TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
WELCOME TO
KJP TANGGUH LNG PROJECT
HSE COMMISSIONING INDUCTION
PROGRAM
Presented By: Rudi P. Purnama
KBR
2
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
Arrived on
Tangguh LNG Project
Site
HSES
Mandatory
Induction
Have HSES
induction
HSE
Commissioning
Induction
Attnddd HSES
induction
Task Specific Training
(Fall Protection,
Confined Spaces
Entry, etc)
Commissioning
Controlled Area
Work Pass
Issued
HSE COMMISSIONING INDUCTION
PROCESS FLOWCHART
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
3
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING INDUCTION
REQUIREMENT
After completion of KJP HSES Mandatory Induction, those who
work at commissioning controlled area are required to attend
the commissioning induction.
The commissioning controlled area work pass will be issued
after the entire induction process are completed.
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
4
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
OBJECTIVE
To provide all commissioning personnel and other
parties involved with basic HSE information prior to
start and throughout the commissioning phase.
By understanding this basic HSE information properly,
we will be able to ensure the safety of all personnel
working within the commissioning areas.
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
5
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
HSE COMMISSIONING GOALS
Create and maintain an incident free environment.
• No Accidents
• No Injuries
• No Damage to the Equipment
• No Damage to the Environment
Complete the project safely and on time for the
benefit of all.
To achieve the goals, regular HSE and PTW audit will
be performed
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
6
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
• Any area which has been identified by KJP
commissioning team before activities are
performed or about to begin
• Commissioning activities mean the energization
of system and equipment. This is mean: over and
above the normal construction activities.
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
C O M M I S S I O N I N G A R E A
KBR
7
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
• Pipes and vessels are pressurized
• Hazardous fluids and gases are present
• Motors and valves can move without warning
• Loud noise and high heat can be encountered
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
C O M M I S S I O N I N G A R E A
KBR
8
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
• These areas will be identified by installing
protective barricades or fence
• Safety signs states:
COMMISSIONING AREA – AUTHORIZED
PERSONNEL ONLY, NO SMOKING, PTW
REQUIRED, NO MATCHES, LIGHTERS, NO CELL
PHONE will be posted.
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
C O M M I S S I O N I N G A R E A
KBR
9
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
Personal Protective Equipment:
• Mandatory PPE
• Approved hardhat
• Safety glasses
• Proper long sleeves work clothes
• Safety shoes
• Suitable gloves
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
10
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
Personal Protective Equipment:
• These requirement will be indicated on the PTW:
• SCBA (Self Contained Breathing Apparatus)
• Life line & full body harnesses
• Hearing protection
• Respiratory protection
• Chemical suits
• Life Jacket
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
11
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING PERMIT
TYPES AND USES:
• All work in Commissioning Designated
Areas or Live System will require a
Commissioning Work Permit and is to
be displayed at the work location
• Permits will be issued from Permit
Issuing Station on site (TBA)
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
12
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
 There are three types of Permit To Work to be
used during commissioning activities:
 Responsibility of the Performing Authority
 Issued & approved by KJP Commissioning team
 Valid for 12 hrs shift and may be extended for
another 12 hrs shift (max 7 days)
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
13
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
1. WORK PERMIT:
 Hot Works
 Cold Works
 Required for all works to be done during
commissioning, start up and initial operations.
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
14
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
 Hot Works: Required for all activities in an
operating area, where the possibility of having
an ignition source exist such as:
 Instrumentation / Electrical work on operating equipment
 Opening of live electrical cabinets / switchgear
 Vehicle Entry
 Use of heat source / spark inducer, open flame, and or
grinding
A GAS TEST WILL ALWAYS BE REQUIRED FOR ANY HOT WORKS
(LEL 0%)
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
15
16
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
 Cold Works: Required for all activities that are
not covered by hot works such as:
 Painting
 Insulation
 Scaffolding
 Open drain cleaning
 General cleaning
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
17
18
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
2. CONFINED SPACES ENTRY:
 Installation of tray parts
 Internal inspection
 Cleaning inside vessels
 Loading Catalysts, chemicals or desiccants
 Mechanical cleaning of big bore size piping system
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
19
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
2. CONFINED SPACES ENTRY:
 Confined space entry is not only refers to
complete body entry but also partial entry of
your body such as head, hands, feet into a
confined space.
 Column / vessel skirts are considered as
confined spaces and will be tagged as NO
ENTRY.
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
20
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
2. CONFINED SPACES ENTRY:
 Before entry is permitted, atmosphere inside of
the CONFINED SPACE will be tested:
 Gas (O2, Flammable, toxicity) after energy
isolation is done
 Temperature > 50 C0 requires engineering
control
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
21
22
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
3. ENERGY ISOLATION (LOTO)
 To ensure personnel are notified that safety or
emergency system are to be bypassed
 This permit is valid for 12 hrs or an operations
shift change, whichever come first. A shift change
shall require the permit to be updated.
 Alternative measures must be in place while
bypassing a safety or emergency system
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
23
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
3. ENERGY ISOLATION (LOTO)
 An active bypass log must be maintained
 More than 24 hrs bypassing requires KJP
Commissioning Manager approval.
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
24
25
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
PERMIT RECIPIENTS:
 All sub contractors will identify personnel who will
be authorized to receive permits. These
personnel will receive additional PTW training by
KJP.
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
26
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
PERMIT TO WORK SYSTEM
PERMIT APPLICATION:
 The latest permit application 16.30 PM (a day
before)
 Permit issued 07.15 to 08.30 AM
 Permit returned / Reissued 17.00 – 17.45 PM
 Urgent request: Please contact Commissioning
Manager or his designees
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
27
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING CLEANING METHODS
The following cleaning methods will be used on KJP
LNG Tangguh Project:
 Air Blowing
 Steam blowing
 Mechanical Cleaning
 Chemical Cleaning (Boilers, Furnace, etc)
 Water Flushing
There are hazards associated with all cleaning
methods. KJP Commissioning Team shall select the
safest method for each equipment to be cleaned.
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
28
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING CLEANING METHODS
MSDS will be made available for any
hazardous chemicals used during
commissioning activities.
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
29
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
GASEOUS HYDROCARBON
 Before hydrocarbons are introduced into any
system, the 02 content must be reduces to avoid
an explosive atmosphere.
 Prior introduction of gaseous hydrocarbons in to
the plant, KJP Commissioning shall:
 Ensure the system is tightness tested
 Ensure the system is N2 purged until 02 content is < 2%
 Ensure the system is kept under slight N2 pressure
until hydrocarbons introduced
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
30
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
HAZARDOUS GASES
 Fuel gas - Flammable
 C1 and Heavier - Flammable
 H2S - Flammable / Highly Toxic
 N2 - Asphyxiation
 CO2 - Asphyxiation
 H2 - Flammable
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
31
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING TAGS AND SIGNS
 DANGER: DO NOT OPERATE
 EQUIPMENT UNDER TEST
 OUT OF SERVICE
 SPADE (including RED SPADE)
 CO2
 LIVE LINE (Stickers)
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
The following signs will posted throughout and around the
commissioning controlled area, as and when applicable:
32
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING TAGS AND SIGNS
 DANGER UNDER N2 PURGE
 COMMISSIONING AREA – AUTHORIZED PERSONNEL ONLY
 DANGER: LIVE SUBSTATION
 UNDER COMMISSIONING CONTROL
 CHEMICAL CLEANING IN PROGRESS
 NO SMOKING
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
33
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING TAGS AND SIGNS
TAGS & SIGNS
ARE ONLY TO BE REMOVED BY
“AUTHORIZED PERSONNEL ONLY”
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
34
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING TAGS AND SIGNS
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
35
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING TAGS AND SIGNS
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
36
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING TAGS AND SIGNS
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
37
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
COMMISSIONING TAGS AND SIGNS
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
38
39
40
41
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
ENTRY TO
SUBSTATIONS / CONTROL ROOMS
 Access to those buildings to be limited from the
point mutually agreed by parties concerned
 Separate control precautions for entrance to those
buildings to be prepared
KBR
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
42
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
ACCIDENT & INCIDENT
REPORTING
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
All accidents, incidents, job-related
injuries & illnesses, environmental
incidents, near misses, and security
events must be reported immediately
to your supervisor.
43
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
ACCIDENT & INCIDENT
INVESTIGATION
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
KJP Commissioning Team shall
provide investigation report and
follow up corrective action (s) to
prevent the similar incident from
happening again.
44
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
EMERGENCY RESPONSE
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT KBR
A RESCUE PLAN SHALL BE
DEVELOPED SPECIFICALLY FOR
THE TASK AND UNDERSTOOD
45
BPMIGAS
TANGGUH LNG
BP Berau Ltd.
TANGGUH LNG PROJECT
HSE TRAINING DEPARTMENT
BE SAFE
SAFETY PROTECTS PEOPLE
Presented By: Rudi P. Purnama
KBR

More Related Content

PDF
Pre commissioning and Commissioning Safety.pdf
PPT
SAFE WORK PERMIT
PPTX
Safety plan
PPTX
Work Permit System.pptx
PDF
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
PPTX
Step 6 hot work permit
PDF
Electrical Commissioning and Arc-Flash Safety presentation
PDF
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013
Pre commissioning and Commissioning Safety.pdf
SAFE WORK PERMIT
Safety plan
Work Permit System.pptx
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Step 6 hot work permit
Electrical Commissioning and Arc-Flash Safety presentation
Id spa-all-2020-105229 rev.e project hse plan (offshore scope)-31 dec 2013

What's hot (20)

PPTX
LOTO Training
PPT
Confined Space Ppt
PPTX
Prestartup Safety Review (PSSR)
PPTX
PPT ON PERMIT TO WORK, by Ekemezie E
PPTX
LOTO - LOCK OUT TAG OUT
PPTX
FORKLIFT SAFETY
PPSX
Emergency response osha 2012
DOC
Jsa heat-treatment
PPTX
Permit to work
DOCX
Fire drill report
PDF
Job safety Analysis
PPS
Lockout Tagout
PPTX
Roles of standby man
PPT
Emergency response planning
PPTX
Gas Tester Training
PDF
Fire Risk Assessment.pdf
PPTX
Fire Watcher Training.pptx
PPTX
LOTO Training (bahasa version)
PDF
Confined space permit sign Entry Log
PPT
HSE-INDUCTION-TRAINING.ppt
LOTO Training
Confined Space Ppt
Prestartup Safety Review (PSSR)
PPT ON PERMIT TO WORK, by Ekemezie E
LOTO - LOCK OUT TAG OUT
FORKLIFT SAFETY
Emergency response osha 2012
Jsa heat-treatment
Permit to work
Fire drill report
Job safety Analysis
Lockout Tagout
Roles of standby man
Emergency response planning
Gas Tester Training
Fire Risk Assessment.pdf
Fire Watcher Training.pptx
LOTO Training (bahasa version)
Confined space permit sign Entry Log
HSE-INDUCTION-TRAINING.ppt
Ad

Recently uploaded (20)

PDF
Empowerment Technology for Senior High School Guide
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
Trump Administration's workforce development strategy
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
advance database management system book.pdf
PDF
Complications of Minimal Access-Surgery.pdf
PDF
International_Financial_Reporting_Standa.pdf
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PPTX
20th Century Theater, Methods, History.pptx
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
HVAC Specification 2024 according to central public works department
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
Empowerment Technology for Senior High School Guide
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Trump Administration's workforce development strategy
TNA_Presentation-1-Final(SAVE)) (1).pptx
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
Uderstanding digital marketing and marketing stratergie for engaging the digi...
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
advance database management system book.pdf
Complications of Minimal Access-Surgery.pdf
International_Financial_Reporting_Standa.pdf
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
20th Century Theater, Methods, History.pptx
Unit 4 Computer Architecture Multicore Processor.pptx
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Weekly quiz Compilation Jan -July 25.pdf
HVAC Specification 2024 according to central public works department
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
B.Sc. DS Unit 2 Software Engineering.pptx
Ad

Commissioning Induction Re#1.ppt

  • 1. 1 BPMIGAS TANGGUH LNG BP Berau Ltd. TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT WELCOME TO KJP TANGGUH LNG PROJECT HSE COMMISSIONING INDUCTION PROGRAM Presented By: Rudi P. Purnama KBR
  • 2. 2 BPMIGAS TANGGUH LNG BP Berau Ltd. Arrived on Tangguh LNG Project Site HSES Mandatory Induction Have HSES induction HSE Commissioning Induction Attnddd HSES induction Task Specific Training (Fall Protection, Confined Spaces Entry, etc) Commissioning Controlled Area Work Pass Issued HSE COMMISSIONING INDUCTION PROCESS FLOWCHART TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR
  • 3. 3 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING INDUCTION REQUIREMENT After completion of KJP HSES Mandatory Induction, those who work at commissioning controlled area are required to attend the commissioning induction. The commissioning controlled area work pass will be issued after the entire induction process are completed. TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR
  • 4. 4 BPMIGAS TANGGUH LNG BP Berau Ltd. OBJECTIVE To provide all commissioning personnel and other parties involved with basic HSE information prior to start and throughout the commissioning phase. By understanding this basic HSE information properly, we will be able to ensure the safety of all personnel working within the commissioning areas. TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR
  • 5. 5 BPMIGAS TANGGUH LNG BP Berau Ltd. HSE COMMISSIONING GOALS Create and maintain an incident free environment. • No Accidents • No Injuries • No Damage to the Equipment • No Damage to the Environment Complete the project safely and on time for the benefit of all. To achieve the goals, regular HSE and PTW audit will be performed TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR
  • 6. 6 BPMIGAS TANGGUH LNG BP Berau Ltd. • Any area which has been identified by KJP commissioning team before activities are performed or about to begin • Commissioning activities mean the energization of system and equipment. This is mean: over and above the normal construction activities. TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT C O M M I S S I O N I N G A R E A KBR
  • 7. 7 BPMIGAS TANGGUH LNG BP Berau Ltd. • Pipes and vessels are pressurized • Hazardous fluids and gases are present • Motors and valves can move without warning • Loud noise and high heat can be encountered TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT C O M M I S S I O N I N G A R E A KBR
  • 8. 8 BPMIGAS TANGGUH LNG BP Berau Ltd. • These areas will be identified by installing protective barricades or fence • Safety signs states: COMMISSIONING AREA – AUTHORIZED PERSONNEL ONLY, NO SMOKING, PTW REQUIRED, NO MATCHES, LIGHTERS, NO CELL PHONE will be posted. TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT C O M M I S S I O N I N G A R E A KBR
  • 9. 9 BPMIGAS TANGGUH LNG BP Berau Ltd. Personal Protective Equipment: • Mandatory PPE • Approved hardhat • Safety glasses • Proper long sleeves work clothes • Safety shoes • Suitable gloves TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR
  • 10. 10 BPMIGAS TANGGUH LNG BP Berau Ltd. Personal Protective Equipment: • These requirement will be indicated on the PTW: • SCBA (Self Contained Breathing Apparatus) • Life line & full body harnesses • Hearing protection • Respiratory protection • Chemical suits • Life Jacket TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR
  • 11. 11 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING PERMIT TYPES AND USES: • All work in Commissioning Designated Areas or Live System will require a Commissioning Work Permit and is to be displayed at the work location • Permits will be issued from Permit Issuing Station on site (TBA) TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR
  • 12. 12 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM  There are three types of Permit To Work to be used during commissioning activities:  Responsibility of the Performing Authority  Issued & approved by KJP Commissioning team  Valid for 12 hrs shift and may be extended for another 12 hrs shift (max 7 days) KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 13. 13 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM 1. WORK PERMIT:  Hot Works  Cold Works  Required for all works to be done during commissioning, start up and initial operations. KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 14. 14 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM  Hot Works: Required for all activities in an operating area, where the possibility of having an ignition source exist such as:  Instrumentation / Electrical work on operating equipment  Opening of live electrical cabinets / switchgear  Vehicle Entry  Use of heat source / spark inducer, open flame, and or grinding A GAS TEST WILL ALWAYS BE REQUIRED FOR ANY HOT WORKS (LEL 0%) KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 15. 15
  • 16. 16 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM  Cold Works: Required for all activities that are not covered by hot works such as:  Painting  Insulation  Scaffolding  Open drain cleaning  General cleaning KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 17. 17
  • 18. 18 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM 2. CONFINED SPACES ENTRY:  Installation of tray parts  Internal inspection  Cleaning inside vessels  Loading Catalysts, chemicals or desiccants  Mechanical cleaning of big bore size piping system KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 19. 19 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM 2. CONFINED SPACES ENTRY:  Confined space entry is not only refers to complete body entry but also partial entry of your body such as head, hands, feet into a confined space.  Column / vessel skirts are considered as confined spaces and will be tagged as NO ENTRY. KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 20. 20 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM 2. CONFINED SPACES ENTRY:  Before entry is permitted, atmosphere inside of the CONFINED SPACE will be tested:  Gas (O2, Flammable, toxicity) after energy isolation is done  Temperature > 50 C0 requires engineering control KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 21. 21
  • 22. 22 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM 3. ENERGY ISOLATION (LOTO)  To ensure personnel are notified that safety or emergency system are to be bypassed  This permit is valid for 12 hrs or an operations shift change, whichever come first. A shift change shall require the permit to be updated.  Alternative measures must be in place while bypassing a safety or emergency system KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 23. 23 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM 3. ENERGY ISOLATION (LOTO)  An active bypass log must be maintained  More than 24 hrs bypassing requires KJP Commissioning Manager approval. KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 24. 24
  • 25. 25 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM PERMIT RECIPIENTS:  All sub contractors will identify personnel who will be authorized to receive permits. These personnel will receive additional PTW training by KJP. KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 26. 26 BPMIGAS TANGGUH LNG BP Berau Ltd. PERMIT TO WORK SYSTEM PERMIT APPLICATION:  The latest permit application 16.30 PM (a day before)  Permit issued 07.15 to 08.30 AM  Permit returned / Reissued 17.00 – 17.45 PM  Urgent request: Please contact Commissioning Manager or his designees KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 27. 27 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING CLEANING METHODS The following cleaning methods will be used on KJP LNG Tangguh Project:  Air Blowing  Steam blowing  Mechanical Cleaning  Chemical Cleaning (Boilers, Furnace, etc)  Water Flushing There are hazards associated with all cleaning methods. KJP Commissioning Team shall select the safest method for each equipment to be cleaned. KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 28. 28 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING CLEANING METHODS MSDS will be made available for any hazardous chemicals used during commissioning activities. KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 29. 29 BPMIGAS TANGGUH LNG BP Berau Ltd. GASEOUS HYDROCARBON  Before hydrocarbons are introduced into any system, the 02 content must be reduces to avoid an explosive atmosphere.  Prior introduction of gaseous hydrocarbons in to the plant, KJP Commissioning shall:  Ensure the system is tightness tested  Ensure the system is N2 purged until 02 content is < 2%  Ensure the system is kept under slight N2 pressure until hydrocarbons introduced KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 30. 30 BPMIGAS TANGGUH LNG BP Berau Ltd. HAZARDOUS GASES  Fuel gas - Flammable  C1 and Heavier - Flammable  H2S - Flammable / Highly Toxic  N2 - Asphyxiation  CO2 - Asphyxiation  H2 - Flammable KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 31. 31 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING TAGS AND SIGNS  DANGER: DO NOT OPERATE  EQUIPMENT UNDER TEST  OUT OF SERVICE  SPADE (including RED SPADE)  CO2  LIVE LINE (Stickers) KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT The following signs will posted throughout and around the commissioning controlled area, as and when applicable:
  • 32. 32 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING TAGS AND SIGNS  DANGER UNDER N2 PURGE  COMMISSIONING AREA – AUTHORIZED PERSONNEL ONLY  DANGER: LIVE SUBSTATION  UNDER COMMISSIONING CONTROL  CHEMICAL CLEANING IN PROGRESS  NO SMOKING KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 33. 33 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING TAGS AND SIGNS TAGS & SIGNS ARE ONLY TO BE REMOVED BY “AUTHORIZED PERSONNEL ONLY” KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 34. 34 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING TAGS AND SIGNS KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 35. 35 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING TAGS AND SIGNS KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 36. 36 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING TAGS AND SIGNS KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 37. 37 BPMIGAS TANGGUH LNG BP Berau Ltd. COMMISSIONING TAGS AND SIGNS KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 38. 38
  • 39. 39
  • 40. 40
  • 41. 41 BPMIGAS TANGGUH LNG BP Berau Ltd. ENTRY TO SUBSTATIONS / CONTROL ROOMS  Access to those buildings to be limited from the point mutually agreed by parties concerned  Separate control precautions for entrance to those buildings to be prepared KBR TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT
  • 42. 42 BPMIGAS TANGGUH LNG BP Berau Ltd. ACCIDENT & INCIDENT REPORTING TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR All accidents, incidents, job-related injuries & illnesses, environmental incidents, near misses, and security events must be reported immediately to your supervisor.
  • 43. 43 BPMIGAS TANGGUH LNG BP Berau Ltd. ACCIDENT & INCIDENT INVESTIGATION TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR KJP Commissioning Team shall provide investigation report and follow up corrective action (s) to prevent the similar incident from happening again.
  • 44. 44 BPMIGAS TANGGUH LNG BP Berau Ltd. EMERGENCY RESPONSE TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT KBR A RESCUE PLAN SHALL BE DEVELOPED SPECIFICALLY FOR THE TASK AND UNDERSTOOD
  • 45. 45 BPMIGAS TANGGUH LNG BP Berau Ltd. TANGGUH LNG PROJECT HSE TRAINING DEPARTMENT BE SAFE SAFETY PROTECTS PEOPLE Presented By: Rudi P. Purnama KBR