JUMJA SLIDE  This slide is located at Km 41.00 on Phuentsholing- Thimpu road in  Bhutan .  This is  over 50 years  old and has been regularly damaging the road stretch.  This slide is basically a rock slide due to planar failure attributed to adverse jointing pattern.  The slide has totally denuded the vegetative cover of the hill right from the crown to the toe.  Due to this, during monsoons the slide tends to slip down because of unstable slope along the wedge.  Presently, most of the slide comprises of overburden material consisting of huge boulders mixed with soil.
Jumja slide
jumja
 
 
 
Fmn cuttings 400 mtr GSB 15 Cm D/Layer 400 mtr S/R/Wall 75x3 mtr (in 3 Steps) S/R/Wall 75x4 mtr (in 4 Steps) S/B/Wall 50x2 mtr (in 2 Steps) Fmn Washed away from Km  41.400 to 41.800  400x6 mtr 2000-01 6 C/R/Wall 24x6 mtr S/B/Wall 70x3 mtr Fmn Breached at Km 41.55 of size  24x3.00 mtr 2001-02 5 S/Wall 20x12 mtr Fmn Breached at Km 41.70 of size 20x3.50 mtr 2002-2003 4 NIL 2003-04  3   Sausage T/wall 20x5 mtr Sausage R/wall 24x6 mtr Fmn damaged Km 41.730 20x3.10 mtr   Km 41.550 to 41.650 Sausage carpeting 100x11 mtr Km 41.55 to 41.650   Km 41.370 to 41.550 Sausage carpeting 180 mtr x 5.50 mtr Fmn Sinking Km 41.370 to 41.550 2004-05 2   Fmn cutting HR 150x2.60x4.20 mtr Km 41.60 to 41.75 (150x2.60x3.00)   Fmn cutting SMB 300x2.60x2.30 mtr Fmn Sinking Km 41.30 to 41.60 (300x2.60x2.10) 2005-06 1   Restoration work carried out Damages occurred in Jumja Year S/No
Detailed Investigation for Long Term Solution.
Reccomndations by CRRI The boulders from the crown rocky bed falls onto the Western part of the slide area and also rolls onto the road stretch.  Scaling of boulders from this zone should be carried out. Only the boulders resting on the surface may be removed.
Reccomndations by CRRI The highly fractured and fragmented rock slope should be regraded/restructured and subsequently measures like shotcreting/rock bolting may be implemented to stabilize the exposed rocks.
Reccomndations by CRRI The debris mass above road level has acquired angle of repose, however, the non cohesive material in the soil-boulder matrix is expected to be eroded  away due to surface runoff.  This material has basically developed from the metamorphic gnessic rocks and has affinity with water. Benching of slope using gabion walls and suitable drainage measures on each bench need to be adopted in this zone.
Reccomndations by CRRI The boulders resting on the surface of slope may be removed, however, no querrying  should be allowed from this zone as this will make cavities as well as loosen the debris material leading to further erosion and debris flows
Reccomndations by CRRI The downhill slope on the extreme West side has exposed rock which may get toppled. Plugging of this zone by suitable retaining structures may be carried out.
Reccomndations by CRRI The debris mass on the uphill of road level has acquired angle of repose, however, the non cohesive material in the soil-boulder matrix is expected to be eroded away due to accumulated surface runoff. Flexible boulder fencing, benching of slope in reinforced gabion walls and provision of rock collection trench between the slope and the fence must be made   .
Reccomndations by CRRI The downhill slope on the extreme left has a large natural drain which has been experiencing channel erosion leading to damages on the road stretch.  The rocks on the side of the channel comprises of transported boulders or debris mass. The channel should be provided check dams at a few locations. Ballie check dam construction with horizontal reinforcement and pre anchoring would be of help as there hardly any location in the gulley to support the foundation of check dams..
Reccomndations by CRRI Scaling of boulders from left flank i.e. the eastern side of the slide, which is presently affected by rockfall problem from the highly fractured and fragmented rock slope. Collection pit should be made just below the rocky zone on the Western zone and  also at the road level, wherever possible
Reccomndations by CRRI Considering the state of land slide and other conditions, it is suggested to explore the possibility of construction of a tunnel to by pass the slide area.
OPTIONS To stabilise the slope with elaborate protective works. To explore possiblity of a tunnel
Scope of works Rock-bolting (14,060 Nos) Gabion-wall in 3 steps, 131 m length Gabion-wall in 3 steps, 126 m length Water-chute 2m wide 25m both sides Water-chute 2m wide 30m both sides Lined derain 645 m length 2m wide benching 2 Nos 131m length
Scope of works 2m wide benching 1 No, 126m length Gabion Wall 16m in 4 steps Collection pits 4 Nos causeway 10 mtr length Check dam with bally 8X3m Shotcreting 50mm thick with  50mmX50mm wire mesh.
 
Conclusion Land slide areas along major highways pose real logistic problems inso far as they tend to affect the economy  of the region in more than one ways. BRO has been battling with many such areas which are ever so prone to landslide in states of Sikkim,Himachal Pradaesh ,J&K and whole of North East.We have been able to reasonably contain slide zones by attending to basics like arresting toe-erosion, improving drianage characterstics etc. However there is a need to undertake a multi-agency in-depth sutdy of chronic cases like Jumja for an effective and expeditious solution of the issues.

More Related Content

PDF
PPTX
Manning equation limitation
PDF
Tunnels concepts
PPTX
Lining of tunnel
PDF
Tunnel Boring Machines (TBM)
PPTX
SLOPE STABILITY AND FAILURE
PPTX
earthquake
Manning equation limitation
Tunnels concepts
Lining of tunnel
Tunnel Boring Machines (TBM)
SLOPE STABILITY AND FAILURE
earthquake

What's hot (20)

PPTX
Elements of fault
PPTX
NATM ppt sumit
PPTX
Tunnel and Underground Excavation Presentation
PPTX
Engineering Geology
PDF
Joints and unconformity
PPT
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
PPTX
PPT
PPTX
PPT
9487 (1).ppt
PPTX
Importance of geological considerations while choosing tunnel sites and align...
PPT
NATM Tunneling ppt
PPT
Tunnelling
PDF
Seismic method soil exploration
PPTX
Canal Regulation & Cross Drainage Works
PPTX
Dam, reservoir & tunnels
PPT
Unconformity
PPT
Dam construction
Elements of fault
NATM ppt sumit
Tunnel and Underground Excavation Presentation
Engineering Geology
Joints and unconformity
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
9487 (1).ppt
Importance of geological considerations while choosing tunnel sites and align...
NATM Tunneling ppt
Tunnelling
Seismic method soil exploration
Canal Regulation & Cross Drainage Works
Dam, reservoir & tunnels
Unconformity
Dam construction
Ad

Viewers also liked (7)

PPT
Aan with gis in rasuwa
PDF
Effective Benching Summary
PDF
effective-benching-summary pdf
PDF
Stability analysis of earth dam by geostudio software
PPTX
Soil Nailing
PPT
Landslide
PPTX
Landslide ppt
Aan with gis in rasuwa
Effective Benching Summary
effective-benching-summary pdf
Stability analysis of earth dam by geostudio software
Soil Nailing
Landslide
Landslide ppt
Ad

Similar to Landslide Control Measures at Jumja Slide,Bhutan (20)

PPTX
Road construction
PPTX
DRAINAGE_DITCHES_CULVERTS_BRIDGES_forest engineering.pptx
DOC
Jhak murkasni final report
PDF
Paper on intrepid approachs in highway tunnel in bhutan
PPTX
Rion antirion bridge
PPTX
Roads in difficult areas
PDF
Gold mine myanmar 0830-0845 mitchell
PPTX
Structural Geology II
PPTX
hillroads-200131051526.pptx
PPTX
Tunneling exploration
PPTX
Hill roads
DOC
Abhishek and tarachand stone columns an over view
PPTX
PPTX
PDF
2015 CDA-Frederickhouse Erosion Control
PPTX
Shaft sinking 2
PPTX
Comparitive study-of-pile-foundations-with-foundations-on-stone-column-treate...
PPTX
RMT Group5 presentation.pptx
PPTX
Design of earth dam at gorukallu
PDF
NATM (New Austrian Tunneling Method ) in Tunneling
Road construction
DRAINAGE_DITCHES_CULVERTS_BRIDGES_forest engineering.pptx
Jhak murkasni final report
Paper on intrepid approachs in highway tunnel in bhutan
Rion antirion bridge
Roads in difficult areas
Gold mine myanmar 0830-0845 mitchell
Structural Geology II
hillroads-200131051526.pptx
Tunneling exploration
Hill roads
Abhishek and tarachand stone columns an over view
2015 CDA-Frederickhouse Erosion Control
Shaft sinking 2
Comparitive study-of-pile-foundations-with-foundations-on-stone-column-treate...
RMT Group5 presentation.pptx
Design of earth dam at gorukallu
NATM (New Austrian Tunneling Method ) in Tunneling

Recently uploaded (20)

PDF
Taming the Chaos: How to Turn Unstructured Data into Decisions
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
DOCX
search engine optimization ppt fir known well about this
PDF
NewMind AI Weekly Chronicles – August ’25 Week III
PPTX
Benefits of Physical activity for teenagers.pptx
PDF
CloudStack 4.21: First Look Webinar slides
PDF
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
PPT
Geologic Time for studying geology for geologist
PDF
STKI Israel Market Study 2025 version august
PDF
A novel scalable deep ensemble learning framework for big data classification...
PDF
A comparative study of natural language inference in Swahili using monolingua...
PPT
What is a Computer? Input Devices /output devices
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PPTX
O2C Customer Invoices to Receipt V15A.pptx
PDF
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
PDF
WOOl fibre morphology and structure.pdf for textiles
PDF
DP Operators-handbook-extract for the Mautical Institute
PDF
Hybrid model detection and classification of lung cancer
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Getting Started with Data Integration: FME Form 101
Taming the Chaos: How to Turn Unstructured Data into Decisions
Univ-Connecticut-ChatGPT-Presentaion.pdf
search engine optimization ppt fir known well about this
NewMind AI Weekly Chronicles – August ’25 Week III
Benefits of Physical activity for teenagers.pptx
CloudStack 4.21: First Look Webinar slides
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
Geologic Time for studying geology for geologist
STKI Israel Market Study 2025 version august
A novel scalable deep ensemble learning framework for big data classification...
A comparative study of natural language inference in Swahili using monolingua...
What is a Computer? Input Devices /output devices
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
O2C Customer Invoices to Receipt V15A.pptx
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
WOOl fibre morphology and structure.pdf for textiles
DP Operators-handbook-extract for the Mautical Institute
Hybrid model detection and classification of lung cancer
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Getting Started with Data Integration: FME Form 101

Landslide Control Measures at Jumja Slide,Bhutan

  • 1. Land Slide Control Measures: A Case Study Of Jumja Land Slide In Western Bhutan S K Pradhan, Border Roads Organisation, New Delhi
  • 2. Land Slide Control Measures In BRO
  • 5.  
  • 6. ANOTHER VIEW OF JUMJA LSIDE
  • 7. JUMJA SLIDE This slide is located at Km 41.00 on Phuentsholing- Thimpu road in Bhutan . This is over 50 years old and has been regularly damaging the road stretch. This slide is basically a rock slide due to planar failure attributed to adverse jointing pattern. The slide has totally denuded the vegetative cover of the hill right from the crown to the toe. Due to this, during monsoons the slide tends to slip down because of unstable slope along the wedge. Presently, most of the slide comprises of overburden material consisting of huge boulders mixed with soil.
  • 10.  
  • 11.  
  • 12.  
  • 13. Fmn cuttings 400 mtr GSB 15 Cm D/Layer 400 mtr S/R/Wall 75x3 mtr (in 3 Steps) S/R/Wall 75x4 mtr (in 4 Steps) S/B/Wall 50x2 mtr (in 2 Steps) Fmn Washed away from Km 41.400 to 41.800 400x6 mtr 2000-01 6 C/R/Wall 24x6 mtr S/B/Wall 70x3 mtr Fmn Breached at Km 41.55 of size 24x3.00 mtr 2001-02 5 S/Wall 20x12 mtr Fmn Breached at Km 41.70 of size 20x3.50 mtr 2002-2003 4 NIL 2003-04 3   Sausage T/wall 20x5 mtr Sausage R/wall 24x6 mtr Fmn damaged Km 41.730 20x3.10 mtr   Km 41.550 to 41.650 Sausage carpeting 100x11 mtr Km 41.55 to 41.650   Km 41.370 to 41.550 Sausage carpeting 180 mtr x 5.50 mtr Fmn Sinking Km 41.370 to 41.550 2004-05 2   Fmn cutting HR 150x2.60x4.20 mtr Km 41.60 to 41.75 (150x2.60x3.00)   Fmn cutting SMB 300x2.60x2.30 mtr Fmn Sinking Km 41.30 to 41.60 (300x2.60x2.10) 2005-06 1   Restoration work carried out Damages occurred in Jumja Year S/No
  • 14. Detailed Investigation for Long Term Solution.
  • 15. Reccomndations by CRRI The boulders from the crown rocky bed falls onto the Western part of the slide area and also rolls onto the road stretch. Scaling of boulders from this zone should be carried out. Only the boulders resting on the surface may be removed.
  • 16. Reccomndations by CRRI The highly fractured and fragmented rock slope should be regraded/restructured and subsequently measures like shotcreting/rock bolting may be implemented to stabilize the exposed rocks.
  • 17. Reccomndations by CRRI The debris mass above road level has acquired angle of repose, however, the non cohesive material in the soil-boulder matrix is expected to be eroded away due to surface runoff. This material has basically developed from the metamorphic gnessic rocks and has affinity with water. Benching of slope using gabion walls and suitable drainage measures on each bench need to be adopted in this zone.
  • 18. Reccomndations by CRRI The boulders resting on the surface of slope may be removed, however, no querrying should be allowed from this zone as this will make cavities as well as loosen the debris material leading to further erosion and debris flows
  • 19. Reccomndations by CRRI The downhill slope on the extreme West side has exposed rock which may get toppled. Plugging of this zone by suitable retaining structures may be carried out.
  • 20. Reccomndations by CRRI The debris mass on the uphill of road level has acquired angle of repose, however, the non cohesive material in the soil-boulder matrix is expected to be eroded away due to accumulated surface runoff. Flexible boulder fencing, benching of slope in reinforced gabion walls and provision of rock collection trench between the slope and the fence must be made .
  • 21. Reccomndations by CRRI The downhill slope on the extreme left has a large natural drain which has been experiencing channel erosion leading to damages on the road stretch. The rocks on the side of the channel comprises of transported boulders or debris mass. The channel should be provided check dams at a few locations. Ballie check dam construction with horizontal reinforcement and pre anchoring would be of help as there hardly any location in the gulley to support the foundation of check dams..
  • 22. Reccomndations by CRRI Scaling of boulders from left flank i.e. the eastern side of the slide, which is presently affected by rockfall problem from the highly fractured and fragmented rock slope. Collection pit should be made just below the rocky zone on the Western zone and also at the road level, wherever possible
  • 23. Reccomndations by CRRI Considering the state of land slide and other conditions, it is suggested to explore the possibility of construction of a tunnel to by pass the slide area.
  • 24. OPTIONS To stabilise the slope with elaborate protective works. To explore possiblity of a tunnel
  • 25. Scope of works Rock-bolting (14,060 Nos) Gabion-wall in 3 steps, 131 m length Gabion-wall in 3 steps, 126 m length Water-chute 2m wide 25m both sides Water-chute 2m wide 30m both sides Lined derain 645 m length 2m wide benching 2 Nos 131m length
  • 26. Scope of works 2m wide benching 1 No, 126m length Gabion Wall 16m in 4 steps Collection pits 4 Nos causeway 10 mtr length Check dam with bally 8X3m Shotcreting 50mm thick with 50mmX50mm wire mesh.
  • 27.  
  • 28. Conclusion Land slide areas along major highways pose real logistic problems inso far as they tend to affect the economy of the region in more than one ways. BRO has been battling with many such areas which are ever so prone to landslide in states of Sikkim,Himachal Pradaesh ,J&K and whole of North East.We have been able to reasonably contain slide zones by attending to basics like arresting toe-erosion, improving drianage characterstics etc. However there is a need to undertake a multi-agency in-depth sutdy of chronic cases like Jumja for an effective and expeditious solution of the issues.