seabed-to-surface
Client:
BP Exploration Operating
Company Limited
Location:
West of Shetland
Project Type:
SURF
BP
Clair Ridge
Subsea 7 has been contracted by BP
to assist in the development of one of
the largest West of Shetland platform
installations in recent history - Clair Ridge.
The workscope covers the engineering, procurement,
fabrication and installation of a 6km 22-inch oil export pipeline
and a 14km 6-inch gas export pipeline between the new Clair
Ridge production facilities and existing Clair Phase 1 export
systems, to allow product to be transported from Clair Ridge
to Sullom Voe Terminal (SVT).
The scope also includes the supply and installation of three
manifold structures and two umbilical jumpers as well as the
field tie-ins, testing and pre-commissioning activities.
www.subsea7.com
© Subsea 7, 2013. Information correct at time of going to press.
18Septmeber2013
BP Clair Ridge
BP Clair Ridge Field Layout
Bundle Launch in Wester Site, Scotland
Seven Navica Laying Pipe
Project
BP Clair Ridge
Client
BP Exploration
Operating Company
Limited
Location
Approx. 75 km West
of Shetland
Water depth
150m
Project Type
SURF
Date Awarded
February 2012
Date Completed
Ongoing
Vessels/Spoolbases
Utilised
Normand Oceanic
Seven Pelican
Acergy Discovery
Seven Petrel
Seven Navica
Skandi Seven
Vigra Spoolbase
Wick Fabrication site
Overview
The Clair Ridge project is the second phase of development
of the Clair Field and will produce the reserves from the ridge
area of the reservoir to the North-East of the initial Clair Phase 1
installation.
Located approximately 75km West of Shetland in water depths
of up to 150m, the Subsea 7 scope of work on the Clair Ridge
project consists of:
• 	Fabrication, installation and tie-in of one 14.1km, 6-inch gas
pipeline
•	 Fabrication, installation and tie-in of one 5.5km bundle
pipeline system consisting of a 22-inch oil pipeline and fibre
optic cable
•	 Fabrication and installation of three subsea manifolds: one
SSIV, one SSIV/Wye structure and one tie-in structure for the
6-inch pipeline
•	 The procurement and installation of two control umbilicals
- totalling 650m, between each platform and their
corresponding SSIV
•	 Procurement and installation of all tie-in spools.
The scale of operations for the Clair Ridge development makes
it one of the largest North Sea projects that Subsea 7
has been awarded in recent times. As an example of its size,
Subsea 7’s offshore installation scope has been split into three
campaigns spanning over three years (2013-2015) and uses
seven different vessels. Although demanding, Subsea 7’s
increased engineering capacity and fleet size has made bidding
on and delivering capital-heavy projects such as Clair Ridge
a possibility.
All design and installation engineering for the Clair Ridge project
is being conducted out of Subsea 7’s Aberdeen offices with a
small contingent of engineers assisting from the Sutton office
in London and Pipeline Production Group in Glasgow. This
relatively local mix of engineers ensures that a wealth of North
Sea experience is on hand to deliver Subsea 7’s first bundle
system West of Shetland.
One challenging aspect of the installation engineering is the
tying-in of the Clair SSIV/Wye structure to the existing 22-inch
oil export line to Sullom Voe Terminal. To avoid having to de-oil
the entire 105km line, a temporary in-pipe isolation method is
being developed. The concept is based upon propelling a high
friction pig train downstream of a dummy spool to establish
an isolation, before the removal of the spool and subsequent
installation of an in-line valve. The SSIV structure will then be
tied in and tested against the valve. Close collaboration with
industry isolation specialists and suppliers will ensure that this
isolation proves successful.
With the complex nature of the scope of work and interfaces,
Clair Ridge is seen as a model of the type of project that
Subsea 7 is committed to delivering in a safe and cost-effective
manner.
•	 2 x Umbilicals (totalling 650m)
•	 1 x Rigid pipeline (14.1km)
•	 1 x Bundle system (flowline and fibre optic cable, 5.5km)
•	 3 x Manifolds (SSIV, SSIV/Wye and tie-in structure)

More Related Content

PPTX
Montrose BLP
PDF
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
PDF
Shark Bay Upgrade
PDF
Alaska LNG Summit
PDF
Lloyd ppt
PDF
Proj ref lrg_anzacbridge
PDF
2000_Charleston_cement
PDF
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
Montrose BLP
Premier Oil - Decommissioning Oil Projects In The North Sea Case Study
Shark Bay Upgrade
Alaska LNG Summit
Lloyd ppt
Proj ref lrg_anzacbridge
2000_Charleston_cement
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh

What's hot (18)

PDF
Renovación de Vías
PDF
Thames Perry Oaks-Iver South 2005
PDF
Infographic Line 10 WSRP SEPT 2015
PPTX
New Presentation Layout 09-09-16 Linkedin
DOCX
Waterman Drainage Project
PDF
Oil and Gas Undergrond Storage Keystone Project.
PDF
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
PDF
Accommodating Trade Growth at Fremantle Ports
PDF
2014 Enbridge Day - Liquids Pipelines
PDF
Introduction to Floating Storage & Regasification Unit (FSRU)
PDF
Project List 2
PDF
Newpark drilling fluids discusses strong presence in fourchon in world oil su...
PDF
FSRU Technology & Project Development
DOC
Mobile crusher
PPTX
Présentation1 Linked In english ind B
PDF
RoadPacker Asia Soil Stabiliser.pdf
PDF
Cc channel lining aberdeen western peripheral route - transport scotland (1)
PDF
2015版中国lng卫星站项目名录
Renovación de Vías
Thames Perry Oaks-Iver South 2005
Infographic Line 10 WSRP SEPT 2015
New Presentation Layout 09-09-16 Linkedin
Waterman Drainage Project
Oil and Gas Undergrond Storage Keystone Project.
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Accommodating Trade Growth at Fremantle Ports
2014 Enbridge Day - Liquids Pipelines
Introduction to Floating Storage & Regasification Unit (FSRU)
Project List 2
Newpark drilling fluids discusses strong presence in fourchon in world oil su...
FSRU Technology & Project Development
Mobile crusher
Présentation1 Linked In english ind B
RoadPacker Asia Soil Stabiliser.pdf
Cc channel lining aberdeen western peripheral route - transport scotland (1)
2015版中国lng卫星站项目名录
Ad

Viewers also liked (13)

DOCX
DOCX
24348746
PPTX
Recovered file 1
DOCX
Schmitt_Resume_43015
PDF
koroshus_2014
DOC
MUHAMMAD SOFIE BIN SAPAWI resume
PPTX
Madelene leininger
PDF
conceptos de metrologia
PPTX
Theory Of Constraints.
PDF
Curso Integral “Las Contrataciones Públicas”
PPTX
Práctica web de la sesión 3
PDF
2.. presentación técnicos laborales 2015
DOCX
Ambiental ecocinema
24348746
Recovered file 1
Schmitt_Resume_43015
koroshus_2014
MUHAMMAD SOFIE BIN SAPAWI resume
Madelene leininger
conceptos de metrologia
Theory Of Constraints.
Curso Integral “Las Contrataciones Públicas”
Práctica web de la sesión 3
2.. presentación técnicos laborales 2015
Ambiental ecocinema
Ad

BPClairRidge

  • 1. seabed-to-surface Client: BP Exploration Operating Company Limited Location: West of Shetland Project Type: SURF BP Clair Ridge Subsea 7 has been contracted by BP to assist in the development of one of the largest West of Shetland platform installations in recent history - Clair Ridge. The workscope covers the engineering, procurement, fabrication and installation of a 6km 22-inch oil export pipeline and a 14km 6-inch gas export pipeline between the new Clair Ridge production facilities and existing Clair Phase 1 export systems, to allow product to be transported from Clair Ridge to Sullom Voe Terminal (SVT). The scope also includes the supply and installation of three manifold structures and two umbilical jumpers as well as the field tie-ins, testing and pre-commissioning activities.
  • 2. www.subsea7.com © Subsea 7, 2013. Information correct at time of going to press. 18Septmeber2013 BP Clair Ridge BP Clair Ridge Field Layout Bundle Launch in Wester Site, Scotland Seven Navica Laying Pipe Project BP Clair Ridge Client BP Exploration Operating Company Limited Location Approx. 75 km West of Shetland Water depth 150m Project Type SURF Date Awarded February 2012 Date Completed Ongoing Vessels/Spoolbases Utilised Normand Oceanic Seven Pelican Acergy Discovery Seven Petrel Seven Navica Skandi Seven Vigra Spoolbase Wick Fabrication site Overview The Clair Ridge project is the second phase of development of the Clair Field and will produce the reserves from the ridge area of the reservoir to the North-East of the initial Clair Phase 1 installation. Located approximately 75km West of Shetland in water depths of up to 150m, the Subsea 7 scope of work on the Clair Ridge project consists of: • Fabrication, installation and tie-in of one 14.1km, 6-inch gas pipeline • Fabrication, installation and tie-in of one 5.5km bundle pipeline system consisting of a 22-inch oil pipeline and fibre optic cable • Fabrication and installation of three subsea manifolds: one SSIV, one SSIV/Wye structure and one tie-in structure for the 6-inch pipeline • The procurement and installation of two control umbilicals - totalling 650m, between each platform and their corresponding SSIV • Procurement and installation of all tie-in spools. The scale of operations for the Clair Ridge development makes it one of the largest North Sea projects that Subsea 7 has been awarded in recent times. As an example of its size, Subsea 7’s offshore installation scope has been split into three campaigns spanning over three years (2013-2015) and uses seven different vessels. Although demanding, Subsea 7’s increased engineering capacity and fleet size has made bidding on and delivering capital-heavy projects such as Clair Ridge a possibility. All design and installation engineering for the Clair Ridge project is being conducted out of Subsea 7’s Aberdeen offices with a small contingent of engineers assisting from the Sutton office in London and Pipeline Production Group in Glasgow. This relatively local mix of engineers ensures that a wealth of North Sea experience is on hand to deliver Subsea 7’s first bundle system West of Shetland. One challenging aspect of the installation engineering is the tying-in of the Clair SSIV/Wye structure to the existing 22-inch oil export line to Sullom Voe Terminal. To avoid having to de-oil the entire 105km line, a temporary in-pipe isolation method is being developed. The concept is based upon propelling a high friction pig train downstream of a dummy spool to establish an isolation, before the removal of the spool and subsequent installation of an in-line valve. The SSIV structure will then be tied in and tested against the valve. Close collaboration with industry isolation specialists and suppliers will ensure that this isolation proves successful. With the complex nature of the scope of work and interfaces, Clair Ridge is seen as a model of the type of project that Subsea 7 is committed to delivering in a safe and cost-effective manner. • 2 x Umbilicals (totalling 650m) • 1 x Rigid pipeline (14.1km) • 1 x Bundle system (flowline and fibre optic cable, 5.5km) • 3 x Manifolds (SSIV, SSIV/Wye and tie-in structure)