INSTITUTE OFTECHNOLOGY
DEPARTMENT OF CIVIL ENGINEERING
BANGALORE – 560097
CERTIFICATE
Seminar
On
CHENAB BRIDGE
BY
KUMAR
Under the Guidance of
MS. …….
Asst. Professor,Dept. of CIVIL
Indian Railways has undertaken the mega-
project of construction of a new railway line in
the State of Jammu and Kashmir.
The Chenab Bridge is a railway steel and
concrete arch bridge under construction
between Bakkal and Kauri in the Reasi from
Udhampur to Baramulla.
INTRODUCTION
CHENAB BRIDGE
Deck height (height above river) - 359 m (1,178 ft.)
Bridge length - 1,315 m (4,314 ft.)
Arch span - 485m (1,532 ft.)
Total number of span – 17
Maximum height of pier - 133.7m
Description of bridge
Chenab bridge ppt
Travelling in and around the
mountainous region has been a
great difficulty and dangerous
for locals.
For better transportation
facilities Government of India
Constructing a national
railway project that will
connect J&K with the rest of
India.
Need for the Chenab rail bridge
SITE OF BRIDGE
Site is located in mountainous region of Jammu
Kashmir.
Geology
The Chenab Bridge is located in the trickiest section of the
Jammu-Udhampur-Srinagar-Baramulla rail route, where the
typical geology consists of young Himalaya rock.
 poor quality, broken rock with dolomitic limestone and
firestone lentils with a silicate content.
 Rock class III to V with a strength of 60 to 100MPa and a
volume weight of 2.7t/m³ is encountered
The RMR (rock mass rating) index amounts to 40 to 60.
The planning of this project has been done by WSP group
(Finland) and design of arch is done by sub consultant Leonhardt.
Indian Railway Standards (IRS Standards), IRC, IS have been
used while designing the bridge.
The design speed of the railway was set to be 100 km/h and the
design life had to be 120 years. Fatigue assessment shall be done
as per BS: 5400 Part –10
All conventional railway bridge loads, this bridge has to sustain
special blast loads specified by Indian railway
Design innovation
 Wind loads will be derived
using physical topographic
models of the site and tests in
a wind tunnel laboratory
The bridge is designed to resist
wind speeds of up to
260kmph.
The seismic nature of the
project zone was also
considered during its design.
Chenab bridge ppt
 Limit state philosophy of
design has been decided to be
followed as per BS codes.
 Provision of long welded rail
(LWR) over the bridges and
resulting force calculation as
per UIC – 774-3R guidelines.
 Deformation limits as per
comfort criteria of UIC –
776-2R and UIC 776 -3R
guidelines.
The bridge’s construction principle entails a large bridge
arch with access viaducts at each side.
The large arch is designed as a 2-fold ribbed arch
comprising steel girders with scaffolding braces produced on
the spot.
 5 bridge pillars for the access viaducts are made of steel and
13 of concrete.
The bridge will consist of about 25000 tonnes of steel
structures, the main portion of which will be used for the
arch bridge section
Construction
 A cable crane will be built
over the valley for
constructing the steel
structures.
 The crane can deliver a
maximum amount of 40
tonnes of steel parts.
FOUNDATION
In order to set up the
foundations for the bridge in
the difficult terrain, Safe
excavation at both sides of
the valley is being prepared
on a grand scale, drilling for
foundation.
The tallest pier is 137.7m tall,
such a tall structure is
required massive foundation
of 150m*36.5m
Slope stabilization
The side slope of the valley
varies from 43 ̊ to 77 ̊
The slope stabilization
measure are design by the
Indian institute of science.
 After excavation rock bolt of
design length of 4m, 8.5m and
11.5m are installed.
 Porus pipes are inserted to prevent the hydrostatic pressure
Guniting with steel reinforcement is provided to strengthen and
stablize the slope.
Challenges in construction
No proper road network in challenging terrain.
The infrastructure of the area are causing additional problems.
Transportation of the construction equipment.
Sensitive region for terrorist attack.
The design of the main arch requires consideration of a number
of additional parameters, such as fatigue, global stability,
second order effects, composite action, etc.
 It also requires that such a bridge is designed to achieve a
consistent level of reliability for all load cases, and that the
design standards match the construction standards.
The Chenab Bridge will be the biggest / the longest-span / the
highest railway arch bridge ever built in the world.
Conclusions
THANK YOU…

More Related Content

PPTX
CHENAB BRIDGE
PPTX
Chenab Bridge
PPTX
conceptual desig of Chenab bridge
DOCX
report
PDF
Construction challenge of bridge in hilly areas
PDF
project report on truss bridge
PPTX
Foot bridge presentation
PPTX
Bridges and its Types & Components by Chetan Bisht
CHENAB BRIDGE
Chenab Bridge
conceptual desig of Chenab bridge
report
Construction challenge of bridge in hilly areas
project report on truss bridge
Foot bridge presentation
Bridges and its Types & Components by Chetan Bisht

What's hot (20)

PPTX
Chenab Bridge, Jammu and Kashmir - Railway Technology
PPTX
Metro Rail in India ppt
DOCX
Training Report on Bridge Construction
PDF
Internship Report on metro project
DOCX
Construction Challenges For Bridges In Hilly Areas
PPTX
Box culverts
PDF
Tunneling & Drilling Equipments
PPTX
Training project report NHAI by Amit Kumar
PPTX
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
PPTX
Worldhighestrailwaybridge
PPTX
Road construction ppt
PPTX
Medians/Traffic separators , kerbs, Road margins
DOCX
final year Project (civil)
DOCX
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
PPTX
Chapter 1 traffic characterstics
PPTX
Left hand turnout
PPTX
Railways for urban transportation
PDF
Summer Internship Report of Civil Engineering in Construction Site
PPTX
Intersection,types
Chenab Bridge, Jammu and Kashmir - Railway Technology
Metro Rail in India ppt
Training Report on Bridge Construction
Internship Report on metro project
Construction Challenges For Bridges In Hilly Areas
Box culverts
Tunneling & Drilling Equipments
Training project report NHAI by Amit Kumar
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
Worldhighestrailwaybridge
Road construction ppt
Medians/Traffic separators , kerbs, Road margins
final year Project (civil)
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
Chapter 1 traffic characterstics
Left hand turnout
Railways for urban transportation
Summer Internship Report of Civil Engineering in Construction Site
Intersection,types
Ad

Viewers also liked (11)

PPTX
Bridges construction
PPTX
Structural engineering ppt 1
PPT
Kashmir rail project
PPTX
Blast resistance building
PDF
Chenab River Bridge
PPT
textile reinforced concrete
DOCX
Bahrain World Trade Centre
PPTX
Canal System of Pakistan
PPTX
World trade centre,bahrain
PPTX
One world trade centre
PPTX
The kingdom of bahrain presentation ppt
Bridges construction
Structural engineering ppt 1
Kashmir rail project
Blast resistance building
Chenab River Bridge
textile reinforced concrete
Bahrain World Trade Centre
Canal System of Pakistan
World trade centre,bahrain
One world trade centre
The kingdom of bahrain presentation ppt
Ad

Similar to Chenab bridge ppt (20)

PDF
Presentation on chenab bridge by Aamir Khan
PPTX
10 infrastructure projects in india(Chenab bridge)
PDF
Report CHENAB BRIDGE 46,47,48,49 ....pdf
PDF
Chenab Bridge.pdf
PPTX
Chenab Railway Bridge
PPTX
Chenab Railway Bridge PPT.pptx
PPTX
Charan bridge construction methodology presentayion
PPTX
Design of t beam bridge using wsm(2)
PPTX
Connecting-the-Future-The-Chenab-Bridge-Story.pptx
DOCX
DESIGN OF T BEAM BRIDGE PROCEDURE
PPTX
Adaptive_Design_Chenab_Bridge_Seminar.pptx
PPT
Presentation on construction of cable stay bridge - a modern technique for su...
PPTX
Bridge-Introduction-8th-civil engineering.pptx
PDF
Bridge introduction-8th-civil
PDF
bridges overview.pdf
PPTX
BRIDGE OVERVIEW
PPTX
Adaptive_Design_Chenab_Bridge_Seminar_Updated.pptx
PDF
Undergraduate major project_-_design_of
PPTX
Munger rail cum road bridge
PPTX
presentation
Presentation on chenab bridge by Aamir Khan
10 infrastructure projects in india(Chenab bridge)
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Chenab Bridge.pdf
Chenab Railway Bridge
Chenab Railway Bridge PPT.pptx
Charan bridge construction methodology presentayion
Design of t beam bridge using wsm(2)
Connecting-the-Future-The-Chenab-Bridge-Story.pptx
DESIGN OF T BEAM BRIDGE PROCEDURE
Adaptive_Design_Chenab_Bridge_Seminar.pptx
Presentation on construction of cable stay bridge - a modern technique for su...
Bridge-Introduction-8th-civil engineering.pptx
Bridge introduction-8th-civil
bridges overview.pdf
BRIDGE OVERVIEW
Adaptive_Design_Chenab_Bridge_Seminar_Updated.pptx
Undergraduate major project_-_design_of
Munger rail cum road bridge
presentation

Recently uploaded (20)

PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
PPT on Performance Review to get promotions
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
Geodesy 1.pptx...............................................
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
737-MAX_SRG.pdf student reference guides
PPT
Project quality management in manufacturing
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
web development for engineering and engineering
PPTX
additive manufacturing of ss316l using mig welding
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
DOCX
573137875-Attendance-Management-System-original
CH1 Production IntroductoryConcepts.pptx
PPT on Performance Review to get promotions
CYBER-CRIMES AND SECURITY A guide to understanding
Automation-in-Manufacturing-Chapter-Introduction.pdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Internet of Things (IOT) - A guide to understanding
Operating System & Kernel Study Guide-1 - converted.pdf
Geodesy 1.pptx...............................................
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
R24 SURVEYING LAB MANUAL for civil enggi
bas. eng. economics group 4 presentation 1.pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
737-MAX_SRG.pdf student reference guides
Project quality management in manufacturing
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
web development for engineering and engineering
additive manufacturing of ss316l using mig welding
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Foundation to blockchain - A guide to Blockchain Tech
573137875-Attendance-Management-System-original

Chenab bridge ppt

  • 1. INSTITUTE OFTECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING BANGALORE – 560097 CERTIFICATE Seminar On CHENAB BRIDGE BY KUMAR Under the Guidance of MS. ……. Asst. Professor,Dept. of CIVIL
  • 2. Indian Railways has undertaken the mega- project of construction of a new railway line in the State of Jammu and Kashmir. The Chenab Bridge is a railway steel and concrete arch bridge under construction between Bakkal and Kauri in the Reasi from Udhampur to Baramulla. INTRODUCTION
  • 4. Deck height (height above river) - 359 m (1,178 ft.) Bridge length - 1,315 m (4,314 ft.) Arch span - 485m (1,532 ft.) Total number of span – 17 Maximum height of pier - 133.7m Description of bridge
  • 6. Travelling in and around the mountainous region has been a great difficulty and dangerous for locals. For better transportation facilities Government of India Constructing a national railway project that will connect J&K with the rest of India. Need for the Chenab rail bridge
  • 7. SITE OF BRIDGE Site is located in mountainous region of Jammu Kashmir.
  • 8. Geology The Chenab Bridge is located in the trickiest section of the Jammu-Udhampur-Srinagar-Baramulla rail route, where the typical geology consists of young Himalaya rock.  poor quality, broken rock with dolomitic limestone and firestone lentils with a silicate content.  Rock class III to V with a strength of 60 to 100MPa and a volume weight of 2.7t/m³ is encountered The RMR (rock mass rating) index amounts to 40 to 60.
  • 9. The planning of this project has been done by WSP group (Finland) and design of arch is done by sub consultant Leonhardt. Indian Railway Standards (IRS Standards), IRC, IS have been used while designing the bridge. The design speed of the railway was set to be 100 km/h and the design life had to be 120 years. Fatigue assessment shall be done as per BS: 5400 Part –10 All conventional railway bridge loads, this bridge has to sustain special blast loads specified by Indian railway Design innovation
  • 10.  Wind loads will be derived using physical topographic models of the site and tests in a wind tunnel laboratory The bridge is designed to resist wind speeds of up to 260kmph. The seismic nature of the project zone was also considered during its design.
  • 12.  Limit state philosophy of design has been decided to be followed as per BS codes.  Provision of long welded rail (LWR) over the bridges and resulting force calculation as per UIC – 774-3R guidelines.  Deformation limits as per comfort criteria of UIC – 776-2R and UIC 776 -3R guidelines.
  • 13. The bridge’s construction principle entails a large bridge arch with access viaducts at each side. The large arch is designed as a 2-fold ribbed arch comprising steel girders with scaffolding braces produced on the spot.  5 bridge pillars for the access viaducts are made of steel and 13 of concrete. The bridge will consist of about 25000 tonnes of steel structures, the main portion of which will be used for the arch bridge section Construction
  • 14.  A cable crane will be built over the valley for constructing the steel structures.  The crane can deliver a maximum amount of 40 tonnes of steel parts.
  • 15. FOUNDATION In order to set up the foundations for the bridge in the difficult terrain, Safe excavation at both sides of the valley is being prepared on a grand scale, drilling for foundation. The tallest pier is 137.7m tall, such a tall structure is required massive foundation of 150m*36.5m
  • 16. Slope stabilization The side slope of the valley varies from 43 ̊ to 77 ̊ The slope stabilization measure are design by the Indian institute of science.  After excavation rock bolt of design length of 4m, 8.5m and 11.5m are installed.
  • 17.  Porus pipes are inserted to prevent the hydrostatic pressure
  • 18. Guniting with steel reinforcement is provided to strengthen and stablize the slope.
  • 19. Challenges in construction No proper road network in challenging terrain. The infrastructure of the area are causing additional problems. Transportation of the construction equipment. Sensitive region for terrorist attack.
  • 20. The design of the main arch requires consideration of a number of additional parameters, such as fatigue, global stability, second order effects, composite action, etc.  It also requires that such a bridge is designed to achieve a consistent level of reliability for all load cases, and that the design standards match the construction standards. The Chenab Bridge will be the biggest / the longest-span / the highest railway arch bridge ever built in the world. Conclusions