Client Introduction & Project Objectives
© 2016 Dragon Sourcing. All rights reserved. 2
 Client introduction:
A world leader in water treatment solutions, specializes in the development, engineering,
construction and operation of enhanced desalination and industrial water treatment plants. They
leads the water industry with some of the world’s most advanced thermal and membrane
desalination plants.
 Objectives:
• The Company hereby appoints Dragon Sourcing to screen the supply market in Mexico.
• Identify potential fabricators capable of manufacturing and assembling client’s desalination unit
and load them in container for export to America’s.
• These suppliers will also need to be able to import the commodity items that go into the making
of desalination units whereas client will be supplying all the strategic items that are needed for
these units.
• These fabricators should be able to manufacture the units based on "end to end solution”.
 Final deliverables:
• RFI Analysis Report with list of recommended suppliers for audit.
• Supplier profiles
© 2016 Dragon Sourcing. All rights reserved.. 3
Approach & Schedule,
No. Step Deliverables
1.
Demand Analysis
Work with client to define and understand the products and requirements (specs, volumes, materials,
production technology requirements, Quality tests, Standards, etc.)
 Project Requirement
Questionnaire
 Kick-Off Report
2.
Supply Market Analysis
Identify long list of potential fabricators in the Mexico by leveraging B2B Websites, DS Database, Fair
catalogues, Chamber of Commerce, Magazines, Network, References.
 Supplier Long List
3.
Telephone Pre-screening
Selection of suppliers to be included in the RFI process by telephone pre-screening based on agreed
simple criteria (e.g. capability to make the product, Able to export, ISO 9001 certified,..)
 Shortlist for RFI
4.
Develop RFI
Prepare an RFI document, with an aligned Balanced Scorecard that has the objective to pre-qualify the
competitiveness and capabilities of the suppliers, including: Background, financial, Client and product
experience, Quality certification & processes, Social Responsibility, Manufacturing/technology
capability)
 RFI Template
 Balanced Scorecard
 Introduction Letter
Milestone 1: RFI & Scorecard Approved
5.
Conduct RFI Administration
The RFI is translated to the local languages as relevant, and distributed to the relevant suppliers, with
telephone follow-up to push for maximum participation.
• Completed RFIs
6.
Analyze RFI Responses
Analysis of RFI responses, estimation of logistics costs, and preparation of a report which profiles &
objectively ranks the suppliers by capability and competitiveness, including a recommendation for
those to be audited/Sampled.
 RFI Report
 Supplier Profiles
 Proposed Shortlist for
Audit/Samples.
Milestone 2: Shortlist for Auditing
Stage 1: Supplier Pre-Qualification
Steps
Duration
/week
commencing
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
07-25
07-29
08-01
08-05
08-08
08-12
08-15
08-19
08-22
08-26
08-29
09-02
09-05
09-09
09-12
09-16
1. Demand Analysis 1
2. Supply Market Analysis 2
3. Pre-screening with identified suppliers 2
4. Develop RFI template for validation 1
5. Administer NDA process 2
6. Administer RFI process 3
7. Submit RFI report with recommendation
for audit.
1
1
RFI validated
4
Not started Done
In process Delay
Project timeline,
- Stage 1: Supplier Pre-Qualification timeframe.
- RFI process was completed in 8 weeks as per schedule.
Today
2
© 2016 Dragon Sourcing. All rights reserved. 5
Supply Market Analysis
- Strategic Sourcing process completed with the following STEPs,
Identify Suppliers
Pre-screen
suppliers
NDA Process RFI Process
80
26
14
11
0
10
20
30
40
50
60
70
80
90
Suppliers identified Supplier passed pre-screening NDA received RFI received
Mexico
54 suppliers failed
pre-screening
12 suppliers
rejected NDA
3 suppliers
rejected RFI
© 2016 Dragon Sourcing. All rights reserved. 6
Rejection analysis were shared for each step, Pre-screening, NDA and RFI.
12
12
11
9
5
5
Interested in domestic sales only &/or Cannot export outside Mexico
Not reachable as none of the Contact details are valid and/or Company shutdown
Not ISO 9001 certified
Not interested as they consider them as very small Companies for such projects.
Not doing turnkey project for fabrication, Equipment assembly, electrical works, engineering skills etc for skid mounting
(Desalination) units
Currently capacity full
Pre-screening rejection
5
5
1
1 Not interested anymore
Not just willing to sign NDA
Others - Duplicated same owner different names
Consider themselves small for this project
NDA rejection analysis
1
1
1
Not interested to continue
Consider themselves small for this project
Do not have the technical capability after reviewing the RFI & Drawings
RFI rejection analysis
54
12
3
BUSINESS INFORMATION
Total number of employees
Number of people in these
positions
Sales &
Management
Production
Quality
Control
Others
Turnover (in Mex $)
2016 - till date 2015
Can you export
USA South American Countries
Percentage of turnover Domestic USA
South
America
Rest of the
world
2016 till date
2015
Top 3 Customers
Customers Industry Country % of sales
CORPORATE RESPONSIBILITY & POLICIES
Follow all rules and
regulations in respect to,
(Yes/No)
Health & Safety Policy
Environmental Policy
Child labor
COMPANY INFORMATION (Head office)
Company Name
Address
Town & State
Company Website
COMPANY INFORMATION (Manufacturing facility)
Company Name
Town & State
CONTACT PERSON INFORMATION
Contact Person
Title
Email
Tel
Mobile phone
BUSINESS INFORMATION
Year Founded
Nature of the Company
Ownership
Registration Capital (Mex $)
square meters overall factory occupy
square meters manufacturing area
Export License
Years of export experience
Free Zone Areas
Nearest INTL sea port & distance in Km
Nearest INTL airport & distance in Km
7
RFI Score 82
RFI Ranking 1
RFI/RFP process was administered to filter out most
capable suppliers
8
Supplier name - Country
• Section: Production: Technology & Process
PRODUCTION: TECHNOLOGY & PROCESS
Area of expertise In house/outsource Quantity
Cutting thickness(mm)
Process area LxW(mm)
Min Max
Cutting
Laser cutting
Area of expertise In house/outsource Quantity
Plate thickness (mm) Press rating
(KN)
Bending length(mm)
Min Max
Bending
Area of expertise In house/outsource Quantity Nominal Press(KN)
Stamping
Area of expertise In house/outsource Quantity
Max process diameter
(mm)
Max process length(mm)
Turning
Area of expertise In house/outsource Quantity
Working table
dimension (mm)
X axis stroke(mm) Y axis stroke(mm) Z axis stroke(mm)
Milling
CNC
Area of expertise In house/outsource Quantity
Working table
dimension (mm)
Welding Gas Welding Way Welding Depth
Welding
Area of expertise In house/outsource Quantity Manufacturing area m3 Max Product Size
MAG Welding
Sand blasting
Painting
Area of expertise In house/outsource Quantity Product size your company can varnish
Varnish
Area of expertise In house/outsource Quantity Coating method Coating thickness (μm)
Zinc coating
Polyuria coating
Area of expertise In house/outsource Quantity
Maximum lifting
weight(T)
Span (m)
Wheel Type (Single or
Double or Girder)
Single or Dual or
Manual Geared Speed
Crane
1. Overhead Crane:
2.Overhead Crane:
© 2016 Dragon Sourcing. All rights reserved.
Supplier Profile Example
Business Registration Tax Registration Factory Overview from outside
Factory Entrance Office Tooling Workshop
Stamping work floor Welding work floor MAG Welding Technology
9
Section: Factory Pictures
© 2016 Dragon Sourcing. All rights reserved.
Supplier Profile Example
Manufacturer locations’ were highlighted with the map
© 2016 Dragon Sourcing. All rights reserved. 10
RFI
Ranking
Supplier name City State
1 XXX XXX
San Luis
Potosi
2 XXX XXX Monterrey
3 XXX XXX Mexico
4 XXX XXX Puebla
5 XXX XXX Mexico
6 XXX XXX Jalisco
7 XXX XXX Mexico
8 XXX XXX Monterrey
9 XXX XXX Mexico
10 XXX XXX
Jalisco
11 XXX XXX
San Luis
Potosi
Mexico
Monterrey
San Luis
Potosi
Puebla
Factory Locations
14
10 12
8 9 9 10 9 8 9 8
16
13 9
8
13 14
7
7 8 7 7
11
14
8
9
1
9
8
8 7 7 8
23
25
18
17
18
9
13
11 11 11 10
9
6
5
7
6 6
5
6 7 6 6
10
10
10
10
10 10
10
10 10 10 10
0
10
20
30
40
50
60
70
80
90
DSMX/DU1 DSMX/DU2 DSMX/DU3 DSMX/DU4 DSMX/DU5 DSMX/DU6 DSMX/DU7 DSMX/DU8 DSMX/DU9 DSMX/DU10 DSMX/DU11
Business information Production
Quality system Manufacturing & Assembly Instructions/ Scope of work
RFI Response & others Corporate Responsibility
11
- Suppliers were assessed and ranked based on the Company profile.
- RFI scoring of the 11 Mexican suppliers,
Average RFI scoring: 59
82 77 63 59 57 56 53 51
Recommended Suppliers
© 2016 Dragon Sourcing. All rights reserved.
51 50 49
© 2016 Dragon Sourcing. All rights reserved.
Conclusions
 Whole project was carried out in 8 weeks, Total 80 Mexican suppliers identified, 14 NDA signed,
& 11 suppliers responded with the RFI document.
 Most of the suppliers were ISO 9001 certified as per Client’s mandatory quality requirement
expect only one supplier.
 Most of the suppliers including the DS recommended suppliers with highly interested in the
client project & confirmed meeting the technical requirement as per the detail scope of work
shared with them.
 Procurement Intelligence report was shared with the client giving insight on the import duties
based on the several HS codes of the commodities that the contracted fabricator will be need to
import, Local taxes applicable and Mexico free trade partners.
 DS recommend the top 4 suppliers as priority and suggested Client to consider visiting other
suppliers too during their trip to Mexico as some of the suppliers were common within same city
or nearby location.
 Overall based on the DS Report, It helped client to shortlist the fabricators in Mexico for the
projects undertaken by them in the neighbouring Countries.
15

More Related Content

DOCX
Doc. RMD
PPTX
Phenolic Resin Sourcing Project Case Study
PDF
Sheet Metal Fabrication & Machining Parts Case Study
PDF
Cooling Towel Sourcing Project​ ​- Case Study​
PDF
Tapioca Starch Sourcing Case Study by Dragon Sourcing
PPTX
Slewing Bearings Case Study by Dragon Sourcing
PPTX
Gear Box Case Study by Dragon Sourcing
PPT
Steel structural parts case study
Doc. RMD
Phenolic Resin Sourcing Project Case Study
Sheet Metal Fabrication & Machining Parts Case Study
Cooling Towel Sourcing Project​ ​- Case Study​
Tapioca Starch Sourcing Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon Sourcing
Gear Box Case Study by Dragon Sourcing
Steel structural parts case study

What's hot (19)

PPTX
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
PDF
Cleaning Sponge Case Study by Dragon Sourcing
PDF
Decorative Luminaire Sourcing Project Case Study by Dragon Sourcing
PPT
Orien Pacific (Shanghai) Ltd. Service Presentation
PDF
Precision Machining Sourcing Case Study
PPTX
Dragon Sourcing case study Supporting New Factory launch
PDF
AP Res September_2015
PPT
Iron Cast and Machined Components Case study
PPTX
V Tek MX Services
PDF
Cv senior qc manager mk-bencharif - english
PPT
Case Study China RFI/RFQ Report for “Tomato Sauce”
DOC
Tamil_Updated_Resume
DOC
I. Bobko_Buyer-Expeditor
PDF
rothenberger-2012-catalogue
PDF
Refteck Catlog
DOCX
RESUMECCHAN
PPTX
Hat Sourcing - Case Study
PPSX
Sistechcon
DOC
Design Engineer - Brixworth
Strategic Sourcing Case Study on Aluminum Industry by Dragon Sourcing
Cleaning Sponge Case Study by Dragon Sourcing
Decorative Luminaire Sourcing Project Case Study by Dragon Sourcing
Orien Pacific (Shanghai) Ltd. Service Presentation
Precision Machining Sourcing Case Study
Dragon Sourcing case study Supporting New Factory launch
AP Res September_2015
Iron Cast and Machined Components Case study
V Tek MX Services
Cv senior qc manager mk-bencharif - english
Case Study China RFI/RFQ Report for “Tomato Sauce”
Tamil_Updated_Resume
I. Bobko_Buyer-Expeditor
rothenberger-2012-catalogue
Refteck Catlog
RESUMECCHAN
Hat Sourcing - Case Study
Sistechcon
Design Engineer - Brixworth
Ad

Similar to Case Study - Desalination Unit Project (20)

PPTX
Injection Moulded Products Sourcing In China _ Case study.pptx
PPTX
Wear Plate Sourcing Project Case Study by Dragon Sourcing
PPTX
Case study-strategic sourcing of powder coating
PPT
Global Sourcing Case Study (Chinese Appliances Market)
PDF
Electric Motors and Iron Castings case study by Dragon Sourcing
PDF
Global Sourcing Case study in Appliances Market
PPTX
Case Study-New Plant Building “Capex Sourcing in China”
DOC
Resume_Gyan_VermaPrakash In_Process_
PPTX
Door Hardware Sourcing Case Study by Dragon Sourcing
PPT
Automotive Steel Component
PDF
Cotton Bags for Luxury Retail Brand Case Study
PPTX
Improve the effectiveness of procurement organization
PDF
Multi Category Sourcing in China, India, Vietnam and Turkey
PDF
Construction categories case study
PDF
Value Propositions - CDMA meeting 2006
PDF
Substation Project Case Study by Dragon Sourcing
PPTX
China Case Study MRO Electrical Spare Parts
PPT
Case Study on sourcing Sodium Chlorate as raw material from China.
PPTX
Strategic Sourcing Case Study – Wind Turbine Industry
PPTX
Wind Turbine Case Study - June, 2014
Injection Moulded Products Sourcing In China _ Case study.pptx
Wear Plate Sourcing Project Case Study by Dragon Sourcing
Case study-strategic sourcing of powder coating
Global Sourcing Case Study (Chinese Appliances Market)
Electric Motors and Iron Castings case study by Dragon Sourcing
Global Sourcing Case study in Appliances Market
Case Study-New Plant Building “Capex Sourcing in China”
Resume_Gyan_VermaPrakash In_Process_
Door Hardware Sourcing Case Study by Dragon Sourcing
Automotive Steel Component
Cotton Bags for Luxury Retail Brand Case Study
Improve the effectiveness of procurement organization
Multi Category Sourcing in China, India, Vietnam and Turkey
Construction categories case study
Value Propositions - CDMA meeting 2006
Substation Project Case Study by Dragon Sourcing
China Case Study MRO Electrical Spare Parts
Case Study on sourcing Sodium Chlorate as raw material from China.
Strategic Sourcing Case Study – Wind Turbine Industry
Wind Turbine Case Study - June, 2014
Ad

More from John William (20)

PDF
Sanitizer & Disinfectants During COVID 19 – A Brief Study
PDF
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
PDF
Newsletter on PPE
PDF
Study on Sourcing Opportunities in Vietnam
PDF
Study on Sourcing Opportunities in Brazil
PDF
Study on Sourcing Opportunities in Ethiopia
PDF
Sourcing Opportunities in Malaysia
PDF
Study on Sourcing Opportunities in Pakistan
PDF
Case Study on Sourcing Opportunities in South Africa
PDF
Case Study on Sourcing Opportunities in Myanmar
PDF
Study on Sourcing Opportunities in Indonesia
PPTX
Battery Sourcing Case Study by Dragon Sourcing
PDF
Decorative Pots Case Study by Dragon Sourcing
PDF
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
PDF
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
PPTX
Glass Bottles and Glass Jars Sourcing Project Case Study
PDF
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
PDF
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
PDF
Cotton Bags For Luxury Retail Brand Case Study by Dragon Sourcing
PPTX
Iron Castings Sourcing Case Study by Dragon Sourcing
Sanitizer & Disinfectants During COVID 19 – A Brief Study
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in Ethiopia
Sourcing Opportunities in Malaysia
Study on Sourcing Opportunities in Pakistan
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in Myanmar
Study on Sourcing Opportunities in Indonesia
Battery Sourcing Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon Sourcing
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
Glass Bottles and Glass Jars Sourcing Project Case Study
Nutrition Product Manufacturers Sourcing in Indonesia Case Study
Pressure Vessle and Heat Exchanger Case Study by Dragon Sourcing
Cotton Bags For Luxury Retail Brand Case Study by Dragon Sourcing
Iron Castings Sourcing Case Study by Dragon Sourcing

Recently uploaded (20)

PDF
Why Hauz Khas is a Perfect Location for Digital Marketing Training.pdf
PDF
Leveraging Earth Observation Data to Improve Wildfire Prevention and Manageme...
PDF
From Concept to Completion Premium Kitchen Design and Installation Solutions ...
PDF
How AI is Transforming Email Security in 2025?
PDF
Payroll Regulations UK 2025: Complete Guide for Employers & Payroll Compliance
PDF
Troubleshooting Volvo EC200B Excavator Service Repair Manual.pdf
PDF
Profitable Farming Starts with AI in Agriculture | Rubixe
PDF
Water Purification for Cooling Towers and Greenhouses
PDF
The Essential Role of Gutter Guard Mesh in Safeguarding Your Property
PPTX
Methane-Fermented Microbial Protein.pptx
PDF
The Cost of Neglect How Skipping Fire Safety Maintenance Can Lead to Disaster...
PPTX
Lowell_Stine_Presentation services .pptx
PDF
Top In-Demand Occupations for Skilled Migration to Australia in 2025
PDF
Pure Tax Investigations presentation at Accountex.pdf
PDF
Bisleri vs Coca Cola.pdf intellectual property rights
PPTX
CCC-Ancillary-Slidesk powerpoint present.pptx
PDF
The Evolution of Marine Monitoring-From Mechanical to Electronic Gauges
PDF
Best Platforms to Buy Verified Cash App Accounts in 2026.pdf
PDF
What Are the Benefits of Mobile Number Portability for Customers.pdf
PPTX
Courier-Delivery-App-Development-Unlocking-the-Future-of-Logistics.pptx
Why Hauz Khas is a Perfect Location for Digital Marketing Training.pdf
Leveraging Earth Observation Data to Improve Wildfire Prevention and Manageme...
From Concept to Completion Premium Kitchen Design and Installation Solutions ...
How AI is Transforming Email Security in 2025?
Payroll Regulations UK 2025: Complete Guide for Employers & Payroll Compliance
Troubleshooting Volvo EC200B Excavator Service Repair Manual.pdf
Profitable Farming Starts with AI in Agriculture | Rubixe
Water Purification for Cooling Towers and Greenhouses
The Essential Role of Gutter Guard Mesh in Safeguarding Your Property
Methane-Fermented Microbial Protein.pptx
The Cost of Neglect How Skipping Fire Safety Maintenance Can Lead to Disaster...
Lowell_Stine_Presentation services .pptx
Top In-Demand Occupations for Skilled Migration to Australia in 2025
Pure Tax Investigations presentation at Accountex.pdf
Bisleri vs Coca Cola.pdf intellectual property rights
CCC-Ancillary-Slidesk powerpoint present.pptx
The Evolution of Marine Monitoring-From Mechanical to Electronic Gauges
Best Platforms to Buy Verified Cash App Accounts in 2026.pdf
What Are the Benefits of Mobile Number Portability for Customers.pdf
Courier-Delivery-App-Development-Unlocking-the-Future-of-Logistics.pptx

Case Study - Desalination Unit Project

  • 1. Dragon Sourcing - 龙 源 Your Tailored Sourcing Approach to Emerging Countries Desalination Unit Project Case Study September 2016
  • 2. Client Introduction & Project Objectives © 2016 Dragon Sourcing. All rights reserved. 2  Client introduction: A world leader in water treatment solutions, specializes in the development, engineering, construction and operation of enhanced desalination and industrial water treatment plants. They leads the water industry with some of the world’s most advanced thermal and membrane desalination plants.  Objectives: • The Company hereby appoints Dragon Sourcing to screen the supply market in Mexico. • Identify potential fabricators capable of manufacturing and assembling client’s desalination unit and load them in container for export to America’s. • These suppliers will also need to be able to import the commodity items that go into the making of desalination units whereas client will be supplying all the strategic items that are needed for these units. • These fabricators should be able to manufacture the units based on "end to end solution”.  Final deliverables: • RFI Analysis Report with list of recommended suppliers for audit. • Supplier profiles
  • 3. © 2016 Dragon Sourcing. All rights reserved.. 3 Approach & Schedule, No. Step Deliverables 1. Demand Analysis Work with client to define and understand the products and requirements (specs, volumes, materials, production technology requirements, Quality tests, Standards, etc.)  Project Requirement Questionnaire  Kick-Off Report 2. Supply Market Analysis Identify long list of potential fabricators in the Mexico by leveraging B2B Websites, DS Database, Fair catalogues, Chamber of Commerce, Magazines, Network, References.  Supplier Long List 3. Telephone Pre-screening Selection of suppliers to be included in the RFI process by telephone pre-screening based on agreed simple criteria (e.g. capability to make the product, Able to export, ISO 9001 certified,..)  Shortlist for RFI 4. Develop RFI Prepare an RFI document, with an aligned Balanced Scorecard that has the objective to pre-qualify the competitiveness and capabilities of the suppliers, including: Background, financial, Client and product experience, Quality certification & processes, Social Responsibility, Manufacturing/technology capability)  RFI Template  Balanced Scorecard  Introduction Letter Milestone 1: RFI & Scorecard Approved 5. Conduct RFI Administration The RFI is translated to the local languages as relevant, and distributed to the relevant suppliers, with telephone follow-up to push for maximum participation. • Completed RFIs 6. Analyze RFI Responses Analysis of RFI responses, estimation of logistics costs, and preparation of a report which profiles & objectively ranks the suppliers by capability and competitiveness, including a recommendation for those to be audited/Sampled.  RFI Report  Supplier Profiles  Proposed Shortlist for Audit/Samples. Milestone 2: Shortlist for Auditing Stage 1: Supplier Pre-Qualification
  • 4. Steps Duration /week commencing Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 07-25 07-29 08-01 08-05 08-08 08-12 08-15 08-19 08-22 08-26 08-29 09-02 09-05 09-09 09-12 09-16 1. Demand Analysis 1 2. Supply Market Analysis 2 3. Pre-screening with identified suppliers 2 4. Develop RFI template for validation 1 5. Administer NDA process 2 6. Administer RFI process 3 7. Submit RFI report with recommendation for audit. 1 1 RFI validated 4 Not started Done In process Delay Project timeline, - Stage 1: Supplier Pre-Qualification timeframe. - RFI process was completed in 8 weeks as per schedule. Today 2
  • 5. © 2016 Dragon Sourcing. All rights reserved. 5 Supply Market Analysis - Strategic Sourcing process completed with the following STEPs, Identify Suppliers Pre-screen suppliers NDA Process RFI Process 80 26 14 11 0 10 20 30 40 50 60 70 80 90 Suppliers identified Supplier passed pre-screening NDA received RFI received Mexico 54 suppliers failed pre-screening 12 suppliers rejected NDA 3 suppliers rejected RFI
  • 6. © 2016 Dragon Sourcing. All rights reserved. 6 Rejection analysis were shared for each step, Pre-screening, NDA and RFI. 12 12 11 9 5 5 Interested in domestic sales only &/or Cannot export outside Mexico Not reachable as none of the Contact details are valid and/or Company shutdown Not ISO 9001 certified Not interested as they consider them as very small Companies for such projects. Not doing turnkey project for fabrication, Equipment assembly, electrical works, engineering skills etc for skid mounting (Desalination) units Currently capacity full Pre-screening rejection 5 5 1 1 Not interested anymore Not just willing to sign NDA Others - Duplicated same owner different names Consider themselves small for this project NDA rejection analysis 1 1 1 Not interested to continue Consider themselves small for this project Do not have the technical capability after reviewing the RFI & Drawings RFI rejection analysis 54 12 3
  • 7. BUSINESS INFORMATION Total number of employees Number of people in these positions Sales & Management Production Quality Control Others Turnover (in Mex $) 2016 - till date 2015 Can you export USA South American Countries Percentage of turnover Domestic USA South America Rest of the world 2016 till date 2015 Top 3 Customers Customers Industry Country % of sales CORPORATE RESPONSIBILITY & POLICIES Follow all rules and regulations in respect to, (Yes/No) Health & Safety Policy Environmental Policy Child labor COMPANY INFORMATION (Head office) Company Name Address Town & State Company Website COMPANY INFORMATION (Manufacturing facility) Company Name Town & State CONTACT PERSON INFORMATION Contact Person Title Email Tel Mobile phone BUSINESS INFORMATION Year Founded Nature of the Company Ownership Registration Capital (Mex $) square meters overall factory occupy square meters manufacturing area Export License Years of export experience Free Zone Areas Nearest INTL sea port & distance in Km Nearest INTL airport & distance in Km 7 RFI Score 82 RFI Ranking 1 RFI/RFP process was administered to filter out most capable suppliers
  • 8. 8 Supplier name - Country • Section: Production: Technology & Process PRODUCTION: TECHNOLOGY & PROCESS Area of expertise In house/outsource Quantity Cutting thickness(mm) Process area LxW(mm) Min Max Cutting Laser cutting Area of expertise In house/outsource Quantity Plate thickness (mm) Press rating (KN) Bending length(mm) Min Max Bending Area of expertise In house/outsource Quantity Nominal Press(KN) Stamping Area of expertise In house/outsource Quantity Max process diameter (mm) Max process length(mm) Turning Area of expertise In house/outsource Quantity Working table dimension (mm) X axis stroke(mm) Y axis stroke(mm) Z axis stroke(mm) Milling CNC Area of expertise In house/outsource Quantity Working table dimension (mm) Welding Gas Welding Way Welding Depth Welding Area of expertise In house/outsource Quantity Manufacturing area m3 Max Product Size MAG Welding Sand blasting Painting Area of expertise In house/outsource Quantity Product size your company can varnish Varnish Area of expertise In house/outsource Quantity Coating method Coating thickness (μm) Zinc coating Polyuria coating Area of expertise In house/outsource Quantity Maximum lifting weight(T) Span (m) Wheel Type (Single or Double or Girder) Single or Dual or Manual Geared Speed Crane 1. Overhead Crane: 2.Overhead Crane: © 2016 Dragon Sourcing. All rights reserved. Supplier Profile Example
  • 9. Business Registration Tax Registration Factory Overview from outside Factory Entrance Office Tooling Workshop Stamping work floor Welding work floor MAG Welding Technology 9 Section: Factory Pictures © 2016 Dragon Sourcing. All rights reserved. Supplier Profile Example
  • 10. Manufacturer locations’ were highlighted with the map © 2016 Dragon Sourcing. All rights reserved. 10 RFI Ranking Supplier name City State 1 XXX XXX San Luis Potosi 2 XXX XXX Monterrey 3 XXX XXX Mexico 4 XXX XXX Puebla 5 XXX XXX Mexico 6 XXX XXX Jalisco 7 XXX XXX Mexico 8 XXX XXX Monterrey 9 XXX XXX Mexico 10 XXX XXX Jalisco 11 XXX XXX San Luis Potosi Mexico Monterrey San Luis Potosi Puebla Factory Locations
  • 11. 14 10 12 8 9 9 10 9 8 9 8 16 13 9 8 13 14 7 7 8 7 7 11 14 8 9 1 9 8 8 7 7 8 23 25 18 17 18 9 13 11 11 11 10 9 6 5 7 6 6 5 6 7 6 6 10 10 10 10 10 10 10 10 10 10 10 0 10 20 30 40 50 60 70 80 90 DSMX/DU1 DSMX/DU2 DSMX/DU3 DSMX/DU4 DSMX/DU5 DSMX/DU6 DSMX/DU7 DSMX/DU8 DSMX/DU9 DSMX/DU10 DSMX/DU11 Business information Production Quality system Manufacturing & Assembly Instructions/ Scope of work RFI Response & others Corporate Responsibility 11 - Suppliers were assessed and ranked based on the Company profile. - RFI scoring of the 11 Mexican suppliers, Average RFI scoring: 59 82 77 63 59 57 56 53 51 Recommended Suppliers © 2016 Dragon Sourcing. All rights reserved. 51 50 49
  • 12. © 2016 Dragon Sourcing. All rights reserved. Conclusions  Whole project was carried out in 8 weeks, Total 80 Mexican suppliers identified, 14 NDA signed, & 11 suppliers responded with the RFI document.  Most of the suppliers were ISO 9001 certified as per Client’s mandatory quality requirement expect only one supplier.  Most of the suppliers including the DS recommended suppliers with highly interested in the client project & confirmed meeting the technical requirement as per the detail scope of work shared with them.  Procurement Intelligence report was shared with the client giving insight on the import duties based on the several HS codes of the commodities that the contracted fabricator will be need to import, Local taxes applicable and Mexico free trade partners.  DS recommend the top 4 suppliers as priority and suggested Client to consider visiting other suppliers too during their trip to Mexico as some of the suppliers were common within same city or nearby location.  Overall based on the DS Report, It helped client to shortlist the fabricators in Mexico for the projects undertaken by them in the neighbouring Countries. 15