---(Pile Foundation)---
* * *
Piles are relatively long and slender members used to transmit
foundation loads through soil strata of low bearing capacity to
* *
deeper soil or rocky strata having a high bearing capacity.
I th d th l d i l t itt d t th il bIn other words, the load is properly transmitted to the soil by
driving long vertical members of either timber or concrete or
steel called “Piles”.
2
Civil engineering practice
Depth at which rocky or hard strata is available can normally be
CHP # 04: Pile Foundation
Depth at which rocky or hard strata is available can normally be
60 to 80 ft, showing the range of depth for the piles.
Piles usually carry excessive loads as load of traffic on a bridge
where the underneath strata can be of sand and silt fully
saturated with watersaturated with water.
Bore logs drawn after soil investigation is used to find out depthg g p
of piles, diameter of piles and the numbers of piles required.
Pile can also be defined as an element of construction placed in
the ground either vertically or slightly inclined to increase the
load carrying capacity of the soil.
3
d c y g c p c y s
Civil engineering practice
4
5
Piles are required for setting out of towers for high power
CHP # 04: Pile Foundation
Piles are required for setting out of towers for high power
transmission lines and in some cases are also used for supporting
the multistory buildings.
4.1 Types of Piles (Based Upon Use)
1- Sheet Piles
Sheet piling is used primarily to resist lateral pressures such asSheet piling is used primarily to resist lateral pressures such as
flow of water and loose soil. Typical uses include cut-off walls
under dams, cofferdams, trench sheeting, etc.
6
Civil engineering practice
7
8
9
10
warehouse
ship
sheet pile
11
2- Load Bearing Piles
CHP # 04: Pile Foundation
These are used primarily to transmit loads through soil
formations with poor supporting properties into or onto
formations that are capable of supporting the loads Dependingformations that are capable of supporting the loads. Depending
upon how load is transferred to the soil, load-bearing piles can
be further classified into:
(a) End Bearing Piles
If l d i i d h il h h h l i h il iIf load is transmitted to the soil through the lower tip, the pile is
called an “End Bearing Pile”.
These piles transmit the superimposed load to stronger strata
such as a rock bed. End area of pile times the bearing capacity of
h k i h l l d hi h b li d
12
the rock is the total load, which can be applied.
Civil engineering practice
Considering reasonable factor of safety, we can find diameter of
CHP # 04: Pile Foundation
the pile required.
13
Civil engineering practice
14
P
I
L
E
weak soil
bed rock
15
(b) Friction Piles
CHP # 04: Pile Foundation
These are designed to transmit the loads by the frictional force
existing between the sides of the pile and the ground such as the
stuff clays or dense sandy depositstuff clays or dense sandy deposit.
Friction can be developed for full length as in first figure or it canp g g
be developed in lower portions only depending upon the
stratification of soil.
Surface area times the safe friction which can be developed per unit
area determines the load to be carried by the pile. Selectingy p g
diameter or length of pile, the other quantity can be calculated.
16
Civil engineering practice
(b) Friction Piles
CHP # 04: Pile Foundation
17
Civil engineering practice
18
19
20
21
(c) End Bearing and Friction Piles
CHP # 04: Pile Foundation
These are the piles that dissipate part of the load by friction and
transfer the remaining load to firm strata.
3- Piles as Soil Compactor
Sometimes closely spaced piles are driven to compact theSometimes closely spaced piles are driven to compact the
surrounding soil.
22
Civil engineering practice
4.2 Types of Piles (Based on material used and method of
CHP # 04: Pile Foundation
construction)
On the basis of the material from which they are made and the
method of constructing and driving them load bearing pilesmethod of constructing and driving them, load-bearing piles
may be classified as follows:
– Timber
U da. Untreated
b. Treated with a preservative
– Concrete
a. Pre-cast
b. Cast-in-place
S l– Steel
a. I-section
b. Steel-pipe
23
p p
– Composite
Civil engineering practice
Driven timber piles, Pacific Highway
24
p g y
25
26
27
4.3 Factors Affecting Selection of Piles
CHP # 04: Pile Foundation
Among the factors that will influence the selection of type of piles
for a given project are the following:
1. Type, size, and weight of the structure to be supported.1. Type, size, and weight of the structure to be supported.
2. Physical properties of the soil at the site.
3. Depth to a stratum capable of supporting the piles.
4. Possibility of variations in the depth to a supporting stratum.
5. Availability of materials for piles.
6 Number of piles required6. Number of piles required.
7. Facilities for driving piles.
8. Comparative costs in place.
9. Durability required.
10. Types of structures adjacent to the project.
11 Depth and kind of water if any above the ground into which
28
11. Depth and kind of water, if any, above the ground into which
the piles will be driven.
Civil engineering practice
4.4 Significance of Pile Foundation
CHP # 04: Pile Foundation
Pile foundation is suitable for works over water such as
bridge`-piers, foundation of transmission towers and
foundation of multistory buildingsfoundation of multistory buildings.
From head or cap of piles, we can construct the grids with
beams and columns.
29
Civil engineering practice
4.4 Significance of Pile Foundation
CHP # 04: Pile Foundation
The number of piles depends on the type of pile and the load
coming from the buildings.
30
Civil engineering practice
31
CHP # 04: Pile Foundation
ooden Pilesooden Piles
32
Civil engineering practice
4.5 Wooden Piles
CHP # 04: Pile Foundation
These piles, if used below the ground water level, last for a
very long period but ordinarily they last no longer than 30
years or so even if treated.yea s o so eve t eated.
The circular piles vary in diameter from 12 inch to 16-inch. If
square sizes are used, they also vary in size fro 12 inch to 16-
inch square. The length of the piles is about 20 times the top
width.width.
The timber point may be protected or replaced by a metallic
shoe; shoes are used while driving through soils containing
boulders, gravels, hard clays etc.
33
Civil engineering practice
4.5 Wooden Piles
CHP # 04: Pile Foundation
They may be of C.I. and should have sufficient length of
wrought iron straps to connect them with the pile.
The head of the pile is subjected to a heavy impact of the
driving machine; hence, rings of wrought iron are fitted to theg ; , g g
pile head. They vary in cross-section from 2 in. to 4 in.
Timber piles should not be loaded above 15 to 20 tons and
should be carefully driven.
Whenever it is necessary to use a longer pile than available in
usual lengths, it is necessary to splice the piles together, with
34
their ends abutting each other.
Civil engineering practice
4.5 Wooden Piles
CHP # 04: Pile Foundation
Additional strength can be obtained by the use of steel
fishplates bolted to the sides of the piles.
Among the advantages of timber piles are the following:
1. The more popular lengths and sizes are available on short
notice.
2. They are economical in cost.
3. They are handled easily, with little danger of breakage.
4. They can be cut off to any desired length after they are driven.
5. They can be pulled easily in the event removal is necessary.
35
Civil engineering practice
4.5 Wooden Piles
CHP # 04: Pile Foundation
Among the disadvantages of timber piles are the following:
1. It may be difficult to obtain piles sufficiently long and straight
for some projects.
2. It may be difficult or impossible to drive them into hard
formations.
3 I i diffi l li h i h i l h3. It is difficult to splice them to increase their lengths.
4. While they are satisfactory when used as friction piles, they are
not suitable for use as end-bearing piles under heavy loads.g p y
5. The length of life may be short unless the piles are treated with
a preservative.
36
Civil engineering practice
37
CHP # 04: Pile Foundation
oncrete Pilesoncrete Piles
38
Civil engineering practice
download.mp4
39
4.6 Concrete Piles
CHP # 04: Pile Foundation
(a) Pre-cast Concrete Piles
Square and octagonal piles are cast in horizontal forms, while
round piles are casts in vertical forms.
After the piles are cast, they should be cured for the period
required by specifications, frequently 21 days.
With the exception of short lengths, Precast concrete piles
t b i f d ith ffi i t t l t t dmust be reinforced with sufficient steel to prevent damage or
breakage while they are being handled from the casting beds to
the driving positions.
40
Civil engineering practice
4.6 Concrete Piles
( ) P C Pil
CHP # 04: Pile Foundation
(a) Pre-cast Concrete Piles
Among the advantages of Pre cast concrete piles are theAmong the advantages of Pre-cast concrete piles are the
following:
1. High resistance to chemical and biological attacks.
2. High strength.
3. A pipe may be installed along the center of a pile to facilitate
driving.
41
Civil engineering practice
4.6 Concrete Piles
( ) P C Pil
CHP # 04: Pile Foundation
(a) Pre-cast Concrete Piles
Among the disadvantages of Pre cast concrete piles are theAmong the disadvantages of Pre-cast concrete piles are the
following:
1. It is difficult to reduce or increase the length.
2. Large sizes require heavy and expensive handling and driving
equipment.
3 I bili b i il b h d l h i f3. Inability to obtain piles by purchase may delay the starting of a
project.
4. Possible breakage of piles during handling or driving producesg p g g g p
a delay hazard.
42
Civil engineering practice
4.6 Concrete Piles
CHP # 04: Pile Foundation
(b) Cast-in-Place Concrete Piles
These piles are constructed by depositing the freshly mixed
concrete in place in the ground and letting it cure there. The
two principal methods of constructing such piles are:p p g p
1. Driving a metallic shell, leaving it in the ground and filling it
with concrete.
2 D i i t lli h ll d filli it ith t th h ll2. Driving a metallic shell and filling it with concrete as the shell
is pulled from the ground.
43
Civil engineering practice
44
4.6 Concrete Piles
CHP # 04: Pile Foundation
(b) Cast-in-Place Concrete Piles
Among the advantages of cast in place concrete piles are theAmong the advantages of cast-in-place concrete piles are the
following:
1. The lightweight shells may be handled and driven easily.
2. Variations in length do not present a serious problem. The
length of a shell may be increased or decreased easily.g y y
3. The shells may be slipped in short lengths and assembled at
the job.
4 E i f i t i t t d b h dli l4. Excess reinforcing, to resist stresses caused by handling only,
is eliminated.
5. The danger of breaking a pile while driving is eliminated.
45
6. Additional piles may be provided quickly if they are needed.
Civil engineering practice
4.6 Concrete Piles
CHP # 04: Pile Foundation
(b) Cast-in-Place Concrete Piles
Among the disadvantages of cast-in-place concrete piles are the
following:
1. A slight movement of the earth around an un-reinforced pile
may break it.
2. An uplifting force, acting on the shaft of an uncased and un-
reinforced pile, may cause it to fail in tension.
3 Th b tt f il t b t i l3. The bottom of pile may not be symmetrical.
46
Civil engineering practice
47
CHP # 04: Pile Foundation
teel Pilesteel Piles
48
Civil engineering practice
4.7 Steel Piles
CHP # 04: Pile Foundation
Steel piles may be of I-section or hollow pipe section 10 inches
t 24 i h di t ith 3/8 i h thi kto 24 inches diameter with 3/8 inches thickness.
Because of a small sectional area steel piles are easy to driveBecause of a small sectional area, steel piles are easy to drive.
The pipes are driven with open ends. Compressed air with a
pressure of 100 psi in a 2½ inches or more diameter pipe and
h f ili h d i ithus facilitates the driving.
These piles are later on filled with concrete Steel piles areThese piles are later on filled with concrete. Steel piles are
mostly used as end bearing piles because of their less available
surface area to take the loads by frictional forces.
49
Civil engineering practice
4.7 Steel Piles
CHP # 04: Pile Foundation
In constructing foundations that require piles driven to great
depths, steel I-section probably are more suitable than anydept s, stee sect o p obab y a e o e su tab e t a a y
other type.
Steel piles may be driven through hard materials to a specified
depth to eliminate the danger of failure due to scouring, such
as under a pier in a river.as under a pier in a river.
Also, steel piles may be driven to great depths through poor
soils to bear on a solid rock stratum.
50
Civil engineering practice
4.7 Steel Piles
CHP # 04: Pile Foundation
The great strength of steel combined with the small
displacement of soil permits a large portion of the energy fromd sp ace e t o so pe ts a a ge po t o o t e e e gy o
a pile hammer to be transmitted to the bottom of a pile.
As a result, it is possible to drive steel piles into soils, which
could not be penetrated by any other type of pile.
By weld splicing sections together, lengths in excess of 200ft
have been driven.
51
Civil engineering practice
52
CHP # 04: Pile Foundation
crew Pilescrew Piles
53
Civil engineering practice
4.8 Screw Piles
CHP # 04: Pile Foundation
Screw piles consist of iron or steel shaft
h i t it d t i t t lhaving at its end a cast iron or cast steel
screw, with a blade 1.5ft to 5ft in diameter.
These piles can be screwed down to a
great depth in clay, etc., and penetrate
h h ll b kthrough small broken stones.
The base area of the screw does most ofThe base area of the screw does most of
the weight bearing; they can be used for
bridges in riverbeds with deep clay
f d i
54
foundation.
Civil engineering practice
55
56
57
58
4.9 Pile Driving
CHP # 04: Pile Foundation
The operation of forcing a pile into ground without any
previous excavation is called “Pile Driving”.
Following are the various methods of pile driving:
1. Drop hammer.
2. Steam-hammer.
3 Boring3. Boring.
4. Screwing.
5. Water jet.
59
Civil engineering practice
4.9 Pile Driving
1 D H M h d
CHP # 04: Pile Foundation
1- Drop Hammer Method
It is the simplest method of pile driving. In this method, at s t e s p est et od o p e d v g. t s et od, a
hammer is dropped on the head of the pile and is guided
during its fall by suitable staging.
The hammer is raised by pulling a rope manually or by steam
engine or electric motor. The weight of the hammer forengine or electric motor. The weight of the hammer for
driving concrete or wooden piles is about 225 kg for short
piles and 900 kg to 2350 kg for long and heavy piles.
Hammer is generally dropped from a height of 15m to 45m
and the height is limited to 6 m The pile-driving frame is kept
60
and the height is limited to 6 m. The pile driving frame is kept
in vertical position by suitable ropes.
Civil engineering practice
61
4.9 Pile Driving
2 S H M h d
CHP # 04: Pile Foundation
2- Steam Hammer Method
A heavy hammer is dropped on to the pile through a smalleavy a e s d opped o to t e p e t oug a s a
height but in quick succession. Single acting or double acting
steam hammers are available.
These hammers are raised with high-pressure steam and are
dropped under gravity when single acting or by steam wheredropped under gravity when single acting or by steam where
there is double acting hammer. These hammers are specially
used for driving sheet piles and where small vibrations are
i d t b t i th ilrequired to be set up in the piles.
Special devices are used to protect the heads of the piles from
62
Special devices are used to protect the heads of the piles from
damage due to excessive blows, which they receive.
Civil engineering practice
63
4.9 Pile Driving
CHP # 04: Pile Foundation
3- Boring
S ti ili i d b b i h l f it bl di tSometimes, piling is done by boring holes of suitable diameter
to the required depth and then dropping piles in them.
Generally cast-in-situ piles are laid by this method.
4- Screwing
Screw piles and disc piles are generally driven by this method.
They are driven into the ground by turning them round andThey are driven into the ground by turning them round and
round in one direction with big levers.
64
Civil engineering practice
4.9 Pile Driving
5 W J
CHP # 04: Pile Foundation
5- Water Jets
Pile driving can also be done by displacing the material at orP e d v g ca a so be do e by d sp ac g t e ate a at o
near the foot of the pile by means of one or more water jets
under pressure.
Sometimes, hammer may be used to force the pile rapidly into
the ground. The pressure of the jet should be sufficient tothe ground. The pressure of the jet should be sufficient to
displace the soil and other removed materials for driving the
piles quickly and satisfactorily.
65
Civil engineering practice
66
End
67

More Related Content

DOCX
Well foundations
PPTX
Pile foundation
PPTX
Bearings in bridges
PPTX
Pile foundations
PPTX
PDF
Pile Foundations
PPTX
Well Foundation
PPTX
19021 d2004 well foundation design ppt
Well foundations
Pile foundation
Bearings in bridges
Pile foundations
Pile Foundations
Well Foundation
19021 d2004 well foundation design ppt

What's hot (20)

PDF
Design of pile foundation
PPTX
Reinforced column design
PPTX
Design of Retaining Wall
PPTX
Well foundation ppt
PPT
Design of footing as per IS 456-2000
PPTX
PPTX
Module 3 pile types and construction
PPTX
Plate load test ppt
PDF
Expansion joints in bridge
PPTX
Pile foundation ppt
PDF
Bridge loading
PPTX
Construction of rigid pavement
PPT
Fundamentals of-psc-bridge
PPTX
Segmental bridge construction
PPTX
Retaining walls
PPTX
Rail and Road Over Rail Bridge
PPTX
Plate load test and its interpretations
PPT
Design of slender columns as per IS 456-2000
PDF
Lecture 2 bearing capacity
PDF
Rcc member design steps
Design of pile foundation
Reinforced column design
Design of Retaining Wall
Well foundation ppt
Design of footing as per IS 456-2000
Module 3 pile types and construction
Plate load test ppt
Expansion joints in bridge
Pile foundation ppt
Bridge loading
Construction of rigid pavement
Fundamentals of-psc-bridge
Segmental bridge construction
Retaining walls
Rail and Road Over Rail Bridge
Plate load test and its interpretations
Design of slender columns as per IS 456-2000
Lecture 2 bearing capacity
Rcc member design steps
Ad

Viewers also liked (20)

PPT
Pile foundation
PPTX
PILE FOUNDATION-INDIA
PPTX
Pile foundation
PDF
Pile foundation
DOCX
Different types of pile
PDF
Pile Foundation
PPT
types of Foundations with animated sketches
PPTX
PILE FOUNDATION (basics)
PPTX
Pile Foundation for advanced construction equipments
PPTX
Pile Foundation presentation
PPTX
Pile foundation
PPT
TYPES OF FOUNDATION(PPT)
PPTX
Foundation & Pile driving equipment
PPT
Foundation
PPTX
Pile foundation
PPTX
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
PPT
PILE FOUNDATION PROJECT TRAINING ANSHUL
PPTX
Pile foundation
PPTX
Pile foundation
PPTX
pile foundation and pile cap presentation
Pile foundation
PILE FOUNDATION-INDIA
Pile foundation
Pile foundation
Different types of pile
Pile Foundation
types of Foundations with animated sketches
PILE FOUNDATION (basics)
Pile Foundation for advanced construction equipments
Pile Foundation presentation
Pile foundation
TYPES OF FOUNDATION(PPT)
Foundation & Pile driving equipment
Foundation
Pile foundation
Best numerical problem group pile capacity (usefulsearch.org) (useful search)
PILE FOUNDATION PROJECT TRAINING ANSHUL
Pile foundation
Pile foundation
pile foundation and pile cap presentation
Ad

Similar to Pile Foundation (20)

PPTX
Pile foundation
PDF
LECT 6 UPDATE.pdf
PPTX
Pile footing.pptx
PDF
Pile foundation
PPTX
DEEP FOUNDATION
PDF
Sagnik_Foundation_Engineering.pdf
PPTX
Pile foundation
PPTX
PILE FOUNDATIONS
PPTX
Sachpazis: Foundation Analysis and Design: Single Piles
PPTX
GT-II-Unit-III-PILE-PartA.pptx
PDF
Pile Foundations in Foundation Engineering
PPT
Pile foundation -sunil kumar mohapatra
PDF
Unit V_Deep Foundation (pile foundation)
PPTX
Pile foundations Case Study Delhi Metro Site Visit
PDF
Pile foundation design
PPTX
pilingvtechniques used in substructure construction
PPTX
1.PILE FOUNDATION (ACE) 2160601 GTU
PPTX
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
PPT
TYPES OF PILE FOUNDATION & APPLICATIONS
PPTX
Pile foundation
Pile foundation
LECT 6 UPDATE.pdf
Pile footing.pptx
Pile foundation
DEEP FOUNDATION
Sagnik_Foundation_Engineering.pdf
Pile foundation
PILE FOUNDATIONS
Sachpazis: Foundation Analysis and Design: Single Piles
GT-II-Unit-III-PILE-PartA.pptx
Pile Foundations in Foundation Engineering
Pile foundation -sunil kumar mohapatra
Unit V_Deep Foundation (pile foundation)
Pile foundations Case Study Delhi Metro Site Visit
Pile foundation design
pilingvtechniques used in substructure construction
1.PILE FOUNDATION (ACE) 2160601 GTU
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
TYPES OF PILE FOUNDATION & APPLICATIONS
Pile foundation

Recently uploaded (20)

PPTX
communication and presentation skills 01
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
Soil Improvement Techniques Note - Rabbi
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
Software Engineering and software moduleing
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PPTX
Current and future trends in Computer Vision.pptx
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
communication and presentation skills 01
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
"Array and Linked List in Data Structures with Types, Operations, Implementat...
August -2025_Top10 Read_Articles_ijait.pdf
Information Storage and Retrieval Techniques Unit III
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Soil Improvement Techniques Note - Rabbi
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Software Engineering and software moduleing
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Current and future trends in Computer Vision.pptx
III.4.1.2_The_Space_Environment.p pdffdf
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx

Pile Foundation

  • 1. Civil Engineering Practice Chapter # 4 Pile Foundation 1 Pile Foundation
  • 2. CHAPTER # 04 CHP # 04: Pile Foundation ---(Pile Foundation)--- * * * Piles are relatively long and slender members used to transmit foundation loads through soil strata of low bearing capacity to * * deeper soil or rocky strata having a high bearing capacity. I th d th l d i l t itt d t th il bIn other words, the load is properly transmitted to the soil by driving long vertical members of either timber or concrete or steel called “Piles”. 2 Civil engineering practice
  • 3. Depth at which rocky or hard strata is available can normally be CHP # 04: Pile Foundation Depth at which rocky or hard strata is available can normally be 60 to 80 ft, showing the range of depth for the piles. Piles usually carry excessive loads as load of traffic on a bridge where the underneath strata can be of sand and silt fully saturated with watersaturated with water. Bore logs drawn after soil investigation is used to find out depthg g p of piles, diameter of piles and the numbers of piles required. Pile can also be defined as an element of construction placed in the ground either vertically or slightly inclined to increase the load carrying capacity of the soil. 3 d c y g c p c y s Civil engineering practice
  • 4. 4
  • 5. 5
  • 6. Piles are required for setting out of towers for high power CHP # 04: Pile Foundation Piles are required for setting out of towers for high power transmission lines and in some cases are also used for supporting the multistory buildings. 4.1 Types of Piles (Based Upon Use) 1- Sheet Piles Sheet piling is used primarily to resist lateral pressures such asSheet piling is used primarily to resist lateral pressures such as flow of water and loose soil. Typical uses include cut-off walls under dams, cofferdams, trench sheeting, etc. 6 Civil engineering practice
  • 7. 7
  • 8. 8
  • 9. 9
  • 10. 10
  • 12. 2- Load Bearing Piles CHP # 04: Pile Foundation These are used primarily to transmit loads through soil formations with poor supporting properties into or onto formations that are capable of supporting the loads Dependingformations that are capable of supporting the loads. Depending upon how load is transferred to the soil, load-bearing piles can be further classified into: (a) End Bearing Piles If l d i i d h il h h h l i h il iIf load is transmitted to the soil through the lower tip, the pile is called an “End Bearing Pile”. These piles transmit the superimposed load to stronger strata such as a rock bed. End area of pile times the bearing capacity of h k i h l l d hi h b li d 12 the rock is the total load, which can be applied. Civil engineering practice
  • 13. Considering reasonable factor of safety, we can find diameter of CHP # 04: Pile Foundation the pile required. 13 Civil engineering practice
  • 14. 14
  • 16. (b) Friction Piles CHP # 04: Pile Foundation These are designed to transmit the loads by the frictional force existing between the sides of the pile and the ground such as the stuff clays or dense sandy depositstuff clays or dense sandy deposit. Friction can be developed for full length as in first figure or it canp g g be developed in lower portions only depending upon the stratification of soil. Surface area times the safe friction which can be developed per unit area determines the load to be carried by the pile. Selectingy p g diameter or length of pile, the other quantity can be calculated. 16 Civil engineering practice
  • 17. (b) Friction Piles CHP # 04: Pile Foundation 17 Civil engineering practice
  • 18. 18
  • 19. 19
  • 20. 20
  • 21. 21
  • 22. (c) End Bearing and Friction Piles CHP # 04: Pile Foundation These are the piles that dissipate part of the load by friction and transfer the remaining load to firm strata. 3- Piles as Soil Compactor Sometimes closely spaced piles are driven to compact theSometimes closely spaced piles are driven to compact the surrounding soil. 22 Civil engineering practice
  • 23. 4.2 Types of Piles (Based on material used and method of CHP # 04: Pile Foundation construction) On the basis of the material from which they are made and the method of constructing and driving them load bearing pilesmethod of constructing and driving them, load-bearing piles may be classified as follows: – Timber U da. Untreated b. Treated with a preservative – Concrete a. Pre-cast b. Cast-in-place S l– Steel a. I-section b. Steel-pipe 23 p p – Composite Civil engineering practice
  • 24. Driven timber piles, Pacific Highway 24 p g y
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 4.3 Factors Affecting Selection of Piles CHP # 04: Pile Foundation Among the factors that will influence the selection of type of piles for a given project are the following: 1. Type, size, and weight of the structure to be supported.1. Type, size, and weight of the structure to be supported. 2. Physical properties of the soil at the site. 3. Depth to a stratum capable of supporting the piles. 4. Possibility of variations in the depth to a supporting stratum. 5. Availability of materials for piles. 6 Number of piles required6. Number of piles required. 7. Facilities for driving piles. 8. Comparative costs in place. 9. Durability required. 10. Types of structures adjacent to the project. 11 Depth and kind of water if any above the ground into which 28 11. Depth and kind of water, if any, above the ground into which the piles will be driven. Civil engineering practice
  • 29. 4.4 Significance of Pile Foundation CHP # 04: Pile Foundation Pile foundation is suitable for works over water such as bridge`-piers, foundation of transmission towers and foundation of multistory buildingsfoundation of multistory buildings. From head or cap of piles, we can construct the grids with beams and columns. 29 Civil engineering practice
  • 30. 4.4 Significance of Pile Foundation CHP # 04: Pile Foundation The number of piles depends on the type of pile and the load coming from the buildings. 30 Civil engineering practice
  • 31. 31
  • 32. CHP # 04: Pile Foundation ooden Pilesooden Piles 32 Civil engineering practice
  • 33. 4.5 Wooden Piles CHP # 04: Pile Foundation These piles, if used below the ground water level, last for a very long period but ordinarily they last no longer than 30 years or so even if treated.yea s o so eve t eated. The circular piles vary in diameter from 12 inch to 16-inch. If square sizes are used, they also vary in size fro 12 inch to 16- inch square. The length of the piles is about 20 times the top width.width. The timber point may be protected or replaced by a metallic shoe; shoes are used while driving through soils containing boulders, gravels, hard clays etc. 33 Civil engineering practice
  • 34. 4.5 Wooden Piles CHP # 04: Pile Foundation They may be of C.I. and should have sufficient length of wrought iron straps to connect them with the pile. The head of the pile is subjected to a heavy impact of the driving machine; hence, rings of wrought iron are fitted to theg ; , g g pile head. They vary in cross-section from 2 in. to 4 in. Timber piles should not be loaded above 15 to 20 tons and should be carefully driven. Whenever it is necessary to use a longer pile than available in usual lengths, it is necessary to splice the piles together, with 34 their ends abutting each other. Civil engineering practice
  • 35. 4.5 Wooden Piles CHP # 04: Pile Foundation Additional strength can be obtained by the use of steel fishplates bolted to the sides of the piles. Among the advantages of timber piles are the following: 1. The more popular lengths and sizes are available on short notice. 2. They are economical in cost. 3. They are handled easily, with little danger of breakage. 4. They can be cut off to any desired length after they are driven. 5. They can be pulled easily in the event removal is necessary. 35 Civil engineering practice
  • 36. 4.5 Wooden Piles CHP # 04: Pile Foundation Among the disadvantages of timber piles are the following: 1. It may be difficult to obtain piles sufficiently long and straight for some projects. 2. It may be difficult or impossible to drive them into hard formations. 3 I i diffi l li h i h i l h3. It is difficult to splice them to increase their lengths. 4. While they are satisfactory when used as friction piles, they are not suitable for use as end-bearing piles under heavy loads.g p y 5. The length of life may be short unless the piles are treated with a preservative. 36 Civil engineering practice
  • 37. 37
  • 38. CHP # 04: Pile Foundation oncrete Pilesoncrete Piles 38 Civil engineering practice
  • 40. 4.6 Concrete Piles CHP # 04: Pile Foundation (a) Pre-cast Concrete Piles Square and octagonal piles are cast in horizontal forms, while round piles are casts in vertical forms. After the piles are cast, they should be cured for the period required by specifications, frequently 21 days. With the exception of short lengths, Precast concrete piles t b i f d ith ffi i t t l t t dmust be reinforced with sufficient steel to prevent damage or breakage while they are being handled from the casting beds to the driving positions. 40 Civil engineering practice
  • 41. 4.6 Concrete Piles ( ) P C Pil CHP # 04: Pile Foundation (a) Pre-cast Concrete Piles Among the advantages of Pre cast concrete piles are theAmong the advantages of Pre-cast concrete piles are the following: 1. High resistance to chemical and biological attacks. 2. High strength. 3. A pipe may be installed along the center of a pile to facilitate driving. 41 Civil engineering practice
  • 42. 4.6 Concrete Piles ( ) P C Pil CHP # 04: Pile Foundation (a) Pre-cast Concrete Piles Among the disadvantages of Pre cast concrete piles are theAmong the disadvantages of Pre-cast concrete piles are the following: 1. It is difficult to reduce or increase the length. 2. Large sizes require heavy and expensive handling and driving equipment. 3 I bili b i il b h d l h i f3. Inability to obtain piles by purchase may delay the starting of a project. 4. Possible breakage of piles during handling or driving producesg p g g g p a delay hazard. 42 Civil engineering practice
  • 43. 4.6 Concrete Piles CHP # 04: Pile Foundation (b) Cast-in-Place Concrete Piles These piles are constructed by depositing the freshly mixed concrete in place in the ground and letting it cure there. The two principal methods of constructing such piles are:p p g p 1. Driving a metallic shell, leaving it in the ground and filling it with concrete. 2 D i i t lli h ll d filli it ith t th h ll2. Driving a metallic shell and filling it with concrete as the shell is pulled from the ground. 43 Civil engineering practice
  • 44. 44
  • 45. 4.6 Concrete Piles CHP # 04: Pile Foundation (b) Cast-in-Place Concrete Piles Among the advantages of cast in place concrete piles are theAmong the advantages of cast-in-place concrete piles are the following: 1. The lightweight shells may be handled and driven easily. 2. Variations in length do not present a serious problem. The length of a shell may be increased or decreased easily.g y y 3. The shells may be slipped in short lengths and assembled at the job. 4 E i f i t i t t d b h dli l4. Excess reinforcing, to resist stresses caused by handling only, is eliminated. 5. The danger of breaking a pile while driving is eliminated. 45 6. Additional piles may be provided quickly if they are needed. Civil engineering practice
  • 46. 4.6 Concrete Piles CHP # 04: Pile Foundation (b) Cast-in-Place Concrete Piles Among the disadvantages of cast-in-place concrete piles are the following: 1. A slight movement of the earth around an un-reinforced pile may break it. 2. An uplifting force, acting on the shaft of an uncased and un- reinforced pile, may cause it to fail in tension. 3 Th b tt f il t b t i l3. The bottom of pile may not be symmetrical. 46 Civil engineering practice
  • 47. 47
  • 48. CHP # 04: Pile Foundation teel Pilesteel Piles 48 Civil engineering practice
  • 49. 4.7 Steel Piles CHP # 04: Pile Foundation Steel piles may be of I-section or hollow pipe section 10 inches t 24 i h di t ith 3/8 i h thi kto 24 inches diameter with 3/8 inches thickness. Because of a small sectional area steel piles are easy to driveBecause of a small sectional area, steel piles are easy to drive. The pipes are driven with open ends. Compressed air with a pressure of 100 psi in a 2½ inches or more diameter pipe and h f ili h d i ithus facilitates the driving. These piles are later on filled with concrete Steel piles areThese piles are later on filled with concrete. Steel piles are mostly used as end bearing piles because of their less available surface area to take the loads by frictional forces. 49 Civil engineering practice
  • 50. 4.7 Steel Piles CHP # 04: Pile Foundation In constructing foundations that require piles driven to great depths, steel I-section probably are more suitable than anydept s, stee sect o p obab y a e o e su tab e t a a y other type. Steel piles may be driven through hard materials to a specified depth to eliminate the danger of failure due to scouring, such as under a pier in a river.as under a pier in a river. Also, steel piles may be driven to great depths through poor soils to bear on a solid rock stratum. 50 Civil engineering practice
  • 51. 4.7 Steel Piles CHP # 04: Pile Foundation The great strength of steel combined with the small displacement of soil permits a large portion of the energy fromd sp ace e t o so pe ts a a ge po t o o t e e e gy o a pile hammer to be transmitted to the bottom of a pile. As a result, it is possible to drive steel piles into soils, which could not be penetrated by any other type of pile. By weld splicing sections together, lengths in excess of 200ft have been driven. 51 Civil engineering practice
  • 52. 52
  • 53. CHP # 04: Pile Foundation crew Pilescrew Piles 53 Civil engineering practice
  • 54. 4.8 Screw Piles CHP # 04: Pile Foundation Screw piles consist of iron or steel shaft h i t it d t i t t lhaving at its end a cast iron or cast steel screw, with a blade 1.5ft to 5ft in diameter. These piles can be screwed down to a great depth in clay, etc., and penetrate h h ll b kthrough small broken stones. The base area of the screw does most ofThe base area of the screw does most of the weight bearing; they can be used for bridges in riverbeds with deep clay f d i 54 foundation. Civil engineering practice
  • 55. 55
  • 56. 56
  • 57. 57
  • 58. 58
  • 59. 4.9 Pile Driving CHP # 04: Pile Foundation The operation of forcing a pile into ground without any previous excavation is called “Pile Driving”. Following are the various methods of pile driving: 1. Drop hammer. 2. Steam-hammer. 3 Boring3. Boring. 4. Screwing. 5. Water jet. 59 Civil engineering practice
  • 60. 4.9 Pile Driving 1 D H M h d CHP # 04: Pile Foundation 1- Drop Hammer Method It is the simplest method of pile driving. In this method, at s t e s p est et od o p e d v g. t s et od, a hammer is dropped on the head of the pile and is guided during its fall by suitable staging. The hammer is raised by pulling a rope manually or by steam engine or electric motor. The weight of the hammer forengine or electric motor. The weight of the hammer for driving concrete or wooden piles is about 225 kg for short piles and 900 kg to 2350 kg for long and heavy piles. Hammer is generally dropped from a height of 15m to 45m and the height is limited to 6 m The pile-driving frame is kept 60 and the height is limited to 6 m. The pile driving frame is kept in vertical position by suitable ropes. Civil engineering practice
  • 61. 61
  • 62. 4.9 Pile Driving 2 S H M h d CHP # 04: Pile Foundation 2- Steam Hammer Method A heavy hammer is dropped on to the pile through a smalleavy a e s d opped o to t e p e t oug a s a height but in quick succession. Single acting or double acting steam hammers are available. These hammers are raised with high-pressure steam and are dropped under gravity when single acting or by steam wheredropped under gravity when single acting or by steam where there is double acting hammer. These hammers are specially used for driving sheet piles and where small vibrations are i d t b t i th ilrequired to be set up in the piles. Special devices are used to protect the heads of the piles from 62 Special devices are used to protect the heads of the piles from damage due to excessive blows, which they receive. Civil engineering practice
  • 63. 63
  • 64. 4.9 Pile Driving CHP # 04: Pile Foundation 3- Boring S ti ili i d b b i h l f it bl di tSometimes, piling is done by boring holes of suitable diameter to the required depth and then dropping piles in them. Generally cast-in-situ piles are laid by this method. 4- Screwing Screw piles and disc piles are generally driven by this method. They are driven into the ground by turning them round andThey are driven into the ground by turning them round and round in one direction with big levers. 64 Civil engineering practice
  • 65. 4.9 Pile Driving 5 W J CHP # 04: Pile Foundation 5- Water Jets Pile driving can also be done by displacing the material at orP e d v g ca a so be do e by d sp ac g t e ate a at o near the foot of the pile by means of one or more water jets under pressure. Sometimes, hammer may be used to force the pile rapidly into the ground. The pressure of the jet should be sufficient tothe ground. The pressure of the jet should be sufficient to displace the soil and other removed materials for driving the piles quickly and satisfactorily. 65 Civil engineering practice
  • 66. 66