SlideShare a Scribd company logo
BUILDING YOUR 
BUSINESS CASE 
for P2P AUTOMATION 
Hi, thank you for joining us! We will begin shortly. In the meantime, please keep in 
mind: 
• We want this to be an interactive webinar, enter your questions and comments 
in the chat or Q&A box 
• Slides and recording will be sent out afterwards
AGENDA 
• A Business Case – But Why? 
• Business Case Must Haves 
• Before You Dive In 
• Be Sure to Include 
• You’re Not Done! 
• Final Thoughts 
• About Tradeshift 
Copyright © Casher Associates, Inc. 2013-2014
BEFORE WE BEGIN… 
Jon Casher 
Serial Entrepreneur 
• Founded Casher Associates in 1976 to design and 
develop custom financial systems and back office 
automation 
• Co-founded CM Associates, provider of financial 
Copyright © Casher Associates, Inc. 2013-2014 
industry software products, in 1985 
• Co-founded RECAP, an A/P Audit firm, in 1988 
Current Focus – Industry Expert & Consultant: 
• Finance, AP, AR and Procure-to-Pay organizations 
• Providers of AP, AR and P2P automation products 
and services 
• Training, Certification
BEFORE WE BEGIN… 
Poll Question 
Have you ever done a major project within your department? 
1. Never tried 
2. Tried but never got started 
3. Started but not completed 
4. Started and completed 
5. Something else… 
Copyright © Casher Associates, Inc. 2013-2014
BEFORE WE BEGIN… 
Poll Question 
Have you ever put together a business case? 
1. Never tried 
2. Tried but never got completed one 
3. Yes but could not get it approved 
4. Yes, got it approved but not implemented 
5. Yes, got it approved and implemented 
Copyright © Casher Associates, Inc. 2013-2014
A BUSINESS CASE – 
BUT WHY?
A BUSINESS CASE – BUT WHY? 
Advice from an expert: 
“If you don’t know where you’re going, you’ll 
probably end up somewhere else.” 
Attributed to Yogi Berra 
Copyright © Casher Associates, Inc. 2013-2014
A BUSINESS CASE – BUT WHY? 
Barriers to Automation 
Top Reason 
• No Business Case or Justification Prepared 
Other Reasons 
• No Project Sponsor 
• Insufficient Resources – People, Money, Technology 
• Excessive Implementation Time 
Excuses 
• Can’t Decide What to Do 
• Difficulty Selecting a Solution Provider 
• Reluctance to Change 
• Risk Aversion 
Copyright © Casher Associates, Inc. 2013-2014
A BUSINESS CASE – BUT WHY? 
Some practical reasons… 
Helps you: 
• Overcome the barriers to automation 
• Focus on what needs to be done 
• Prioritize 
• Justify what should be done 
Makes it easier to get approval to proceed 
Surveys show the average and median time from identifying the 
need to getting approval is 9-11 months regardless of industry or 
company size 
Copyright © Casher Associates, Inc. 2013-2014
BUSINESS CASE MUST 
HAVES
BUSINESS CASE MUST HAVES 
Copyright © Casher Associates, Inc. 2013-2014 
Sample Outline 
1. An Executive Summary 
2. Background of the Case: 
• Current Situation 
• Description of the Problem 
3. Objective 
4. Alternatives 
5. Proposed Solutions: 
• Benefits, Tangible 
• Benefits, Intangible 
• Costs, one-time 
• Costs, Ongoing 
6. Assumptions & Constraints 
7. Dependencies & 
Interdependencies 
8. Return on Investment & 
Payback 
9. Risks 
10. Implementation Plan: 
• Resources 
• Schedule 
• Milestones 
• Deliverables
BEFORE YOU DIVE IN
BEFORE YOU DIVE IN 
1. Assemble a Business Case Team 
• Team Leader 
• People from departments/organizations who will need 
to be on the implementation team 
• People from departments/organizations most impacted 
• Solution provider personnel 
Copyright © Casher Associates, Inc. 2013-2014
BEFORE YOU DIVE IN 
2. Prepare a Business Case Project Plan 
• Schedule 
• Deliverables 
• Milestones 
• Status Reporting 
Copyright © Casher Associates, Inc. 2013-2014
BEFORE YOU DIVE IN 
3. Understand Your Approval Process 
Parties involved in making decisions and their roles 
Parties 
Roles 
• CEO/President 
• Sponsor 
• Chief Financial Officer (CFO) 
• Champion 
• Chief Information Officer (CIO) 
• Decision Maker 
• Controller 
• Buying Influence 
• Shared Services Manager 
• Barrier 
• Accounts Payable Manager 
• Purchasing Manager 
• Other 
Copyright © Casher Associates, Inc. 2013-2014
BEFORE YOU DIVE IN 
4. Assess Where You Are 
• Identify Stakeholders 
• Determine Stakeholder Concerns and Needs 
• Understand How Your Processes Work 
• Identify and Develop Baseline Metrics 
Copyright © Casher Associates, Inc. 2013-2014
BEFORE YOU DIVE IN 
5. Identify Where You Want & Need to 
Be 
• Identify Automation Alternatives 
• Determine What Others are Doing 
• Determine Senior Management Goals 
• Develop Goals Consistent With Stakeholder and 
Senior Management 
• Select an Appropriate Automation Alternative 
Copyright © Casher Associates, Inc. 2013-2014
BEFORE YOU DIVE IN 
6. Determine How to Get There 
• Decide What to Do 
• Get Preliminary Buy In 
• Find Solution Providers 
• Issue an RFP (to a few bidders) 
• Evaluate Responses 
• Select a Vendor 
Copyright © Casher Associates, Inc. 2013-2014
BE SURE TO INCLUDE
OUTLINE 
Copyright © Casher Associates, Inc. 2013-2014 
1. An Executive Summary 
2. Background of the Case: 
• Current Situation 
• Description of the Problem 
3. Objective 
4. Alternatives 
5. Proposed Solutions: 
• Benefits, Tangible 
• Benefits, Intangible 
• Costs, one-time 
• Costs, Ongoing 
6. Assumptions & Constraints 
7. Dependencies & Interdependencies 
8. Return on Investment & Payback 
9. Risks 
10. Implementation Plan: 
• Resources 
• Schedule 
• Milestones 
• Deliverables
BE SURE TO INCLUDE 
1. Executive Summary 
• Write this section last 
• Have one topic corresponding to each 
of the subsequent sections 
• Include “headlines” and key points 
• Keep it short – no more than 3 pages 
Copyright © Casher Associates, Inc. 2013-2014
BE SURE TO INCLUDE 
Copyright © Casher Associates, Inc. 2013-2014 
2. Background 
Current Situation 
• Describe current operations, 
organization(s) and processes 
• May have been included in an 
RFP 
The Problem 
Draw on: 
• Informal surveys of staff, internal 
customers and suppliers 
• Automation you don’t have in 
place that others are using 
• Goals of senior management not 
currently being met 
• Issues identified in internal 
audits, results of process 
mapping
BE SURE TO INCLUDE 
3. Objective 
Current metrics and expected improvements to: 
Cost and Effort 
• Time to process various types of transactions 
• # of people and skills needed 
Input Quality 
• # and % of transactions requiring exception processing 
• # of rejects due to missing or inconsistent information 
Input Timeliness 
• # and % of transactions arriving at Purchasing or AP within X days 
• # and amount of discounts lost due to late arrival 
Process Quality 
• # and amount impact of errors made in Purchasing/AP 
Process Timeliness 
• Cycle time from receipt of transaction to posting 
Achieving Senior Management Goals and Objectives 
Other Goals and Objectives 
Copyright © Casher Associates, Inc. 2013-2014
BE SURE TO INCLUDE 
4. Alternatives 
• Identify and briefly describe alternatives 
that were considered 
• Provide matrix showing how alternatives 
do or do not achieve the objective or the 
individual metrics 
Copyright © Casher Associates, Inc. 2013-2014
BE SURE TO INCLUDE 
5. Proposed Solution 
Describe proposed solution using information from the selected vendor. 
Benefits – Tangible and Intangible: 
• Present metrics for the current situation and expected changes based 
on the proposed solution 
• Include information about ongoing impact on: 
- People and Processes within AP and Purchasing 
- People and Processes in Company external to AP and Purchasing 
- People and Processes of External Parties 
- AP and Purchasing Productivity 
- Cycle Time 
- Cash Flow and Working Capital 
- Controls 
- Other 
Costs: One-Time and Ongoing 
• Draw on information from the selected vendor and expected changes to current 
Copyright © Casher Associates, Inc. 2013-2014 
costs 
• Be conservative
BE SURE TO INCLUDE 
6. Assumptions and 
Constraints 
Draw on information: 
• From RFP if you did an RFP 
• From answers to questions asked of 
bidders and their references 
• From the selected vendor 
Copyright © Casher Associates, Inc. 2013-2014
BE SURE TO INCLUDE 
7. Dependencies and Interdependencies 
Draw on: 
• Your team’s experience 
• Issues raised by internal partners, customers, 
suppliers and other parties who will be impacted 
• The selected vendor’s experience 
Copyright © Casher Associates, Inc. 2013-2014
BE SURE TO INCLUDE 
8. Return on Investment and Payback 
Vendors have models to calculate the return on investment 
and payback. 
• Some may have provided such information within their 
proposals. 
Make sure the model accurately reflects your situation, cost 
structure, etc. 
Test the model by changing some of the assumptions 
Be conservative in what you present in your business case 
Copyright © Casher Associates, Inc. 2013-2014
BE SURE TO INCLUDE 
9. Risks 
Project Risks 
• Determine areas where the team may have to 
be supplemented with training and/or specific 
skills 
• Identify actions that can or will be taken to 
reduce such risks 
Solution Risks 
• Identify what might go wrong and possible 
Copyright © Casher Associates, Inc. 2013-2014 
fallback 
• Identify contingencies and/or alternatives 
• Identify financial and compliance risks
BE SURE TO INCLUDE 
10. Implementation Plan 
Resources 
People and technologies needed 
Schedule 
Include slack for unexpected issues, missing tasks, etc. 
Milestones 
Measurable meaningful milestones 
Deliverables 
Identify who is responsible and how to measure quality and completeness 
Other 
• Regular status reporting 
• Document deviations from plan, changes to scope, key actions and key 
decisions 
Copyright © Casher Associates, Inc. 2013-2014
YOU’RE NOT DONE!
YOU’RE NOT DONE! 
Get the Approval 
Validate key points and issues before putting everything in writing 
Prepare a draft Business Case Report 
Circulate to key people for comments and suggestions 
Revise as appropriate 
Prepare a short presentation 
Get appropriate signoffs 
Get going! 
Copyright © Casher Associates, Inc. 2013-2014
YOU’RE NOT DONE! 
Go Live 
You may need a temporary increase in staff 
If possible, start with a pilot and work out the kinks: 
• Look out for unexpected effects 
• Expect to make adjustments, and Allocate resources to do so 
Monitor Key Metrics and Performance Indicators 
• Track before and after to see if expectations are met 
• Measure against metrics used to build the business case 
Do a post project review of lessons learned and what to do differently next time 
Celebrate and reward success 
After a few months, survey key customers and business partners and share results 
Copyright © Casher Associates, Inc. 2013-2014
YOU’RE NOT DONE! 
Final Thoughts 
Decide what’s best and appropriate for your Company, Purchasing and AP departments 
Understand your company’s approval process 
Understand the capabilities and limitations of your existing systems and people 
Beware of icebergs and expect the unexpected 
Be creative, flexible, adaptable and willing to change 
Avoid overpromising 
Set priorities, realistic expectations and measurable goals 
Use people and technology wisely 
Take appropriate risks 
Copyright © Casher Associates, Inc. 2013-2014
ABOUT TRADESHIFT
ABOUT TRADESHIFT 
Amazing things happen when businesses connect 
Tradeshift brings all companies, big and small, together to 
transact, connect and collaborate with each other. 
• Enterprises – Work more easily and productively with their 
entire supply chain, anywhere in the world. 
• Suppliers - Free electronic invoicing, faster payments and 
predictable cash flow is only the beginning. 
Over 500,000 suppliers in over 100 countries 
5 million suppliers connected through platform partners such as 
Intuit 
Fastest growing B2B platform in the world today with more than 
2000 suppliers joining every week
WHO WE WORK WITH 
SBS 
Some large suppliers on the Tradeshift Network:
TRADESHIFT’S OPEN PLATFORM 
APPROACH 
CloudScan® 
(Paper) 
Supplier 
Management 
TRADESHIFT PLATFORM 
Document Transmission, Statuses, Messages, Integration, Security, API 
Supplier 
Buyer 
Order 
Management 
Electronic 
Invoicing 
Business 
Firewall 
Collaborative 
Workflow 
Financial 
Solutions 
Build Your Own 
App 
Ability to expand functionality as needed
3 PRONGS OF SAVINGS 
1. AP Automation 
• Eliminate paper invoices, reduce invoice 
approval cycle time, and improve visibility 
and overall AP processes Business 
Case 
per 
$1B 
of 
Spend 
$600K 
$3.5M+ 
2. Early Payment Discounts 
Discount program management and dynamic 
discounting, savings of $3-5M per billion of 
spend. 
3. Power of the Platform $3.6M 
Rapid innovation through apps: Legal 
compliance in mandate countries, supplier 
information & risk management, tax 
compliance, expense management, billing, 
quick quotes, contract compliance, more… 
Real-time supply chain information: 
Minimizes currency risk, eliminates quarterly 
AP 
Automation 
cost data lag, enables better cash plan and 
business plan design. 
Total 
Business 
Case 
Additional Benefits 
Apps 
Early Pay 
Discounts $7.1M+ 
$3M
Paper, PDF, Email, Fax 
EDI, XML, e-invoice, PO Flip, Portal
Building Your Business Case for P2P Automation
Building Your Business Case for P2P Automation
CONTACT INFO 
Copyright © Casher Associates, Inc. 2013-2014 
Jon Casher 
www.casherassociates.com 
jcasher@casherassociates.com 
+1.617.527.3927 
Vishal Patel 
Tradeshift.com 
vpa@tradeshift.com 
+1.781.492.2525 
@VishalP_
BUILDING YOUR 
BUSINESS CASE for P2P 
TRANSFORMATION 
Thanks for joining us! 
• Visit tradeshift.com/resources 
• Slides and recording will be sent out afterwards

More Related Content

PDF
Ten Tips to Ensue that Your Suppliers are Real
PPTX
Perfect Your Touchless Invoicing
PPT
P2P in 2020 - The Push for Supplier Self-Service
PPTX
Tradeshift, Hackett Group & sharedserviceslink - P2P Webinar
PPTX
Top P2P Trends in 2016
PPTX
5 ways to accelerate supplier onboarding
PPTX
Tradeshift Corporate Presentation
PPTX
Fact or Fiction – You Can Manage All Your Supplier Information, Transactions ...
Ten Tips to Ensue that Your Suppliers are Real
Perfect Your Touchless Invoicing
P2P in 2020 - The Push for Supplier Self-Service
Tradeshift, Hackett Group & sharedserviceslink - P2P Webinar
Top P2P Trends in 2016
5 ways to accelerate supplier onboarding
Tradeshift Corporate Presentation
Fact or Fiction – You Can Manage All Your Supplier Information, Transactions ...

What's hot (20)

PPTX
Overlooked issues in procure to-pay may 28-webinar vpa_v2
PPTX
Tradeshift Supplier Management - Live Demo
PDF
Driving a Supplier Responsibility Agenda that Your CEO Would be Proud Of
PPTX
The Art of Supplier Onboarding
PPTX
Boost your bottom line and supply chain health
PPTX
How Finance Leaders are Transforming P2P into a High Value Process
PPTX
The Power of Complete AP Automation Webinar
PPTX
Tradeshift CFO in the cloud
PPTX
What Your Suppliers Really Think About You
PPTX
Fixing the Broken Promise of eProcurement
PPTX
Collaborating to Achieve Seamless Source to Pay in 2017
PDF
Transform 2014: Trends in Procure to Pay
PDF
Report: Improving the Procure-to-Pay Process - A Transformational Approach
PPTX
5 Proven Strategies for Working Capital
PPTX
How to Simplify your AP Automation: Live Demo
PPTX
Tradeshift Webinar: Fully Compliant E-Invoicing Solution to Latin America
PDF
Procure-to-Pay Process Framework
PPTX
Supplier Information and Lifecycle Management
PPTX
Accounts Payable Trends 2017: The Process and Technology of AP Invoice | Octo...
PPTX
Hackett tradeshift webinar final
Overlooked issues in procure to-pay may 28-webinar vpa_v2
Tradeshift Supplier Management - Live Demo
Driving a Supplier Responsibility Agenda that Your CEO Would be Proud Of
The Art of Supplier Onboarding
Boost your bottom line and supply chain health
How Finance Leaders are Transforming P2P into a High Value Process
The Power of Complete AP Automation Webinar
Tradeshift CFO in the cloud
What Your Suppliers Really Think About You
Fixing the Broken Promise of eProcurement
Collaborating to Achieve Seamless Source to Pay in 2017
Transform 2014: Trends in Procure to Pay
Report: Improving the Procure-to-Pay Process - A Transformational Approach
5 Proven Strategies for Working Capital
How to Simplify your AP Automation: Live Demo
Tradeshift Webinar: Fully Compliant E-Invoicing Solution to Latin America
Procure-to-Pay Process Framework
Supplier Information and Lifecycle Management
Accounts Payable Trends 2017: The Process and Technology of AP Invoice | Octo...
Hackett tradeshift webinar final
Ad

Viewers also liked (8)

PPT
The Business Case for AP Automation
PPTX
AP – A Catalyst for P2P Transformation
PDF
GEP Procure-to-Pay (P2P)
 
PDF
Infographic: Dynamic Discounting
PDF
Did you know? | Procure-to-Pay Statistics You Should Know
DOC
Procure to Pay P2P Training
PDF
3 Things Every Sales Team Needs to Be Thinking About in 2017
PDF
How to Become a Thought Leader in Your Niche
The Business Case for AP Automation
AP – A Catalyst for P2P Transformation
GEP Procure-to-Pay (P2P)
 
Infographic: Dynamic Discounting
Did you know? | Procure-to-Pay Statistics You Should Know
Procure to Pay P2P Training
3 Things Every Sales Team Needs to Be Thinking About in 2017
How to Become a Thought Leader in Your Niche
Ad

Similar to Building Your Business Case for P2P Automation (20)

PDF
Building a P2P Transformation Case
PPTX
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...
PDF
Open text tag_bpm 04-12 v3
PDF
Business case development workshop october 2019
PPTX
Success with business cases
PPTX
Project Management: Business Case
PPT
Cash Perform Key Offerings Jan 2012
PPTX
Successful web projects writing a business case - jan 2012
PDF
Business Analysis.pdf
PDF
Webinar program business case template
PPTX
How to Build a Business Case for ERP Replatforming
PDF
[Webinar] Stop Thinking About It and Automate Your AP Processes
PPTX
How to build a business case?
PDF
Social Media Business Case
PDF
CRM Business Case Template
PPT
Better Business Cases - APMG
PDF
20 things you should know
PPTX
Making a business case - the 10 essential sections that you need to cover
PPT
Project Management For The Curious
PDF
MindMap - Developing a Business Case [Please Download for better view]
Building a P2P Transformation Case
Building a Powerful Business Case That Will Resonate With All Key Stakeholder...
Open text tag_bpm 04-12 v3
Business case development workshop october 2019
Success with business cases
Project Management: Business Case
Cash Perform Key Offerings Jan 2012
Successful web projects writing a business case - jan 2012
Business Analysis.pdf
Webinar program business case template
How to Build a Business Case for ERP Replatforming
[Webinar] Stop Thinking About It and Automate Your AP Processes
How to build a business case?
Social Media Business Case
CRM Business Case Template
Better Business Cases - APMG
20 things you should know
Making a business case - the 10 essential sections that you need to cover
Project Management For The Curious
MindMap - Developing a Business Case [Please Download for better view]

More from Tradeshift (18)

PDF
Discover Tradeshift Pay
PDF
What is an invoice? A Quick Jaunt through the history of invoices.
PPTX
Collaborating to Achieve Seamless Source to Pay in 2017
PPTX
A Procurement Leaders Guide to Enabling Agility
PPTX
What Procurement Organizations Need Most - Flexibility & Agility
PPTX
Christian Lanng Delivers Keynote at ProcureCon Indirect West
PPTX
My Top 10 Procurement Takeaways
PDF
ProcureCon Indirect East 2016: Tradeshift CEO Keynote
PPTX
How Santa procures all those toys
PDF
Executive Forum: Driving the Digital Supply Chain Agenda
PPTX
The future of procurement
PPTX
The rise of the as-a-service economy
PPTX
From e invoicing to supply chain collaboration- the benefits of a platform ap...
PDF
A Proactive Approach to Supplier Onboarding
PPTX
The death of big business (as we know it)
PPTX
Archer Daniels Midland: The Journey from 100% Paper to 100% Digital
PPTX
AP Fiscal Year-End Close: A 10-Step Checklist
PPTX
DHL Takes E-invoicing Global
Discover Tradeshift Pay
What is an invoice? A Quick Jaunt through the history of invoices.
Collaborating to Achieve Seamless Source to Pay in 2017
A Procurement Leaders Guide to Enabling Agility
What Procurement Organizations Need Most - Flexibility & Agility
Christian Lanng Delivers Keynote at ProcureCon Indirect West
My Top 10 Procurement Takeaways
ProcureCon Indirect East 2016: Tradeshift CEO Keynote
How Santa procures all those toys
Executive Forum: Driving the Digital Supply Chain Agenda
The future of procurement
The rise of the as-a-service economy
From e invoicing to supply chain collaboration- the benefits of a platform ap...
A Proactive Approach to Supplier Onboarding
The death of big business (as we know it)
Archer Daniels Midland: The Journey from 100% Paper to 100% Digital
AP Fiscal Year-End Close: A 10-Step Checklist
DHL Takes E-invoicing Global

Recently uploaded (20)

PDF
Paper PDF World Game (s) Great Redesign.pdf
PDF
FINAL CALL-6th International Conference on Networks & IOT (NeTIOT 2025)
PDF
Vigrab.top – Online Tool for Downloading and Converting Social Media Videos a...
PDF
Sims 4 Historia para lo sims 4 para jugar
PPTX
522797556-Unit-2-Temperature-measurement-1-1.pptx
PDF
WebRTC in SignalWire - troubleshooting media negotiation
PDF
An introduction to the IFRS (ISSB) Stndards.pdf
PDF
RPKI Status Update, presented by Makito Lay at IDNOG 10
PPTX
presentation_pfe-universite-molay-seltan.pptx
PPTX
INTERNET------BASICS-------UPDATED PPT PRESENTATION
PDF
Cloud-Scale Log Monitoring _ Datadog.pdf
PDF
💰 𝐔𝐊𝐓𝐈 𝐊𝐄𝐌𝐄𝐍𝐀𝐍𝐆𝐀𝐍 𝐊𝐈𝐏𝐄𝐑𝟒𝐃 𝐇𝐀𝐑𝐈 𝐈𝐍𝐈 𝟐𝟎𝟐𝟓 💰
PPTX
Power Point - Lesson 3_2.pptx grad school presentation
PDF
How to Ensure Data Integrity During Shopify Migration_ Best Practices for Sec...
PDF
Introduction to the IoT system, how the IoT system works
PPTX
Job_Card_System_Styled_lorem_ipsum_.pptx
PPTX
Funds Management Learning Material for Beg
PDF
Testing WebRTC applications at scale.pdf
PDF
Slides PDF The World Game (s) Eco Economic Epochs.pdf
PDF
Unit-1 introduction to cyber security discuss about how to secure a system
Paper PDF World Game (s) Great Redesign.pdf
FINAL CALL-6th International Conference on Networks & IOT (NeTIOT 2025)
Vigrab.top – Online Tool for Downloading and Converting Social Media Videos a...
Sims 4 Historia para lo sims 4 para jugar
522797556-Unit-2-Temperature-measurement-1-1.pptx
WebRTC in SignalWire - troubleshooting media negotiation
An introduction to the IFRS (ISSB) Stndards.pdf
RPKI Status Update, presented by Makito Lay at IDNOG 10
presentation_pfe-universite-molay-seltan.pptx
INTERNET------BASICS-------UPDATED PPT PRESENTATION
Cloud-Scale Log Monitoring _ Datadog.pdf
💰 𝐔𝐊𝐓𝐈 𝐊𝐄𝐌𝐄𝐍𝐀𝐍𝐆𝐀𝐍 𝐊𝐈𝐏𝐄𝐑𝟒𝐃 𝐇𝐀𝐑𝐈 𝐈𝐍𝐈 𝟐𝟎𝟐𝟓 💰
Power Point - Lesson 3_2.pptx grad school presentation
How to Ensure Data Integrity During Shopify Migration_ Best Practices for Sec...
Introduction to the IoT system, how the IoT system works
Job_Card_System_Styled_lorem_ipsum_.pptx
Funds Management Learning Material for Beg
Testing WebRTC applications at scale.pdf
Slides PDF The World Game (s) Eco Economic Epochs.pdf
Unit-1 introduction to cyber security discuss about how to secure a system

Building Your Business Case for P2P Automation

  • 1. BUILDING YOUR BUSINESS CASE for P2P AUTOMATION Hi, thank you for joining us! We will begin shortly. In the meantime, please keep in mind: • We want this to be an interactive webinar, enter your questions and comments in the chat or Q&A box • Slides and recording will be sent out afterwards
  • 2. AGENDA • A Business Case – But Why? • Business Case Must Haves • Before You Dive In • Be Sure to Include • You’re Not Done! • Final Thoughts • About Tradeshift Copyright © Casher Associates, Inc. 2013-2014
  • 3. BEFORE WE BEGIN… Jon Casher Serial Entrepreneur • Founded Casher Associates in 1976 to design and develop custom financial systems and back office automation • Co-founded CM Associates, provider of financial Copyright © Casher Associates, Inc. 2013-2014 industry software products, in 1985 • Co-founded RECAP, an A/P Audit firm, in 1988 Current Focus – Industry Expert & Consultant: • Finance, AP, AR and Procure-to-Pay organizations • Providers of AP, AR and P2P automation products and services • Training, Certification
  • 4. BEFORE WE BEGIN… Poll Question Have you ever done a major project within your department? 1. Never tried 2. Tried but never got started 3. Started but not completed 4. Started and completed 5. Something else… Copyright © Casher Associates, Inc. 2013-2014
  • 5. BEFORE WE BEGIN… Poll Question Have you ever put together a business case? 1. Never tried 2. Tried but never got completed one 3. Yes but could not get it approved 4. Yes, got it approved but not implemented 5. Yes, got it approved and implemented Copyright © Casher Associates, Inc. 2013-2014
  • 6. A BUSINESS CASE – BUT WHY?
  • 7. A BUSINESS CASE – BUT WHY? Advice from an expert: “If you don’t know where you’re going, you’ll probably end up somewhere else.” Attributed to Yogi Berra Copyright © Casher Associates, Inc. 2013-2014
  • 8. A BUSINESS CASE – BUT WHY? Barriers to Automation Top Reason • No Business Case or Justification Prepared Other Reasons • No Project Sponsor • Insufficient Resources – People, Money, Technology • Excessive Implementation Time Excuses • Can’t Decide What to Do • Difficulty Selecting a Solution Provider • Reluctance to Change • Risk Aversion Copyright © Casher Associates, Inc. 2013-2014
  • 9. A BUSINESS CASE – BUT WHY? Some practical reasons… Helps you: • Overcome the barriers to automation • Focus on what needs to be done • Prioritize • Justify what should be done Makes it easier to get approval to proceed Surveys show the average and median time from identifying the need to getting approval is 9-11 months regardless of industry or company size Copyright © Casher Associates, Inc. 2013-2014
  • 11. BUSINESS CASE MUST HAVES Copyright © Casher Associates, Inc. 2013-2014 Sample Outline 1. An Executive Summary 2. Background of the Case: • Current Situation • Description of the Problem 3. Objective 4. Alternatives 5. Proposed Solutions: • Benefits, Tangible • Benefits, Intangible • Costs, one-time • Costs, Ongoing 6. Assumptions & Constraints 7. Dependencies & Interdependencies 8. Return on Investment & Payback 9. Risks 10. Implementation Plan: • Resources • Schedule • Milestones • Deliverables
  • 13. BEFORE YOU DIVE IN 1. Assemble a Business Case Team • Team Leader • People from departments/organizations who will need to be on the implementation team • People from departments/organizations most impacted • Solution provider personnel Copyright © Casher Associates, Inc. 2013-2014
  • 14. BEFORE YOU DIVE IN 2. Prepare a Business Case Project Plan • Schedule • Deliverables • Milestones • Status Reporting Copyright © Casher Associates, Inc. 2013-2014
  • 15. BEFORE YOU DIVE IN 3. Understand Your Approval Process Parties involved in making decisions and their roles Parties Roles • CEO/President • Sponsor • Chief Financial Officer (CFO) • Champion • Chief Information Officer (CIO) • Decision Maker • Controller • Buying Influence • Shared Services Manager • Barrier • Accounts Payable Manager • Purchasing Manager • Other Copyright © Casher Associates, Inc. 2013-2014
  • 16. BEFORE YOU DIVE IN 4. Assess Where You Are • Identify Stakeholders • Determine Stakeholder Concerns and Needs • Understand How Your Processes Work • Identify and Develop Baseline Metrics Copyright © Casher Associates, Inc. 2013-2014
  • 17. BEFORE YOU DIVE IN 5. Identify Where You Want & Need to Be • Identify Automation Alternatives • Determine What Others are Doing • Determine Senior Management Goals • Develop Goals Consistent With Stakeholder and Senior Management • Select an Appropriate Automation Alternative Copyright © Casher Associates, Inc. 2013-2014
  • 18. BEFORE YOU DIVE IN 6. Determine How to Get There • Decide What to Do • Get Preliminary Buy In • Find Solution Providers • Issue an RFP (to a few bidders) • Evaluate Responses • Select a Vendor Copyright © Casher Associates, Inc. 2013-2014
  • 19. BE SURE TO INCLUDE
  • 20. OUTLINE Copyright © Casher Associates, Inc. 2013-2014 1. An Executive Summary 2. Background of the Case: • Current Situation • Description of the Problem 3. Objective 4. Alternatives 5. Proposed Solutions: • Benefits, Tangible • Benefits, Intangible • Costs, one-time • Costs, Ongoing 6. Assumptions & Constraints 7. Dependencies & Interdependencies 8. Return on Investment & Payback 9. Risks 10. Implementation Plan: • Resources • Schedule • Milestones • Deliverables
  • 21. BE SURE TO INCLUDE 1. Executive Summary • Write this section last • Have one topic corresponding to each of the subsequent sections • Include “headlines” and key points • Keep it short – no more than 3 pages Copyright © Casher Associates, Inc. 2013-2014
  • 22. BE SURE TO INCLUDE Copyright © Casher Associates, Inc. 2013-2014 2. Background Current Situation • Describe current operations, organization(s) and processes • May have been included in an RFP The Problem Draw on: • Informal surveys of staff, internal customers and suppliers • Automation you don’t have in place that others are using • Goals of senior management not currently being met • Issues identified in internal audits, results of process mapping
  • 23. BE SURE TO INCLUDE 3. Objective Current metrics and expected improvements to: Cost and Effort • Time to process various types of transactions • # of people and skills needed Input Quality • # and % of transactions requiring exception processing • # of rejects due to missing or inconsistent information Input Timeliness • # and % of transactions arriving at Purchasing or AP within X days • # and amount of discounts lost due to late arrival Process Quality • # and amount impact of errors made in Purchasing/AP Process Timeliness • Cycle time from receipt of transaction to posting Achieving Senior Management Goals and Objectives Other Goals and Objectives Copyright © Casher Associates, Inc. 2013-2014
  • 24. BE SURE TO INCLUDE 4. Alternatives • Identify and briefly describe alternatives that were considered • Provide matrix showing how alternatives do or do not achieve the objective or the individual metrics Copyright © Casher Associates, Inc. 2013-2014
  • 25. BE SURE TO INCLUDE 5. Proposed Solution Describe proposed solution using information from the selected vendor. Benefits – Tangible and Intangible: • Present metrics for the current situation and expected changes based on the proposed solution • Include information about ongoing impact on: - People and Processes within AP and Purchasing - People and Processes in Company external to AP and Purchasing - People and Processes of External Parties - AP and Purchasing Productivity - Cycle Time - Cash Flow and Working Capital - Controls - Other Costs: One-Time and Ongoing • Draw on information from the selected vendor and expected changes to current Copyright © Casher Associates, Inc. 2013-2014 costs • Be conservative
  • 26. BE SURE TO INCLUDE 6. Assumptions and Constraints Draw on information: • From RFP if you did an RFP • From answers to questions asked of bidders and their references • From the selected vendor Copyright © Casher Associates, Inc. 2013-2014
  • 27. BE SURE TO INCLUDE 7. Dependencies and Interdependencies Draw on: • Your team’s experience • Issues raised by internal partners, customers, suppliers and other parties who will be impacted • The selected vendor’s experience Copyright © Casher Associates, Inc. 2013-2014
  • 28. BE SURE TO INCLUDE 8. Return on Investment and Payback Vendors have models to calculate the return on investment and payback. • Some may have provided such information within their proposals. Make sure the model accurately reflects your situation, cost structure, etc. Test the model by changing some of the assumptions Be conservative in what you present in your business case Copyright © Casher Associates, Inc. 2013-2014
  • 29. BE SURE TO INCLUDE 9. Risks Project Risks • Determine areas where the team may have to be supplemented with training and/or specific skills • Identify actions that can or will be taken to reduce such risks Solution Risks • Identify what might go wrong and possible Copyright © Casher Associates, Inc. 2013-2014 fallback • Identify contingencies and/or alternatives • Identify financial and compliance risks
  • 30. BE SURE TO INCLUDE 10. Implementation Plan Resources People and technologies needed Schedule Include slack for unexpected issues, missing tasks, etc. Milestones Measurable meaningful milestones Deliverables Identify who is responsible and how to measure quality and completeness Other • Regular status reporting • Document deviations from plan, changes to scope, key actions and key decisions Copyright © Casher Associates, Inc. 2013-2014
  • 32. YOU’RE NOT DONE! Get the Approval Validate key points and issues before putting everything in writing Prepare a draft Business Case Report Circulate to key people for comments and suggestions Revise as appropriate Prepare a short presentation Get appropriate signoffs Get going! Copyright © Casher Associates, Inc. 2013-2014
  • 33. YOU’RE NOT DONE! Go Live You may need a temporary increase in staff If possible, start with a pilot and work out the kinks: • Look out for unexpected effects • Expect to make adjustments, and Allocate resources to do so Monitor Key Metrics and Performance Indicators • Track before and after to see if expectations are met • Measure against metrics used to build the business case Do a post project review of lessons learned and what to do differently next time Celebrate and reward success After a few months, survey key customers and business partners and share results Copyright © Casher Associates, Inc. 2013-2014
  • 34. YOU’RE NOT DONE! Final Thoughts Decide what’s best and appropriate for your Company, Purchasing and AP departments Understand your company’s approval process Understand the capabilities and limitations of your existing systems and people Beware of icebergs and expect the unexpected Be creative, flexible, adaptable and willing to change Avoid overpromising Set priorities, realistic expectations and measurable goals Use people and technology wisely Take appropriate risks Copyright © Casher Associates, Inc. 2013-2014
  • 36. ABOUT TRADESHIFT Amazing things happen when businesses connect Tradeshift brings all companies, big and small, together to transact, connect and collaborate with each other. • Enterprises – Work more easily and productively with their entire supply chain, anywhere in the world. • Suppliers - Free electronic invoicing, faster payments and predictable cash flow is only the beginning. Over 500,000 suppliers in over 100 countries 5 million suppliers connected through platform partners such as Intuit Fastest growing B2B platform in the world today with more than 2000 suppliers joining every week
  • 37. WHO WE WORK WITH SBS Some large suppliers on the Tradeshift Network:
  • 38. TRADESHIFT’S OPEN PLATFORM APPROACH CloudScan® (Paper) Supplier Management TRADESHIFT PLATFORM Document Transmission, Statuses, Messages, Integration, Security, API Supplier Buyer Order Management Electronic Invoicing Business Firewall Collaborative Workflow Financial Solutions Build Your Own App Ability to expand functionality as needed
  • 39. 3 PRONGS OF SAVINGS 1. AP Automation • Eliminate paper invoices, reduce invoice approval cycle time, and improve visibility and overall AP processes Business Case per $1B of Spend $600K $3.5M+ 2. Early Payment Discounts Discount program management and dynamic discounting, savings of $3-5M per billion of spend. 3. Power of the Platform $3.6M Rapid innovation through apps: Legal compliance in mandate countries, supplier information & risk management, tax compliance, expense management, billing, quick quotes, contract compliance, more… Real-time supply chain information: Minimizes currency risk, eliminates quarterly AP Automation cost data lag, enables better cash plan and business plan design. Total Business Case Additional Benefits Apps Early Pay Discounts $7.1M+ $3M
  • 40. Paper, PDF, Email, Fax EDI, XML, e-invoice, PO Flip, Portal
  • 43. CONTACT INFO Copyright © Casher Associates, Inc. 2013-2014 Jon Casher www.casherassociates.com jcasher@casherassociates.com +1.617.527.3927 Vishal Patel Tradeshift.com vpa@tradeshift.com +1.781.492.2525 @VishalP_
  • 44. BUILDING YOUR BUSINESS CASE for P2P TRANSFORMATION Thanks for joining us! • Visit tradeshift.com/resources • Slides and recording will be sent out afterwards