IRRIGATION ENGINEERING
TOPIC NAME: CROSS SECTION OF THE CANAL,
BALANCING DEPTH, AND CANAL F.S.L.
SUBJECT CODE: 2I70609
BRANCH: CIVIL ENGG,. 7TH SEM
PREPARED BY:
GUIDED BY: PROF. MAMTA PATEL
SR NO. NAME ENROLL. NO.
1. PATEL PRASHANT S. 141100106078
2. PATEL TWINKAL D. 141100106092
3. MISTRY ADITYA P. 151103106009
4. PATEL KAJAL M. 151103106011
5. RATNANI MANISHA N. 151103106016
CONTENT
 Cross section of an irrigation channel
- In cutting
- In filling
- In partial cutting and filling
 Balancing depth
 Canal F.S.L.
CROSS SECTION OF AN IRRIGATION CHANNEL
An irrigation channel section may be either,
1) In cutting
2) In filling
3) In partial cutting and filling
Cross section of canal in cutting
Cross section of canal in filling
Cross section of canal in partial cutting and filling
The main components of the canal cross- section are:
1. Side slope
2. Berm
3. Free board
4. Banks
5. Dowla
6. Inspection road
7. Borrow pits
8. Spoil bank
9. Lang width
10. Counter berm
1. SIDE SLOPES
 The side slope of channel depend on the nature of the soil.
 In average loam soil the side slopes are usually kept 1 : 1 in
cutting and 1.5 : 1in filling.
 In sandy soil say 1.5 : 1 in cutting and 2 : 1 in filling to be used.
2. BERM
 Berm is the horizontal distance left at ground level
between the toe of the bank and top edge of cutting.
 Berm is provided additional strength to bank and help in
safe guarding them against breaches.
 It is also provided for future widening of channel.
3.FREE BOARD
Free board is defined as the vertical distance between the designed full
supply level ( F.S.L.) in the canal and top level of canal banks.
It is provided to allow for wave action and floating debris.
 free board is consideration of
- canal capacity
- soil characteristics
- hydraulic gradient
4. BANKS
The purpose of the bank is to retain water so long as the berm is
not formed. They thus have to with stand full pressure of water above
the ground level.
5. INSPECTION ROAD
 An inspection road is usually provided on one or both bank of the
canal for the purpose of inspection, repair and maintenance of the
roads.
6.DOWEL
As the measure of safety for the vehicles, a raised projection of
soil, called dowel, is provided on the channel side of the inspection
road.
The top width of dowel is 0.5m, height above road level is 0.5m
and side slope is 1.5 : 1.
7. BORROW PITS
Borrow pits are small
pits which are dug to
obtain the extra earth for
making banks if the soil
obtained from cutting is
not sufficient.
The borrow pits are
usually located at distance
of 4D to 6D away from
outer toe of the bank.
The borrow pits may be
located either inside or
outside the channel.
8. SPOIL BANK
When the quantity of earth obtained from excavation or cutting of
the channel section is in excess of the quantity required for forming
the bank and service road then extra earth is usually deposited in the
form of spoil bank.
9. LAND WIDTH
The total land required for the construction of channel is divided in to two
parts. Permanent land and temporary land.
The permanent land is the land which will be required permanently during
and after construction of channel.
During construction period of the canal, some extra land is required for
storage of materials and machineries nearer the site of construction.
10.COUNTER BERM
Even after providing the usual embankment section of a bank,
saturation gradient may cut the downstream side of the bank .
In such case the saturation line should always be covered by 0.3
to 0.6 m of earth.
BALANCING DEPTH
The channel section is entirely in cutting, the extra soil has to be
deposited in spoil bank.
For the channel section entirely in filling the soil has to be obtained
from borrow pits. In both case required double handling and increased
cost of earth work.
If for a channel section the depth of cutting is such that the quantity
of excavation or cutting is equal to the earth filling required for making
the banks, then depth of cutting is known as balancing depth or most
economical depth of cutting.
The normal maximum operating water level of a water storage
when not affected by floods.
 This water level corresponds to 100% capacity.
CANAL F.S.L.
THANK YOU

More Related Content

PPTX
Canal irrigation
PPTX
Cross Drainage Works
PPTX
Canal Fall
PDF
design of weirs
PDF
09. Silt Theories [Kennedy's Theory].pdf
PDF
Canal regulation works. m4pptx
PDF
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Canal irrigation
Cross Drainage Works
Canal Fall
design of weirs
09. Silt Theories [Kennedy's Theory].pdf
Canal regulation works. m4pptx
Major project report of diploma civil engineering at mamts gothatar to jorpat...

What's hot (20)

PPTX
Highway Drainage (Highway Engineering)
PPTX
Canal outlets and modules
PPTX
weir & barrage
PPTX
Field control of compaction and compaction Equipment
PPTX
Irrigation canals
PPTX
energy dissipator in hydraulic structure
PPTX
Lec-00-Weir&Barrages.pptx
PPTX
Khosla theory
PPTX
Gravity dam
PDF
Consolidation of Soil
PPTX
economic channel section
PPTX
presentation : cross drainage work
PPTX
Canal lining
PPT
SOIL EXPLORATION
PPTX
Water requirement of crops and reservoir planing
PPTX
Canal Irrigation
PPTX
Canal falls and its classification
PPTX
Sub soil exploration
PDF
Design of Hydraulic Structures
Highway Drainage (Highway Engineering)
Canal outlets and modules
weir & barrage
Field control of compaction and compaction Equipment
Irrigation canals
energy dissipator in hydraulic structure
Lec-00-Weir&Barrages.pptx
Khosla theory
Gravity dam
Consolidation of Soil
economic channel section
presentation : cross drainage work
Canal lining
SOIL EXPLORATION
Water requirement of crops and reservoir planing
Canal Irrigation
Canal falls and its classification
Sub soil exploration
Design of Hydraulic Structures
Ad

Similar to Cross section of the canal, balancing depth and canal fsl (20)

PDF
WREII Canals Head Works and Distribution system
PPTX
Canal Irrigation
PDF
Irrigation and Drainage Engineering (Chapter-3& 4).pdf
PDF
08. Classification of Canals.pdf
PPTX
Unit 4-canal
PPT
Design of a channel Reach
PPTX
Geological factor for canal alignment
PPTX
Lectures on Pavement Shoulder design and construction.pptx
PPT
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
PPTX
Module 03 Distribution Works.pptx
PPTX
Canal of design
PPTX
Information about the perception tank ppt
PPTX
7. TUNNEL ENGINEERING
PDF
Topic 3 - Earth Dams. Preliminary inf.pdf
PDF
3. Highway Drainage.pdf
PDF
3. Highway Drainage.pdf
PPTX
Water Resources Engineering types of wells with figures Denish Jangid Open we...
PDF
Travis_Smith_Work_Term_Report_F2016
PPTX
Lined or non erodible design channel study
PPTX
Module-5.pptx
WREII Canals Head Works and Distribution system
Canal Irrigation
Irrigation and Drainage Engineering (Chapter-3& 4).pdf
08. Classification of Canals.pdf
Unit 4-canal
Design of a channel Reach
Geological factor for canal alignment
Lectures on Pavement Shoulder design and construction.pptx
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Module 03 Distribution Works.pptx
Canal of design
Information about the perception tank ppt
7. TUNNEL ENGINEERING
Topic 3 - Earth Dams. Preliminary inf.pdf
3. Highway Drainage.pdf
3. Highway Drainage.pdf
Water Resources Engineering types of wells with figures Denish Jangid Open we...
Travis_Smith_Work_Term_Report_F2016
Lined or non erodible design channel study
Module-5.pptx
Ad

More from Aditya Mistry (20)

PPTX
Valuation
PPTX
Traffic studies
PPTX
Earthquake design example
PPT
Urban transportation system
PPT
Water and Waste Water Engineering
PPT
Railway Bridge and Tunnel Engineering
PPT
Applied Fluid Mechanics
PPT
Advance Construction & Equipment
PPTX
Traffic control devices
PPTX
Shear strength of soil
PPTX
Stiffness Matrix
PPTX
Flood Management
PPTX
Air Pollution
PPTX
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
PPTX
Special concrete and concreting method
PPTX
Modern surveying instruments
PPTX
Earthquake resistant building
PPTX
Direct and bending stress
PPT
Temporary works
PPT
Notches and weir
Valuation
Traffic studies
Earthquake design example
Urban transportation system
Water and Waste Water Engineering
Railway Bridge and Tunnel Engineering
Applied Fluid Mechanics
Advance Construction & Equipment
Traffic control devices
Shear strength of soil
Stiffness Matrix
Flood Management
Air Pollution
APPLICATION OF SCIENCE AND TECHNOLOGY FOR DISASTER MANAGEMENT & MITIGATION
Special concrete and concreting method
Modern surveying instruments
Earthquake resistant building
Direct and bending stress
Temporary works
Notches and weir

Recently uploaded (20)

PDF
Digital Logic Computer Design lecture notes
PPTX
Geodesy 1.pptx...............................................
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
Lesson 3_Tessellation.pptx finite Mathematics
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
Sustainable Sites - Green Building Construction
PPT
Mechanical Engineering MATERIALS Selection
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PDF
Well-logging-methods_new................
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
Foundation to blockchain - A guide to Blockchain Tech
DOCX
573137875-Attendance-Management-System-original
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
composite construction of structures.pdf
Digital Logic Computer Design lecture notes
Geodesy 1.pptx...............................................
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Lesson 3_Tessellation.pptx finite Mathematics
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
Sustainable Sites - Green Building Construction
Mechanical Engineering MATERIALS Selection
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Strings in CPP - Strings in C++ are sequences of characters used to store and...
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Well-logging-methods_new................
Model Code of Practice - Construction Work - 21102022 .pdf
Foundation to blockchain - A guide to Blockchain Tech
573137875-Attendance-Management-System-original
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
composite construction of structures.pdf

Cross section of the canal, balancing depth and canal fsl

  • 2. TOPIC NAME: CROSS SECTION OF THE CANAL, BALANCING DEPTH, AND CANAL F.S.L. SUBJECT CODE: 2I70609 BRANCH: CIVIL ENGG,. 7TH SEM PREPARED BY: GUIDED BY: PROF. MAMTA PATEL SR NO. NAME ENROLL. NO. 1. PATEL PRASHANT S. 141100106078 2. PATEL TWINKAL D. 141100106092 3. MISTRY ADITYA P. 151103106009 4. PATEL KAJAL M. 151103106011 5. RATNANI MANISHA N. 151103106016
  • 3. CONTENT  Cross section of an irrigation channel - In cutting - In filling - In partial cutting and filling  Balancing depth  Canal F.S.L.
  • 4. CROSS SECTION OF AN IRRIGATION CHANNEL An irrigation channel section may be either, 1) In cutting 2) In filling 3) In partial cutting and filling Cross section of canal in cutting
  • 5. Cross section of canal in filling Cross section of canal in partial cutting and filling
  • 6. The main components of the canal cross- section are: 1. Side slope 2. Berm 3. Free board 4. Banks 5. Dowla 6. Inspection road 7. Borrow pits 8. Spoil bank 9. Lang width 10. Counter berm
  • 7. 1. SIDE SLOPES  The side slope of channel depend on the nature of the soil.  In average loam soil the side slopes are usually kept 1 : 1 in cutting and 1.5 : 1in filling.  In sandy soil say 1.5 : 1 in cutting and 2 : 1 in filling to be used.
  • 8. 2. BERM  Berm is the horizontal distance left at ground level between the toe of the bank and top edge of cutting.  Berm is provided additional strength to bank and help in safe guarding them against breaches.  It is also provided for future widening of channel.
  • 9. 3.FREE BOARD Free board is defined as the vertical distance between the designed full supply level ( F.S.L.) in the canal and top level of canal banks. It is provided to allow for wave action and floating debris.  free board is consideration of - canal capacity - soil characteristics - hydraulic gradient
  • 10. 4. BANKS The purpose of the bank is to retain water so long as the berm is not formed. They thus have to with stand full pressure of water above the ground level. 5. INSPECTION ROAD  An inspection road is usually provided on one or both bank of the canal for the purpose of inspection, repair and maintenance of the roads.
  • 11. 6.DOWEL As the measure of safety for the vehicles, a raised projection of soil, called dowel, is provided on the channel side of the inspection road. The top width of dowel is 0.5m, height above road level is 0.5m and side slope is 1.5 : 1.
  • 12. 7. BORROW PITS Borrow pits are small pits which are dug to obtain the extra earth for making banks if the soil obtained from cutting is not sufficient. The borrow pits are usually located at distance of 4D to 6D away from outer toe of the bank. The borrow pits may be located either inside or outside the channel.
  • 13. 8. SPOIL BANK When the quantity of earth obtained from excavation or cutting of the channel section is in excess of the quantity required for forming the bank and service road then extra earth is usually deposited in the form of spoil bank.
  • 14. 9. LAND WIDTH The total land required for the construction of channel is divided in to two parts. Permanent land and temporary land. The permanent land is the land which will be required permanently during and after construction of channel. During construction period of the canal, some extra land is required for storage of materials and machineries nearer the site of construction.
  • 15. 10.COUNTER BERM Even after providing the usual embankment section of a bank, saturation gradient may cut the downstream side of the bank . In such case the saturation line should always be covered by 0.3 to 0.6 m of earth.
  • 16. BALANCING DEPTH The channel section is entirely in cutting, the extra soil has to be deposited in spoil bank. For the channel section entirely in filling the soil has to be obtained from borrow pits. In both case required double handling and increased cost of earth work. If for a channel section the depth of cutting is such that the quantity of excavation or cutting is equal to the earth filling required for making the banks, then depth of cutting is known as balancing depth or most economical depth of cutting.
  • 17. The normal maximum operating water level of a water storage when not affected by floods.  This water level corresponds to 100% capacity. CANAL F.S.L.