➢ Indian Railways has undertaken the mega-
project of construction of a new railway line
in the State of Jammu and Kashmir.
➢ The Chenab Bridge is a railway steel and
concrete arch bridge under construction
between Bakkal and Kauri in the Reasi from
Udhampur to Baramulla.
INTRODUCTION
CHENAB BRIDGE
➢ Deck height (height above river) - 359 m (1,178 ft.)
➢ Bridge length - 1,315 m (4,314 ft.)
➢ Arch span - 485m (1,532 ft.)
➢ Total number of span – 17
➢ Maximum height of pier - 133.7m
Description of bridge
Presentation on chenab bridge by Aamir Khan
➢ Travelling in and around the
mountainous region has been a
great difficulty and dangerous
for locals.
➢ For better transportation
facilities Government of India
Constructing a national
railway project that will
connect J&K with the rest of
India.
Need for the Chenab rail bridge
SITE OF BRIDGE
➢ Site is located in mountainous region of Jammu
Kashmir.
Geology
➢ The Chenab Bridge is located in the trickiest section of the
Jammu-Udhampur-Srinagar-Baramulla rail route, where
the typical geology consists of young Himalaya rock.
➢ poor quality, broken rock with dolomitic limestone and
firestone lentils with a silicate content.
➢ Rock class III to V with a strength of 60 to 100MPa and a
volume weight of 2.7t/m³ is encountered
➢ The RMR (rock mass rating) index amounts to 40 to 60.
➢ The planning of this project has been done by WSP group
(Finland) and design of arch is done by sub consultant Leonhardt.
➢ Indian Railway Standards (IRS Standards), IRC, IS have been
used while designing the bridge.
➢ The design speed of the railway was set to be 100 km/h and the
design life had to be 120 years. Fatigue assessment shall be done
as per BS: 5400 Part –10
➢ All conventional railway bridge loads, this bridge has to sustain
special blast loads specified by Indian railway
Design innovation
➢ Wind loads will be derived
using physical topographic
models of the site and tests in
a wind tunnel laboratory
➢ The bridge is designed to resist
wind speeds of up to
260kmph.
➢ The seismic nature of the
project zone was also
considered during its design.
Presentation on chenab bridge by Aamir Khan
➢ Limit state philosophy of
design has been decided to be
followed as per BS codes.
➢ Provision of long welded rail
(LWR) over the bridges and
resulting force calculation as
per UIC – 774-3R guidelines.
➢ Deformation limits as per
comfort criteria of UIC –
776-2R and UIC 776 -3R
guidelines.
➢ The bridge’s construction principle entails a large bridge
arch with access viaducts at each side.
➢ The large arch is designed as a 2-fold ribbed arch
comprising steel girders with scaffolding braces produced on
the spot.
➢ 5 bridge pillars for the access viaducts are made of steel and
13 of concrete.
➢ The bridge will consist of about 25000 tonnes of steel
structures, the main portion of which will be used for the
arch bridge section
Construction
➢ A cable crane will be built
over the valley for
constructing the steel
structures.
➢ The crane can deliver a
maximum amount of 40
tonnes of steel parts.
FOUNDATION
➢ In order to set up the
foundations for the bridge in
the difficult terrain, Safe
excavation at both sides of
the valley is being prepared
on a grand scale, drilling
for foundation.
➢ The tallest pier is 137.7m tall,
such a tall structure is
required massive foundation
of 150m*36.5m
Slope stabilization
➢ The side slope of the valley
varies from 43 ̊ to 77
➢ The slope stabilization
measure are design by the
Indian institute of science.
➢ After excavation rock bolt of
design length of 4m, 8.5m and
11.5m are installed.
∗ Porus pipes are inserted to prevent the hydrostatic pressure
➢ Guniting with steel reinforcement is provided to strengthen and
stablize the slope.
Challenges in construction
➢ No proper road network in challenging terrain.
➢ The infrastructure of the area are causing additional problems.
➢ Transportation of the construction equipment.
➢ Sensitive region for terrorist attack.
➢ The design of the main arch requires consideration of a
number of additional parameters, such as fatigue, global
stability, second order effects, composite action, etc.
➢ It also requires that such a bridge is designed to achieve a
consistent level of reliability for all load cases, and that the
design standards match the construction standards.
➢ The Chenab Bridge will be the biggest / the longest-span /
the highest railway arch bridge ever built in the world.
Conclusions
Thank You

More Related Content

PPTX
conceptual desig of Chenab bridge
PPTX
CHENAB BRIDGE
PPTX
Chenab Bridge, Jammu and Kashmir - Railway Technology
PPTX
Chenab Bridge
PDF
Construction challenge of bridge in hilly areas
DOCX
report
PPTX
Bridges in Hilly areas seminar
PDF
my project on chenab bridge
conceptual desig of Chenab bridge
CHENAB BRIDGE
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge
Construction challenge of bridge in hilly areas
report
Bridges in Hilly areas seminar
my project on chenab bridge

What's hot (20)

PPTX
challanges made for construction of bridge in hilly areas
PPTX
Worldhighestrailwaybridge
PPTX
Segmental bridge construction
PPTX
Chenab bridge ppt
PPTX
Metro presentation
PDF
flyover internship 2
DOCX
Construction Challenges For Bridges In Hilly Areas
PPT
segmental construction of bridges
PPT
Presentation on construction of cable stay bridge - a modern technique for su...
PPTX
Bridge engineering
PDF
Delhi metro internship Report (05.05.2018 04.06.2018)
PPTX
Construction sequence for metro Project (Elevated and Underground) and Time c...
PPTX
Bandra worli sea link case study
DOCX
project report on water supply works under supervision of indian railways
PPTX
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
PDF
Construction of a New Railway Track
PPTX
Cable stayed ppt acp
PDF
Metro ppt-180628112005
PPTX
BOGIBEEL BRIDGE
challanges made for construction of bridge in hilly areas
Worldhighestrailwaybridge
Segmental bridge construction
Chenab bridge ppt
Metro presentation
flyover internship 2
Construction Challenges For Bridges In Hilly Areas
segmental construction of bridges
Presentation on construction of cable stay bridge - a modern technique for su...
Bridge engineering
Delhi metro internship Report (05.05.2018 04.06.2018)
Construction sequence for metro Project (Elevated and Underground) and Time c...
Bandra worli sea link case study
project report on water supply works under supervision of indian railways
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
Construction of a New Railway Track
Cable stayed ppt acp
Metro ppt-180628112005
BOGIBEEL BRIDGE
Ad

Similar to Presentation on chenab bridge by Aamir Khan (20)

PPTX
10 infrastructure projects in india(Chenab bridge)
PPTX
Chenab Railway Bridge
PDF
Report CHENAB BRIDGE 46,47,48,49 ....pdf
PDF
Chenab Bridge.pdf
PPTX
Chenab Railway Bridge PPT.pptx
PPTX
Charan bridge construction methodology presentayion
PPTX
Connecting-the-Future-The-Chenab-Bridge-Story.pptx
PPTX
Design of t beam bridge using wsm(2)
PPTX
Adaptive_Design_Chenab_Bridge_Seminar.pptx
DOCX
DESIGN OF T BEAM BRIDGE PROCEDURE
PPTX
Analysis of Chenab bridge intro and methods
 
PPTX
Bridges construction
PPTX
Bridge-Introduction-8th-civil engineering.pptx
PPTX
Adaptive_Design_Chenab_Bridge_Seminar_Updated.pptx
PDF
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
PDF
Bridge introduction-8th-civil
PPTX
Munger rail cum road bridge
PDF
bridges overview.pdf
PPTX
BRIDGE OVERVIEW
PDF
Project report on pile construction
10 infrastructure projects in india(Chenab bridge)
Chenab Railway Bridge
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Chenab Bridge.pdf
Chenab Railway Bridge PPT.pptx
Charan bridge construction methodology presentayion
Connecting-the-Future-The-Chenab-Bridge-Story.pptx
Design of t beam bridge using wsm(2)
Adaptive_Design_Chenab_Bridge_Seminar.pptx
DESIGN OF T BEAM BRIDGE PROCEDURE
Analysis of Chenab bridge intro and methods
 
Bridges construction
Bridge-Introduction-8th-civil engineering.pptx
Adaptive_Design_Chenab_Bridge_Seminar_Updated.pptx
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Bridge introduction-8th-civil
Munger rail cum road bridge
bridges overview.pdf
BRIDGE OVERVIEW
Project report on pile construction
Ad

Recently uploaded (20)

PPTX
UNIT 4 Total Quality Management .pptx
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
Sustainable Sites - Green Building Construction
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
additive manufacturing of ss316l using mig welding
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Lecture Notes Electrical Wiring System Components
PDF
PPT on Performance Review to get promotions
PDF
Arduino robotics embedded978-1-4302-3184-4.pdf
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
Welding lecture in detail for understanding
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
UNIT 4 Total Quality Management .pptx
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Sustainable Sites - Green Building Construction
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
additive manufacturing of ss316l using mig welding
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Lecture Notes Electrical Wiring System Components
PPT on Performance Review to get promotions
Arduino robotics embedded978-1-4302-3184-4.pdf
Embodied AI: Ushering in the Next Era of Intelligent Systems
Welding lecture in detail for understanding
Operating System & Kernel Study Guide-1 - converted.pdf
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx

Presentation on chenab bridge by Aamir Khan

  • 1. Seminar On CHENAB BRIDGE BY Aamir Khan Under the Guidance of Er. Mahesh Sharma Asst. Professor,Dept. of CIVIL ENGINEERING School of Engineering And Applied Research
  • 2. ➢ Indian Railways has undertaken the mega- project of construction of a new railway line in the State of Jammu and Kashmir. ➢ The Chenab Bridge is a railway steel and concrete arch bridge under construction between Bakkal and Kauri in the Reasi from Udhampur to Baramulla. INTRODUCTION
  • 4. ➢ Deck height (height above river) - 359 m (1,178 ft.) ➢ Bridge length - 1,315 m (4,314 ft.) ➢ Arch span - 485m (1,532 ft.) ➢ Total number of span – 17 ➢ Maximum height of pier - 133.7m Description of bridge
  • 6. ➢ Travelling in and around the mountainous region has been a great difficulty and dangerous for locals. ➢ For better transportation facilities Government of India Constructing a national railway project that will connect J&K with the rest of India. Need for the Chenab rail bridge
  • 7. SITE OF BRIDGE ➢ Site is located in mountainous region of Jammu Kashmir.
  • 8. Geology ➢ The Chenab Bridge is located in the trickiest section of the Jammu-Udhampur-Srinagar-Baramulla rail route, where the typical geology consists of young Himalaya rock. ➢ poor quality, broken rock with dolomitic limestone and firestone lentils with a silicate content. ➢ Rock class III to V with a strength of 60 to 100MPa and a volume weight of 2.7t/m³ is encountered ➢ The RMR (rock mass rating) index amounts to 40 to 60.
  • 9. ➢ The planning of this project has been done by WSP group (Finland) and design of arch is done by sub consultant Leonhardt. ➢ Indian Railway Standards (IRS Standards), IRC, IS have been used while designing the bridge. ➢ The design speed of the railway was set to be 100 km/h and the design life had to be 120 years. Fatigue assessment shall be done as per BS: 5400 Part –10 ➢ All conventional railway bridge loads, this bridge has to sustain special blast loads specified by Indian railway Design innovation
  • 10. ➢ Wind loads will be derived using physical topographic models of the site and tests in a wind tunnel laboratory ➢ The bridge is designed to resist wind speeds of up to 260kmph. ➢ The seismic nature of the project zone was also considered during its design.
  • 12. ➢ Limit state philosophy of design has been decided to be followed as per BS codes. ➢ Provision of long welded rail (LWR) over the bridges and resulting force calculation as per UIC – 774-3R guidelines. ➢ Deformation limits as per comfort criteria of UIC – 776-2R and UIC 776 -3R guidelines.
  • 13. ➢ The bridge’s construction principle entails a large bridge arch with access viaducts at each side. ➢ The large arch is designed as a 2-fold ribbed arch comprising steel girders with scaffolding braces produced on the spot. ➢ 5 bridge pillars for the access viaducts are made of steel and 13 of concrete. ➢ The bridge will consist of about 25000 tonnes of steel structures, the main portion of which will be used for the arch bridge section Construction
  • 14. ➢ A cable crane will be built over the valley for constructing the steel structures. ➢ The crane can deliver a maximum amount of 40 tonnes of steel parts.
  • 15. FOUNDATION ➢ In order to set up the foundations for the bridge in the difficult terrain, Safe excavation at both sides of the valley is being prepared on a grand scale, drilling for foundation. ➢ The tallest pier is 137.7m tall, such a tall structure is required massive foundation of 150m*36.5m
  • 16. Slope stabilization ➢ The side slope of the valley varies from 43 ̊ to 77 ➢ The slope stabilization measure are design by the Indian institute of science. ➢ After excavation rock bolt of design length of 4m, 8.5m and 11.5m are installed.
  • 17. ∗ Porus pipes are inserted to prevent the hydrostatic pressure
  • 18. ➢ Guniting with steel reinforcement is provided to strengthen and stablize the slope.
  • 19. Challenges in construction ➢ No proper road network in challenging terrain. ➢ The infrastructure of the area are causing additional problems. ➢ Transportation of the construction equipment. ➢ Sensitive region for terrorist attack.
  • 20. ➢ The design of the main arch requires consideration of a number of additional parameters, such as fatigue, global stability, second order effects, composite action, etc. ➢ It also requires that such a bridge is designed to achieve a consistent level of reliability for all load cases, and that the design standards match the construction standards. ➢ The Chenab Bridge will be the biggest / the longest-span / the highest railway arch bridge ever built in the world. Conclusions