CHALLENGES AT PROJECT LEVEL
SOLAR/DIESEL MINI-GRIDS
TREVOR DE VRIES
2www.canadiansolar.com 2
3www.canadiansolar.com 3
4www.canadiansolar.com 4
 Reduction in variable cost;
 Oil Price at 6 yr low but ……?
 Of Total price <50% is retail;
 Significant diesel savings over LOM;
 8-12 PPA financially viable due to
high cost of Diesel;
 Demand for power is growing as
mines ‘dig deeper’;
 Reduction in CO2 emissions;
 Reduction of O&M costs
• Unstable grid;
• Logistical challenges for Fuel supply;
• Theft & Contamination of fuel;
• Political instability;
• Grid extension prohibitively high;
• >7km access makes Mini-grids feasible;
• Mini-grids will jump the grid like mobile did.!
• Monopolistic conditions causing
price uncertainty;
• Government subsidies aimed at
Gridco;
Why PV/Diesel Mini-grids….?
5www.canadiansolar.com
Why Mini-grid
PV-Diesel-Hybrid* is already a real business case in high irradiation regions with effective
Diesel cost > 1 USD/liter
* Ref: SMA, 2013
* RE penetration <15%
6www.canadiansolar.com
Mini-Grid Challenges
PV Penetration & Control
Technical
Legacy Retrofit
Project Finance
Financial
Solutions
Other
Challenges
Perceptions
Logistical
Environmental
Community Involvement
7www.canadiansolar.com
Technical Challenges
Design
PV Penetration & Control
Why is this important?
• Solar PV is an intermittent resource;
• Failure could result in electrical system collapse and outages;
• Large thermal power plants are generally made of multiple medium speed generators;
• Medium speed generators may not respond quick enough to the match intermittency;
• High speed generators sized to mirror solar PV capacity due to their fast response.
Degree of Penetration
• <20% - PV regarded as negative load no controller neccessary
• Prolonged PV may cause several DG to switch off affecting system inertia & frequency
fluctuations;
• Requires PV Inverter intelligence;
• >20% - DG Production must match consumption;
• Maintain minimum DG load under large influx of PV energy;
• Load loss – must throttle back PV inverters
• Mechanical Injection - operating at 30% of its rated power consumes 20% more fuel per kilowatt hour
produced compared with a diesel generator under full load.
• This leads to greater engine wear and an increased maintenance requirement due to deposits in the waste
gas system and in the pistons;
• N+1 rule for 110% of estimated load;
8www.canadiansolar.com
Technical Challenges
Legacy Retrofit
Diesel Generators
• Low Load or Variable Speed engines;
• Minimum Loading will determine RE penetration;
• Option 1: solar design is modified to suit the generators) or
• Option 2: the generators are modified to suit the solar design.
Example impact of diesel engine size on solar penetration (100kW load)
Ref: Solar/Diesel/Grid Handbook
Minimum Load Factor
Spinning Reserve
• Several HS DG running at load level to ramp up faster;
• Spinning reserve can be reduced if PV oversized compared to Inverter;
• Storage will reduce Diesel sizing, load shifting;
9www.canadiansolar.com
Technical Challenges
• Dropping a large load on a generator in a short timeframe can result in engine stall;
• Management of over-production (curtailment);
• Storage is key;
Illustrative Overview of Hybrid PV/Diesel Load and Generation Profile
Legacy Retrofit
Energy Management Plan
• Inadequate Load curve (15min) and future growth needs + margin;
• Powerhouse…?;
• Existing Diesel assets usually EOL;
• Outdated Diesel control systems;
• Contaminated fuel (Diesel & HFO);
• Adequate reference sites for controller technology;
• Accurate evaluation of DER and controller integration;
Other
10www.canadiansolar.com
Financial Challenges
Project Finance
PV / Diesel Hybrids
• Projects too small for Investors;
• How to secure PPA Risk (LOM, Curtailment, Sovereign, Liquidity, Foreign Exchange);
• Venture Risk with Infrastructure returns…?;
• Parental company guarantee not always available;
• Propriety engineering drives up cost….(MG test centre)
Rural Mini-grids
• No clear standards for technical bankability;
• No confirmed revenue stream; (PAYG, Political Risks and grid expansion;
• No Scalable business model;
• Current projects only exist through large Government subsidies;
• Early development funding:
• Grants;
• Crowdfunding (Sun Exchange. TRINE, Ecoligo);
11www.canadiansolar.com
Financial Challenges
Solutions
• Establishing common features for PPAs;
• Develop industrywide standards.;
• Reduced due diligence costs;
• > $300m threshold;
• Default de-risk;
• MG backed assets to access secondary markets
• Streamline due-diligence process;
• Green Bonds;
• Streamline Operations;
• Need policy change to re-divert subsidies;
• Leverage existing data to match consumption for POC;
• Leverage anchor (commercial) client to subsidise residential tariffs;
Standerdised Contracts
Aggregation
Securitisation
Other
12www.canadiansolar.com
Other Challenges
Logistical
• Remoteness;
• Local logistics partners;
• Country specific Sub-contractor HSE requirements do not match contacting party;
• Special transport requirements (air suspension trucks);
• Very specific packing requirements;
• Permitting for abnormal loads vary considerably (no superlinks !) resulting in additional trips;
• Clearly defined laydown area (goods arrive site not ready!)
• Goods held at port incurring demurrage costs;
• Lack of heavy lifting equipment;
• Identified spares storage for O&M;
• Environmental issues like water onsite for dust & road control;
• Bribery & Theft;
• Inadequate lead time;
• Country specific investment incentives direct subsidise import duties; (up to project developer to provide)
• Custom risks must be well defined;
Environmental
• Risk of diesel spills in-situ and in transit, causing contamination of soil and ground water
• Greenhouse gas emissions from diesel combustion and fuel transportation
Community Involvement
13www.canadiansolar.com
Mini-grid Project Experience
Keewaywin
North Spirit Lake McDowell Lake
Deer Lake
14www.canadiansolar.com
Case Study – Fort Severn
400x people, 100 houses, 1x healthcare facility, some offices, church, community hall.
15www.canadiansolar.com
Case Study – Fort Severn
----What did we do?
 Proposed a phased-in solar
capacity development plan
 Phase I - Installed a grid
connected 24kWdc/20kWac solar
rooftop system.
 Gained confidence of community
and utility that renewables would
not have a negative impact.
 Phase II – To implement a pilot
Mini-grid including 300kW solar,
10kW wind and 200kW battery to
study the impact on the grid with
diesel as primary.
 Phase III – To implement a full
Mini-grid including 600kW solar,
500kW wind and 750kW battery
allowing for diesel-off operation.
----What did we learned?
 Logistics in remote locations
is unpredictable.
 Shipping BOS materials
was another challenge
 Important to triple check and
cross check bills of material.
 Necessity of working with
the situations as they arrive
and adapting to a change
on the fly.
----How did it start?
 Most remote community in
Ontario.
 Highest cost of electricity
generation due to transport
cost of diesel fuel.
 Planned community
growth.
 Prior – failed – experience
with wind energy.
16www.canadiansolar.com
Mini-Grid Test Centre
Mini-grid Control System
PV system
Wind Turbine
Flywheel
Battery Storage System
Load Banks
Diesel Gensets
Grid Simulator
PV Solar Simulator
Wind Simulator
Forecasting
17Canadian Solar Inc.
THANK YOU!
November 2016

More Related Content

PDF
Ab 2729 williams oil wells oppose
PDF
41 chris campbell - marine renewable canada
PDF
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
PDF
VERDIS Presentation - APR 2015 - CUSTOMER
PDF
Ricardo total cost of ownership-economics of emerging fleet technologies
PDF
LTBR Presentation April 2014
PDF
Earth_Renewed_CNRGH2.1
PPT
NEWE REAL ESTATE & ENERGY HOLDING, LLC
Ab 2729 williams oil wells oppose
41 chris campbell - marine renewable canada
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
VERDIS Presentation - APR 2015 - CUSTOMER
Ricardo total cost of ownership-economics of emerging fleet technologies
LTBR Presentation April 2014
Earth_Renewed_CNRGH2.1
NEWE REAL ESTATE & ENERGY HOLDING, LLC

What's hot (17)

PDF
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
PPTX
Brodeur Family Farms
PDF
New base 09 february 2021 energy news issue 1404 summary al awadi
PDF
Maritime Application of Hydrogen Fuel Cell Demonstration Project at Young Bro...
PDF
New base energy news 30 november 2020 issue no-1390 by senior editor khal...
PPT
Colgreen North Shore presentation-7.26.12
PDF
The Future of Hydrogen & RNG in Canada, Part 2: The Role of Utilities in Acce...
PDF
The Future of Hydrogen & RNG in Canada, Part 1: The Potential of Hydrogen & R...
PPT
Colgreen North Shore presentation-1.8a.13
PPTX
Nuclear Opportunities in the US and UK
PPT
Mark thomas presentation
PDF
World ROV Operations Market Forecast 2015-2019 Leaflet + Contents
PDF
Propell Technology Group, Inc. - Unlocking America's Petroleum
PPTX
Key Developments in Advanced Fuel Cycles and SNC-Lavalin's Vision for the Future
PDF
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
PDF
General Carbon Newsletter - April 2011
PDF
Advanced Fuel CANDU Reactor & the Fuel Cycle
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Brodeur Family Farms
New base 09 february 2021 energy news issue 1404 summary al awadi
Maritime Application of Hydrogen Fuel Cell Demonstration Project at Young Bro...
New base energy news 30 november 2020 issue no-1390 by senior editor khal...
Colgreen North Shore presentation-7.26.12
The Future of Hydrogen & RNG in Canada, Part 2: The Role of Utilities in Acce...
The Future of Hydrogen & RNG in Canada, Part 1: The Potential of Hydrogen & R...
Colgreen North Shore presentation-1.8a.13
Nuclear Opportunities in the US and UK
Mark thomas presentation
World ROV Operations Market Forecast 2015-2019 Leaflet + Contents
Propell Technology Group, Inc. - Unlocking America's Petroleum
Key Developments in Advanced Fuel Cycles and SNC-Lavalin's Vision for the Future
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
General Carbon Newsletter - April 2011
Advanced Fuel CANDU Reactor & the Fuel Cycle
Ad

Viewers also liked (6)

PPSX
Poa taoufik
DOCX
SOLAR PROJECTS ABSTRACT-Wind solar energy -hybrid power generation system (wise)
PPTX
Design & Construction of Wind-Solar Hybrid Power Generation System
PPTX
HYBRID POWER GENERATION SYSTEM From KMP College
PDF
Diesel to Solar
 
PDF
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
Poa taoufik
SOLAR PROJECTS ABSTRACT-Wind solar energy -hybrid power generation system (wise)
Design & Construction of Wind-Solar Hybrid Power Generation System
HYBRID POWER GENERATION SYSTEM From KMP College
Diesel to Solar
 
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
Ad

Similar to Challenges at project level for microgrid solutions lisbon 2016 (20)

PDF
Ips connect 2015 simon franklin
PDF
Funding commercial solar
PDF
Bunaken Island | Nov-15 | Renewable Energy in Small Island Grids
PPTX
Solar Panels
PDF
Murrray sheerin-renewable-energy-storage-best-practice-at-tpl-and-issues-faced
PPTX
SES - overall group
PPTX
Ontario pv market presentation see management team cb
PPTX
finalpresentation2.pptx
PPTX
Presentation to Baran Group Ltd. in summer 2015
PDF
Csiq ir ppt august 21 2013 v final
PPTX
Mini-grids for Energy Access in Sub-Saharan Africa
PPTX
Session_6_Project_risks_identification_and_mitigation_techniques.pptx
PPTX
Sachu constantine into the final steps
PPTX
Sachu constantine into the final steps
PDF
Solar Brochure
PDF
Prospects and Challenges of Solar Energy
PPTX
World| Electricity| Analysis and Commentary| December
PDF
Textbook retscreen pv
PPTX
Smart energy buildings 02.03.2016
PDF
Rebecca mills-securing-the-n ts-energy-future
Ips connect 2015 simon franklin
Funding commercial solar
Bunaken Island | Nov-15 | Renewable Energy in Small Island Grids
Solar Panels
Murrray sheerin-renewable-energy-storage-best-practice-at-tpl-and-issues-faced
SES - overall group
Ontario pv market presentation see management team cb
finalpresentation2.pptx
Presentation to Baran Group Ltd. in summer 2015
Csiq ir ppt august 21 2013 v final
Mini-grids for Energy Access in Sub-Saharan Africa
Session_6_Project_risks_identification_and_mitigation_techniques.pptx
Sachu constantine into the final steps
Sachu constantine into the final steps
Solar Brochure
Prospects and Challenges of Solar Energy
World| Electricity| Analysis and Commentary| December
Textbook retscreen pv
Smart energy buildings 02.03.2016
Rebecca mills-securing-the-n ts-energy-future

Recently uploaded (20)

PPTX
Research Process - Research Methods course
PPTX
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
PPT
First Aid Training Presentation Slides.ppt
PPTX
Sustainable Forest Management ..SFM.pptx
PPTX
Introduction-to-Food-Packaging-and-packaging -materials.pptx
DOCX
ENGLISH PROJECT FOR BINOD BIHARI MAHTO KOYLANCHAL UNIVERSITY
PPTX
PurpoaiveCommunication for students 02.pptx
PPTX
An Unlikely Response 08 10 2025.pptx
PPTX
ART-APP-REPORT-FINctrwxsg f fuy L-na.pptx
PPTX
Impressionism_PostImpressionism_Presentation.pptx
PDF
COLEAD A2F approach and Theory of Change
PPTX
Hydrogel Based delivery Cancer Treatment
PPTX
Tour Presentation Educational Activity.pptx
PDF
IKS PPT.....................................
PPTX
water for all cao bang - a charity project
PDF
6.-propertise of noble gases, uses and isolation in noble gases
PPTX
Anesthesia and it's stage with mnemonic and images
PDF
Yusen Logistics Group Sustainability Report 2024.pdf
PPTX
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
PPTX
Tablets And Capsule Preformulation Of Paracetamol
Research Process - Research Methods course
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
First Aid Training Presentation Slides.ppt
Sustainable Forest Management ..SFM.pptx
Introduction-to-Food-Packaging-and-packaging -materials.pptx
ENGLISH PROJECT FOR BINOD BIHARI MAHTO KOYLANCHAL UNIVERSITY
PurpoaiveCommunication for students 02.pptx
An Unlikely Response 08 10 2025.pptx
ART-APP-REPORT-FINctrwxsg f fuy L-na.pptx
Impressionism_PostImpressionism_Presentation.pptx
COLEAD A2F approach and Theory of Change
Hydrogel Based delivery Cancer Treatment
Tour Presentation Educational Activity.pptx
IKS PPT.....................................
water for all cao bang - a charity project
6.-propertise of noble gases, uses and isolation in noble gases
Anesthesia and it's stage with mnemonic and images
Yusen Logistics Group Sustainability Report 2024.pdf
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
Tablets And Capsule Preformulation Of Paracetamol

Challenges at project level for microgrid solutions lisbon 2016

  • 1. November 2016 CSIQ NASDAQ Listed CHALLENGES AT PROJECT LEVEL SOLAR/DIESEL MINI-GRIDS TREVOR DE VRIES
  • 4. 4www.canadiansolar.com 4  Reduction in variable cost;  Oil Price at 6 yr low but ……?  Of Total price <50% is retail;  Significant diesel savings over LOM;  8-12 PPA financially viable due to high cost of Diesel;  Demand for power is growing as mines ‘dig deeper’;  Reduction in CO2 emissions;  Reduction of O&M costs • Unstable grid; • Logistical challenges for Fuel supply; • Theft & Contamination of fuel; • Political instability; • Grid extension prohibitively high; • >7km access makes Mini-grids feasible; • Mini-grids will jump the grid like mobile did.! • Monopolistic conditions causing price uncertainty; • Government subsidies aimed at Gridco; Why PV/Diesel Mini-grids….?
  • 5. 5www.canadiansolar.com Why Mini-grid PV-Diesel-Hybrid* is already a real business case in high irradiation regions with effective Diesel cost > 1 USD/liter * Ref: SMA, 2013 * RE penetration <15%
  • 6. 6www.canadiansolar.com Mini-Grid Challenges PV Penetration & Control Technical Legacy Retrofit Project Finance Financial Solutions Other Challenges Perceptions Logistical Environmental Community Involvement
  • 7. 7www.canadiansolar.com Technical Challenges Design PV Penetration & Control Why is this important? • Solar PV is an intermittent resource; • Failure could result in electrical system collapse and outages; • Large thermal power plants are generally made of multiple medium speed generators; • Medium speed generators may not respond quick enough to the match intermittency; • High speed generators sized to mirror solar PV capacity due to their fast response. Degree of Penetration • <20% - PV regarded as negative load no controller neccessary • Prolonged PV may cause several DG to switch off affecting system inertia & frequency fluctuations; • Requires PV Inverter intelligence; • >20% - DG Production must match consumption; • Maintain minimum DG load under large influx of PV energy; • Load loss – must throttle back PV inverters • Mechanical Injection - operating at 30% of its rated power consumes 20% more fuel per kilowatt hour produced compared with a diesel generator under full load. • This leads to greater engine wear and an increased maintenance requirement due to deposits in the waste gas system and in the pistons; • N+1 rule for 110% of estimated load;
  • 8. 8www.canadiansolar.com Technical Challenges Legacy Retrofit Diesel Generators • Low Load or Variable Speed engines; • Minimum Loading will determine RE penetration; • Option 1: solar design is modified to suit the generators) or • Option 2: the generators are modified to suit the solar design. Example impact of diesel engine size on solar penetration (100kW load) Ref: Solar/Diesel/Grid Handbook Minimum Load Factor Spinning Reserve • Several HS DG running at load level to ramp up faster; • Spinning reserve can be reduced if PV oversized compared to Inverter; • Storage will reduce Diesel sizing, load shifting;
  • 9. 9www.canadiansolar.com Technical Challenges • Dropping a large load on a generator in a short timeframe can result in engine stall; • Management of over-production (curtailment); • Storage is key; Illustrative Overview of Hybrid PV/Diesel Load and Generation Profile Legacy Retrofit Energy Management Plan • Inadequate Load curve (15min) and future growth needs + margin; • Powerhouse…?; • Existing Diesel assets usually EOL; • Outdated Diesel control systems; • Contaminated fuel (Diesel & HFO); • Adequate reference sites for controller technology; • Accurate evaluation of DER and controller integration; Other
  • 10. 10www.canadiansolar.com Financial Challenges Project Finance PV / Diesel Hybrids • Projects too small for Investors; • How to secure PPA Risk (LOM, Curtailment, Sovereign, Liquidity, Foreign Exchange); • Venture Risk with Infrastructure returns…?; • Parental company guarantee not always available; • Propriety engineering drives up cost….(MG test centre) Rural Mini-grids • No clear standards for technical bankability; • No confirmed revenue stream; (PAYG, Political Risks and grid expansion; • No Scalable business model; • Current projects only exist through large Government subsidies; • Early development funding: • Grants; • Crowdfunding (Sun Exchange. TRINE, Ecoligo);
  • 11. 11www.canadiansolar.com Financial Challenges Solutions • Establishing common features for PPAs; • Develop industrywide standards.; • Reduced due diligence costs; • > $300m threshold; • Default de-risk; • MG backed assets to access secondary markets • Streamline due-diligence process; • Green Bonds; • Streamline Operations; • Need policy change to re-divert subsidies; • Leverage existing data to match consumption for POC; • Leverage anchor (commercial) client to subsidise residential tariffs; Standerdised Contracts Aggregation Securitisation Other
  • 12. 12www.canadiansolar.com Other Challenges Logistical • Remoteness; • Local logistics partners; • Country specific Sub-contractor HSE requirements do not match contacting party; • Special transport requirements (air suspension trucks); • Very specific packing requirements; • Permitting for abnormal loads vary considerably (no superlinks !) resulting in additional trips; • Clearly defined laydown area (goods arrive site not ready!) • Goods held at port incurring demurrage costs; • Lack of heavy lifting equipment; • Identified spares storage for O&M; • Environmental issues like water onsite for dust & road control; • Bribery & Theft; • Inadequate lead time; • Country specific investment incentives direct subsidise import duties; (up to project developer to provide) • Custom risks must be well defined; Environmental • Risk of diesel spills in-situ and in transit, causing contamination of soil and ground water • Greenhouse gas emissions from diesel combustion and fuel transportation Community Involvement
  • 14. 14www.canadiansolar.com Case Study – Fort Severn 400x people, 100 houses, 1x healthcare facility, some offices, church, community hall.
  • 15. 15www.canadiansolar.com Case Study – Fort Severn ----What did we do?  Proposed a phased-in solar capacity development plan  Phase I - Installed a grid connected 24kWdc/20kWac solar rooftop system.  Gained confidence of community and utility that renewables would not have a negative impact.  Phase II – To implement a pilot Mini-grid including 300kW solar, 10kW wind and 200kW battery to study the impact on the grid with diesel as primary.  Phase III – To implement a full Mini-grid including 600kW solar, 500kW wind and 750kW battery allowing for diesel-off operation. ----What did we learned?  Logistics in remote locations is unpredictable.  Shipping BOS materials was another challenge  Important to triple check and cross check bills of material.  Necessity of working with the situations as they arrive and adapting to a change on the fly. ----How did it start?  Most remote community in Ontario.  Highest cost of electricity generation due to transport cost of diesel fuel.  Planned community growth.  Prior – failed – experience with wind energy.
  • 16. 16www.canadiansolar.com Mini-Grid Test Centre Mini-grid Control System PV system Wind Turbine Flywheel Battery Storage System Load Banks Diesel Gensets Grid Simulator PV Solar Simulator Wind Simulator Forecasting
  • 17. 17Canadian Solar Inc. THANK YOU! November 2016