Profile Synopsis
 B.Tech in Civil Engineering from IIT/Kanpur 1987
 IRSE 1988 Exam Batch, Joined in January, 1990 – more than
26 years of service.
 M.Tech from IIT Kanpur in Environmental Engineering, May
1989.
 Was President of Society of Civil Engineers at IIT Kanpur
1986-87.
 Received Best Project Award in Civil Engineering at IIT
Kanpur as undergraduate student.
 God fearing person, believe in the principal of “work is
worship” and very passionate.
 Able to take bold decision within the ambient of the
contract.
 Posted in Railways in various capacities in Operation &
Maintenance, Construction, Bridge design and General
Administration.
 Joined RVNL on deputation as Chief Project Manager in
January 2010 and now working as Chief Project Manager
cum Group General Manager for implementation of
projects.
 Executing Metro works in one of the most busy road in
heart of Kolkata City. Have executed three major workshops
and also executing a cable stayed bridge.
Achievements and work experience
 Successfully completed probation period.
 AEN and Sectional Sr. DEN in Rajdhani Route.
 Sr.DEN/Co-ordination for more than 4 years at Sealdah
(Suburban Traffic)
 Dy. CE Construction/Howrah for about 2.5 years Howrah (in and
around Kolkata)
 Received Railway Minister’s Award twice 2005 (for AMP Project)
and 2009 for outstanding services.
 GM Award – 1996, 1997, 2003, 2008
 Best construction shield – 2007 and 2008
 Overall Engg. Efficiency Shield – 2004 and 2006
 Engineering Runners up, Bridge Shields etc. – 6 Nos.
 In RVNL - 7 Nos. of Shields (including Most Innovative Project)
- Certificate of Merit – 4 Nos.
- Group Awards and certificates – 7 Nos.
 Planning and DPR of 66 Kms of Metro Projects.
 Execution of two Metro Corridors- Joka – Majerhat & Noapara –
Dakshineswar.
 Timely Completion of 3 workshops in time-DLCF/Dankuni, DMU
Factory/Haldia, Electric Loco factory/Dankuni and handed over.
 More than 12 Nos. of appreciation letters, latest by CMD/RVNL –
“I am happy to note that this has won appreciation from various
agencies and sections of the society including State Government,
General public and media. This commendable work has served
to enhance the image of RVNL as a technically competent
organization”.
1 of 3
 Have got vast experience of leading Multi-disciplinary team and
execution of works in Urban Environment.
 CSR Projects – very actively involved in last 5 years.
 Having the qualities like: Sincerity, Integrity, Experience of
leading Multi disciplinary team in urban environment,
Confidence, Passion and keen to implement the project.
 APRs from 2001-02 to 2015-16 :- All Outstanding
Few quotes recorded in APR
2006-07 :- “Entrust an assignment to this officer and before you
settle down, he is ready with dazzling results. He is an asset
amongst assets”.
2011-12 :– “His remarkable contribution in implementation of
metro projects. He is highly motivated and upright officer”.
2010-11 :- “He is a work alcoholic person to shoulder any
responsibility assigned to him. He believes in perfection and
drive pride and satisfaction by achieving the goals”.
2012–13 :– “He is one of the most efficient, brilliant, hard
working and highly motivated officer I’ve ever worked with. He
is a good planner, outstanding Engineer and efficient
Manager.”
2013-14 :- “He is an ever motivated, hard working and a
dynamic officer. He is a good engineer as well as a top class
manager.
2014-15 :- “He is a highly motivated, technically competent,
delving oriented successful manager. He has handled the issues
much beyond his level.”
2 of 3
Achievements and work experience
3 of 3
Achievements and work experience
 More than 30 technical papers written and published.
 Electric Loco Factory, Cable stayed bridge and Joka Metro
projects have given maximum satisfaction in terms of
challenges and achievement.
 Coffee Table Books were made on completion of Projects:-
Handbook cum Coffee Table Book titled Staying with Cables- A
modern construction in new era is at:
http://www.slideshare.net/slideshow/embed_code/key/2sfp4L
bZIXl1so
Coffee Table Book titled Electric Loco Assembly and Ancillary
unit of CLW is at:
http://www.slideshare.net/slideshow/embed_code/key/2H52
UCfDjzCJ0O
Coffee Table Book titled Diesel Multiple Unit Factory Haldia,
South Eastern Railway is at:
http://www.slideshare.net/slideshow/embed_code/key/3FiRjJ
OFYf4UnO
Coffee Table Book titled Diesel Loco Component Factory,
Dankuni, South Eastern Railway is at:
http://www.slideshare.net/slideshow/embed_code/key/dwXh
0Ni6DgpYK9
Strengths and Weaknesses
 Have all kinds of experiences in Railway and Metro
construction works.
 Having huge experience and successful implementation of
Projects in West Bengal (Eastern Part of the countary).
 Have got experience in Commissioning of Railway Line,
various yard remodeling works, Major Bridges etc.
 Have got experience in Track Layout, Track Laying &
Maintenance procedure.
 Experience in Contract Management.
 Experience of working as a team in Construction/Open line
of Railways and RVNL. Able to interface with all
departments to implement the project .
 Huge experience of working in Urban Environment and
Multi disciplinary Projects in successful manner.
 Experience of getting CTE’s inspection done and all the
paras got concluded in short period.
 Take bold and timely decisions and aggressive approach for
implementation of projects. Work only for implementation
of Projects.
How can I contribute
 Having my own vast experience and knowledge of various
aspects of construction and Railway working along with
successful co-ordination with the State Government &
various utility owning agencies, I can help in
implementation of various kinds of projects.
 Execute the project in targeted time schedule and
estimated cost based on the experience of completed
projects (three nos of workshops) and two on going Metro
projects. Develop the system and procedure for design &
timely working.
 Develop the procedure and set up the quality control
system and proper documentation of quality control
system.
 Developing internal vigilance mechanism for adopting
better quality control system.
 To implement the project in a very safe manner based on
the experience and of execution of the work in very busy &
congested roads of Kolkata
 To plan the property development at suitable location along
the alignment.
 To plan and develop training facilities at needed location.
 Design of structures to optimize faster construction, space
requirement, improved passenger dispersal system,
develop area having proper business potential, Kiosks,
advertisement etc.
 Can handle and lead multidisciplinary team in time to come
as proven in past.
Performance as per ACRs at a glance
S.No Year Achievement
Special Remarks
Recorded in ACRs
Rating
1 2001-02 All targets achieved. All time
records for rehabilitation of bridges
and expenditure was achieved by
Eastern Railway. All SRSF bridge
works were finalized, planned.
- Outstanding
2 2002-03 All time records for Track Renewal
was achieved, Engineering
Efficiency Runners Cup and
Certificate of Merit (Individual
Award & Certificate of Merit – GM
Award) was received.
He always tried to improve upon
the performance to excel in his
standard of work and he is very
fast in implementation.
Outstanding
3 2003-04 Got the overall Engineering
Efficiency Shield for the first time in
the history of Sealdah Division.
Due to his committed and hard
working to achieve targets
performance of Engineering
Department was excellent in all
field.
Outstanding
4 2004-05 Received Track Maintenance
Shield and overall Runners Cup.
He is a very hard working officer
and takes keen initiative and
prompt actions for compliance
of instructions and has been
rated as the best Sr. DEN of the
Railway.
Outstanding
5 2005-06 Received overall Engineering
Efficiency Shield (second time in
history of Sealdah Division) and
Track Maintenance Shield.
Received Railway Minister’s Award
for Best Project of the year for
Advance Management Programme
for a Project on Sealdah Division.
He is a sincere and hard
working officer and has good
skill for monitoring of works and
use of computers and
presentations.
Outstanding
6 2006-07 Received Best Construction
District Shield for the first time in
Howrah-II District.
Entrust an assignment to this
officer, - and before you settle
down, he is ready with dazzling
results. He is an asset amongst
assets.
Outstanding
7 2007-08 Received Best Construction
District Shield – for the Second
time in Howrah-II District.
He plans his work in a very
systematic and methodical
manner to complete them in
time.
Outstanding
8 2008-09 Received Service Medal and
Hon’ble MR’s Award.
He is very intelligent, sincere and
conscientious officer. I consider him an
asset to the Organization.
Outstanding
9 2009-10 All targets achieved Very intelligent, capable and hard working
officer, is trustworthy and is an asset for the
organization.
Outstanding
10 2010-11 Received Certificate of Merit from
CRB/Railway Board during RVNL’s
Annual Day Function in April 2011
He believes in performance and derives
pride and satisfaction by achieving the
goals.
Outstanding
11 2011-12 Received Project Shields for
Dankuni Factory and for Joka Metro
work, during RVNL’s Annual Day
Function in April 2012
He is an extremely bright highly motivated
and upright officer.
Outstanding
.
12 2012-13 Received the Project Shield for
DMU Factory at Haldia and also for
Joka-Majerhat Metro Project.
He is one of the most efficient, brilliant,
hardworking and highly motivated officer I
have ever worked with. He is a good
planner, outstanding engineer and efficient
manager.
Outstanding
13 2013-14 Received the best workshop shield
for Electric Loco Factory at Dankuni
He is sharp in analyzing the issues and
addresses them with speed & accuracy.
His compliance to instructions are not only
faster than expected, he anticipates well in
advance the issues which are likely to
arise. He has great potential to shoulder
higher responsibility.
He is an ever motivated, hard working and
a dynamic officer. He is a good engineer as
well as a top class manager.
Outstanding
14 2014-15 1. Certification of Merit for Signing
MOU and developing a new
model for execution of a project
from State Govt.
2. Certificate of Merit and a group
award for Electric Loco Factory,
Dankuni.
3. Received the Best Innovative
Project Shield for Barddhaman
Cable Stayed Bridge.
He is a highly motivated, technically
competent, result oriented successful
manager. He has handed the issues much
beyond his level.
Outstanding
15 2015-16 Received the Best Special Structure
Completed Shield for Barddhaman
Cable Stayed Bridge.
He is a man of extra-ordinary caliber who is
always willing to take up challenging time
bound delivery tasks which are technically
and managerially difficult and environment
is not conducive.
Outstanding
Morning starts with sharing self
designed quote images and quote
to more than 1000 persons…
Active in social media and stay positive ..
Morning starts with…
and it brings smile and
happiness…..
Gets a lot of pleasure in…
Unfortunately either their parents are no
more or they have abandoned them..
Spending time and having dinner with these
sweet children at Oxford Mission..
Associated with
Dakshineshwar Kali Temple
Release of CTBs
Coffee table book for Electric Loco Factory Dankuni is at:
www.slideshare.net/slideshow/embed_code/key/2H52UCfDjzCJ0
O
Coffee table book for Diesel Component Factory, Dankuni is
at:
https://www.slideshare.net/slideshow/embed_code/key/dwXh0Ni6
DgpYK9
Coffee table book for DMU Factory, Haldia is at:
https://www.slideshare.net/slideshow/embed_code/key/3FiRjJOF
Yf4UnO
Handbook cum Coffee Table Book titled "Staying with Cables-
A modern construction in new era” is at:
www.slideshare.net/slideshow/embed_code/key/2sfp4LbZIXl1so
A lecture on Fast Track Project at IRICEN
Fast track project at IRICEN,
the presentation is at:
http://www.slideshare.net/
slideshow/embed_code/409
63256
Innovative solution for crossing larger
spaces like Railway Yard - A case study on
Barddhaman Cable Stayed ROB
5th Annual Metro Rail India Summit held at SHANGRI-LA,
New Delhi on 11.03.2016 is at:
www.slideshare.net/rajesh83196/5th-metro-rail-summit-
at-shangri-la-cp-new-delhi-on-11032016
IPWE Seminar 2016- The paper presented was declared as the
best technical paper and will get a certificate from MR and
ME in January 2017, detailed presentation, it is at slide share
at:
www.slideshare.net/slideshow/embed_code/key/nIurFSvRWy
A lecture on Fast Track
Project at IRICEN
Fast track project at IRICEN, the presentation is at:
http://www.slideshare.net/slideshow/embed_cod
e/40963256
5th
Metro Rail Summit2016
5th Annual Metro Rail India Summit held at SHANGRI-LA,
New Delhi on 11.03.2016 is at:
www.slideshare.net/rajesh83196/5th-metro-rail-summit-
at-shangri-la-cp-new-delhi-on-11032016
Presentations at different forums
IPWE Seminar 2016- The paper presented
was declared as the best technical paper
and will get a certificate from MR and ME
in January 2017, detailed presentation, it is
at slide share at:
www.slideshare.net/slideshow/embed_co
de/key/nIurFSvRWyIDjG
Total 30 Technical Papers written and
presented in different forums
Diesel Loco Component Factory – conceived, implemented,
handed over, final bill paid, completion report drawn.
,
,
,
II
,
I
,
.. II
Electric locomotive Factory – conceived, implemented,
handed over, final bill drawn.
Haldia DMU Factory – conceived, implemented, handed
over, final bill paid, completion report
,
I
,
II
4 Lane Cable Stayed ROB, Barddhaman
,
,
.. II
Joka-Majerhat Metro
, ,
- ,
II
-
I
Corporate Social Responsibility

More Related Content

DOC
PDF
Profile company
PDF
Chetan Arora CV
PDF
CV-Nazim Aziz
DOC
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
PDF
2015 Resume - Private Sector
DOCX
CURRICULUM VITAE
DOC
Lokesh_Srivastava_CV_6
Profile company
Chetan Arora CV
CV-Nazim Aziz
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
2015 Resume - Private Sector
CURRICULUM VITAE
Lokesh_Srivastava_CV_6

What's hot (20)

PDF
social profile.
DOC
Rajesh Sree Ramachandran Nair Original Copy
DOC
Phil Keeley's resume_1
DOC
AK-BIODATA-Sep-2016
DOCX
CV Suresh44UIC
DOCX
CV Partha
PDF
FINAL Summer Internship REPORT NICMAR
PDF
CV A SAMUEL N
PDF
Internship Report Construction Site and Office Work
DOC
RESUME ARUN BERA
DOCX
Manish kumar project planning & control with 3.7 years of experience
DOC
DOCX
Er. Anand Resume
DOC
Resume_of_radheyshyam_(1)_
DOCX
DOCX
Final Project
DOCX
CURRICULAM VITAE
PDF
Industrial report for civil engg. training
PDF
NP Geotechnical Engineer
social profile.
Rajesh Sree Ramachandran Nair Original Copy
Phil Keeley's resume_1
AK-BIODATA-Sep-2016
CV Suresh44UIC
CV Partha
FINAL Summer Internship REPORT NICMAR
CV A SAMUEL N
Internship Report Construction Site and Office Work
RESUME ARUN BERA
Manish kumar project planning & control with 3.7 years of experience
Er. Anand Resume
Resume_of_radheyshyam_(1)_
Final Project
CURRICULAM VITAE
Industrial report for civil engg. training
NP Geotechnical Engineer
Ad

Similar to Brief about self through ppt (20)

DOCX
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
PDF
Rajeev Bhargava_Resume'
DOC
RESUMEjan16Ll
DOCX
Sunil Adep. 29.10.16
DOC
Sanjay CV
DOCX
Cv model english consultant
DOC
kkbiodata 1.6.15
PDF
CV_Ravi_Kumar
DOC
Shanmukharao K_resume
DOCX
CV_09.09.2016
DOC
Resume - Vikas Datta-v2
PDF
RESUME (AjitDas)
PPT
Copy of Senior Manager
PPT
Senior Manager
DOC
SURESH KUMAR
DOC
AKJ RESUME
PDF
nilesh moon resume
DOC
Resume- VPJ
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
Rajeev Bhargava_Resume'
RESUMEjan16Ll
Sunil Adep. 29.10.16
Sanjay CV
Cv model english consultant
kkbiodata 1.6.15
CV_Ravi_Kumar
Shanmukharao K_resume
CV_09.09.2016
Resume - Vikas Datta-v2
RESUME (AjitDas)
Copy of Senior Manager
Senior Manager
SURESH KUMAR
AKJ RESUME
nilesh moon resume
Resume- VPJ
Ad

More from Rajesh Prasad (20)

PDF
19th Annual Conference on 'Railways in India' by Indian Infrastructure.pdf b...
PDF
19th Annual Conference on 'Railways in India' by Indian Infrastructure.pdf A ...
PDF
Appreciation Endorsements in favour of Rajesh Prasad
PDF
Urban Transport Infrastructure September 2023
PDF
Rail Business July Sep 2024- Highlights on RVNL n Infra Projects
PDF
57th convocation Speech at IIT Kanpur by Shri Rajesh Prasad on 29.06.24 2
PDF
Vision Document and Business Plan of RVNL
PDF
Vikshit Bharat by Rajesh Prasad- a detailed presentation
PPTX
Building Management System for Kolkata Metro by RVNL.pptx
PDF
GST issues resolved in Sep-2024 once for all.pdf
PDF
Rajesh Prasad- details about degrees and memberships
PDF
Pamban Bridge - a presentation by Rajesh Prasad
PDF
Rail-Business-Magazine-Pamban -Bridge-Mar-Apr-issue-2025.pdf
PDF
Kavi Subhash to Hemanta Mukherjee Metro Orange Line
PDF
Barkhera Budhni 3rd Line Project of WC Railway having large non. of technical...
PDF
Corporate Booklet of RVNLcorrected upton30.09.2024
PDF
Electric Loco Workshop Dabohi, Gujrat- a turnkey project implemented by RVNL.
PDF
Bridging over River Bhagirathi in Eastern Railway
PDF
Rly Tunnel Execution with Administrative n Technical Challenges in Saranga Fo...
PDF
Jheel Siding n Ranaghat Workshop executed on Fast Track by RVNL
19th Annual Conference on 'Railways in India' by Indian Infrastructure.pdf b...
19th Annual Conference on 'Railways in India' by Indian Infrastructure.pdf A ...
Appreciation Endorsements in favour of Rajesh Prasad
Urban Transport Infrastructure September 2023
Rail Business July Sep 2024- Highlights on RVNL n Infra Projects
57th convocation Speech at IIT Kanpur by Shri Rajesh Prasad on 29.06.24 2
Vision Document and Business Plan of RVNL
Vikshit Bharat by Rajesh Prasad- a detailed presentation
Building Management System for Kolkata Metro by RVNL.pptx
GST issues resolved in Sep-2024 once for all.pdf
Rajesh Prasad- details about degrees and memberships
Pamban Bridge - a presentation by Rajesh Prasad
Rail-Business-Magazine-Pamban -Bridge-Mar-Apr-issue-2025.pdf
Kavi Subhash to Hemanta Mukherjee Metro Orange Line
Barkhera Budhni 3rd Line Project of WC Railway having large non. of technical...
Corporate Booklet of RVNLcorrected upton30.09.2024
Electric Loco Workshop Dabohi, Gujrat- a turnkey project implemented by RVNL.
Bridging over River Bhagirathi in Eastern Railway
Rly Tunnel Execution with Administrative n Technical Challenges in Saranga Fo...
Jheel Siding n Ranaghat Workshop executed on Fast Track by RVNL

Recently uploaded (20)

DOCX
PRACTICE-TEST-12 is specially designed for those
PPTX
STS CHAP 4 human development as reflected
PPTX
Unit 2 CORPORATE CULTURE AND EXPECTATIONS
PPTX
CYBER SECURITY PPT.pptx CYBER SECURITY APPLICATION AND USAGE
PDF
Basic GMP - Training good manufacturing procedure
PPT
ppt-of-extraction-of-metals-12th-1.pptb9
PPTX
GPAT Presentation PPT and details about imp topics.pptx
PPTX
_Dispute Resolution_July 2022.pptxmhhghhhh
PPTX
employee on boarding for jobs for freshers try it
PPTX
430838499-Anaesthesiiiia-Equipmenooot.pptx
PDF
Environmental-social-and-governance-report.pdf
PPTX
Unit 1- Introduction to Corporate Etiquettes
PPT
2- CELL INJURY L1 Medical (2) gggggggggg
PPTX
ANN DL UNIT 1 ANIL 13.10.24.pptxcccccccccc
PPTX
Opioid_Analgesics_Presentation (1).pptxp
PPTX
formulation and evaluation of polyherbal antiageing cream
PPTX
D1basicstoloopscppforbeginnersgodoit.pptx
PDF
LSR CASEBOOK 2024-25.pdf. very nice casbook
PDF
CV of Architect Professor A F M Mohiuddin Akhand.pdf
PPT
NO000387 (1).pptsbsnsnsnsnsnsnsmsnnsnsnsjsnnsnsnsnnsnnansnwjwnshshshs
PRACTICE-TEST-12 is specially designed for those
STS CHAP 4 human development as reflected
Unit 2 CORPORATE CULTURE AND EXPECTATIONS
CYBER SECURITY PPT.pptx CYBER SECURITY APPLICATION AND USAGE
Basic GMP - Training good manufacturing procedure
ppt-of-extraction-of-metals-12th-1.pptb9
GPAT Presentation PPT and details about imp topics.pptx
_Dispute Resolution_July 2022.pptxmhhghhhh
employee on boarding for jobs for freshers try it
430838499-Anaesthesiiiia-Equipmenooot.pptx
Environmental-social-and-governance-report.pdf
Unit 1- Introduction to Corporate Etiquettes
2- CELL INJURY L1 Medical (2) gggggggggg
ANN DL UNIT 1 ANIL 13.10.24.pptxcccccccccc
Opioid_Analgesics_Presentation (1).pptxp
formulation and evaluation of polyherbal antiageing cream
D1basicstoloopscppforbeginnersgodoit.pptx
LSR CASEBOOK 2024-25.pdf. very nice casbook
CV of Architect Professor A F M Mohiuddin Akhand.pdf
NO000387 (1).pptsbsnsnsnsnsnsnsmsnnsnsnsjsnnsnsnsnnsnnansnwjwnshshshs

Brief about self through ppt

  • 1. Profile Synopsis  B.Tech in Civil Engineering from IIT/Kanpur 1987  IRSE 1988 Exam Batch, Joined in January, 1990 – more than 26 years of service.  M.Tech from IIT Kanpur in Environmental Engineering, May 1989.  Was President of Society of Civil Engineers at IIT Kanpur 1986-87.  Received Best Project Award in Civil Engineering at IIT Kanpur as undergraduate student.  God fearing person, believe in the principal of “work is worship” and very passionate.  Able to take bold decision within the ambient of the contract.  Posted in Railways in various capacities in Operation & Maintenance, Construction, Bridge design and General Administration.  Joined RVNL on deputation as Chief Project Manager in January 2010 and now working as Chief Project Manager cum Group General Manager for implementation of projects.  Executing Metro works in one of the most busy road in heart of Kolkata City. Have executed three major workshops and also executing a cable stayed bridge.
  • 2. Achievements and work experience  Successfully completed probation period.  AEN and Sectional Sr. DEN in Rajdhani Route.  Sr.DEN/Co-ordination for more than 4 years at Sealdah (Suburban Traffic)  Dy. CE Construction/Howrah for about 2.5 years Howrah (in and around Kolkata)  Received Railway Minister’s Award twice 2005 (for AMP Project) and 2009 for outstanding services.  GM Award – 1996, 1997, 2003, 2008  Best construction shield – 2007 and 2008  Overall Engg. Efficiency Shield – 2004 and 2006  Engineering Runners up, Bridge Shields etc. – 6 Nos.  In RVNL - 7 Nos. of Shields (including Most Innovative Project) - Certificate of Merit – 4 Nos. - Group Awards and certificates – 7 Nos.  Planning and DPR of 66 Kms of Metro Projects.  Execution of two Metro Corridors- Joka – Majerhat & Noapara – Dakshineswar.  Timely Completion of 3 workshops in time-DLCF/Dankuni, DMU Factory/Haldia, Electric Loco factory/Dankuni and handed over.  More than 12 Nos. of appreciation letters, latest by CMD/RVNL – “I am happy to note that this has won appreciation from various agencies and sections of the society including State Government, General public and media. This commendable work has served to enhance the image of RVNL as a technically competent organization”. 1 of 3
  • 3.  Have got vast experience of leading Multi-disciplinary team and execution of works in Urban Environment.  CSR Projects – very actively involved in last 5 years.  Having the qualities like: Sincerity, Integrity, Experience of leading Multi disciplinary team in urban environment, Confidence, Passion and keen to implement the project.  APRs from 2001-02 to 2015-16 :- All Outstanding Few quotes recorded in APR 2006-07 :- “Entrust an assignment to this officer and before you settle down, he is ready with dazzling results. He is an asset amongst assets”. 2011-12 :– “His remarkable contribution in implementation of metro projects. He is highly motivated and upright officer”. 2010-11 :- “He is a work alcoholic person to shoulder any responsibility assigned to him. He believes in perfection and drive pride and satisfaction by achieving the goals”. 2012–13 :– “He is one of the most efficient, brilliant, hard working and highly motivated officer I’ve ever worked with. He is a good planner, outstanding Engineer and efficient Manager.” 2013-14 :- “He is an ever motivated, hard working and a dynamic officer. He is a good engineer as well as a top class manager. 2014-15 :- “He is a highly motivated, technically competent, delving oriented successful manager. He has handled the issues much beyond his level.” 2 of 3 Achievements and work experience
  • 4. 3 of 3 Achievements and work experience  More than 30 technical papers written and published.  Electric Loco Factory, Cable stayed bridge and Joka Metro projects have given maximum satisfaction in terms of challenges and achievement.  Coffee Table Books were made on completion of Projects:- Handbook cum Coffee Table Book titled Staying with Cables- A modern construction in new era is at: http://www.slideshare.net/slideshow/embed_code/key/2sfp4L bZIXl1so Coffee Table Book titled Electric Loco Assembly and Ancillary unit of CLW is at: http://www.slideshare.net/slideshow/embed_code/key/2H52 UCfDjzCJ0O Coffee Table Book titled Diesel Multiple Unit Factory Haldia, South Eastern Railway is at: http://www.slideshare.net/slideshow/embed_code/key/3FiRjJ OFYf4UnO Coffee Table Book titled Diesel Loco Component Factory, Dankuni, South Eastern Railway is at: http://www.slideshare.net/slideshow/embed_code/key/dwXh 0Ni6DgpYK9
  • 5. Strengths and Weaknesses  Have all kinds of experiences in Railway and Metro construction works.  Having huge experience and successful implementation of Projects in West Bengal (Eastern Part of the countary).  Have got experience in Commissioning of Railway Line, various yard remodeling works, Major Bridges etc.  Have got experience in Track Layout, Track Laying & Maintenance procedure.  Experience in Contract Management.  Experience of working as a team in Construction/Open line of Railways and RVNL. Able to interface with all departments to implement the project .  Huge experience of working in Urban Environment and Multi disciplinary Projects in successful manner.  Experience of getting CTE’s inspection done and all the paras got concluded in short period.  Take bold and timely decisions and aggressive approach for implementation of projects. Work only for implementation of Projects.
  • 6. How can I contribute  Having my own vast experience and knowledge of various aspects of construction and Railway working along with successful co-ordination with the State Government & various utility owning agencies, I can help in implementation of various kinds of projects.  Execute the project in targeted time schedule and estimated cost based on the experience of completed projects (three nos of workshops) and two on going Metro projects. Develop the system and procedure for design & timely working.  Develop the procedure and set up the quality control system and proper documentation of quality control system.  Developing internal vigilance mechanism for adopting better quality control system.  To implement the project in a very safe manner based on the experience and of execution of the work in very busy & congested roads of Kolkata  To plan the property development at suitable location along the alignment.  To plan and develop training facilities at needed location.  Design of structures to optimize faster construction, space requirement, improved passenger dispersal system, develop area having proper business potential, Kiosks, advertisement etc.  Can handle and lead multidisciplinary team in time to come as proven in past.
  • 7. Performance as per ACRs at a glance S.No Year Achievement Special Remarks Recorded in ACRs Rating 1 2001-02 All targets achieved. All time records for rehabilitation of bridges and expenditure was achieved by Eastern Railway. All SRSF bridge works were finalized, planned. - Outstanding 2 2002-03 All time records for Track Renewal was achieved, Engineering Efficiency Runners Cup and Certificate of Merit (Individual Award & Certificate of Merit – GM Award) was received. He always tried to improve upon the performance to excel in his standard of work and he is very fast in implementation. Outstanding 3 2003-04 Got the overall Engineering Efficiency Shield for the first time in the history of Sealdah Division. Due to his committed and hard working to achieve targets performance of Engineering Department was excellent in all field. Outstanding 4 2004-05 Received Track Maintenance Shield and overall Runners Cup. He is a very hard working officer and takes keen initiative and prompt actions for compliance of instructions and has been rated as the best Sr. DEN of the Railway. Outstanding 5 2005-06 Received overall Engineering Efficiency Shield (second time in history of Sealdah Division) and Track Maintenance Shield. Received Railway Minister’s Award for Best Project of the year for Advance Management Programme for a Project on Sealdah Division. He is a sincere and hard working officer and has good skill for monitoring of works and use of computers and presentations. Outstanding 6 2006-07 Received Best Construction District Shield for the first time in Howrah-II District. Entrust an assignment to this officer, - and before you settle down, he is ready with dazzling results. He is an asset amongst assets. Outstanding 7 2007-08 Received Best Construction District Shield – for the Second time in Howrah-II District. He plans his work in a very systematic and methodical manner to complete them in time. Outstanding
  • 8. 8 2008-09 Received Service Medal and Hon’ble MR’s Award. He is very intelligent, sincere and conscientious officer. I consider him an asset to the Organization. Outstanding 9 2009-10 All targets achieved Very intelligent, capable and hard working officer, is trustworthy and is an asset for the organization. Outstanding 10 2010-11 Received Certificate of Merit from CRB/Railway Board during RVNL’s Annual Day Function in April 2011 He believes in performance and derives pride and satisfaction by achieving the goals. Outstanding 11 2011-12 Received Project Shields for Dankuni Factory and for Joka Metro work, during RVNL’s Annual Day Function in April 2012 He is an extremely bright highly motivated and upright officer. Outstanding . 12 2012-13 Received the Project Shield for DMU Factory at Haldia and also for Joka-Majerhat Metro Project. He is one of the most efficient, brilliant, hardworking and highly motivated officer I have ever worked with. He is a good planner, outstanding engineer and efficient manager. Outstanding 13 2013-14 Received the best workshop shield for Electric Loco Factory at Dankuni He is sharp in analyzing the issues and addresses them with speed & accuracy. His compliance to instructions are not only faster than expected, he anticipates well in advance the issues which are likely to arise. He has great potential to shoulder higher responsibility. He is an ever motivated, hard working and a dynamic officer. He is a good engineer as well as a top class manager. Outstanding 14 2014-15 1. Certification of Merit for Signing MOU and developing a new model for execution of a project from State Govt. 2. Certificate of Merit and a group award for Electric Loco Factory, Dankuni. 3. Received the Best Innovative Project Shield for Barddhaman Cable Stayed Bridge. He is a highly motivated, technically competent, result oriented successful manager. He has handed the issues much beyond his level. Outstanding 15 2015-16 Received the Best Special Structure Completed Shield for Barddhaman Cable Stayed Bridge. He is a man of extra-ordinary caliber who is always willing to take up challenging time bound delivery tasks which are technically and managerially difficult and environment is not conducive. Outstanding
  • 9. Morning starts with sharing self designed quote images and quote to more than 1000 persons… Active in social media and stay positive ..
  • 10. Morning starts with… and it brings smile and happiness…..
  • 11. Gets a lot of pleasure in…
  • 12. Unfortunately either their parents are no more or they have abandoned them.. Spending time and having dinner with these sweet children at Oxford Mission..
  • 14. Release of CTBs Coffee table book for Electric Loco Factory Dankuni is at: www.slideshare.net/slideshow/embed_code/key/2H52UCfDjzCJ0 O Coffee table book for Diesel Component Factory, Dankuni is at: https://www.slideshare.net/slideshow/embed_code/key/dwXh0Ni6 DgpYK9 Coffee table book for DMU Factory, Haldia is at: https://www.slideshare.net/slideshow/embed_code/key/3FiRjJOF Yf4UnO Handbook cum Coffee Table Book titled "Staying with Cables- A modern construction in new era” is at: www.slideshare.net/slideshow/embed_code/key/2sfp4LbZIXl1so
  • 15. A lecture on Fast Track Project at IRICEN Fast track project at IRICEN, the presentation is at: http://www.slideshare.net/ slideshow/embed_code/409 63256 Innovative solution for crossing larger spaces like Railway Yard - A case study on Barddhaman Cable Stayed ROB
  • 16. 5th Annual Metro Rail India Summit held at SHANGRI-LA, New Delhi on 11.03.2016 is at: www.slideshare.net/rajesh83196/5th-metro-rail-summit- at-shangri-la-cp-new-delhi-on-11032016 IPWE Seminar 2016- The paper presented was declared as the best technical paper and will get a certificate from MR and ME in January 2017, detailed presentation, it is at slide share at: www.slideshare.net/slideshow/embed_code/key/nIurFSvRWy
  • 17. A lecture on Fast Track Project at IRICEN Fast track project at IRICEN, the presentation is at: http://www.slideshare.net/slideshow/embed_cod e/40963256
  • 18. 5th Metro Rail Summit2016 5th Annual Metro Rail India Summit held at SHANGRI-LA, New Delhi on 11.03.2016 is at: www.slideshare.net/rajesh83196/5th-metro-rail-summit- at-shangri-la-cp-new-delhi-on-11032016
  • 20. IPWE Seminar 2016- The paper presented was declared as the best technical paper and will get a certificate from MR and ME in January 2017, detailed presentation, it is at slide share at: www.slideshare.net/slideshow/embed_co de/key/nIurFSvRWyIDjG Total 30 Technical Papers written and presented in different forums
  • 21. Diesel Loco Component Factory – conceived, implemented, handed over, final bill paid, completion report drawn. , , , II
  • 22. , I , .. II Electric locomotive Factory – conceived, implemented, handed over, final bill drawn.
  • 23. Haldia DMU Factory – conceived, implemented, handed over, final bill paid, completion report , I , II
  • 24. 4 Lane Cable Stayed ROB, Barddhaman , , .. II