Offshore Production Technology
Functional Requirements of FPSO
Systems
Marine & Offshore Technology
Official Open
Learning Outcomes
1. Determine the Evaluating Criterion for Floating
Platform Selection
2. Compare and Select the platform and build
method based on the evaluating criterion
3. Understand the decommissioning process for
offshore platforms
4. Understand the Parametric Design flowchart
Official Open
1. Determine the Evaluating Criterion for
Floating Platform Selection
- Floater system
- Newbuild or Conversion
Official Open
Influences on Processing Capability
• Vessel Motions
• Weather
• Layout
• Processing Capacity and Storage
Official Open
Vessel Motion
• Vessel motion affect the operation of process systems on
board, e.g.
– the separator
– units that operate by spraying
– rotating equipment
Official Open
Weather
• Floating installations are affected by weather
– Under extreme weather conditions, production may have
to be shut down as a safety measure
– Offloading by shuttle tanker may be interrupted by
extreme weather
Official Open
Layout
• Limited deck area on FPS will
affect layout
• Need for clear separation of
hazardous and benign systems
• Accommodation and critical
functions to be away from
hazardous locations
• Multi-deck arrangement may be
necessary for semi, SPAR or TLP
Official Open
Processing Capability and Storage
• Early FPSO process 15,000 bopd, now up to 200,000 bopd.
• Storage of processed crude on board can reach 2,000,000
barrels on a single FPSO
• The trend is towards deeper waters, larger capacities
facilitated by improved technology
Official Open
FPSO Example 1
Greater Plutonio FPSO
Official Open
Example - Greater Plutonio FPSO
Official Open
A simple subsea layout
Tieback flowline
Risers
Subsea Pipe
Official Open
Greater Plutonio FPSO
Official Open
Greater Plutonio - Topsides
• Laydown Area
• Sulphate Reduction
• Deareation
• Utilities and Water
Injection
• LP and HP Separation
• LP Compression
• HP Compression
• Gas Dehydration, Vapour
Recovery and Fuel Gas
• MP Gas Compression
• Well Fluids Reception
• Electrostatic Coalescer
and Crude Oil Metering
• Power Generation and
Main Switch Room
Official Open
Greater Plutonio FPSO
• The FPSO was built by HHI in
South Korea.
• The topsides processing
system was designed by KBR
in the UK with support from
other KBR offices, and in
conjunction with BP.
• Accommodation, control
room, helideck and lifeboats
are forward.
Official Open
Example of Block-Building Strategy
FPSO Schiehallion
Official Open
FPSO Example 2
Falcon FPSO
Official Open
Falcon FPSO
Official Open
Falcon FPSO - Layout
Show Flacon Video
Official Open
Falcon FPSO
Official Open
Falcon FPSO
Official Open
Falcon FPSO - Equipment
Official Open
2. Compare and Select the platform and
build method based on the evaluating
criterion
Official Open
Learning Activity
• Read Topic 2 of the notes “Functional
Requirements of FPSO Systems”
• In pairs/groups, complete the tutorial
assignment for determining evaluation
criterion for
– Different floating production systems
– Newbuild or Conversion method of
procurement and construction
Official Open
Platform Evaluation Matrix
Criterion Mono-hull Semi-submersible SPAR Tensioned Leg Platform
1. Water Depth Deep to Ultradeep (1000 –
3000m)
Deep to Ultradeep (1000 –
3000m)
400 – 1200m To research online…
2. Weather …. …. …. ….
3…. …. …. …. ….
4…. …. …. …. ….
5…. …. …. …. ….
6…. …. …. …. ….
1. Set evaluating criterion and carry out an evaluation of different floating production systems e.g. mono-
hull FPSO, Semi-Submersible, Spar and/or Tensioned-Leg Platforms.
You might want to use a table format to conduct evaluation.
Official Open
Newbuild vs Conversion Evaluation
1. Set evaluating criterion and carry out an evaluation between a new-build and a converted mono-hull
FPSO.
You might want to use a table format to conduct evaluation.
Criterion New-build mono-hull FPSO Converted mono-hull FPSO
1. Capital Cost
2. Lead Time to first oil …. ….
3…. …. ….
4…. …. ….
5…. …. ….
6…. …. ….
Official Open
3. Understand the decommissioning process
for offshore platforms
Official Open
Decommissioning (BOEMRE, US)
1. Project Management, Engineering and Planning;
2. Permitting and Regulatory Compliance;
3. Platform Preparation;
4. Well Plugging and Abandonment;
5. Conductor Removal;
6. Mobilization and Demobilization of Derrick Barges;
7. Platform Removal;
8. Pipeline and Power Cable Decommissioning;
9. Materials Disposal; and
10.Site Clearance.
Official Open
4. Understand the Parametric Design
flowchart
Official Open
Terpstra T., IHC Gusto Engineering; d'Hautefeuille B.B., Single Buoy
Moorings; MacMillan A. A., Det Norske Veritas; 2001, OTC 13210
FPSO Design and Conversion: A Designer's Approach, Offshore
Technology Conference Houston 2001
Official Open
Key Questions
1. Explain the two key benefits FPSO owners enjoy when choosing a new-
build FPSO rather than converting one from an existing tanker. (Pg 2-12
and 13)
2. Set evaluating criterion and carry out an evaluation of different floating
production systems.
(e.g. mono-hull FPSO, Semi-Submersible, Spar and/or Tensioned-Leg
Platforms)
Explain your recommendation if an oil field of 10 years’ is to be developed in
shallow water and mild weather? (Pg 2-3 - 6)
3. Explain the ten (10) steps of platform decommissioning.

More Related Content

PDF
0020 introduction to fpso design
PDF
FPSO SYSTEMS-1.pdf
PDF
OFFSHORE PLATFORM_1.ppt (1).pdf
PDF
212790628 fpso
PDF
Oil Production Facilities
PPTX
Subsea Separation presentation
PDF
Offshore structures
PPTX
Floting Production Storage and Offloading
0020 introduction to fpso design
FPSO SYSTEMS-1.pdf
OFFSHORE PLATFORM_1.ppt (1).pdf
212790628 fpso
Oil Production Facilities
Subsea Separation presentation
Offshore structures
Floting Production Storage and Offloading

What's hot (20)

PDF
Design and Analysis of Floating Production Systems
PPTX
WELLHEAD FOR OIL AND GAS WELL.pptx
PDF
Fpso – general overview of conversion & topside process description -abstract
PPTX
Tutorial #5 - SACS Basic
PPTX
Well Workover
PPTX
Well head and christmas tress 2019.
PDF
Offshore platform-design
PPT
C9 FPSO Layout and Turret 2004
PPT
PPTX
Tutorial #1 - SACS Basic
PPT
reservoir engineering
PPT
176589.pptx.ppt
PDF
Drilling rig components ( illustrated glossary )
PDF
3. sequances of drilling operations
PDF
Subsurface safety valves
PDF
Well completion equipment 2. landing nipples
PDF
Oil & Gas Production and Surface Facilities
PPTX
Offshore oil and gas overview
Design and Analysis of Floating Production Systems
WELLHEAD FOR OIL AND GAS WELL.pptx
Fpso – general overview of conversion & topside process description -abstract
Tutorial #5 - SACS Basic
Well Workover
Well head and christmas tress 2019.
Offshore platform-design
C9 FPSO Layout and Turret 2004
Tutorial #1 - SACS Basic
reservoir engineering
176589.pptx.ppt
Drilling rig components ( illustrated glossary )
3. sequances of drilling operations
Subsurface safety valves
Well completion equipment 2. landing nipples
Oil & Gas Production and Surface Facilities
Offshore oil and gas overview
Ad

Similar to C2. Functional Requirements of FPSO (20)

PDF
C1. Introduction to Offshore Production Tech
PDF
FPSO Redeployment
PDF
FPSO Redeployment
PPT
POINT - Design & Op of FPSO & Subsea Systems.ppt
PDF
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PPTX
Offshore structure design, Sigve Hamilton Aspelund
PPTX
Fpso floating structures
PDF
FPSO Bulletin
PDF
Topsides - Cherobelle
PDF
Floating production storage and offloading(FPSO) by tharun kumar malapati.pdf
PPTX
94008456-Offshore-Storage.pptx
PDF
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
PDF
Offshore Oil & Gas Production Systems
PDF
FPSO / Floating Production Technology for Offshore Oil & Gas Production
PPT
jeff_baker_masterclass_2005 - samples.ppt
PDF
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
PDF
Into the Deep
PPT
C0. Module Brief to OPT_2022.ppt
PPT
FPSO Dynamic positioning
PDF
Corrosion Management System and Implementation of IMO PSPC on FPSO
C1. Introduction to Offshore Production Tech
FPSO Redeployment
FPSO Redeployment
POINT - Design & Op of FPSO & Subsea Systems.ppt
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
Offshore structure design, Sigve Hamilton Aspelund
Fpso floating structures
FPSO Bulletin
Topsides - Cherobelle
Floating production storage and offloading(FPSO) by tharun kumar malapati.pdf
94008456-Offshore-Storage.pptx
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Offshore Oil & Gas Production Systems
FPSO / Floating Production Technology for Offshore Oil & Gas Production
jeff_baker_masterclass_2005 - samples.ppt
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Into the Deep
C0. Module Brief to OPT_2022.ppt
FPSO Dynamic positioning
Corrosion Management System and Implementation of IMO PSPC on FPSO
Ad

More from David Seow (8)

PPT
C7b. Mooring Components 2020
PPT
C7a Mooring Layouts_2020
PPT
C3.2.3&4. Fluid Recovery _2020
PPT
C4 Subsea Production
PPT
C3.2.11. Chemical Injection_2020
PPT
C3.2.2. Topside Gas Compression_2020
PPT
C3.2.1. Topside Separation_2020
PPT
C3.1.0. Topside Intro 2020
C7b. Mooring Components 2020
C7a Mooring Layouts_2020
C3.2.3&4. Fluid Recovery _2020
C4 Subsea Production
C3.2.11. Chemical Injection_2020
C3.2.2. Topside Gas Compression_2020
C3.2.1. Topside Separation_2020
C3.1.0. Topside Intro 2020

Recently uploaded (20)

PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
PDF
RMMM.pdf make it easy to upload and study
PDF
Computing-Curriculum for Schools in Ghana
PDF
Complications of Minimal Access Surgery at WLH
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PPTX
Cell Types and Its function , kingdom of life
202450812 BayCHI UCSC-SV 20250812 v17.pptx
History, Philosophy and sociology of education (1).pptx
LDMMIA Reiki Yoga Finals Review Spring Summer
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Orientation - ARALprogram of Deped to the Parents.pptx
A powerpoint presentation on the Revised K-10 Science Shaping Paper
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Supply Chain Operations Speaking Notes -ICLT Program
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
RMMM.pdf make it easy to upload and study
Computing-Curriculum for Schools in Ghana
Complications of Minimal Access Surgery at WLH
Weekly quiz Compilation Jan -July 25.pdf
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Cell Types and Its function , kingdom of life

C2. Functional Requirements of FPSO

  • 1. Official Open Offshore Production Technology Functional Requirements of FPSO Systems Marine & Offshore Technology
  • 2. Official Open Learning Outcomes 1. Determine the Evaluating Criterion for Floating Platform Selection 2. Compare and Select the platform and build method based on the evaluating criterion 3. Understand the decommissioning process for offshore platforms 4. Understand the Parametric Design flowchart
  • 3. Official Open 1. Determine the Evaluating Criterion for Floating Platform Selection - Floater system - Newbuild or Conversion
  • 4. Official Open Influences on Processing Capability • Vessel Motions • Weather • Layout • Processing Capacity and Storage
  • 5. Official Open Vessel Motion • Vessel motion affect the operation of process systems on board, e.g. – the separator – units that operate by spraying – rotating equipment
  • 6. Official Open Weather • Floating installations are affected by weather – Under extreme weather conditions, production may have to be shut down as a safety measure – Offloading by shuttle tanker may be interrupted by extreme weather
  • 7. Official Open Layout • Limited deck area on FPS will affect layout • Need for clear separation of hazardous and benign systems • Accommodation and critical functions to be away from hazardous locations • Multi-deck arrangement may be necessary for semi, SPAR or TLP
  • 8. Official Open Processing Capability and Storage • Early FPSO process 15,000 bopd, now up to 200,000 bopd. • Storage of processed crude on board can reach 2,000,000 barrels on a single FPSO • The trend is towards deeper waters, larger capacities facilitated by improved technology
  • 9. Official Open FPSO Example 1 Greater Plutonio FPSO
  • 10. Official Open Example - Greater Plutonio FPSO
  • 11. Official Open A simple subsea layout Tieback flowline Risers Subsea Pipe
  • 13. Official Open Greater Plutonio - Topsides • Laydown Area • Sulphate Reduction • Deareation • Utilities and Water Injection • LP and HP Separation • LP Compression • HP Compression • Gas Dehydration, Vapour Recovery and Fuel Gas • MP Gas Compression • Well Fluids Reception • Electrostatic Coalescer and Crude Oil Metering • Power Generation and Main Switch Room
  • 14. Official Open Greater Plutonio FPSO • The FPSO was built by HHI in South Korea. • The topsides processing system was designed by KBR in the UK with support from other KBR offices, and in conjunction with BP. • Accommodation, control room, helideck and lifeboats are forward.
  • 15. Official Open Example of Block-Building Strategy FPSO Schiehallion
  • 16. Official Open FPSO Example 2 Falcon FPSO
  • 18. Official Open Falcon FPSO - Layout Show Flacon Video
  • 22. Official Open 2. Compare and Select the platform and build method based on the evaluating criterion
  • 23. Official Open Learning Activity • Read Topic 2 of the notes “Functional Requirements of FPSO Systems” • In pairs/groups, complete the tutorial assignment for determining evaluation criterion for – Different floating production systems – Newbuild or Conversion method of procurement and construction
  • 24. Official Open Platform Evaluation Matrix Criterion Mono-hull Semi-submersible SPAR Tensioned Leg Platform 1. Water Depth Deep to Ultradeep (1000 – 3000m) Deep to Ultradeep (1000 – 3000m) 400 – 1200m To research online… 2. Weather …. …. …. …. 3…. …. …. …. …. 4…. …. …. …. …. 5…. …. …. …. …. 6…. …. …. …. …. 1. Set evaluating criterion and carry out an evaluation of different floating production systems e.g. mono- hull FPSO, Semi-Submersible, Spar and/or Tensioned-Leg Platforms. You might want to use a table format to conduct evaluation.
  • 25. Official Open Newbuild vs Conversion Evaluation 1. Set evaluating criterion and carry out an evaluation between a new-build and a converted mono-hull FPSO. You might want to use a table format to conduct evaluation. Criterion New-build mono-hull FPSO Converted mono-hull FPSO 1. Capital Cost 2. Lead Time to first oil …. …. 3…. …. …. 4…. …. …. 5…. …. …. 6…. …. ….
  • 26. Official Open 3. Understand the decommissioning process for offshore platforms
  • 27. Official Open Decommissioning (BOEMRE, US) 1. Project Management, Engineering and Planning; 2. Permitting and Regulatory Compliance; 3. Platform Preparation; 4. Well Plugging and Abandonment; 5. Conductor Removal; 6. Mobilization and Demobilization of Derrick Barges; 7. Platform Removal; 8. Pipeline and Power Cable Decommissioning; 9. Materials Disposal; and 10.Site Clearance.
  • 28. Official Open 4. Understand the Parametric Design flowchart
  • 29. Official Open Terpstra T., IHC Gusto Engineering; d'Hautefeuille B.B., Single Buoy Moorings; MacMillan A. A., Det Norske Veritas; 2001, OTC 13210 FPSO Design and Conversion: A Designer's Approach, Offshore Technology Conference Houston 2001
  • 30. Official Open Key Questions 1. Explain the two key benefits FPSO owners enjoy when choosing a new- build FPSO rather than converting one from an existing tanker. (Pg 2-12 and 13) 2. Set evaluating criterion and carry out an evaluation of different floating production systems. (e.g. mono-hull FPSO, Semi-Submersible, Spar and/or Tensioned-Leg Platforms) Explain your recommendation if an oil field of 10 years’ is to be developed in shallow water and mild weather? (Pg 2-3 - 6) 3. Explain the ten (10) steps of platform decommissioning.