Landscape Project
Constructed Landscape
Group Leader:
Hooi Zhao Hong [0318564]
Group Members:
Bryan Teh Qing Da
Tan Ken Ric [0318631]
Tan Zhao Ming [0318724]
Agnes Yeo Shu Yuan [0318668]
Kong Xhiang Lynn [0317730]
Janice Lee Juen Yung [0318695]
Lecturer:
Mr. Fariz
Introduction
The site we have chosen is located in the car park. It is a 10 x 10m site. It is an abandoned
space located in between the car park and full of weeds. This space is abandoned and ignored
as many tall weeds are growing. It is very dangerous because this can be snake’s habitat,
making student’s life more dangerous because snakes can harm them.
Cl fp report (final)
Cl fp report (final)
Site analysis
The site located in the car park zone is very haunting, boring, and plain. It is an empty space.
The site is not very eye-catching, hence we have chosen this site. We can improve that area
by making it into a garden. People can rest here before taking their car which is located at the
far back of the car park since this space is located in the centre of the car park. People can
also hang out here. People can use this as a place for shelter to avoid being drenched in the
rain.
Concept
To create a better environment for car park. To improve visualisations, comfort, the
environment and as a shelter from rain.
Master Plan
To give an overall idea of how the site looks like with improvements made.
SCALE : 1: 50
Hardscape Plan
This garden consists of wooden fence , rocks, wood pavement, gazebo , fountain and bricks .
SCALE : 1:50
Planting Plan
There are different layers of planting plan , tall trees , mid-trees and low shrubs .
We have different types of plants and tree as shown below .
SHRUBS AND GROUND COVERS PLAN
TALL TREES AND MID-TREES PLAN
Costing
Construction Details (2 drawing)
[water fountain / fence ]
Maintenance Plan
Maintenance Cost RM/Mth
 Labour Cost
1. 3 laborers @ RM50/day x 4 times a month 600.00
2. 1 supervisor @ RM70/day x 4times a month 70.00
3. Transport – 1 lorry @ RM100/day x 4 times a month 400.00
 Material Cost
1. Fertiliser; once a month 100.00
2. Pest Control, once a month 100.00
3. Replacing Dead Plants 100.00
4. Unweed 100.00
Total 1470.00
 Add Profit &Overhead 20% 294.00
1,764.00 per month.
Total maintenance cost in a year 21,168.00
Plant List
Key Common Name Botanical Name Quantity
1. Cape Jasmine Gardenia Jasminoides 33
2. Pink Powderpuff Calliandra emarginata 12
3. Butterfly Bush Clerodendrum Myricodes 21
4. Spiny Bucida Bucida Molineti 7
5. Black Olive Bucida Buceras 3
6. Turtle Vine Callisia Repens 64m2
7. Zoysia Zoisya Grass 7m2
8. Golden Dew Drop Duranta 28m2

More Related Content

DOCX
Ici final project
DOCX
Scrapbook Journal
DOCX
Scrapbook Journal
ODP
What makes a good developer from a management perspective
PPTX
Epc presentation slides
DOCX
Concept
DOCX
Musical film
DOCX
Avenir report
Ici final project
Scrapbook Journal
Scrapbook Journal
What makes a good developer from a management perspective
Epc presentation slides
Concept
Musical film
Avenir report

Viewers also liked (6)

PPTX
Comic explained
PPTX
ORM Designer: Speed up your ORM development
DOCX
Booklet (architect)
PDF
WebSockets - how to do real-time applications in PHP
DOCX
Culture and History II: Report
DOCX
Effect of stress on students
Comic explained
ORM Designer: Speed up your ORM development
Booklet (architect)
WebSockets - how to do real-time applications in PHP
Culture and History II: Report
Effect of stress on students
Ad

Similar to Cl fp report (final) (20)

PDF
Cl final project
DOCX
CL report
DOCX
ICI Report
DOCX
Chong yu xuan cl-report
DOCX
CL final assignment report
DOCX
Chong yu xuan cl-report
DOCX
Chong yu xuan cl-report
DOCX
CL - Final Project Report
PDF
Constructed Landscape Proposal
PDF
Cl proposal
PDF
Cl proposal
PDF
CL S1P3 Proposal
PDF
Cl proposal
DOCX
ICI Final Project
DOC
Cl report
DOC
CL Report
PDF
FNBE0214_CL_Final Project_Report
DOCX
CL Final Report
DOCX
CL FINAL PROJECT REPORT
DOCX
Foundation in natural and built environment
Cl final project
CL report
ICI Report
Chong yu xuan cl-report
CL final assignment report
Chong yu xuan cl-report
Chong yu xuan cl-report
CL - Final Project Report
Constructed Landscape Proposal
Cl proposal
Cl proposal
CL S1P3 Proposal
Cl proposal
ICI Final Project
Cl report
CL Report
FNBE0214_CL_Final Project_Report
CL Final Report
CL FINAL PROJECT REPORT
Foundation in natural and built environment
Ad

More from Lynnstyles (20)

PDF
M arch dissertation proposal
PDF
The roles and process of research in architecture
PDF
Ent 2A
PDF
Ent1 proj1 final
PDF
Final report
PDF
Comparitive essay
PDF
Synopsis
PDF
Food and culture proposal
PDF
Bscience ii
PDF
Arc2625 logsheet
PDF
Arc2625 report file
PDF
Representing place proj2
DOCX
PDF
PDF
Service
PDF
Bstructure p2
PDF
Aa- passive design strategies
PDF
Bcon report
DOCX
Final report final copy
PPTX
Landscape architecture drawing
M arch dissertation proposal
The roles and process of research in architecture
Ent 2A
Ent1 proj1 final
Final report
Comparitive essay
Synopsis
Food and culture proposal
Bscience ii
Arc2625 logsheet
Arc2625 report file
Representing place proj2
Service
Bstructure p2
Aa- passive design strategies
Bcon report
Final report final copy
Landscape architecture drawing

Recently uploaded (20)

PDF
advance database management system book.pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
Complications of Minimal Access-Surgery.pdf
PDF
International_Financial_Reporting_Standa.pdf
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Race Reva University – Shaping Future Leaders in Artificial Intelligence
PPTX
Core Concepts of Personalized Learning and Virtual Learning Environments
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PPTX
Module on health assessment of CHN. pptx
PDF
HVAC Specification 2024 according to central public works department
PDF
Journal of Dental Science - UDMY (2021).pdf
advance database management system book.pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
What if we spent less time fighting change, and more time building what’s rig...
Complications of Minimal Access-Surgery.pdf
International_Financial_Reporting_Standa.pdf
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
Uderstanding digital marketing and marketing stratergie for engaging the digi...
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 2).pdf
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Race Reva University – Shaping Future Leaders in Artificial Intelligence
Core Concepts of Personalized Learning and Virtual Learning Environments
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Virtual and Augmented Reality in Current Scenario
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Module on health assessment of CHN. pptx
HVAC Specification 2024 according to central public works department
Journal of Dental Science - UDMY (2021).pdf

Cl fp report (final)

  • 1. Landscape Project Constructed Landscape Group Leader: Hooi Zhao Hong [0318564] Group Members: Bryan Teh Qing Da Tan Ken Ric [0318631] Tan Zhao Ming [0318724] Agnes Yeo Shu Yuan [0318668] Kong Xhiang Lynn [0317730] Janice Lee Juen Yung [0318695] Lecturer: Mr. Fariz
  • 2. Introduction The site we have chosen is located in the car park. It is a 10 x 10m site. It is an abandoned space located in between the car park and full of weeds. This space is abandoned and ignored as many tall weeds are growing. It is very dangerous because this can be snake’s habitat, making student’s life more dangerous because snakes can harm them.
  • 5. Site analysis The site located in the car park zone is very haunting, boring, and plain. It is an empty space. The site is not very eye-catching, hence we have chosen this site. We can improve that area by making it into a garden. People can rest here before taking their car which is located at the far back of the car park since this space is located in the centre of the car park. People can also hang out here. People can use this as a place for shelter to avoid being drenched in the rain. Concept To create a better environment for car park. To improve visualisations, comfort, the environment and as a shelter from rain.
  • 6. Master Plan To give an overall idea of how the site looks like with improvements made. SCALE : 1: 50 Hardscape Plan This garden consists of wooden fence , rocks, wood pavement, gazebo , fountain and bricks . SCALE : 1:50
  • 7. Planting Plan There are different layers of planting plan , tall trees , mid-trees and low shrubs . We have different types of plants and tree as shown below . SHRUBS AND GROUND COVERS PLAN TALL TREES AND MID-TREES PLAN
  • 9. Construction Details (2 drawing) [water fountain / fence ]
  • 10. Maintenance Plan Maintenance Cost RM/Mth  Labour Cost 1. 3 laborers @ RM50/day x 4 times a month 600.00 2. 1 supervisor @ RM70/day x 4times a month 70.00 3. Transport – 1 lorry @ RM100/day x 4 times a month 400.00  Material Cost 1. Fertiliser; once a month 100.00 2. Pest Control, once a month 100.00 3. Replacing Dead Plants 100.00 4. Unweed 100.00 Total 1470.00  Add Profit &Overhead 20% 294.00 1,764.00 per month. Total maintenance cost in a year 21,168.00 Plant List Key Common Name Botanical Name Quantity 1. Cape Jasmine Gardenia Jasminoides 33 2. Pink Powderpuff Calliandra emarginata 12 3. Butterfly Bush Clerodendrum Myricodes 21 4. Spiny Bucida Bucida Molineti 7 5. Black Olive Bucida Buceras 3 6. Turtle Vine Callisia Repens 64m2 7. Zoysia Zoisya Grass 7m2 8. Golden Dew Drop Duranta 28m2