BUILD OPERATE AND TRANSFER
(BOT) MODEL
Presented By:
Puneet Israni
Sweety Singh
Darshil Shah
Rutwik Gori
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
WHAT IS BUILD-OPERATE-
TRANSFER (BOT)?
Build Operate Transfer (BOT) is a project financing and operating approach that has found
an application in recent years primarily in the area of infrastructure privatization in the
developing countries. It enables direct private sector investment in large scale
infrastructure projects.
In BOT the private contractor constructs and operates the facility for a specified period.
The public agency pays the contractor a fee, which may be a fixed sum, linked to output or,
more likely, a combination of the two. The fee will cover the operators fixed and variable
costs, including recovery of the capital invested by the contractor. In this case, ownership
of the facility rests with the public agency.
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
BUILD
OPERATE
TRANSFER
A private company (or consortium) agrees with a government to invest in a
public infrastructure project. The company then secures their own
financing to construct the project.
The private developer then operates, maintains, and manages the facility
for an agreed concession period and recoups their investment through
charges or tolls.
After the concessionary period the company transfers ownership and
operation of the facility to the government or relevant state authority.
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
HOW BOT MODEL WORKS?
In a BOT arrangement, the private sector designs and builds the infrastructure,
finances its construction and operates and maintains it over a period, often as long as
20 or 30 years. This period is referred to as the “concession” period.
In short, under a BOT structure, a government typically grants a concession to a
project company under which the project company has the right to build and operate a
facility. The project company borrows from the lending institutions in order to finance
the construction of the facility. The loans are repaid from “tariffs” paid by the
government under the off take agreement during the life of the concession.
At the end of the concession period the facility is usually transferred back to the
government.
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Private entities/concessionaire
Banks
Other parties to the contract
They come together to form a special purpose entity and contribute towards the financial
requirement of the project.
The bank will finance the project on a ‘non-recourse’ basis which means it has recourse to the
special purpose entity and all its assets for the repayment of the debt.
The special purpose entity will subcontract to perform its obligation under the contract such
as the supply of raw materials and other resources necessary to a third party.
Government agency
The government is the initiator of the infrastructure project and decides if the BOT model is
appropriate to meet its needs taking into account other economic and political factors as well.
WHO ARE THE PARTIES INVOLVED IN BOT
CONTRACTS?
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Build-own-operate (BOO)
Build-lease-transfer (BLT)
Build-lease-operate-transfer (BLOT)
Here, a private organization builds, owns, and operates a part of a facility with encouragement
from the government. In return, the organization receives financial incentives such as tax-
exempt status. This mostly applies to BPO companies in different countries.
Upon completion of a project, the company sets a joint venture agreement with the public
sector for the ownership of the facility. Then they will lease it back for a minimum of 10 years
to operate as a business. This is usually common in healthcare facilities and institutions.
Lastly, in this method, the private organization builds and operates a facility in a publicly
leased land for a limited time. Once the lease duration is due, the organization transfers back
the leased land to the public institution that owns it.
Build-own-operate-transfer (BOOT)
A company owns and operates the facility to recover the investment costs while gaining
margin profit on the project. This method usually involves large infrastructure projects done
through private funding.
VARIATIONS OF BUILD-OPERATE-TRANSFER (BOT)
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
RELATIONSHIP BETWEEN PUBLIC-
PRIVATE PARTNERSHIP (PPP) AND BOT?
Public-private partnerships (PPP) refer to project agreements where a private entity takes
over the building and operation part of a government-owned infrastructure.
This helps to improve public infrastructures and services in coordination with the private
sector. Some of the examples include roads, schools, airports, and government buildings.
PPP takes in several forms of participation. This includes build-operate-transfer (BOT) and
design-build-operate (DBO). Through these models, the public sector can allow private
companies and institutions to invest in infrastructures depending on its requirements.
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
The Government gets the benefit of the private sector to
mobilize finance and to use the best management skills in the
construction, operation and maintenance of the project.
The private participation also ensures efficiency and quality by
using the best equipment.
BOT provides a mechanism and incentives for enterprises to
improve efficiency through performance-based contracts and
output-oriented targets.
The projects are conducted in a fully competitive bidding
situation and are thus completed at the lowest possible cost.
The risks of the project are shared by the private sector.
ADVANTAGES OF BOT MODEL
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
DISADVANTAGES OF BOT MODEL
There is a profit element in the equity portion of the
financing, which is higher than the debt cost. This is the price
paid for passing of the risk to the private sector.
It may take a long time and considerable up front expenses to
prepare and close a BOT financing deal as it involves multiple
entities and requires a relatively complicated legal and
institutional framework. There the BOT may not be suitable
for small projects.
It may take time to develop the necessary institutional
capacity to ensure that the full benefits of BOT are realized,
such as development and enforcement of transparent and fair
bidding and evaluation procedures and the resolution of
potential disputes during implementation.
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
SOME PROJECTS RESULTING OUT OF BOT MODEL
IN INDIA
Nhava Sheva International Container Terminal (Jawaharlal Nehru Port Trust of the Government of India and DP WORLD, Dubai, U.A.E)
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Amritsar Interstate Bus Terminal (Department of Transportation, Government of Punjab with the consortium of Rohan Builders (India)
Pvt Ltd., Rajdeep Buildcon Pvt Ltd and Rajdeep Road Developers Pvt. Ltd.)
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Delhi Gurgaon Expressway (National Highways Authority of India with the consortium of Jaypee Industries and DS Construction Ltd.)
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Hyderabad Metro (Government of Andhra Pradesh with the consortium of Maytas Infrastructure, Nav Bharat Ventures, IL&FS and Ital-Thai).
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin GroupGlobal Network of Quantity Surveyors (QS) and Project
Managers (PM) Linkedin Group
Salt Lake Water Supply and Sewage Disposal System (Kolkata Metropolitan Development Authority and Naba Diganta Industrial
Township Authority and Jamshedpur Utilities and Services Company Limited and Voltas Limited).
Tuni Anakapalli Project (National Highways Authority of India with the consortium of The GMR Group and United Engineers Malaysia
Berhad Group).
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Alandur Underground Sewerage Project (The Alandur Municipality worked in partnership with the Tamil Nadu Urban Infrastructure
Financial Services Limited, the state asset management company and with USAID’s Financial Institution Reform and Expansion
Project).
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
Kakinada Deep Water Port (Government of Andhra Pradesh with the consortium of Larsen & Toubro Ltd, India, Stevedoring Services of
America, USA, Precious Shipping Company, Thailand, Konsortium Perkaplan Berhard, Malaysia)
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
BHADANIS INSTITUTE FOR QUANTITY SURVEYORS
WWW.BILLINGENGINEER.COM THANKS !!
Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
BHADANIS INSTITUTE FOR QUANTITY SURVEYORS
WWW.BILLINGENGINEER.COM THANKS !!

More Related Content

PDF
FIDIC Red Book (PEC 2019).pdf
PPTX
Strategies in building procurement (summarized)
PPT
Construction contracts docuements_08092008
PPTX
Comparison of boot and bolt modes of Construction
PDF
Training fidic moustafa ismail 2017 _ lec 4
PPTX
Bot(build operate transfr)
PDF
Pmp Final Review - M Maged
PPTX
Contracts
FIDIC Red Book (PEC 2019).pdf
Strategies in building procurement (summarized)
Construction contracts docuements_08092008
Comparison of boot and bolt modes of Construction
Training fidic moustafa ismail 2017 _ lec 4
Bot(build operate transfr)
Pmp Final Review - M Maged
Contracts

What's hot (20)

PPTX
BOOT, BOT, Management Contracts & Turnkey PROJECTS
PPT
Project Execution
DOC
Project management chapter 1 notes
PDF
Claims 20.1 (Flow chart)
PDF
The Case for Standard Forms of Construction Contract
PDF
Fidic contracts management introduction
PDF
Fidic contract
PPTX
PDF
Analytical Comparison between BOT,BOOT and PPP Projects
PPTX
Tendering in Construction
PPTX
Analytical comparision of BOT,BOOT and PPP models
PDF
Contracts classification
PPTX
Types of contract
PPTX
CONTRACTS AND ITS TYPES
PPTX
Time management in fidic red book 2017(prmg080 project)
PPTX
Project management PPT
PPTX
Work breakdown structure ppt
PDF
Contract Administration Presentation
PPTX
Tendering presenation
PPTX
#FIDIC Understanding Basics# By SN Panigrahi
BOOT, BOT, Management Contracts & Turnkey PROJECTS
Project Execution
Project management chapter 1 notes
Claims 20.1 (Flow chart)
The Case for Standard Forms of Construction Contract
Fidic contracts management introduction
Fidic contract
Analytical Comparison between BOT,BOOT and PPP Projects
Tendering in Construction
Analytical comparision of BOT,BOOT and PPP models
Contracts classification
Types of contract
CONTRACTS AND ITS TYPES
Time management in fidic red book 2017(prmg080 project)
Project management PPT
Work breakdown structure ppt
Contract Administration Presentation
Tendering presenation
#FIDIC Understanding Basics# By SN Panigrahi
Ad

Similar to BOT MODEL.pdf (20)

PPTX
Build–operate–transfer (BOT) or build–own–operate–transfer (BOOT) is a form o...
PDF
Bot(build operate transfer)
PPTX
Build - Operate - Transfer
PDF
Build, Operate, Transfer (BOT)_ A Guide to Public-Private Partnerships
PDF
Build, Operate, Transfer (BOT)_ A Guide to Public-Private Partnerships
DOCX
Pgpm14 infrastructure development
PDF
FINANCIAL VIABILITY OF BOT ROAD PROJECTS IN INDIA
DOCX
Built operate transfer case studies in local construction Sector in Pakistan
PDF
Understanding "BOT" projects
PDF
Zaid Mahayni - Bankability of BOT Arrangements - CEPMLP 2000-2001
PPTX
Public private partnership in development of road network
PPTX
Piyush
PDF
Procurement & contract.(bot)
PPTX
Public private parnership.pptx
PPTX
Public private parnership.pptx
PDF
Build operate transfer services
PDF
UNDERSTANDING_PPPs.pdf
PDF
Toll Roads
DOCX
הסכמי BOT מאת עודד ווסוק
Build–operate–transfer (BOT) or build–own–operate–transfer (BOOT) is a form o...
Bot(build operate transfer)
Build - Operate - Transfer
Build, Operate, Transfer (BOT)_ A Guide to Public-Private Partnerships
Build, Operate, Transfer (BOT)_ A Guide to Public-Private Partnerships
Pgpm14 infrastructure development
FINANCIAL VIABILITY OF BOT ROAD PROJECTS IN INDIA
Built operate transfer case studies in local construction Sector in Pakistan
Understanding "BOT" projects
Zaid Mahayni - Bankability of BOT Arrangements - CEPMLP 2000-2001
Public private partnership in development of road network
Piyush
Procurement & contract.(bot)
Public private parnership.pptx
Public private parnership.pptx
Build operate transfer services
UNDERSTANDING_PPPs.pdf
Toll Roads
הסכמי BOT מאת עודד ווסוק
Ad

Recently uploaded (20)

PDF
1911 Gold Corporate Presentation Aug 2025.pdf
PDF
Kishore Vora - Best CFO in India to watch in 2025.pdf
PPTX
basic introduction to research chapter 1.pptx
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PPTX
operations management : demand supply ch
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PPTX
Astra-Investor- business Presentation (1).pptx
PDF
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
DOCX
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
PDF
Ron Thomas - Top Influential Business Leaders Shaping the Modern Industry – 2025
DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PDF
533158074-Saudi-Arabia-Companies-List-Contact.pdf
1911 Gold Corporate Presentation Aug 2025.pdf
Kishore Vora - Best CFO in India to watch in 2025.pdf
basic introduction to research chapter 1.pptx
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
operations management : demand supply ch
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
NEW - FEES STRUCTURES (01-july-2024).pdf
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
Astra-Investor- business Presentation (1).pptx
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
IITM - FINAL Option - 01 - 12.08.25.pptx
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Slide gioi thieu VietinBank Quy 2 - 2025
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
CTG - Business Update 2Q2025 & 6M2025.pptx
Ron Thomas - Top Influential Business Leaders Shaping the Modern Industry – 2025
Hand book of Entrepreneurship 4 Chapters.docx
533158074-Saudi-Arabia-Companies-List-Contact.pdf

BOT MODEL.pdf

  • 1. BUILD OPERATE AND TRANSFER (BOT) MODEL Presented By: Puneet Israni Sweety Singh Darshil Shah Rutwik Gori Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 2. WHAT IS BUILD-OPERATE- TRANSFER (BOT)? Build Operate Transfer (BOT) is a project financing and operating approach that has found an application in recent years primarily in the area of infrastructure privatization in the developing countries. It enables direct private sector investment in large scale infrastructure projects. In BOT the private contractor constructs and operates the facility for a specified period. The public agency pays the contractor a fee, which may be a fixed sum, linked to output or, more likely, a combination of the two. The fee will cover the operators fixed and variable costs, including recovery of the capital invested by the contractor. In this case, ownership of the facility rests with the public agency. Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 3. BUILD OPERATE TRANSFER A private company (or consortium) agrees with a government to invest in a public infrastructure project. The company then secures their own financing to construct the project. The private developer then operates, maintains, and manages the facility for an agreed concession period and recoups their investment through charges or tolls. After the concessionary period the company transfers ownership and operation of the facility to the government or relevant state authority. Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 4. HOW BOT MODEL WORKS? In a BOT arrangement, the private sector designs and builds the infrastructure, finances its construction and operates and maintains it over a period, often as long as 20 or 30 years. This period is referred to as the “concession” period. In short, under a BOT structure, a government typically grants a concession to a project company under which the project company has the right to build and operate a facility. The project company borrows from the lending institutions in order to finance the construction of the facility. The loans are repaid from “tariffs” paid by the government under the off take agreement during the life of the concession. At the end of the concession period the facility is usually transferred back to the government. Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 5. Private entities/concessionaire Banks Other parties to the contract They come together to form a special purpose entity and contribute towards the financial requirement of the project. The bank will finance the project on a ‘non-recourse’ basis which means it has recourse to the special purpose entity and all its assets for the repayment of the debt. The special purpose entity will subcontract to perform its obligation under the contract such as the supply of raw materials and other resources necessary to a third party. Government agency The government is the initiator of the infrastructure project and decides if the BOT model is appropriate to meet its needs taking into account other economic and political factors as well. WHO ARE THE PARTIES INVOLVED IN BOT CONTRACTS? Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 6. Build-own-operate (BOO) Build-lease-transfer (BLT) Build-lease-operate-transfer (BLOT) Here, a private organization builds, owns, and operates a part of a facility with encouragement from the government. In return, the organization receives financial incentives such as tax- exempt status. This mostly applies to BPO companies in different countries. Upon completion of a project, the company sets a joint venture agreement with the public sector for the ownership of the facility. Then they will lease it back for a minimum of 10 years to operate as a business. This is usually common in healthcare facilities and institutions. Lastly, in this method, the private organization builds and operates a facility in a publicly leased land for a limited time. Once the lease duration is due, the organization transfers back the leased land to the public institution that owns it. Build-own-operate-transfer (BOOT) A company owns and operates the facility to recover the investment costs while gaining margin profit on the project. This method usually involves large infrastructure projects done through private funding. VARIATIONS OF BUILD-OPERATE-TRANSFER (BOT) Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 7. RELATIONSHIP BETWEEN PUBLIC- PRIVATE PARTNERSHIP (PPP) AND BOT? Public-private partnerships (PPP) refer to project agreements where a private entity takes over the building and operation part of a government-owned infrastructure. This helps to improve public infrastructures and services in coordination with the private sector. Some of the examples include roads, schools, airports, and government buildings. PPP takes in several forms of participation. This includes build-operate-transfer (BOT) and design-build-operate (DBO). Through these models, the public sector can allow private companies and institutions to invest in infrastructures depending on its requirements. Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 8. The Government gets the benefit of the private sector to mobilize finance and to use the best management skills in the construction, operation and maintenance of the project. The private participation also ensures efficiency and quality by using the best equipment. BOT provides a mechanism and incentives for enterprises to improve efficiency through performance-based contracts and output-oriented targets. The projects are conducted in a fully competitive bidding situation and are thus completed at the lowest possible cost. The risks of the project are shared by the private sector. ADVANTAGES OF BOT MODEL Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 9. DISADVANTAGES OF BOT MODEL There is a profit element in the equity portion of the financing, which is higher than the debt cost. This is the price paid for passing of the risk to the private sector. It may take a long time and considerable up front expenses to prepare and close a BOT financing deal as it involves multiple entities and requires a relatively complicated legal and institutional framework. There the BOT may not be suitable for small projects. It may take time to develop the necessary institutional capacity to ensure that the full benefits of BOT are realized, such as development and enforcement of transparent and fair bidding and evaluation procedures and the resolution of potential disputes during implementation. Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 10. SOME PROJECTS RESULTING OUT OF BOT MODEL IN INDIA Nhava Sheva International Container Terminal (Jawaharlal Nehru Port Trust of the Government of India and DP WORLD, Dubai, U.A.E) Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 11. Amritsar Interstate Bus Terminal (Department of Transportation, Government of Punjab with the consortium of Rohan Builders (India) Pvt Ltd., Rajdeep Buildcon Pvt Ltd and Rajdeep Road Developers Pvt. Ltd.) Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 12. Delhi Gurgaon Expressway (National Highways Authority of India with the consortium of Jaypee Industries and DS Construction Ltd.) Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 13. Hyderabad Metro (Government of Andhra Pradesh with the consortium of Maytas Infrastructure, Nav Bharat Ventures, IL&FS and Ital-Thai). Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin GroupGlobal Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 14. Salt Lake Water Supply and Sewage Disposal System (Kolkata Metropolitan Development Authority and Naba Diganta Industrial Township Authority and Jamshedpur Utilities and Services Company Limited and Voltas Limited).
  • 15. Tuni Anakapalli Project (National Highways Authority of India with the consortium of The GMR Group and United Engineers Malaysia Berhad Group). Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 16. Alandur Underground Sewerage Project (The Alandur Municipality worked in partnership with the Tamil Nadu Urban Infrastructure Financial Services Limited, the state asset management company and with USAID’s Financial Institution Reform and Expansion Project). Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group
  • 17. Kakinada Deep Water Port (Government of Andhra Pradesh with the consortium of Larsen & Toubro Ltd, India, Stevedoring Services of America, USA, Precious Shipping Company, Thailand, Konsortium Perkaplan Berhard, Malaysia) Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group BHADANIS INSTITUTE FOR QUANTITY SURVEYORS WWW.BILLINGENGINEER.COM THANKS !!
  • 18. Global Network of Quantity Surveyors (QS) and Project Managers (PM) Linkedin Group BHADANIS INSTITUTE FOR QUANTITY SURVEYORS WWW.BILLINGENGINEER.COM THANKS !!