Data Center Floor
Design – Your
Layout Can Save or
Kill Your PUE &
Cooling Efficiency
The following data center upgrade proposal
demonstrates how floor layout has a major
impact on data center performance.
Implementing best practices and validating
those practices through CFD models allowed
Great Lakes to suggest a new layout that
would provide an improved PUE, cooling
costs reduction, and increased ROI.
Jason Hallenbeck, DCDC, explains the
concepts behind how data center floor
design can save or kill your PUE and
cooling efficiency—as found in this
proposal. Find Jason presenting
at the BICSI Fall Conference on
September 14th at 1:30pm.
WeRackYourWorld.com
2
Executive Summary
Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance
improvement within the customer data center.
After a series of initial conversations, the customer expressed a desire to gain an assessment of the current
operational status of the company’s data center, along with data center infrastructure management (DCIM)
recommendations which could provide multi-generational support as the company’s IT needs continue to evolve.
Great Lakes Case & Cabinet was contracted to provide a comprehensive evaluation of the customer’s Data Center
and to conduct complete computational fluid dynamics (CFD) analysis of the facility in its current form. Numerous site
visits were conducted and numerous on-site measurements were taken. The operational capabilities of the current
data center were captured in a CFD to establish baseline standards against which any potential future improvements
might be measured.
Great Lakes was also asked to look at the short, medium and long term potential for increased density within the
data center as well as an expansion of IT operations within the space. As part of that effort, Great Lakes would offer
infrastructure recommendations, supported by CFD analysis which would create real world performance estimates of
future operations within the data center, as those recommendations might be implemented.
The following pages outline the scope of work performed by Great Lakes as well as the presentation of data
collected, infrastructure recommendations made to the management of the data center (along with estimates and
ROI for recommended solutions) as well as CFD modeling designed to estimate data center performance conditions
as those recommendations might be implemented.
WeRackYourWorld.com
3
Overview Phase 1
Recommended Action Plan:
The following recommendations are described to increase the performance and efficiency of the data center based
on the modeling data and discussions with the data center team.
Phase 1 includes:
• Network Core tile migration pg. 4-7
• Removing under-floor baffle pg. 8-9
• Migrating Floor Tiles pg. 10-11
• Cold aisle and enclosure containment pg. 12-19
• Eliminate air re-circulation in current enclosures
Deployment of cold aisle containment
Core switch migration pg. 20-25
• Increasing CRAC unit set point (as desired) pg. 26-27
Additional Information:
• Recommended action plan pg. 28
• PUE, Cooling Cost Reduction and ROI pg. 29
• Conclusion pg. 30
WeRackYourWorld.com
4
Network Core (Baseline)
Enclosure 207
Rendered view Rendered view with airflow patterns
Rendered view with
airflow patterns
Enclosure 207 was chosen for an internal view to demonstrate
the airflow patterns inside the enclosure. The excess air
introduced by the unsealed cable cut-out lowers the
temperatures inside the enclosures in the row protecting the
side-to-side airflow equipment from overheating.
WeRackYourWorld.com
5
Network Core (Baseline)
WeRackYourWorld.com
6
Network Core (Phase 1)
Enclosure 207
Rendered view Rendered view with airflow patterns
Rendered view with airflow patterns
Enclosure 207 was chosen for an internal view to demonstrate
the airflow patterns inside the enclosure. The excess air
introduced by the unsealed cable cut-out lowers the
temperatures inside the enclosures in the row protecting the
side-to-side airflow equipment from overheating.
207
Perforated floor tiles have been moved to provide a higher flow of conditioned air to the equipment. A high flow tile was place
WeRackYourWorld.com
7
207
Network Core (Baseline)
• Side to side airflow equipment creating a
cascading heat elevation scenario
Unblocked cable cutouts provide a supply of
cool air inside the enclosure
This reduces the temperature cascading
effect
Network Core
(Rearranged floor tiles)
• Floor tiles reorganized providing higher flow
of air directly in front of the enclosures
• High flow tile installed in front of #207 to
provide additional airflow to core switches in
nearby enclosures
• Sampling the temperatures at enclosure #204
we can see a 7.1o Fahrenheit decline in
temperature.
Temp at 81.5o F
Temp at 74.4o F
WeRackYourWorld.com
8
Under-floor (Baseline)
207
Entrance
With the under-floor plenum installed, the secondary zone created is highly pressurized.
In addition, there is minimal to no load in the secondary zone. This greatly reduces the
efficiency of the two CRAC units installed in the zone. It is recommended that this barrier
be removed to allow the two units to supply additional cooling to the entire room.
WeRackYourWorld.com
9
Under-floor (Phase 1)
207
With the plenum barrier removed, the CRAC units airflow from the secondary zone can travel to the
entire data center supporting IT loads where needed. This is especially significant when utilizing
cold aisle containment. With the cold aisle contained the proximity of the CRAC unit in a data center
to the load becomes less critical. Every unit in the data center can supply conditioned air to the
entire facility. In the event of unit(s) failures(s) provided that the overall cooling capacity does not fall
below the IT load the equipment will continue to operate without interruption. This increases uptime
by reducing the criticality of any one unit, and makes unit maintenance more manageable.
Entrance
WeRackYourWorld.com
10
Tile Migration
207
Tile migration for phase 1 development. By removing tiles in the hot aisle and locations not directly
near IT equipment the under-floor pressure increases creating a higher velocity of airflow to the
equipment providing better cooling. In addition, by reducing the amount of conditioned air mixing
with exhaust air the return temperature to the CRAC units increases which increases the efficiency
of the entire HVAC system.
Entrance
WeRackYourWorld.com
11
Equipment Orientation - Baseline
207
Shown is the current layout of enclosures and floor tiles in the data center. The red X
on the CRAC unit indicates that it is currently non-operational.
Entrance
WeRackYourWorld.com
12
Aisle Completion with Enclosures
207
The following enclosures are recommended to complete the rows. These were based on
discussions with IT and their future expansion plans.
GL840ES-2442 enclosures - qty 13 (2 enclosures will replace enclosures highlighted in red)
· #1— Qty. 2
· #2— Qty. 6
· #3— Qty. 5
GL840ENT-3242MSS enclosures—qty 3
· #4— Qty. 3
1
2
3
4
WeRackYourWorld.com
13
Equipment Orientation – Phase 1
207
Phase 1 layout shows the completed rows, migrated tiles overhead panels and aisle doors are
hidden to show cold aisles.
Entrance
WeRackYourWorld.com
14
Server Farm (Baseline)
• Unfinished rows increase potential for
recirculation of hot air
• Open rack spaces create short circuits inside the
enclosure, allowing conditioned air to bypass
equipment and hot aisle to recirculate back into the
equipment intakes
Server Farm (Phase 1)
• Additional enclosures complete rows and segregate
hot and conditioned air
• Open rack spaces have filler panels installed to
reduce short circuits
• Cisco 6500 switches migrated from EMC
enclosure to 30” wide enclosure
• Floor tiles have been moved from other areas in the
datacenter to complete cold aisle
• Model temperature comparison shows a 10.9o F
71.9oF
61.1oF
WeRackYourWorld.com
15
Server Farm Cold Aisle Containment
207
Shown is an overhead view of the complete aisles with containment doors at the end of the aisles
and overhead containment panels containing conditioned air in the cold aisle. This design was
tested based on discussion with the data center team based on its ability to reduce the criticality of
any one CRAC unit failure, eliminates hot air re-circulation improving the performance and
extending the life of the equipment.
WeRackYourWorld.com
16
Server Farm Cold Aisle Containment
207
Great Lakes enclosures were added to rows of enclosures already installed in the server farm
area of the data center. The completed rows allow better hot and cold air segregation.
Completed rows would also allow the installation of aisle containment doors.
Enclosures
already
installed in the
data center
Great Lakes
enclosures
WeRackYourWorld.com
17
Server Farm Cold Aisle Containment
207
Each aisle in the server
farm was contained using a
single, custom aisle door
(model shows two doors
which represents standards
aisle doors offered by Great
Lakes).
WeRackYourWorld.com
18
Server Farm Cold Aisle Containment
207
In addition to single aisle doors, Polargy Polarplex panels were installed across the top of the
rows to trap cool air in. Floor tiles from other locations in the data center were moved to the
aisles to create a row of fully perforated floor tiles (a mixture of standard and high flow tiles).
Single, custom
aisle door
Polargy
PolarPlex
Panels
Perforated
floor tile
High flow
floor tile
WeRackYourWorld.com
19
Server Farm Cold Aisle Containment
207
Because there was a height difference between the existing enclosures and the new Great
Lakes enclosures, a custom support bar was designed to create a level service to properly
mount the Polargy PolarPlex Panels to.
Height difference between the
existing enclosures (left) and
Great Lakes enclosures (right).
Custom support bar
WeRackYourWorld.com
20
San Switch Migration: Phase 1
207
Cisco Catalyst 6509-E core switches are migrated to two of the GL840ES-3048 enclosures in the 700 row. Baffle kits are installed to
prevent air recirculation from one switch to the next eliminating the potential for cascading heat issues.
WeRackYourWorld.com
21
San Switch: Phase 1
(Phase one)
207
Baffles reduce recirculation by directing conditioned air toward the intake side and exhausting the hot air toward the cold aisle. Used
in conjunction with a brush grommet kit, side-to-side airflow operates efficiently in a hot aisle/cold aisle configuration.
Intake side
(baffle side hidden) Exhaust side
WeRackYourWorld.com
22
Baseline: Top View
207
1. Highest temp in the cold aisle currently. Model
data average temp 73.6F
2. Network core temps outside of the enclosure
reach upwards of 75F
Entrance
CRAC Unit Specifications
Set Point 72° F
Supply Temp. 61° F
WeRackYourWorld.com
23
Phase 1: Top View
Polargy panels hidden to make cold aisle visible
207
1. Cold aisle temp consistent at 62.2°F
2. Network core temps outside of the enclosure at 73.4°F
3. Migrated SAN switches are active and exhausting temps at 82°F
By implementing containment, cold aisle temperatures are within a
few degrees of under-floor tile supply. This allows the CRAC units to
be increased in one degree increments and cold aisle temps will increase accordingly.
CRAC Unit Specifications
Set Point 72° F
Supply Temp. 61° F
Entrance
WeRackYourWorld.com
24
Baseline: Look Down View
207
WeRackYourWorld.com
25
Phase 1: Look Down View
207
SAN switch migration
creating temps of 87°F
WeRackYourWorld.com
26
CRAC Unit Failure Analysis: Baseline
207
90.1°F Temp
When the CRAC unit with the highest load on it (conditioning the most air in the data center) is
shutdown, the hot air from the server farm (specifically the blade server enclosures) travels to
the next nearest unit. This increases the load on that unit as well as increases the cold aisle
temperatures. This scenario creates massive short cycling of hot air, increasing the
equipment intake temperatures, resulting in equipment “thermal-ing down/off” or failing.
WeRackYourWorld.com
27
CRAC Unit Failure Analysis: Phase 1
207
When cold aisle containment is implemented and the CRAC unit is shut down the hot air
continues to travel to the nearest available unit. However, with the cold aisle contained a
consistent flow of conditioned air is supplied into the aisle equipment intakes; no hot air short
cycling can occur, resulting in uninterrupted service in the event of a single unit failure.
Temps taken at enclosure 508 show a delta of 8 degrees Farenheit. In addition temps taken in
the cold remain a consistent
60-63 degrees F.
82.1°F Temp
WeRackYourWorld.com
28
Recommended Action Plan
207
Recommended Action Plan
• Network Core tile migration pg. 4-6
• Migrating floor tiles pg. 9
• Removing under-floor baffle pg. 7-8
• Cold aisle and enclosure containment pg. 10-14
o Completing aisles with enclosures pg. 11-13
o Eliminate air re-circulation in current
enclosures
o Install filler panels in open RMU
o Install solid top panels— IT3 Install
side panel blanks— IT4
• Deployment of cold aisle containment
o Install Polargy Polar-Plex panels-IT6
o Install aisle containment doors- IT1/IT2
• Core switch migration pg. 15-16
o Installation of Baffle Kits— ESSAB14
• Increasing CRAC unit set point (as desired) -For every degree the set point is raised 4% efficiency gain*
*Source: The American Society of Heating Refrigeration and Air Conditioning Engineers TC 9.9
WeRackYourWorld.com
29
PUE, Cooling Cost Reduction and ROI
207
PUE (Power Usage Effectiveness):
Average PUE for 2011 (based on data provided) 1.84
PUE estimate (after phase 1 completion) 1.39
Current and Projected cooling costs:
Current average monthly cooling cost (based on data provided) $4,153.38
Projected average monthly cooling cost $1,930.75
Estimated savings $2,222.63*
*Projected average savings and ROI can be improved by raising set point(s), reducing fan speed and cycling
CRAC units. Performance will vary based on system flexibility and tolerances
WeRackYourWorld.com
30
Conclusion
Great Lakes has designed and modeled a solution that provides the customer with a data center upgrade plan
designed to increase the energy efficiency and reliability of their current design by segregating hot and cold air
optimizing air delivery, and deploying cold aisle containment.
Recommendations:
1. Adjust the floor tiles providing airflow to the enclosures at the network core. Moving the tiles directly in front of
the enclosures will allow a greater supply of conditioned air to reach the equipment, greatly improving the
exhaust temperature of the airflow equipment installed in the racks and lowering the internal enclosure
temperatures. This effort will result in a decreased risk of thermal issues: performance degradation, thermal
shutdown, and early equipment
mortality.
2. Create and fully contain the cold aisles in the server farm. This can be achieved in several steps: redeploying
and consolidating floor tiles; completing the aisles with enclosures; installing filler panels in any unused RMU;
and containing the cold aisle through the use of end of row doors and overhead containment panels.
Through containment, the conditioned air is segregated from hot exhaust air. Contained conditioned air will remain at
delivered temperature until used by the equipment. Another advantage of cold aisle containment is consistency in
cold aisle temperatures which will be very close to the supply temperatures of the CRAC units. Any increase to the
set points of the CRAC unit should proportionally increase the conditioned air supplied to the cold aisle. This should
make it much easier to the deliver a consistent supply temperature to every piece of equipment.
Modeling revealed that the removal of the under floor baffle could increase the amount of cooling capacity to the
entire room. A fully open raised floor, in conjunction with cold aisle containment, could reduce the impact a single
CRAC unit failure will have on the data center. This scenario was modeled at the CRAC unit with the highest load in
the server farm. Hot aisle temperatures increased dramatically, while the cold aisle remained at supply temperatures.
WeRackYourWorld.com
31
Conclusion
By completing the Phase 1 recommendations, the data centers overall performance will be improved by:
Better utilizing the conditioned air
• Balancing the load per CRAC unit more effectively
• Increasing the available capacity (in RMU) on the datacenter floor space
• Significantly reducing recirculation in the enclosure
Improving reliability
• Reduced intake temperatures increasing equipment lifespan
• Balanced CRAC unit load reduces dependency on a single unit failure
• Cold aisle containment allows the server equipment to continue operation even when closest
proximity CRAC unit fails

More Related Content

PDF
Data center Building & General Specification
PPTX
Data Center Cooling Design - Datacenter-serverroom
PPTX
Modular Data Center Design
PDF
Best Practices for Planning your Datacenter
PPTX
Data center design 2
PDF
Data Center Cooling, Critical Facility and Infrastructure Optimization
PPT
Simplifying Data Center Design/ Build
ODP
Datacenter101
Data center Building & General Specification
Data Center Cooling Design - Datacenter-serverroom
Modular Data Center Design
Best Practices for Planning your Datacenter
Data center design 2
Data Center Cooling, Critical Facility and Infrastructure Optimization
Simplifying Data Center Design/ Build
Datacenter101

What's hot (20)

ZIP
DataCenter:: Infrastructure Presentation
PPTX
ASHRAE 90.4 vs. 90.1 - Five Questions
PPTX
Data Center
PDF
Datwyler data center presentation info tech middle east
PPT
Hot Aisle & Cold Aisle Containment Solutions & Case Studies
PPT
Data Center Cooling Study on Liquid Cooling
PPTX
Data Center Efficiency Workshop 2016
PPT
Tia 942 Data Center Standards
PPTX
HVAC for Data Centers
PPTX
Datacenter best practices design and implementation
PPTX
Gaining Data Center Cooling Efficiency Through Airflow Management
PPTX
Data Center Infrastructure Management(DCIM)
PPTX
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
PDF
Implementing Hot and Cold Air Containment in Existing Data Centers
PPT
Datacenter
PDF
Datacenter Strategy, Design, and Build
PDF
Data center cooling ahmed abdel-salam (2019)
PPTX
DATA CENTER
PPT
Data Center Server Rack Strategies
DOCX
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
DataCenter:: Infrastructure Presentation
ASHRAE 90.4 vs. 90.1 - Five Questions
Data Center
Datwyler data center presentation info tech middle east
Hot Aisle & Cold Aisle Containment Solutions & Case Studies
Data Center Cooling Study on Liquid Cooling
Data Center Efficiency Workshop 2016
Tia 942 Data Center Standards
HVAC for Data Centers
Datacenter best practices design and implementation
Gaining Data Center Cooling Efficiency Through Airflow Management
Data Center Infrastructure Management(DCIM)
Cooling Optimization 101: A Beginner's Guide to Data Center Cooling
Implementing Hot and Cold Air Containment in Existing Data Centers
Datacenter
Datacenter Strategy, Design, and Build
Data center cooling ahmed abdel-salam (2019)
DATA CENTER
Data Center Server Rack Strategies
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
Ad

Viewers also liked (16)

PDF
iBIM value to Data Center from design to operate
PPTX
Taller practico el cuento
PDF
Barajafamiliaslexicas 150310145951-conversion-gate01
PDF
Organisation Internationale de La Francophonie II
PDF
Tabela de orçamento 2015
PPT
Collapse
PPTX
Solar Job New York 2
PDF
Instant Response Focus Groups for Political Campaigns - KEEVOON Research
PPTX
Locations
PDF
Reference Letter Mentor Teacher Shoreham
PPTX
3D IT Architecture - Data Center
PPTX
PPTX
The LightConnectTM Fabric V-POD Data Center Architecture
PDF
Presentation data center and cloud architecture
PPTX
HTRC Architecture Overview
PDF
Data-Ed Webinar: Data Architecture Requirements
iBIM value to Data Center from design to operate
Taller practico el cuento
Barajafamiliaslexicas 150310145951-conversion-gate01
Organisation Internationale de La Francophonie II
Tabela de orçamento 2015
Collapse
Solar Job New York 2
Instant Response Focus Groups for Political Campaigns - KEEVOON Research
Locations
Reference Letter Mentor Teacher Shoreham
3D IT Architecture - Data Center
The LightConnectTM Fabric V-POD Data Center Architecture
Presentation data center and cloud architecture
HTRC Architecture Overview
Data-Ed Webinar: Data Architecture Requirements
Ad

Similar to Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Efficiency (20)

PPT
Cooling & Power Issues
PPTX
Data Center Simulation Modeling must do
PPTX
Server room
PPTX
Bicsi Sa Adriaan Steyn V3
PDF
Server room cooling report
PDF
How 8 California Data Centers Reduced Cooling Energy by 40%
PDF
Commercial Overview SCS Session 1 Server Rack Strategies
PPT
Csc.Cooling Audit Results.V1.12 Jul 08
PPTX
Unit 3_Data Center Design in storage.pptx
PPT
Eliminating Data Center Hot Spots
PPT
2008 09-16-presentation
PPTX
Tcc cooling
PDF
Datacenters
PPT
Ever Green Dc
PPT
Afcom air control solution presentation
PPTX
05_Overhead_or_Under_Floor_Installation.pptx
PDF
Stulz datacentre cooling
PPT
Afcom2010
PDF
Data center cooling
PDF
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...
Cooling & Power Issues
Data Center Simulation Modeling must do
Server room
Bicsi Sa Adriaan Steyn V3
Server room cooling report
How 8 California Data Centers Reduced Cooling Energy by 40%
Commercial Overview SCS Session 1 Server Rack Strategies
Csc.Cooling Audit Results.V1.12 Jul 08
Unit 3_Data Center Design in storage.pptx
Eliminating Data Center Hot Spots
2008 09-16-presentation
Tcc cooling
Datacenters
Ever Green Dc
Afcom air control solution presentation
05_Overhead_or_Under_Floor_Installation.pptx
Stulz datacentre cooling
Afcom2010
Data center cooling
Ppt4 exp leeds - alan real and jon summers ( university of leeds ) experien...

Recently uploaded (20)

PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
cuic standard and advanced reporting.pdf
PDF
Electronic commerce courselecture one. Pdf
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
Getting Started with Data Integration: FME Form 101
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
Machine Learning_overview_presentation.pptx
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PPTX
SOPHOS-XG Firewall Administrator PPT.pptx
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PPTX
Tartificialntelligence_presentation.pptx
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Reach Out and Touch Someone: Haptics and Empathic Computing
Digital-Transformation-Roadmap-for-Companies.pptx
cuic standard and advanced reporting.pdf
Electronic commerce courselecture one. Pdf
The Rise and Fall of 3GPP – Time for a Sabbatical?
Agricultural_Statistics_at_a_Glance_2022_0.pdf
gpt5_lecture_notes_comprehensive_20250812015547.pdf
Getting Started with Data Integration: FME Form 101
Group 1 Presentation -Planning and Decision Making .pptx
MYSQL Presentation for SQL database connectivity
Machine Learning_overview_presentation.pptx
Advanced methodologies resolving dimensionality complications for autism neur...
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
SOPHOS-XG Firewall Administrator PPT.pptx
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Spectral efficient network and resource selection model in 5G networks
Encapsulation_ Review paper, used for researhc scholars
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Tartificialntelligence_presentation.pptx
Build a system with the filesystem maintained by OSTree @ COSCUP 2025

Data Center Floor Design - Your Layout Can Save of Kill Your PUE & Cooling Efficiency

  • 1. WeRackYourWorld.com Data Center Floor Design – Your Layout Can Save or Kill Your PUE & Cooling Efficiency The following data center upgrade proposal demonstrates how floor layout has a major impact on data center performance. Implementing best practices and validating those practices through CFD models allowed Great Lakes to suggest a new layout that would provide an improved PUE, cooling costs reduction, and increased ROI. Jason Hallenbeck, DCDC, explains the concepts behind how data center floor design can save or kill your PUE and cooling efficiency—as found in this proposal. Find Jason presenting at the BICSI Fall Conference on September 14th at 1:30pm.
  • 2. WeRackYourWorld.com 2 Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the customer data center. After a series of initial conversations, the customer expressed a desire to gain an assessment of the current operational status of the company’s data center, along with data center infrastructure management (DCIM) recommendations which could provide multi-generational support as the company’s IT needs continue to evolve. Great Lakes Case & Cabinet was contracted to provide a comprehensive evaluation of the customer’s Data Center and to conduct complete computational fluid dynamics (CFD) analysis of the facility in its current form. Numerous site visits were conducted and numerous on-site measurements were taken. The operational capabilities of the current data center were captured in a CFD to establish baseline standards against which any potential future improvements might be measured. Great Lakes was also asked to look at the short, medium and long term potential for increased density within the data center as well as an expansion of IT operations within the space. As part of that effort, Great Lakes would offer infrastructure recommendations, supported by CFD analysis which would create real world performance estimates of future operations within the data center, as those recommendations might be implemented. The following pages outline the scope of work performed by Great Lakes as well as the presentation of data collected, infrastructure recommendations made to the management of the data center (along with estimates and ROI for recommended solutions) as well as CFD modeling designed to estimate data center performance conditions as those recommendations might be implemented.
  • 3. WeRackYourWorld.com 3 Overview Phase 1 Recommended Action Plan: The following recommendations are described to increase the performance and efficiency of the data center based on the modeling data and discussions with the data center team. Phase 1 includes: • Network Core tile migration pg. 4-7 • Removing under-floor baffle pg. 8-9 • Migrating Floor Tiles pg. 10-11 • Cold aisle and enclosure containment pg. 12-19 • Eliminate air re-circulation in current enclosures Deployment of cold aisle containment Core switch migration pg. 20-25 • Increasing CRAC unit set point (as desired) pg. 26-27 Additional Information: • Recommended action plan pg. 28 • PUE, Cooling Cost Reduction and ROI pg. 29 • Conclusion pg. 30
  • 4. WeRackYourWorld.com 4 Network Core (Baseline) Enclosure 207 Rendered view Rendered view with airflow patterns Rendered view with airflow patterns Enclosure 207 was chosen for an internal view to demonstrate the airflow patterns inside the enclosure. The excess air introduced by the unsealed cable cut-out lowers the temperatures inside the enclosures in the row protecting the side-to-side airflow equipment from overheating.
  • 6. WeRackYourWorld.com 6 Network Core (Phase 1) Enclosure 207 Rendered view Rendered view with airflow patterns Rendered view with airflow patterns Enclosure 207 was chosen for an internal view to demonstrate the airflow patterns inside the enclosure. The excess air introduced by the unsealed cable cut-out lowers the temperatures inside the enclosures in the row protecting the side-to-side airflow equipment from overheating. 207 Perforated floor tiles have been moved to provide a higher flow of conditioned air to the equipment. A high flow tile was place
  • 7. WeRackYourWorld.com 7 207 Network Core (Baseline) • Side to side airflow equipment creating a cascading heat elevation scenario Unblocked cable cutouts provide a supply of cool air inside the enclosure This reduces the temperature cascading effect Network Core (Rearranged floor tiles) • Floor tiles reorganized providing higher flow of air directly in front of the enclosures • High flow tile installed in front of #207 to provide additional airflow to core switches in nearby enclosures • Sampling the temperatures at enclosure #204 we can see a 7.1o Fahrenheit decline in temperature. Temp at 81.5o F Temp at 74.4o F
  • 8. WeRackYourWorld.com 8 Under-floor (Baseline) 207 Entrance With the under-floor plenum installed, the secondary zone created is highly pressurized. In addition, there is minimal to no load in the secondary zone. This greatly reduces the efficiency of the two CRAC units installed in the zone. It is recommended that this barrier be removed to allow the two units to supply additional cooling to the entire room.
  • 9. WeRackYourWorld.com 9 Under-floor (Phase 1) 207 With the plenum barrier removed, the CRAC units airflow from the secondary zone can travel to the entire data center supporting IT loads where needed. This is especially significant when utilizing cold aisle containment. With the cold aisle contained the proximity of the CRAC unit in a data center to the load becomes less critical. Every unit in the data center can supply conditioned air to the entire facility. In the event of unit(s) failures(s) provided that the overall cooling capacity does not fall below the IT load the equipment will continue to operate without interruption. This increases uptime by reducing the criticality of any one unit, and makes unit maintenance more manageable. Entrance
  • 10. WeRackYourWorld.com 10 Tile Migration 207 Tile migration for phase 1 development. By removing tiles in the hot aisle and locations not directly near IT equipment the under-floor pressure increases creating a higher velocity of airflow to the equipment providing better cooling. In addition, by reducing the amount of conditioned air mixing with exhaust air the return temperature to the CRAC units increases which increases the efficiency of the entire HVAC system. Entrance
  • 11. WeRackYourWorld.com 11 Equipment Orientation - Baseline 207 Shown is the current layout of enclosures and floor tiles in the data center. The red X on the CRAC unit indicates that it is currently non-operational. Entrance
  • 12. WeRackYourWorld.com 12 Aisle Completion with Enclosures 207 The following enclosures are recommended to complete the rows. These were based on discussions with IT and their future expansion plans. GL840ES-2442 enclosures - qty 13 (2 enclosures will replace enclosures highlighted in red) · #1— Qty. 2 · #2— Qty. 6 · #3— Qty. 5 GL840ENT-3242MSS enclosures—qty 3 · #4— Qty. 3 1 2 3 4
  • 13. WeRackYourWorld.com 13 Equipment Orientation – Phase 1 207 Phase 1 layout shows the completed rows, migrated tiles overhead panels and aisle doors are hidden to show cold aisles. Entrance
  • 14. WeRackYourWorld.com 14 Server Farm (Baseline) • Unfinished rows increase potential for recirculation of hot air • Open rack spaces create short circuits inside the enclosure, allowing conditioned air to bypass equipment and hot aisle to recirculate back into the equipment intakes Server Farm (Phase 1) • Additional enclosures complete rows and segregate hot and conditioned air • Open rack spaces have filler panels installed to reduce short circuits • Cisco 6500 switches migrated from EMC enclosure to 30” wide enclosure • Floor tiles have been moved from other areas in the datacenter to complete cold aisle • Model temperature comparison shows a 10.9o F 71.9oF 61.1oF
  • 15. WeRackYourWorld.com 15 Server Farm Cold Aisle Containment 207 Shown is an overhead view of the complete aisles with containment doors at the end of the aisles and overhead containment panels containing conditioned air in the cold aisle. This design was tested based on discussion with the data center team based on its ability to reduce the criticality of any one CRAC unit failure, eliminates hot air re-circulation improving the performance and extending the life of the equipment.
  • 16. WeRackYourWorld.com 16 Server Farm Cold Aisle Containment 207 Great Lakes enclosures were added to rows of enclosures already installed in the server farm area of the data center. The completed rows allow better hot and cold air segregation. Completed rows would also allow the installation of aisle containment doors. Enclosures already installed in the data center Great Lakes enclosures
  • 17. WeRackYourWorld.com 17 Server Farm Cold Aisle Containment 207 Each aisle in the server farm was contained using a single, custom aisle door (model shows two doors which represents standards aisle doors offered by Great Lakes).
  • 18. WeRackYourWorld.com 18 Server Farm Cold Aisle Containment 207 In addition to single aisle doors, Polargy Polarplex panels were installed across the top of the rows to trap cool air in. Floor tiles from other locations in the data center were moved to the aisles to create a row of fully perforated floor tiles (a mixture of standard and high flow tiles). Single, custom aisle door Polargy PolarPlex Panels Perforated floor tile High flow floor tile
  • 19. WeRackYourWorld.com 19 Server Farm Cold Aisle Containment 207 Because there was a height difference between the existing enclosures and the new Great Lakes enclosures, a custom support bar was designed to create a level service to properly mount the Polargy PolarPlex Panels to. Height difference between the existing enclosures (left) and Great Lakes enclosures (right). Custom support bar
  • 20. WeRackYourWorld.com 20 San Switch Migration: Phase 1 207 Cisco Catalyst 6509-E core switches are migrated to two of the GL840ES-3048 enclosures in the 700 row. Baffle kits are installed to prevent air recirculation from one switch to the next eliminating the potential for cascading heat issues.
  • 21. WeRackYourWorld.com 21 San Switch: Phase 1 (Phase one) 207 Baffles reduce recirculation by directing conditioned air toward the intake side and exhausting the hot air toward the cold aisle. Used in conjunction with a brush grommet kit, side-to-side airflow operates efficiently in a hot aisle/cold aisle configuration. Intake side (baffle side hidden) Exhaust side
  • 22. WeRackYourWorld.com 22 Baseline: Top View 207 1. Highest temp in the cold aisle currently. Model data average temp 73.6F 2. Network core temps outside of the enclosure reach upwards of 75F Entrance CRAC Unit Specifications Set Point 72° F Supply Temp. 61° F
  • 23. WeRackYourWorld.com 23 Phase 1: Top View Polargy panels hidden to make cold aisle visible 207 1. Cold aisle temp consistent at 62.2°F 2. Network core temps outside of the enclosure at 73.4°F 3. Migrated SAN switches are active and exhausting temps at 82°F By implementing containment, cold aisle temperatures are within a few degrees of under-floor tile supply. This allows the CRAC units to be increased in one degree increments and cold aisle temps will increase accordingly. CRAC Unit Specifications Set Point 72° F Supply Temp. 61° F Entrance
  • 25. WeRackYourWorld.com 25 Phase 1: Look Down View 207 SAN switch migration creating temps of 87°F
  • 26. WeRackYourWorld.com 26 CRAC Unit Failure Analysis: Baseline 207 90.1°F Temp When the CRAC unit with the highest load on it (conditioning the most air in the data center) is shutdown, the hot air from the server farm (specifically the blade server enclosures) travels to the next nearest unit. This increases the load on that unit as well as increases the cold aisle temperatures. This scenario creates massive short cycling of hot air, increasing the equipment intake temperatures, resulting in equipment “thermal-ing down/off” or failing.
  • 27. WeRackYourWorld.com 27 CRAC Unit Failure Analysis: Phase 1 207 When cold aisle containment is implemented and the CRAC unit is shut down the hot air continues to travel to the nearest available unit. However, with the cold aisle contained a consistent flow of conditioned air is supplied into the aisle equipment intakes; no hot air short cycling can occur, resulting in uninterrupted service in the event of a single unit failure. Temps taken at enclosure 508 show a delta of 8 degrees Farenheit. In addition temps taken in the cold remain a consistent 60-63 degrees F. 82.1°F Temp
  • 28. WeRackYourWorld.com 28 Recommended Action Plan 207 Recommended Action Plan • Network Core tile migration pg. 4-6 • Migrating floor tiles pg. 9 • Removing under-floor baffle pg. 7-8 • Cold aisle and enclosure containment pg. 10-14 o Completing aisles with enclosures pg. 11-13 o Eliminate air re-circulation in current enclosures o Install filler panels in open RMU o Install solid top panels— IT3 Install side panel blanks— IT4 • Deployment of cold aisle containment o Install Polargy Polar-Plex panels-IT6 o Install aisle containment doors- IT1/IT2 • Core switch migration pg. 15-16 o Installation of Baffle Kits— ESSAB14 • Increasing CRAC unit set point (as desired) -For every degree the set point is raised 4% efficiency gain* *Source: The American Society of Heating Refrigeration and Air Conditioning Engineers TC 9.9
  • 29. WeRackYourWorld.com 29 PUE, Cooling Cost Reduction and ROI 207 PUE (Power Usage Effectiveness): Average PUE for 2011 (based on data provided) 1.84 PUE estimate (after phase 1 completion) 1.39 Current and Projected cooling costs: Current average monthly cooling cost (based on data provided) $4,153.38 Projected average monthly cooling cost $1,930.75 Estimated savings $2,222.63* *Projected average savings and ROI can be improved by raising set point(s), reducing fan speed and cycling CRAC units. Performance will vary based on system flexibility and tolerances
  • 30. WeRackYourWorld.com 30 Conclusion Great Lakes has designed and modeled a solution that provides the customer with a data center upgrade plan designed to increase the energy efficiency and reliability of their current design by segregating hot and cold air optimizing air delivery, and deploying cold aisle containment. Recommendations: 1. Adjust the floor tiles providing airflow to the enclosures at the network core. Moving the tiles directly in front of the enclosures will allow a greater supply of conditioned air to reach the equipment, greatly improving the exhaust temperature of the airflow equipment installed in the racks and lowering the internal enclosure temperatures. This effort will result in a decreased risk of thermal issues: performance degradation, thermal shutdown, and early equipment mortality. 2. Create and fully contain the cold aisles in the server farm. This can be achieved in several steps: redeploying and consolidating floor tiles; completing the aisles with enclosures; installing filler panels in any unused RMU; and containing the cold aisle through the use of end of row doors and overhead containment panels. Through containment, the conditioned air is segregated from hot exhaust air. Contained conditioned air will remain at delivered temperature until used by the equipment. Another advantage of cold aisle containment is consistency in cold aisle temperatures which will be very close to the supply temperatures of the CRAC units. Any increase to the set points of the CRAC unit should proportionally increase the conditioned air supplied to the cold aisle. This should make it much easier to the deliver a consistent supply temperature to every piece of equipment. Modeling revealed that the removal of the under floor baffle could increase the amount of cooling capacity to the entire room. A fully open raised floor, in conjunction with cold aisle containment, could reduce the impact a single CRAC unit failure will have on the data center. This scenario was modeled at the CRAC unit with the highest load in the server farm. Hot aisle temperatures increased dramatically, while the cold aisle remained at supply temperatures.
  • 31. WeRackYourWorld.com 31 Conclusion By completing the Phase 1 recommendations, the data centers overall performance will be improved by: Better utilizing the conditioned air • Balancing the load per CRAC unit more effectively • Increasing the available capacity (in RMU) on the datacenter floor space • Significantly reducing recirculation in the enclosure Improving reliability • Reduced intake temperatures increasing equipment lifespan • Balanced CRAC unit load reduces dependency on a single unit failure • Cold aisle containment allows the server equipment to continue operation even when closest proximity CRAC unit fails