• The Project is part of the development of East Port Said along parts of the newly
extended Suez Canal. The site is located east of Port Said on the east shore of the
Suez Canal extension.
• Light-weight structures and broad roads in between the structures shall be built
over an area of great dimensions (km).
Within this zone, 8 CPTu test
s were carried out to investi
gate the underground situati
on in more detail.
Soil Profile
Clayey Silt
Silty Clay
ImprovementDepth
Trial Zone
Inclinometer
Settlement Points
Pre and post investigation including:
- Boreholes
- CPTu
- Vane shear
- Stand Pipe Piezometer
Instrumentation Measurements
Settlement and Pore pressure
Primary
Consolidation
Stage
Secondary
Compression
Stage
Average Settlement after 6 month preloading
105 cm 115 cm 185 cm
0.0
0.5
1.0
1.5
2.0
2.5
0 2 4 6 8 10 12 14 16 18 20
SettlementRate[cm/day]
Time [week]
After
Embankment
Construction
0.4 cm/day2 to 1 cm/day
During
Embankment
Construction
Settlement Rate
Settlement rate after 9 months preloading is about 0.6mm/day (0.4 cm/week)
Normal settlement prediction
Asaoka Method
Point GMP6 GMP7 GMP8 GMP9 GMP10
Expected Settlement, cm 152 134 145 147 152
Settlement Prediction
Point GMP6 GMP7 GMP8 GMP9 GMP10
Expected Settlement, cm 237 237 238 246 242
Sherif Method
Settlement Prediction
Numerical Model
Back
calculation
Initial Soil models, Soil
parameters & Soil profile
Numerical
Model
Long term
prediction
Boreholes &
CPTu results
Adjusting the
soil parameters
General Model
Calibration with
measured settlement
Verification with other
measurements
Literature
Adjusting the
model
Modelling Verification
0
20
40
60
80
100
120
140
160
180
200
0 50 100 150 200 250 300 350
Settlement[cm]
Time [days]
GMP 6
GMP 7
GMP 8
GMP 9
GMP 10
GMP 18
GMP 19
FEA - I - V1
FEA - II - V1
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
0 50 100 150 200 250
Settlement[m]
Time [days]
GMP 438
GMP 439
FEA-I - V2
FEA- II - V2
Generalized Model Results
Settlement after 9 months preloading Long term settlement
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
0-10 10-15 15-25 25-50
TipResistance,MPa
Depth, m
Before Preloading
After 1 month
After 3 month
After 5 months
0.000
0.005
0.010
0.015
0.020
0.025
0.030
0.035
0-10 10-15 15-25 25-50
SleeveFriction,MPa
Depth, m
Before Preloading
After 1 month
After 3 month
After 5 months
Post Investigation
0
5
10
15
20
25
30
35
40
0 3 6 9 12
Depth(m)
Ch (m2/year)
Before preloading
After 3 months
• Constructing a trial zone in mega project and being monitored well is
essential and can give a clear idea about the system behaviour.
• The combination between intensive soil investigation work and data from
monitoring the trial zone can be used in an efficient way to build up a
trustable numerical model which can simulate the behaviour in high accuracy.
• The improvement in the soil parameters can be noticed by the CPTu results
which is related in somehow to the degree of consolidation. However caution
should be taken in analyzing the data which can be misleading as effect of the
preloading.
• The combination between PVD and surcharge can improve the soil strength
and reduce the settlement with high efficiency and as ecofriendly technique.
Conclusion and Recommendations
Thanks for your attention… Mohamed AYELDEEN
Keller Grundbau GmbH
Robert THURNER
Keller Grundbau GmbH

More Related Content

PPTX
Improvement of soft soil using Prefabricated Vertical Drains (PVD)
PDF
Fly Ash Brick Machine
DOCX
Sand making machine is the necessary equipment to run a sand making plant
PDF
Chicago poster-tiremodeling
PDF
02.20-21.2014, PRESENTATION, Coal processing, IMC Montan
PPTX
EarthZyme - Paving a New Way For Haul Road Construction
PDF
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand Reclamation
PDF
EarthZyme 2013; SMART
Improvement of soft soil using Prefabricated Vertical Drains (PVD)
Fly Ash Brick Machine
Sand making machine is the necessary equipment to run a sand making plant
Chicago poster-tiremodeling
02.20-21.2014, PRESENTATION, Coal processing, IMC Montan
EarthZyme - Paving a New Way For Haul Road Construction
IRJET-Testing of Fluidized Bed Combustor for Foundry Sand Reclamation
EarthZyme 2013; SMART

Similar to Case study behavior of soft soil improved with prefabricated vertical drains (19)

PPTX
3d consolidation test
PPTX
case study on terzaghi’s theory
PPTX
Pradipta Banik- Buet 1204012- thesis presentation
PPTX
Presentation - Case Study on Site Investigation Plan at Chek.pptx
PPTX
Settlement of soil with sand drains
PPTX
Embankment on Soft Soil - 23438 (1).pptx
PPTX
Presentation subsoil investigation foundation recommendation geotechnical ass...
PPTX
Vertical Drain
PDF
settlement.pdf
PDF
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
PDF
Soil test sanepa housing
PPTX
II-II DENSIFICATION METHODS IN COHESIVE SOILS.pptx
PDF
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
PDF
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
PDF
“STABILAZATION OF SOIL USING PLASTIC WASTE GENERATED FROM PLASTIC BAGS AND BO...
PDF
Settlement
PPTX
Consolidation & Drainage properties
DOCX
SOIL INVESTIGATION-ST JOSEPH SITE-MOH
DOCX
CIVE 416 report(final)
3d consolidation test
case study on terzaghi’s theory
Pradipta Banik- Buet 1204012- thesis presentation
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Settlement of soil with sand drains
Embankment on Soft Soil - 23438 (1).pptx
Presentation subsoil investigation foundation recommendation geotechnical ass...
Vertical Drain
settlement.pdf
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED CONSOLIDATION USING VERTICAL DR...
Soil test sanepa housing
II-II DENSIFICATION METHODS IN COHESIVE SOILS.pptx
Field and Theoretical Analysis of Accelerated Consolidation Using Vertical Dr...
FIELD AND THEORETICAL ANALYSIS OF ACCELERATED SETTLEMENT USING VERTICAL DRAINS
“STABILAZATION OF SOIL USING PLASTIC WASTE GENERATED FROM PLASTIC BAGS AND BO...
Settlement
Consolidation & Drainage properties
SOIL INVESTIGATION-ST JOSEPH SITE-MOH
CIVE 416 report(final)
Ad

Recently uploaded (20)

PPTX
Module_4_Updated_Presentation CORRUPTION AND GRAFT IN THE PHILIPPINES.pptx
PDF
Module 7 guard mounting of security pers
PDF
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
PDF
Unnecessary information is required for the
PDF
Yusen Logistics Group Sustainability Report 2024.pdf
PPTX
NORMAN_RESEARCH_PRESENTATION.in education
PPTX
chapter8-180915055454bycuufucdghrwtrt.pptx
PPTX
lesson6-211001025531lesson plan ppt.pptx
DOCX
ENGLISH PROJECT FOR BINOD BIHARI MAHTO KOYLANCHAL UNIVERSITY
PPTX
Research Process - Research Methods course
PPTX
Phylogeny and disease transmission of Dipteran Fly (ppt).pptx
PDF
COLEAD A2F approach and Theory of Change
PPTX
PHIL.-ASTRONOMY-AND-NAVIGATION of ..pptx
PPTX
Hydrogel Based delivery Cancer Treatment
PDF
natwest.pdf company description and business model
PPTX
Intro to ISO 9001 2015.pptx wareness raising
PPTX
ANICK 6 BIRTHDAY....................................................
PPTX
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
PDF
6.-propertise of noble gases, uses and isolation in noble gases
DOCX
Action plan to easily understanding okey
Module_4_Updated_Presentation CORRUPTION AND GRAFT IN THE PHILIPPINES.pptx
Module 7 guard mounting of security pers
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
Unnecessary information is required for the
Yusen Logistics Group Sustainability Report 2024.pdf
NORMAN_RESEARCH_PRESENTATION.in education
chapter8-180915055454bycuufucdghrwtrt.pptx
lesson6-211001025531lesson plan ppt.pptx
ENGLISH PROJECT FOR BINOD BIHARI MAHTO KOYLANCHAL UNIVERSITY
Research Process - Research Methods course
Phylogeny and disease transmission of Dipteran Fly (ppt).pptx
COLEAD A2F approach and Theory of Change
PHIL.-ASTRONOMY-AND-NAVIGATION of ..pptx
Hydrogel Based delivery Cancer Treatment
natwest.pdf company description and business model
Intro to ISO 9001 2015.pptx wareness raising
ANICK 6 BIRTHDAY....................................................
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
6.-propertise of noble gases, uses and isolation in noble gases
Action plan to easily understanding okey
Ad

Case study behavior of soft soil improved with prefabricated vertical drains

  • 1. Studying the behavior of soft soil improved with prefabricated vertical drains. Case study Mohamed AYELDEEN Keller Grundbau GmbH Robert THURNER Keller Grundbau GmbH
  • 2. Location • The Project is part of the development of East Port Said along parts of the newly extended Suez Canal. The site is located east of Port Said on the east shore of the Suez Canal extension. • Light-weight structures and broad roads in between the structures shall be built over an area of great dimensions (km).
  • 3. Within this zone, 8 CPTu test s were carried out to investi gate the underground situati on in more detail. Soil Profile Clayey Silt Silty Clay ImprovementDepth
  • 4. Trial Zone Inclinometer Settlement Points Pre and post investigation including: - Boreholes - CPTu - Vane shear - Stand Pipe Piezometer
  • 5. Instrumentation Measurements Settlement and Pore pressure Primary Consolidation Stage Secondary Compression Stage
  • 6. Average Settlement after 6 month preloading 105 cm 115 cm 185 cm
  • 7. 0.0 0.5 1.0 1.5 2.0 2.5 0 2 4 6 8 10 12 14 16 18 20 SettlementRate[cm/day] Time [week] After Embankment Construction 0.4 cm/day2 to 1 cm/day During Embankment Construction Settlement Rate Settlement rate after 9 months preloading is about 0.6mm/day (0.4 cm/week)
  • 8. Normal settlement prediction Asaoka Method Point GMP6 GMP7 GMP8 GMP9 GMP10 Expected Settlement, cm 152 134 145 147 152 Settlement Prediction
  • 9. Point GMP6 GMP7 GMP8 GMP9 GMP10 Expected Settlement, cm 237 237 238 246 242 Sherif Method Settlement Prediction
  • 10. Numerical Model Back calculation Initial Soil models, Soil parameters & Soil profile Numerical Model Long term prediction Boreholes & CPTu results Adjusting the soil parameters General Model Calibration with measured settlement Verification with other measurements Literature Adjusting the model
  • 11. Modelling Verification 0 20 40 60 80 100 120 140 160 180 200 0 50 100 150 200 250 300 350 Settlement[cm] Time [days] GMP 6 GMP 7 GMP 8 GMP 9 GMP 10 GMP 18 GMP 19 FEA - I - V1 FEA - II - V1 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 0 50 100 150 200 250 Settlement[m] Time [days] GMP 438 GMP 439 FEA-I - V2 FEA- II - V2
  • 12. Generalized Model Results Settlement after 9 months preloading Long term settlement
  • 13. 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 0-10 10-15 15-25 25-50 TipResistance,MPa Depth, m Before Preloading After 1 month After 3 month After 5 months 0.000 0.005 0.010 0.015 0.020 0.025 0.030 0.035 0-10 10-15 15-25 25-50 SleeveFriction,MPa Depth, m Before Preloading After 1 month After 3 month After 5 months Post Investigation 0 5 10 15 20 25 30 35 40 0 3 6 9 12 Depth(m) Ch (m2/year) Before preloading After 3 months
  • 14. • Constructing a trial zone in mega project and being monitored well is essential and can give a clear idea about the system behaviour. • The combination between intensive soil investigation work and data from monitoring the trial zone can be used in an efficient way to build up a trustable numerical model which can simulate the behaviour in high accuracy. • The improvement in the soil parameters can be noticed by the CPTu results which is related in somehow to the degree of consolidation. However caution should be taken in analyzing the data which can be misleading as effect of the preloading. • The combination between PVD and surcharge can improve the soil strength and reduce the settlement with high efficiency and as ecofriendly technique. Conclusion and Recommendations
  • 15. Thanks for your attention… Mohamed AYELDEEN Keller Grundbau GmbH Robert THURNER Keller Grundbau GmbH