 T/hr, Td=55 sec).
In Unit-1 & 3 – BFP flow hi-hi is through 2 Tx’s (2/2 logic)
In Unit-2 – BFP flow hi-hi is through one switch & one Tx
combination (2/2 logic).
7. Deaerator level low-low (Alarm: 550mm, Trip: 400mm)
8. Emergency push button.
BFP, Local C&I Connections
BFP Isolations
1. Ensure that pump is in stopped condition.
2. Get the main motor breaker isolated ( Electrical isolation).
3. Close discharge valve and isolate its electrical supply .
4. Close the suction valve .Ensure there is no rise in suction
press.
5. Open suction strainer, booster pump casing, discharge line
and main pump casing drain valves.
6. Open the transfer line vent, booster pump vent.
7. Close the manual recirculation valve at deaerator level.
BFP Normalisations
1. Physically check that work is complete and all men and
materials are removed from site.
2. Get the electrical supply of AOP normalised.
3. Ensure that one lube oil cooler and one working oil cooler
are charged from oil and water side.
4. Check oil level ( It should be more than 50 %)
Start AOP, observe lube oil pressure (It should be more than
2.5 ksc) and oil filter DP (It should be less than 0.5 ksc).Check
return oil flow in all bearings.
5. Open motor cooling inlet/outlet valves .
BFP Normalisations
6. Ensure booster pump,transfer line & recirculation line
vents open , Close all drains. (To avoid pressurisation of
pump).
7. Charge clarified water to mech seal coolers and jacket
cooling. Ensure clarified water Pressure is more than 3 ksc .
8. Open manual recirculation valve at deaerator and ensure
recirculation control valve is open. Also ensure air supply to
recirculation control valve.
9. Crack open suction and observe the discharge through the
vents. Close the vent valves after venting is over.
10. Open suction valve fully and ensure the suction pressure
is adequate.
11. Get the discharge valve and its integral bypass valves
supply, BCW valve supply normalized .
12. Open its discharge valve from UCB, Ensure there is no
reverse rotation of the pump.
13. Get the main motor electrically normalised.
BFP Normalisations
BFP Lube Oil Filter Changeover
Two lube oil filters provided in BFP Main pump.
1. No charging line provided.
2. No venting provided in both lube oil filters.
Lube oil filter chocked alarm provided in alarm fascia.
(Lube oil filter chocked at DP > 0.5 Ksc)
BFP tripping on lube oil pressure low-low at 0.8 Ksc, Time
delay- 5 seconds.
Lube oil
Filter-A
in-service
Hydraulic Coupling
Pointer, T shape bottom
For Lube oil filter change over moves the handle in this direction
Yellow Mark on Handle & Nut
Lube oil
Filter-B
in-service
Hydraulic Coupling
Pointer, T shape bottom
For Lube oil filter change over moves the handle in this direction
Yellow Mark on Handle & Nut
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"
BFP Lube Oil Filter Change Over.
During Changeover :-
Place the handle over nut by matching the Yellow Mark.(Half
Yellow mark on Nut & Half Yellow mark on handle)
Slowly rotates the change over handle (180 degree) so that the
pointer (bottom part of T) provided in the nut always moves
towards the Hydraulic coupling side.
When pointer moves towards Hydraulic coupling- both filters
remain in service in pointer mid position.
When pointer moves opposite to Hydraulic coupling- both filters
became out of service in pointer mid position.
The pointer (bottom part of T) shows the Lube oil filter in-service.
Observe the rise in DP of filter to be taken in service.
Drum Level Control (Stage-1, 200 MW, KSTPS)
Low range
FRS
CV
BFP-A
scoop
BFP-B
scoop
BFP-C
scoop
BFP
master
BFP
DP control
BFP
scoop
control
Hi range
FRS
CV
Three
Element
controller
Single element
controller
Hi range
FRS
CV
Drum level
PV 79
SV 70
MV 44.7
569 TPH 562.3 TPH
FRS-
LOW
0.0 %
57 MM
FEED FLOW STEAM FLOW DRUM LEVEL
PV 0.5
SV 5.5
MV 55
PV 57
SV 23
MV 0.0
PV 79
SV 68
MV 100
AUT MAN
AUT MAN
1-ELEMENT TO 3-ELEMENT
SELECTION
SELECTION
FRS-A
100 %
FB= 99.9
FRS-B
100 %
FB= 101.1
1- ELEMENT FRS CONTROL 3-ELEMENT FRS CONTROL 3-ELEMENT SCOOP CONTROL DP SCOOP CONTROL
BFP-A ON
SUC FLOW 273 T/Hr
BFP-B ON
SUC FLOW 307 T/Hr
BFP-C OFF
SUC FLOW 0 T/Hr
CAS CAS CAS
CAS
AUT AUT
AUT
44.7 %
DP 1 : SW=1
DP 2 : SW=2
MS : SW=1
BLI : SW=2
MS SELECTOR
PR 1 : SW=1
PR 2 : SW=2
FS PR SELECTOR
DP SELECTOR
Drum Level Control (Stage-1, 200MW KSTPS)
1. 3-Elements – Drum Level, Steam flow & feed water flow.
Drum Level - Measured through 2 Tx’s (Left & Right,
one Tx in selection).
Steam Flow – Measured through flow nozzle &
calculated through 1st
stage pressure.
(one in selection)
Feed Water Flow - Measured through 2 Tx’s (one Tx in
selection).
2. 1-Element Controller – FRS Low Range Control Valve.
Maintain only drum level {auto & manual} .
For BLI < 30% operation.
3. 3-Element Controller – FRS High Range Control Valves (FRS-
A & FRS-B).
Maintain only drum level {auto & manual} .
For BLI > 30% operation.
Can be loop with DP and Scoop controllers.
Independent operation not required BFP Master in
auto.
4. DP Controller – Maintain DP across FRS high range CV’s.
DP maintained by BFP’s scoop & FRS CV’s maintains
drum level.
Requires FRS high range CV’s in auto & BFP master in
auto.
For BLI > 30% operation.
Drum Level Control (Stage-1, 200MW KSTPS)
Drum Level Control (Stage-1)
5. Scoop Controller – Maintain drum level directly through
BFP scoop.
Requires FRS high range CV’s 100% open in forced
manual & BFP master in auto.
For BLI > 70 % operation.
Gives command to BFP’s scoop through BFP master.
6. BFP Master– Gives command to BFP scoop’s and requires 2
BFP’s out of 3 in auto for BFP Master in auto.
Drum Level Control (Stage-1, 200MW KSTPS)
1. 1- Element to 3-Element Changeover
At BLI > 30 %, 1-Element to 3-Element auto changeover,
but,
At BLI < 30 %, 3-Element to 1-Element auto changeover
doesn’t occur.
During 1-Element to 3-Element auto changeover, 3-Element
controller will be in manual, until we put in auto.
For smooth changeover put MV of 3-Element controller >
30%, before changeover.
Drum Level Control (Stage-1, 200MW KSTPS)
2. Scoop to DP Controller Changeover
At BLI < 70 %, Scoop to DP auto changeover, but at BLI >
70 %, DP to Scoop auto changeover doesn’t occur.
Immediate Command to FRS high range controller to
25%, (MV becomes 25), FRS high range CV’s throttles
with a ramp rate of 50% per minute in MANUAL.
FRS high range CV’s closes till DP reaches the +/- 1
deviation band of Set value of DP Controller and
then ,FRS high range & DP controllers immediately go to
AUTO.
For smooth change over, put DP set point (SV) of DP
controller 5 – 6 Ksc.
Drum Level Control (Stage-1, 200MW KSTPS)
Drum Level Control Logics (Stage-1)
3. DP to Scoop Controller Changeover
At BLI > 70 %, we can put Drum level in Scoop
Controller.
Immediate Command to FRS high range controller to
100%, (MV becomes 100) and 3-Element controller in
Forced Manual, FRS high range CV’s opens with a ramp
rate of 10% per minute.
If FRS high range CV’s does not open 100% within 300
seconds, then a second command extends for 100 %
opening of CV’s with a ramp rate of 100% per minute.
4. Controllers logic in Drum Level Mimic
Controller in Manual – We can only change the value of
MV.
(SV & PV remains inoperative)
Controller in Auto- We can only change the SV. (PV
comes from 3 elements & MV changes according to
difference in SV & PV).
Controller in Forced Manual – We can’t change the MV.
Slave controllers can be put in Auto, Manual and
Cascaded.
In cascaded mode (CAS) slave controller is taking
command from master controller (It does not work
independently).
Drum Level Control (Stage-1, 200MW KSTPS)
Sequence of Activities from light up to Full Load.
Checks (Before taking first BFP in service):-
FRS low range CV, FRS high range control v/v’s in Cascaded
mode (CAS) & full closed condition.
Open the FRS low range & high range motorised isolating
v/v’s (upstream and downstream).
Activities:-
1. Start the first BFP & take FRS low range (1-Element)
controller in service (auto or manual, preferably in auto).
Control the drum level through 1-Element up to BLI – 30%.
Drum Level Control (Stage-1, 200MW KSTPS)
2. At BLI > 30% FRS low range to high range autochange over
done, but FRS High range (3-Element) controller will be in
manual, so before changeover at BLI –30 %, set the MV of 3-
Element controller between 30 – 40 %. After changeover, put
3-Element controller in Auto.
FRS high range controller work independently and maintain
the drum. (After Change over 1-Element controller will also
remain in auto)
Drum Level Control (Stage-1, 200MW KSTPS)
3. For putting Drum level in DP control (only at BLI >30%),
First make sure 3-Element controller in Auto. After that put 2
BFP’s in Auto (from UCB desk) so that BFP master in Auto &
put the SV of DP controller 5 to 6 KSC, then put the DP
controller in Auto.
Now DP controller maintain the DP across FRS high range
CV’s by operating the BFP’s scoop through BFP Master & FRS
high range CV’s maintain the drum level.
Range of operation of DP controller is BLI – 30% to 100%.
Drum Level Control (Stage-1, 200MW KSTPS)
4. At BLI > 70%, we can put drum level in Scoop control, for
that only click on the selection switch.
FRS high range CV’s opened-100% in Forced Manual and
Scoop controller goes to Auto. Now, BFP master control the
drum level by operating the running BFP’s scoop in Auto.
Drum Level Control (Stage-1, 200MW KSTPS)
Note :-
1. If drum level is in Scoop control and we take BFP master in
manual (by taking 2 BFP’s in manual), Scoop controller goes
to manual and FRS high range control v/v’s remains full open
in Manual (3-Element controller will remain in Manual).
2. If drum level is in DP control and we take BFP master in
manual (by taking 2 BFP’s in manual), DP controller goes to
manual but 3-Element controller remains in auto (FRS high
range control v/v’s opened & closed in auto to maintain the
drum level only.)
Drum Level Control (Stage-1, 200MW KSTPS)
PV 79
SV 70
MV 44.7
569 TPH 562.3 TPH
FRS-
LOW
0.0 %
57 MM
FEED FLOW STEAM FLOW DRUM LEVEL
PV 0.5
SV 5.5
MV 55
PV 57
SV 23
MV 0.0
PV 79
SV 68
MV 100
AUT MAN
AUT MAN
1-ELEMENT TO 3-ELEMENT
SELECTION
SELECTION
FRS-A
100 %
FB= 99.9
FRS-B
100 %
FB= 101.1
1- ELEMENT FRS CONTROL 3-ELEMENT FRS CONTROL 3-ELEMENT SCOOP CONTROL DP SCOOP CONTROL
BFP-A ON
SUC FLOW 273 T/Hr
BFP-B ON
SUC FLOW 307 T/Hr
BFP-C OFF
SUC FLOW 0 T/Hr
CAS CAS CAS
CAS
AUT AUT
AUT
44.7 %
DP 1 : SW=1
DP 2 : SW=2
MS : SW=1
BLI : SW=2
MS SELECTOR
PR 1 : SW=1
PR 2 : SW=2
FS PR SELECTOR
DP SELECTOR
Manual Mode Auto Mode Cascaded Mode
PV
DP/3 ELEMENT
SELECTOR
0
DP CNTR
PV 79
SV 30
MV 35
569 TPH 562.3 TPH
FRS-
LOW
0.0 %
57 MM
FEED FLOW STEAM FLOW DRUM LEVEL
PV 5.5
SV 5.5
MV 58
PV 57
SV 23
MV 0.0
PV 79
SV 68
MV 60
AUT AUT
MAN AUT
1-ELEMENT TO 3-ELEMENT
SELECTION
SELECTION
FRS-A
60 %
FB= 60
FRS-B
60 %
FB= 62
1- ELEMENT FRS CONTROL 3-ELEMENT FRS CONTROL 3-ELEMENT SCOOP CONTROL DP SCOOP CONTROL
BFP-A ON
SUC FLOW 273 T/Hr
BFP-B ON
SUC FLOW 307 T/Hr
BFP-C OFF
SUC FLOW 0 T/Hr
CAS CAS CAS
CAS
AUT AUT
AUT
58%
DP 1 : SW=1
DP 2 : SW=2
MS : SW=1
BLI : SW=2
MS SELECTOR
PR 1 : SW=1
PR 2 : SW=2
FS PR SELECTOR
DP SELECTOR
BFP- Emergency Handling (Stage-1, 200 MW)
Condition:-
Unit running at full load (200 MW), with two BFP’s in service
and one BFP under permit. Suddenly one BFP Trips.
Consequences:-
1. Drum level starts decreasing rapidly.
2. Only running BFP flow goes High, Then Hi-Hi to maintain the
drum level. (and chances are BFP trip on Flow Hi-Hi).
Boiler May Trip on:-
1. Drum Level Lo-Lo (-250 mm, Time delay- 10 sec), OR
2. All BFP’s Trip.
ACTIONS TO BE TAKEN
BFP- Emergency Handling (Stage-1, 200 MW)
1. If M/C is in CMC, take it out into Turbine pressure Control
Mode.
2. Continuous Three Mills to be kept in service, rest other
mills hand tripped (Pulveriser made OFF).
3. Running BFP should be taken into Manual & try to
maximize the flow (above 400 T/Hr), keep recirculation in
auto. (BFP flow High & Hi-Hi alarms provided in different
alarm fascia).
4. Ensuring Flame Stability through Fire Ball Scanners, Oil
BFP – Emergency Handling (Do’s)
BFP – Emergency Handling (Do’s)
5. Boiler firing is to be reduced so that the Steam Flow should
be less than Feed Water Flow, to improve Drum level,
consequently load reduces.
6. If further required another Mill also can be tripped by
taking Oil gun in the running Mill combination elevation.
7. Try to restore the tripped BFP at the earliest (like in case of
human error) and take it into service to maintain the drum
level.
ACTIONS NOT TO BE
TAKEN
BFP- Emergency Handling (Stage-1, 200 MW)
BFP – Emergency Handling (Don'ts)
1. Do not operate the Load Limiter or Load reference, if M/C
is in pressure controller. (Fast unloading of turbine will
increase the drum pressure which will lead into more BFP
discharge pressure and BFP flow decreases).
2. Do not operate the HP Bypass. (Extra BFP flow is added as
a HP Bypass spray due to opening of BD Valves).
3. Do not press the EPB of any BFP in which permit is to
be given if its electrical isolation is already done . (To
avoid the chances of Human Error)
DO NOT PRESS THE EPB OF BFP
Recommendations
1. BFP suction strainer DP to be provided in Drum Level
Mimic.
2. Working oil temperature of BFP to be provided in UCB.
3. BFP Main pump suction pressure value to be provided in
UCB.
4. At BLI<30%, 3-Element to 1-Element changeover should
occur in Auto.
5. At BLI>30%, High Range Controller should come in Auto.
"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"

More Related Content

PPTX
Planetary gear set
PPTX
I.C.Engine Valve Timing
PPTX
Role of lubrication in Automobile
PPT
final drive and differential
PPS
404909 634109716902618750
PPTX
Ksrtc central works INDUSTRIAL VISIT REPORT
PDF
Toyota 7 fbmf 16 electric forklift truck service repair manual
PPTX
Scavenging in Diesel Engines by tharun kumar.pptx
Planetary gear set
I.C.Engine Valve Timing
Role of lubrication in Automobile
final drive and differential
404909 634109716902618750
Ksrtc central works INDUSTRIAL VISIT REPORT
Toyota 7 fbmf 16 electric forklift truck service repair manual
Scavenging in Diesel Engines by tharun kumar.pptx

Similar to "Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained" (20)

PPTX
Boiler feed pump operation.pptx
PPT
condensate system
PPTX
CENTRIFUGAL PUMP WITH CASE STUDY
PDF
Pumps pdf.pdf
PDF
Glossary of Pumping terms + Pumps Industry Terminology
PPTX
1- Pumps operations and troublshooting.pptx
PPT
Cement Industry Pumps (to work on and do).ppt
PPTX
Powerpoint presentation on pumps and working
PDF
Pumps (mech 326)
PPTX
PPT
Feasibility study bfp
PDF
pumps and thier characteristics study details
PDF
Pumps | Characteristics and Performance Evaluation | Gaurav Singh Rajput
PPT
TG_AUX_TRG_PowerPoint Presentation 3.ppt
PPTX
Positive Displacement Pumps
PPTX
radial piston pump
PPTX
Pumps of all the pump of power plant engineer
PDF
Pump clasification.pdf
PDF
Centrifugal Pump _230706_144603.pdf
PDF
Training Manual Of Centrifugal Pump.pdf
Boiler feed pump operation.pptx
condensate system
CENTRIFUGAL PUMP WITH CASE STUDY
Pumps pdf.pdf
Glossary of Pumping terms + Pumps Industry Terminology
1- Pumps operations and troublshooting.pptx
Cement Industry Pumps (to work on and do).ppt
Powerpoint presentation on pumps and working
Pumps (mech 326)
Feasibility study bfp
pumps and thier characteristics study details
Pumps | Characteristics and Performance Evaluation | Gaurav Singh Rajput
TG_AUX_TRG_PowerPoint Presentation 3.ppt
Positive Displacement Pumps
radial piston pump
Pumps of all the pump of power plant engineer
Pump clasification.pdf
Centrifugal Pump _230706_144603.pdf
Training Manual Of Centrifugal Pump.pdf
Ad

More from Infopitaara (20)

PPT
Advanced Automation and Technology in Coal Handling Plants
PPT
CHP Equipment's & Interlocks Complete PPT
PPT
"Feed Water Heaters in Thermal Power Plants: Types, Working, and Efficiency G...
PPT
3 Smart Positioner [Compatibility Mode] [Repaired].ppt
PPT
Understanding Pneumatic Actuators: Principles and Applications
PPT
An Overview of Electrical Actuation Mechanisms in Automation
PPTX
"Heaters in Power Plants: Types, Functions, and Performance Analysis"
PPTX
Deaerator
PPT
Coal to Electricity
PPTX
generation 200 vs 500 MW
PPT
Bearings and lubrication
PPT
Ball & tube mill
PPTX
Computer Virus
PPTX
Top 10 Phones Under 10k
RTF
STUDY ON EFFECTIVE THERMAL CONDUCTIVITY OF COPPER PARTICLE FILLED POLYMER COM...
PPTX
Top 5 "Ethical Hackers of India"
PPTX
Dc motor
DOC
Ntpc tranning report
PDF
Suspension system for any vehicle
PPTX
Advanced Automation and Technology in Coal Handling Plants
CHP Equipment's & Interlocks Complete PPT
"Feed Water Heaters in Thermal Power Plants: Types, Working, and Efficiency G...
3 Smart Positioner [Compatibility Mode] [Repaired].ppt
Understanding Pneumatic Actuators: Principles and Applications
An Overview of Electrical Actuation Mechanisms in Automation
"Heaters in Power Plants: Types, Functions, and Performance Analysis"
Deaerator
Coal to Electricity
generation 200 vs 500 MW
Bearings and lubrication
Ball & tube mill
Computer Virus
Top 10 Phones Under 10k
STUDY ON EFFECTIVE THERMAL CONDUCTIVITY OF COPPER PARTICLE FILLED POLYMER COM...
Top 5 "Ethical Hackers of India"
Dc motor
Ntpc tranning report
Suspension system for any vehicle
Ad

Recently uploaded (20)

PPTX
OOP with Java - Java Introduction (Basics)
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PDF
Arduino robotics embedded978-1-4302-3184-4.pdf
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
Structs to JSON How Go Powers REST APIs.pdf
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPT
Project quality management in manufacturing
PPT
Mechanical Engineering MATERIALS Selection
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
Internet of Things (IOT) - A guide to understanding
OOP with Java - Java Introduction (Basics)
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Arduino robotics embedded978-1-4302-3184-4.pdf
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Structs to JSON How Go Powers REST APIs.pdf
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Model Code of Practice - Construction Work - 21102022 .pdf
Project quality management in manufacturing
Mechanical Engineering MATERIALS Selection
CYBER-CRIMES AND SECURITY A guide to understanding
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Embodied AI: Ushering in the Next Era of Intelligent Systems
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Lecture Notes Electrical Wiring System Components
Internet of Things (IOT) - A guide to understanding

"Boiler Feed Pump (BFP): Working, Applications, Advantages, and Limitations Explained"

  • 5. BFP(Stage-1, 200 MW , KSTPS) Specification No-3 nos(2X 50%) Type-Motor driven Motor-6.6 KV Motor speed -1485 rpm, 3500 Kw Booster p/p-single stage centrifugal Main p/p-8 stage centrifugal p/p
  • 6. Deliver Your Presentation Broadcast and compress for seamless delivery MOTOR To D/A Suction v/v Strainer R/C v/v NRV Discharge v/v Transfer line Booster Pump Main Pump Gear box & Hydraulic coupling D/A To BFP Discharge Transfer line vent Booster p/p casing vent Suction Line drain R/C line vent R/C line drain Main p/p casing drain Disc. Line drain BFP Line Diagram BP casing drain Booster Pump (Specifications) Single Stage Centrifugal Type Manufacturer- Wier P/P’s Ltd. Speed- 1485 rpm. Motor (Specifications) 6.6 KV, Induction Motor Power- 3.5 MW, Current- 360 Amp. Speed- 1485 rpm. Lub oil p/p Working oil p/p Lube oil tank Hydraulic coupling Speed output- 4750 rpm Slip % - 3.9 1 2 3 4 5 6 7 8 9 10 Scoop tube Step-up Gear Unit Gear ratio- 1:3.3 Gear box & Hydraulic Coupling • BFP Main pump (Specifications) • 8- Stage, Cartridge Type, Centrifugal • Weir Co. made - FK8D30. • Speed- 4750 rpm.
  • 7. Main pump The weir type FK8D30 pressure stage pump is an eight stage horizontal centrifugal pump of the barrel casing design. The pump internals are designed as a cartridge, which can be easily removed for maintenance without disturbing the suction and discharge pipe work, or the alignment of the pump and the turbo coupling.
  • 8. BFP Main pump Drawing
  • 9. BFP BARREL & CARTRIDGE
  • 10. BFP CARTRIDGE BFP CARTRIDGE ASSEMBLY COMPRISES OF THE FOLLOWING SALIENT PARTS :  SHAFT  IMPELLERS  DIFFUSERS  RING SECTIONS  SUCTION GUIDE  DISCHARGE COVER  BEARING HOUSINGS  BEARING BRACKETS  JOURNAL BEARINGS  THRUST BEARING  MECHANICAL SEALS IN OTHER WORDS BFP CARTRIDGE IS A COMPLETE PUMP EXCEPTING BARREL (PUMP CASING).
  • 11. BFP CARTRIDGE ADVANTAGES :  IN CASE OF A BREAK DOWN OF RUNNING PUMP, SPARE CARTRIDGE CAN REPLACE IT TOTALLY.  DOWN TIME FOR CHANGE OVER WILL BE MINIMUM (ONE OR TWO SHIFTS)  SPARE CARTRIDGE RESTORES THE ORIGINAL EFFICIENCY OF THE PUMP  SEMI SKILLED TECHNICIANS CAN CARRY OUT THE REPLACEMENT.
  • 12.  It houses the hydraulic components of Pumps.  It prevents the leakage and guides the liquid in a proper direction.  It is closed by Suction Guide at it’s suction side and Discharge  Cover at it’s discharge side. PUMP CASING
  • 13. It rotates the mass of fluid with the peripheral speed of its vane tips, thereby determining the head developed or the Pump working pressure. IMPELLER
  • 14.  It converts Kinetic energy of the fluid into Pressure Energy. INTER-STAGE DIFFUSER END-DIFFUSER DIFFUSER
  • 15.  It consists of Ring Sections located one to another.  Each Ring Section houses one Impeller and one Diffuser.  Ring Sections along with Diffusers form the passage of liquid from  the Impeller outlet of one stage to the Impeller inlet of the next stage. RING-SECTION ASSEMBLY
  • 16. It consists of Shaft, Impellers, Balance Drum, Thrust Collar, rotating parts of Mechanical Seals and the Pump Half Coupling. ROTATING ASSEMBLY
  • 19.  They locate the rotor axially & take residual axial thrust.  They are fitted in the NDE Bearing Housing.  They have 8 white metal lined tilting pads held in a split Carrier  Ring positioned on each side of the Thrust Collar.  Carrier Rings are prevented from rotating with the Shaft by dowel pins in each ring which engage in slots in the Bearing Housing top half. THRUST BEARING
  • 25. Main pump & Booster pump Sealing The pump shaft is sealed at the drive end and non- drive end by Crane mechanical seals, each seal being flushed by water in a closed circuit and the water is circulated by the action of the seal retaining ring. The flushing water is cooled by passing through seal coolers, (two coolers per seal, one working and one standby), and each seal cooler being circulated with clarified cooling water. The rotating assembly is supported by plain white metal lined journal bearings and axially located by a Glacier double tilting pad thrust bearing.
  • 26. Sealing system Mechanical seals are used in MP & BP Clarified water used for seal cooling Mechanical seal cooling arrangement in main p/p Mechanical seal cooling arrangement in main p/p Mechanical seal cooler DM water running in closed ckt Hot DM cooling water Cold DM cooling water Clarified water used for cooling of DM water Clarified o/l
  • 27. MECHANICAL SEAL P/p shaft O ring Carbon steel(static) Tungsten carbide (rotating) P/p casing
  • 28.  It consists of two highly polished surfaces, one surface connected to the Shaft and the other to the stationary part of the Pump.  Both the surfaces are of dissimilar materials held in continuous contact by a spring.  These wearing surfaces are perpendicular to the axis of Shaft.  A thin film of working fluid between these faces provides cooling & lubrication. MECHANICAL SEAL
  • 30. Hydraulic Thrust balancing Drum. Due to differential pressures acting on the impeller the rotating assembly is subjected to axial thrusts. The balance drum located at the non-drive end is designed to keep these forces neutralised and only the residual thrust remains, which is taken up by thrust bearing. The main components of hydraulic balancing arrangement are the balance chamber machined in discharge cover, the balance drum secured to the shaft and balance drum bush fitted in the bore of discharge cover. The thrust caused by the suction pressure acting on the area inside the wear ring on inlet side of each impeller is overcome by much greater thrust caused by the discharge pressure acting on the equivalent area on the outlet side of each impeller. The resultant thrust is therefore towards drive end of pump. Thrust force varies with load on the pump but hydraulic balance arrangement will reduce its effect enabling residual thrust to be taken by fitting pads of thrust bearing.
  • 31. Thrust balancing Balancing disc is provided in main p/p Balance leak off pr-16 ksc.
  • 36. BFP Lub oil system Main p/p -- DE side-journal brg – NDE side-journal & trust bearing Booster p/p-p/p- DE side-journal brg – NDE side-journal & trust bearing – Hydraulic coupling-10 bearings(4 thrust bearings, rest-journal bearings) Lub oil system-2 source 1)MOP-shaft driven 2)AOP-motor driven
  • 37. Lub oil scheme 2 no lub oil cooler AOP AOP motor MOP(connected to gear box) Lub oil filter Oil header Booster p/p bearings NRV Motor bearings Main p/p brg Return from bearing Oil tank Raw water from ARCW discharge
  • 38. When BFP is in S/B condition motor driven AOP is in service. Pr is around 3 ksc. When we give start command to BFP motor driven cut out in auto at 2.3 ksc pr(gear driven MOP will supply lub. oil to bearings
  • 39. Bearings Journal bearings White metal liner(babbit metal) Thickness-0.5 mm shaft Lub oil Journal bearing
  • 40. LUB OIL TANK Regulation control Working oil make up drain Hydraulic coupling Hot working oil Cold working oil WC p/p Cooling water From ARCW P/P Working oil scheme Working oil cooler (2 in numbers) CW in CW out
  • 44. SCOOP TUBE WORKING MECHANISM
  • 45. Motor cooler BFP Motor cooling Arrangement 2 cooling fans are provided at the both ends of motor Cooling air fans sucks cold air which cools motor stator /rotor Hot air is cooled by water in the cooler(2 no of cooler provided) Cooling water coming from Aux. Raw cooling water p/p(ARCW p/p)discharge header Motor cooler Cold air Hot air Motor stator Motor rotor To WC cooler Cooling water BCW v/v
  • 46. WHY Recirculation ? For minimum FW flow. To avoid churning BFP discharge header To D/A A B 180 kg 0 kg 180 kg 100kg 181kg
  • 47. BFP parameter UCB parameter Normal value BFP current 290-300amp BFP flow 340 ton/hr BFP(MP) discharge pr 180 kg D/A pr 6.5 ksc BFP suction temp 167 degree BFP suction strainer DP 0.07 Drum level +50 mm Lub oil pr 3 ksc Lub oil cooler in service normally one Lub oil temp cooler I/l/O/L 60/40 degree Local parameter
  • 48. Local parameter Normal value Working oil pr 1.4 ksc Working oil cooler in service normally one Working oil temp cooler I/l/O/L 120/75 degree Hydraulic coupling max bearing temp 65 degree Motor air temp 50 degree Clarified water pr 3.5 ksc Balance leak off pr 16 ksc BP suction pr 8 kg MP suction pr 16 ksc
  • 49. BFP Start Permissives 1. Deareator level normal > 800 mm. 2. Lube oil pressure adequate > 1.5 ksc. 3. Main pump/Motor bearing temp. normal < 75 deg. C. 4. Suction valve full open. 5. Suction pressure of booster pump adequate > 2.0 Ksc. 6. Emergency push button released. 7. Discharge valve closed or any BFP running & header pressure normal > 90 Ksc. 8. Recirculation valve open.
  • 50. BFP Protections Sr. No. Parameters Alarm Value Trip Value / Remarks 1 Motor [DE/NDE] bearing temperature 75ºC 85ºC 2 Main pump [DE/NDE] bearing temperature 75ºC 85ºC 3 Lube oil pressure low < 1.2 Ksc < 0.8 Ksc (Time delay – 5 sec) 4 Working oil temp Hi-Hi 90ºC > 130ºC 5 BFP running & Main pump suction pressure low < 12 Ksc < 8 Ksc 6 BFP Flow Hi-Hi 450 T/hr 450 T/hr (Time delay – 55 sec) 7 Deaerator level low-low 550 mm 400 mm 8 Emergency Push Button Pressed
  • 51. BFP Protections 1. Motor [DE/NDE] bearing temp. (Alarm: 75ºC, Trip: 85ºC) In Unit-1 & 2 – Temperatures provided in Omniguard. In Unit- 3 - Temperatures provided in DAS, Group-86 (2 RTD’s, Alarm through any one, Trip- 2/2 logic) 2. Main pump[DE/NDE] bearing temp. (Alarm:75ºC, Trip: 85ºC) In Unit-1 & 2 – Temperatures provided in Omniguard. In Unit- 3 - Temperatures provided in DAS, Group-86 (2 RTD’s, Alarm through any one, Trip- 2/2 logic) 3. Lube oil pressure low (Alarm:<1.2 Ksc,Trip:<0.8ksc,Td=5 sec) AOP Cut in at – Lube oil press < 1.7 Ksc. AOP Cut out at – Lube oil press > 2.9 Ksc.
  • 52. BFP Protections 4. Working oil temp Hi-Hi. (Alarm:90ºC, Trip: >130ºC) Alarm & Tripping through- Temp guage cum switch (in local) 5. BFP running & Main pump suction pressure low (< 8 KSC). Through one pressure switch. 6. BFP Flow Hi-Hi. (Alarm: 450 T/hr,Trip>450 T/hr, Td=55 sec). In Unit-1 & 3 – BFP flow hi-hi is through 2 Tx’s (2/2 logic) In Unit-2 – BFP flow hi-hi is through one switch & one Tx combination (2/2 logic). 7. Deaerator level low-low (Alarm: 550mm, Trip: 400mm) 8. Emergency push button.
  • 53. BFP, Local C&I Connections
  • 54. BFP Isolations 1. Ensure that pump is in stopped condition. 2. Get the main motor breaker isolated ( Electrical isolation). 3. Close discharge valve and isolate its electrical supply . 4. Close the suction valve .Ensure there is no rise in suction press. 5. Open suction strainer, booster pump casing, discharge line and main pump casing drain valves. 6. Open the transfer line vent, booster pump vent. 7. Close the manual recirculation valve at deaerator level.
  • 55. BFP Normalisations 1. Physically check that work is complete and all men and materials are removed from site. 2. Get the electrical supply of AOP normalised. 3. Ensure that one lube oil cooler and one working oil cooler are charged from oil and water side. 4. Check oil level ( It should be more than 50 %) Start AOP, observe lube oil pressure (It should be more than 2.5 ksc) and oil filter DP (It should be less than 0.5 ksc).Check return oil flow in all bearings. 5. Open motor cooling inlet/outlet valves .
  • 56. BFP Normalisations 6. Ensure booster pump,transfer line & recirculation line vents open , Close all drains. (To avoid pressurisation of pump). 7. Charge clarified water to mech seal coolers and jacket cooling. Ensure clarified water Pressure is more than 3 ksc . 8. Open manual recirculation valve at deaerator and ensure recirculation control valve is open. Also ensure air supply to recirculation control valve. 9. Crack open suction and observe the discharge through the vents. Close the vent valves after venting is over.
  • 57. 10. Open suction valve fully and ensure the suction pressure is adequate. 11. Get the discharge valve and its integral bypass valves supply, BCW valve supply normalized . 12. Open its discharge valve from UCB, Ensure there is no reverse rotation of the pump. 13. Get the main motor electrically normalised. BFP Normalisations
  • 58. BFP Lube Oil Filter Changeover Two lube oil filters provided in BFP Main pump. 1. No charging line provided. 2. No venting provided in both lube oil filters. Lube oil filter chocked alarm provided in alarm fascia. (Lube oil filter chocked at DP > 0.5 Ksc) BFP tripping on lube oil pressure low-low at 0.8 Ksc, Time delay- 5 seconds.
  • 59. Lube oil Filter-A in-service Hydraulic Coupling Pointer, T shape bottom For Lube oil filter change over moves the handle in this direction Yellow Mark on Handle & Nut
  • 60. Lube oil Filter-B in-service Hydraulic Coupling Pointer, T shape bottom For Lube oil filter change over moves the handle in this direction Yellow Mark on Handle & Nut
  • 62. BFP Lube Oil Filter Change Over. During Changeover :- Place the handle over nut by matching the Yellow Mark.(Half Yellow mark on Nut & Half Yellow mark on handle) Slowly rotates the change over handle (180 degree) so that the pointer (bottom part of T) provided in the nut always moves towards the Hydraulic coupling side. When pointer moves towards Hydraulic coupling- both filters remain in service in pointer mid position. When pointer moves opposite to Hydraulic coupling- both filters became out of service in pointer mid position. The pointer (bottom part of T) shows the Lube oil filter in-service. Observe the rise in DP of filter to be taken in service.
  • 63. Drum Level Control (Stage-1, 200 MW, KSTPS) Low range FRS CV BFP-A scoop BFP-B scoop BFP-C scoop BFP master BFP DP control BFP scoop control Hi range FRS CV Three Element controller Single element controller Hi range FRS CV Drum level
  • 64. PV 79 SV 70 MV 44.7 569 TPH 562.3 TPH FRS- LOW 0.0 % 57 MM FEED FLOW STEAM FLOW DRUM LEVEL PV 0.5 SV 5.5 MV 55 PV 57 SV 23 MV 0.0 PV 79 SV 68 MV 100 AUT MAN AUT MAN 1-ELEMENT TO 3-ELEMENT SELECTION SELECTION FRS-A 100 % FB= 99.9 FRS-B 100 % FB= 101.1 1- ELEMENT FRS CONTROL 3-ELEMENT FRS CONTROL 3-ELEMENT SCOOP CONTROL DP SCOOP CONTROL BFP-A ON SUC FLOW 273 T/Hr BFP-B ON SUC FLOW 307 T/Hr BFP-C OFF SUC FLOW 0 T/Hr CAS CAS CAS CAS AUT AUT AUT 44.7 % DP 1 : SW=1 DP 2 : SW=2 MS : SW=1 BLI : SW=2 MS SELECTOR PR 1 : SW=1 PR 2 : SW=2 FS PR SELECTOR DP SELECTOR
  • 65. Drum Level Control (Stage-1, 200MW KSTPS) 1. 3-Elements – Drum Level, Steam flow & feed water flow. Drum Level - Measured through 2 Tx’s (Left & Right, one Tx in selection). Steam Flow – Measured through flow nozzle & calculated through 1st stage pressure. (one in selection) Feed Water Flow - Measured through 2 Tx’s (one Tx in selection). 2. 1-Element Controller – FRS Low Range Control Valve. Maintain only drum level {auto & manual} . For BLI < 30% operation.
  • 66. 3. 3-Element Controller – FRS High Range Control Valves (FRS- A & FRS-B). Maintain only drum level {auto & manual} . For BLI > 30% operation. Can be loop with DP and Scoop controllers. Independent operation not required BFP Master in auto. 4. DP Controller – Maintain DP across FRS high range CV’s. DP maintained by BFP’s scoop & FRS CV’s maintains drum level. Requires FRS high range CV’s in auto & BFP master in auto. For BLI > 30% operation. Drum Level Control (Stage-1, 200MW KSTPS)
  • 67. Drum Level Control (Stage-1) 5. Scoop Controller – Maintain drum level directly through BFP scoop. Requires FRS high range CV’s 100% open in forced manual & BFP master in auto. For BLI > 70 % operation. Gives command to BFP’s scoop through BFP master. 6. BFP Master– Gives command to BFP scoop’s and requires 2 BFP’s out of 3 in auto for BFP Master in auto. Drum Level Control (Stage-1, 200MW KSTPS)
  • 68. 1. 1- Element to 3-Element Changeover At BLI > 30 %, 1-Element to 3-Element auto changeover, but, At BLI < 30 %, 3-Element to 1-Element auto changeover doesn’t occur. During 1-Element to 3-Element auto changeover, 3-Element controller will be in manual, until we put in auto. For smooth changeover put MV of 3-Element controller > 30%, before changeover. Drum Level Control (Stage-1, 200MW KSTPS)
  • 69. 2. Scoop to DP Controller Changeover At BLI < 70 %, Scoop to DP auto changeover, but at BLI > 70 %, DP to Scoop auto changeover doesn’t occur. Immediate Command to FRS high range controller to 25%, (MV becomes 25), FRS high range CV’s throttles with a ramp rate of 50% per minute in MANUAL. FRS high range CV’s closes till DP reaches the +/- 1 deviation band of Set value of DP Controller and then ,FRS high range & DP controllers immediately go to AUTO. For smooth change over, put DP set point (SV) of DP controller 5 – 6 Ksc. Drum Level Control (Stage-1, 200MW KSTPS)
  • 70. Drum Level Control Logics (Stage-1) 3. DP to Scoop Controller Changeover At BLI > 70 %, we can put Drum level in Scoop Controller. Immediate Command to FRS high range controller to 100%, (MV becomes 100) and 3-Element controller in Forced Manual, FRS high range CV’s opens with a ramp rate of 10% per minute. If FRS high range CV’s does not open 100% within 300 seconds, then a second command extends for 100 % opening of CV’s with a ramp rate of 100% per minute.
  • 71. 4. Controllers logic in Drum Level Mimic Controller in Manual – We can only change the value of MV. (SV & PV remains inoperative) Controller in Auto- We can only change the SV. (PV comes from 3 elements & MV changes according to difference in SV & PV). Controller in Forced Manual – We can’t change the MV. Slave controllers can be put in Auto, Manual and Cascaded. In cascaded mode (CAS) slave controller is taking command from master controller (It does not work independently). Drum Level Control (Stage-1, 200MW KSTPS)
  • 72. Sequence of Activities from light up to Full Load. Checks (Before taking first BFP in service):- FRS low range CV, FRS high range control v/v’s in Cascaded mode (CAS) & full closed condition. Open the FRS low range & high range motorised isolating v/v’s (upstream and downstream). Activities:- 1. Start the first BFP & take FRS low range (1-Element) controller in service (auto or manual, preferably in auto). Control the drum level through 1-Element up to BLI – 30%. Drum Level Control (Stage-1, 200MW KSTPS)
  • 73. 2. At BLI > 30% FRS low range to high range autochange over done, but FRS High range (3-Element) controller will be in manual, so before changeover at BLI –30 %, set the MV of 3- Element controller between 30 – 40 %. After changeover, put 3-Element controller in Auto. FRS high range controller work independently and maintain the drum. (After Change over 1-Element controller will also remain in auto) Drum Level Control (Stage-1, 200MW KSTPS)
  • 74. 3. For putting Drum level in DP control (only at BLI >30%), First make sure 3-Element controller in Auto. After that put 2 BFP’s in Auto (from UCB desk) so that BFP master in Auto & put the SV of DP controller 5 to 6 KSC, then put the DP controller in Auto. Now DP controller maintain the DP across FRS high range CV’s by operating the BFP’s scoop through BFP Master & FRS high range CV’s maintain the drum level. Range of operation of DP controller is BLI – 30% to 100%. Drum Level Control (Stage-1, 200MW KSTPS)
  • 75. 4. At BLI > 70%, we can put drum level in Scoop control, for that only click on the selection switch. FRS high range CV’s opened-100% in Forced Manual and Scoop controller goes to Auto. Now, BFP master control the drum level by operating the running BFP’s scoop in Auto. Drum Level Control (Stage-1, 200MW KSTPS)
  • 76. Note :- 1. If drum level is in Scoop control and we take BFP master in manual (by taking 2 BFP’s in manual), Scoop controller goes to manual and FRS high range control v/v’s remains full open in Manual (3-Element controller will remain in Manual). 2. If drum level is in DP control and we take BFP master in manual (by taking 2 BFP’s in manual), DP controller goes to manual but 3-Element controller remains in auto (FRS high range control v/v’s opened & closed in auto to maintain the drum level only.) Drum Level Control (Stage-1, 200MW KSTPS)
  • 77. PV 79 SV 70 MV 44.7 569 TPH 562.3 TPH FRS- LOW 0.0 % 57 MM FEED FLOW STEAM FLOW DRUM LEVEL PV 0.5 SV 5.5 MV 55 PV 57 SV 23 MV 0.0 PV 79 SV 68 MV 100 AUT MAN AUT MAN 1-ELEMENT TO 3-ELEMENT SELECTION SELECTION FRS-A 100 % FB= 99.9 FRS-B 100 % FB= 101.1 1- ELEMENT FRS CONTROL 3-ELEMENT FRS CONTROL 3-ELEMENT SCOOP CONTROL DP SCOOP CONTROL BFP-A ON SUC FLOW 273 T/Hr BFP-B ON SUC FLOW 307 T/Hr BFP-C OFF SUC FLOW 0 T/Hr CAS CAS CAS CAS AUT AUT AUT 44.7 % DP 1 : SW=1 DP 2 : SW=2 MS : SW=1 BLI : SW=2 MS SELECTOR PR 1 : SW=1 PR 2 : SW=2 FS PR SELECTOR DP SELECTOR Manual Mode Auto Mode Cascaded Mode PV DP/3 ELEMENT SELECTOR 0 DP CNTR
  • 78. PV 79 SV 30 MV 35 569 TPH 562.3 TPH FRS- LOW 0.0 % 57 MM FEED FLOW STEAM FLOW DRUM LEVEL PV 5.5 SV 5.5 MV 58 PV 57 SV 23 MV 0.0 PV 79 SV 68 MV 60 AUT AUT MAN AUT 1-ELEMENT TO 3-ELEMENT SELECTION SELECTION FRS-A 60 % FB= 60 FRS-B 60 % FB= 62 1- ELEMENT FRS CONTROL 3-ELEMENT FRS CONTROL 3-ELEMENT SCOOP CONTROL DP SCOOP CONTROL BFP-A ON SUC FLOW 273 T/Hr BFP-B ON SUC FLOW 307 T/Hr BFP-C OFF SUC FLOW 0 T/Hr CAS CAS CAS CAS AUT AUT AUT 58% DP 1 : SW=1 DP 2 : SW=2 MS : SW=1 BLI : SW=2 MS SELECTOR PR 1 : SW=1 PR 2 : SW=2 FS PR SELECTOR DP SELECTOR
  • 79. BFP- Emergency Handling (Stage-1, 200 MW) Condition:- Unit running at full load (200 MW), with two BFP’s in service and one BFP under permit. Suddenly one BFP Trips. Consequences:- 1. Drum level starts decreasing rapidly. 2. Only running BFP flow goes High, Then Hi-Hi to maintain the drum level. (and chances are BFP trip on Flow Hi-Hi). Boiler May Trip on:- 1. Drum Level Lo-Lo (-250 mm, Time delay- 10 sec), OR 2. All BFP’s Trip.
  • 80. ACTIONS TO BE TAKEN BFP- Emergency Handling (Stage-1, 200 MW)
  • 81. 1. If M/C is in CMC, take it out into Turbine pressure Control Mode. 2. Continuous Three Mills to be kept in service, rest other mills hand tripped (Pulveriser made OFF). 3. Running BFP should be taken into Manual & try to maximize the flow (above 400 T/Hr), keep recirculation in auto. (BFP flow High & Hi-Hi alarms provided in different alarm fascia). 4. Ensuring Flame Stability through Fire Ball Scanners, Oil BFP – Emergency Handling (Do’s)
  • 82. BFP – Emergency Handling (Do’s) 5. Boiler firing is to be reduced so that the Steam Flow should be less than Feed Water Flow, to improve Drum level, consequently load reduces. 6. If further required another Mill also can be tripped by taking Oil gun in the running Mill combination elevation. 7. Try to restore the tripped BFP at the earliest (like in case of human error) and take it into service to maintain the drum level.
  • 83. ACTIONS NOT TO BE TAKEN BFP- Emergency Handling (Stage-1, 200 MW)
  • 84. BFP – Emergency Handling (Don'ts) 1. Do not operate the Load Limiter or Load reference, if M/C is in pressure controller. (Fast unloading of turbine will increase the drum pressure which will lead into more BFP discharge pressure and BFP flow decreases). 2. Do not operate the HP Bypass. (Extra BFP flow is added as a HP Bypass spray due to opening of BD Valves). 3. Do not press the EPB of any BFP in which permit is to be given if its electrical isolation is already done . (To avoid the chances of Human Error)
  • 85. DO NOT PRESS THE EPB OF BFP
  • 86. Recommendations 1. BFP suction strainer DP to be provided in Drum Level Mimic. 2. Working oil temperature of BFP to be provided in UCB. 3. BFP Main pump suction pressure value to be provided in UCB. 4. At BLI<30%, 3-Element to 1-Element changeover should occur in Auto. 5. At BLI>30%, High Range Controller should come in Auto.