Data Center Consolidation & Springfield Data Center Program Integrated Commisioning Program
Integrated Commissioning  Security Management Cooling Physical Building (envelope) and Grounds Fire Suppression Power
Power  UPS GENERATOR BYPASS CIRCUIT BREAKERS OTHER SYSTEMS Envelope (Roof leaks/Walls/Vapor Gaps)
Integrated Commissioning Checklist starting point Commissioning Scope Master Check List Power Test Cooling Test Fire Suppression and Security Test Infrastructure Monitor Systems and Control Tests High Density Load Testing (using independent Rack Heaters ) Systems Grounding Chillers Pipes Power Monitoring System Power Distribution installation UPS Chilled water Pumps sprinklers CRAC Monitoring System Hot/Cold Aisle air flow Automatic Transfer Switch (ATS) Cooling Tower Gauges Humidity Sensors Rack Hot air flow patterns Integrated Power Systems Condenser Water Pumps Pumps  Temperature Sensors Rack mounted outlets in the rack EPO Piping Automatic Alarms Motion Detection sensors PDU serving the rack heat exchanger Smoke Detection Building Management System   CRAC (like) Electronics       Ducting and air flow Man Traps       integrated cooling systems Door Lock Systems       Test power and Cooling together Test power and Cooling together   Security Camera    
Electrical Electrical Distribution Circuit Breakers Transformers Relays Grounding (Building and Raised Floor) Uninterruptible Power Supply (UPS) Power Distribution Units (PDU) Generator or Standby Emergency Power (SEP) Lightning Protection
Mechanical Systems Fuel Oil Delivery System for Standby Generators Chillers Cooling Towers Computer Room Air Conditioning Units (CRAC) Thermal Energy Storage Fan Systems Heat Exchangers Heating, Ventilating and Air Conditioning (HVAC) System and Controls Pumps Boilers Floor Drains
FIRE LIFE SAFETY (FLS) AND PROTECTION SYSTEMS Fire Detection and Alarm System Life Safety Systems Fire Suppression System Wet Sprinklers Preaction Sprinkler FM 200
BUILDING MANAGEMENT SYSTEM AND CONTROL Building Management System (BMS) Building Controls EPO (Emergency Power Off) Systems Monitoring and Control Systems
SECURITY SYSTEMS Closed Circuit TV System Intrusion Detection
Envelope Visual Inspection – This is an on-site inspection of the building to assess building conditions. A visual inspection is performed in combination with some form of non-invasive testing. Depending on the nature or complexity of the issue, the findings of this inspection can be used to create a detailed plan of action to diagnose and determine causes. Non-Invasive Testing – This testing is used to support the findings of the visual inspection. Electronic moisture detection equipment, moisture measurement tools, permeability testing, borescope cameras, hygrometers, plus other equipment and test methods can be used to assess the building. Invasive Testing & Analysis – Invasive testing is used to verify findings, determine if proper components were used in construction, verify if proper installation or repair techniques were followed, and to define the extent of a problem. Examples of invasive testing include the removal of various materials and claddings, sealant testing, and water testing.

More Related Content

PPTX
Testing With OutSystems
DOC
Thin Client
PDF
Vertex AI: Pipelines for your MLOps workflows
PPTX
At Last, MuleSoft RPA Revealed - A Quick Guide To Automating Your Business | ...
PDF
MuleSoft for Enterprises
PDF
L10 system implementation
PPTX
BMC Remedy ITSM 8.0 What's New
PDF
The factory of the future
Testing With OutSystems
Thin Client
Vertex AI: Pipelines for your MLOps workflows
At Last, MuleSoft RPA Revealed - A Quick Guide To Automating Your Business | ...
MuleSoft for Enterprises
L10 system implementation
BMC Remedy ITSM 8.0 What's New
The factory of the future

What's hot (9)

PPTX
Puppet Tutorial | Puppet Tutorial For Beginners | Puppet Configuration Manage...
PPTX
Green cloud computing India
PDF
What Is Platform as a Product - Clues from Team Topologies @ AXA, Sep 2021
PDF
Containerising the Mule Runtime with Kubernetes & From Zero to Batch : MuleS...
PPTX
Washington DC MuleSoft Meetup: CI/CD Pipeline with MuleSoft and Azure DevOps
PDF
TM Forum Webinar - Telco API-driven digital marketplace opportunities | Post-...
PDF
Sharing and Deploying Data Science with KNIME Server
PDF
Knative Intro
KEY
Mini Curso - Gestão de Infraestrutura de TI
Puppet Tutorial | Puppet Tutorial For Beginners | Puppet Configuration Manage...
Green cloud computing India
What Is Platform as a Product - Clues from Team Topologies @ AXA, Sep 2021
Containerising the Mule Runtime with Kubernetes & From Zero to Batch : MuleS...
Washington DC MuleSoft Meetup: CI/CD Pipeline with MuleSoft and Azure DevOps
TM Forum Webinar - Telco API-driven digital marketplace opportunities | Post-...
Sharing and Deploying Data Science with KNIME Server
Knative Intro
Mini Curso - Gestão de Infraestrutura de TI
Ad

Similar to Data Center Program Integrated Commissioning Program Baseline (20)

PPTX
Cfd presentation customer version
PPSX
How intelligent infrastructure reduces operating costs and improves patient c...
PDF
Facility Condition Assessment And Asset Management With GIS
PPTX
It integration for intelligent buildings
PPTX
Data Center Advanced.pptx
PDF
Building services -
PPTX
AS-BUILT CHECKINGREPORT
PPTX
Ncs Energy Management Overview with InduSoft
PDF
Introduction To Building Services
PDF
Clark Nexsen Architecture and Engineering
PPTX
Controls-Con 2019 | Business Track
PPT
Tia 942 Data Center Standards
PDF
Mechanical Rough In Inspection Checklist with eAuditor Audits & Inspections
PDF
DCS Commissioning Steps.pdf
PDF
Telecom argentina datacenters
PDF
Liam brady lancs best practice club 7th march 2013 v1
DOCX
Facility management
PPTX
PPT
PCTY 2012, IBM Smarter Buildings v. Claire Penny
Cfd presentation customer version
How intelligent infrastructure reduces operating costs and improves patient c...
Facility Condition Assessment And Asset Management With GIS
It integration for intelligent buildings
Data Center Advanced.pptx
Building services -
AS-BUILT CHECKINGREPORT
Ncs Energy Management Overview with InduSoft
Introduction To Building Services
Clark Nexsen Architecture and Engineering
Controls-Con 2019 | Business Track
Tia 942 Data Center Standards
Mechanical Rough In Inspection Checklist with eAuditor Audits & Inspections
DCS Commissioning Steps.pdf
Telecom argentina datacenters
Liam brady lancs best practice club 7th march 2013 v1
Facility management
PCTY 2012, IBM Smarter Buildings v. Claire Penny
Ad

Recently uploaded (20)

PDF
Laughter Yoga Basic Learning Workshop Manual
PPT
Data mining for business intelligence ch04 sharda
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPT
Chapter four Project-Preparation material
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
IFRS Notes in your pocket for study all the time
PDF
A Brief Introduction About Julia Allison
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PPTX
Lecture (1)-Introduction.pptx business communication
Laughter Yoga Basic Learning Workshop Manual
Data mining for business intelligence ch04 sharda
HR Introduction Slide (1).pptx on hr intro
Reconciliation AND MEMORANDUM RECONCILATION
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
ICG2025_ICG 6th steering committee 30-8-24.pptx
Chapter four Project-Preparation material
340036916-American-Literature-Literary-Period-Overview.ppt
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Nidhal Samdaie CV - International Business Consultant
Chapter 5_Foreign Exchange Market in .pdf
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Power and position in leadershipDOC-20250808-WA0011..pdf
DOC-20250806-WA0002._20250806_112011_0000.pdf
MSPs in 10 Words - Created by US MSP Network
IFRS Notes in your pocket for study all the time
A Brief Introduction About Julia Allison
Roadmap Map-digital Banking feature MB,IB,AB
Ôn tập tiếng anh trong kinh doanh nâng cao
Lecture (1)-Introduction.pptx business communication

Data Center Program Integrated Commissioning Program Baseline

  • 1. Data Center Consolidation & Springfield Data Center Program Integrated Commisioning Program
  • 2. Integrated Commissioning Security Management Cooling Physical Building (envelope) and Grounds Fire Suppression Power
  • 3. Power UPS GENERATOR BYPASS CIRCUIT BREAKERS OTHER SYSTEMS Envelope (Roof leaks/Walls/Vapor Gaps)
  • 4. Integrated Commissioning Checklist starting point Commissioning Scope Master Check List Power Test Cooling Test Fire Suppression and Security Test Infrastructure Monitor Systems and Control Tests High Density Load Testing (using independent Rack Heaters ) Systems Grounding Chillers Pipes Power Monitoring System Power Distribution installation UPS Chilled water Pumps sprinklers CRAC Monitoring System Hot/Cold Aisle air flow Automatic Transfer Switch (ATS) Cooling Tower Gauges Humidity Sensors Rack Hot air flow patterns Integrated Power Systems Condenser Water Pumps Pumps Temperature Sensors Rack mounted outlets in the rack EPO Piping Automatic Alarms Motion Detection sensors PDU serving the rack heat exchanger Smoke Detection Building Management System   CRAC (like) Electronics       Ducting and air flow Man Traps       integrated cooling systems Door Lock Systems       Test power and Cooling together Test power and Cooling together   Security Camera    
  • 5. Electrical Electrical Distribution Circuit Breakers Transformers Relays Grounding (Building and Raised Floor) Uninterruptible Power Supply (UPS) Power Distribution Units (PDU) Generator or Standby Emergency Power (SEP) Lightning Protection
  • 6. Mechanical Systems Fuel Oil Delivery System for Standby Generators Chillers Cooling Towers Computer Room Air Conditioning Units (CRAC) Thermal Energy Storage Fan Systems Heat Exchangers Heating, Ventilating and Air Conditioning (HVAC) System and Controls Pumps Boilers Floor Drains
  • 7. FIRE LIFE SAFETY (FLS) AND PROTECTION SYSTEMS Fire Detection and Alarm System Life Safety Systems Fire Suppression System Wet Sprinklers Preaction Sprinkler FM 200
  • 8. BUILDING MANAGEMENT SYSTEM AND CONTROL Building Management System (BMS) Building Controls EPO (Emergency Power Off) Systems Monitoring and Control Systems
  • 9. SECURITY SYSTEMS Closed Circuit TV System Intrusion Detection
  • 10. Envelope Visual Inspection – This is an on-site inspection of the building to assess building conditions. A visual inspection is performed in combination with some form of non-invasive testing. Depending on the nature or complexity of the issue, the findings of this inspection can be used to create a detailed plan of action to diagnose and determine causes. Non-Invasive Testing – This testing is used to support the findings of the visual inspection. Electronic moisture detection equipment, moisture measurement tools, permeability testing, borescope cameras, hygrometers, plus other equipment and test methods can be used to assess the building. Invasive Testing & Analysis – Invasive testing is used to verify findings, determine if proper components were used in construction, verify if proper installation or repair techniques were followed, and to define the extent of a problem. Examples of invasive testing include the removal of various materials and claddings, sealant testing, and water testing.