Deficiency in IT Controls
Why Now?
After decades of cost over-runs, late projects and portfolio mismanagement, it’s
time to change the controls we use for managing our IT Portfolios, Projects and
Outsource vendors.
The major deficiency in IT Controls is the complete lack of Unit Measurement. ISO
has defined a Unit Measurement for IT since 1996. The current standard is called
COSMIC Function Points. This is not new, we simply don’t use it.
Without Unit Measurement of IT the following devastating results impact our
budgets and shareholder wealth:
 Value for Money (VFM) Audits are flawed. The Cost Effectiveness and
Efficiency of IT can’t be accurately measured.
 Governance of IT Outsource contracts is mismanaged. The cost of a Change
Order or new Project can’t be accurately measured to determine if the
financial cost is reasonable.
 Annual Budgeting is flawed. The time (schedule), cost and resources needed
for IT can’t be accurately determined.
 Financial analysis of IT Assets is flawed. The size of the assets, replacement
costs, support costs and risk can’t be accurately determined.
 Procurement is forced to use Time and Materials contracts with IT Vendors.
A Unit Price Contract, like manufacturing, is not possible.
IT Control Deficiency – How Bad is it?
Without IT Unit Cost Measurement, your Outsourcing and IT Costs are probably 5X
what they should be and you don’t know it.
The international benchmarking organization, ISBSG, studies performance of
projects and operations in all types of organizations through the application of
Functional Size Measurement. Function Point sizing and analysis provide data
about productivity rates, support rates and unit costs.
JVG
Business Model Program©
Deficiency in IT Controls
The following data provides insights into today’s IT Unit Costs, expressed in
Function Points (FP) and Canadian dollars:
 International Benchmark of Unit Cost = $1,000/FP
 Insurance Company (1) Unit Cost = $6,300/FP
 Insurance Company (2) Unit Cost = $6,700/FP
 Government IT Unit Cost = $10,000/FP
 Transportation Agency = $14,700/FP
 Average Government Cost = 12X International Benchmark
 Average Corporate Cost = 6.5X International Benchmark
IT Control Deficiency – Scenario
If you have outsourced all or part of your IT department:
 How do you know that you are getting Value for Money?
 How do you know that you are not being overcharged?
 Without Unit Measurement of IT, you don’t know.
The average Unit Cost of IT is summarized below:
 International Benchmark Unit Cost = $1,000/FP
 Average Government Unit Cost = $12,000/FP
 Average Corporate Unit Cost = $6,500/FP
So the critical questions to ask are:
 What are your IT Unit Costs?
 What are your Outsource Vendor Unit Costs?
If you don’t know these Unit Costs, then the ability to control contract and IT costs
has been completely lost, as demonstrated below:
 Project Size = 1,000 Function Points (FP)
 Project Cost (Benchmark) = $1.0M
 Project Cost (Government) = $12.0M
 Project Cost (Corporate) = $6.5M
JVG
Business Model Program©
Deficiency in IT Controls
To be blunt, the same project with a size of 1,000 FP can vary in cost between
$1.0M and $12.0M.
This fiscal volatility affects all IT Work – Portfolios, Projects, Maintenance,
management of IT Assets.
Consequently, our Annual Budgets, Capital Expenditures, Operational
Expenditures, and Vendor Contracts will suffer from this massive fiscal volatility,
generating tremendous business operational and regulatory risk.
Is this not the situation we find ourselves in?
What to do?
The first step is to accept the fact that all current methods of estimation and
control are inadequate, thereby supporting this fiscal volatility.
The second step is to implement Functional Size Measurement and the
measurement of Function Points for the following business functions:
 Value for Money Audits
 Procurement Contracts
 Governance – executive management of IT investments
 Portfolio Management – management of IT projects
 Operations Management – management of IT assets
The third step is to automate the collection and management of this Functional
Size Measurement data.
Obstacles to Overcome
Evidence from 20 years of consulting projects has revealed that there are 2 main
obstacles to overcome when implementing Function Point Controls to manage the
Unit Costs of IT:
1. Management Resistance
2. Staff Resistance
Management, especially Project Managers, will be resistant to measurement of IT
Unit Costs as this will initially be seen as a threat to their position. Why? They
instinctively know that their performance is significantly under par.
JVG
Business Model Program©
Deficiency in IT Controls
One response is to position the use of Function Point Controls as a Change
Program or Transformation to move the organization to a world class level.
Staff will be resistant to the measurement of IT Unit Costs because they will see
this as a threat to their status and job security. They will worry that they will be
seen as nothing more than automatons the produce code and, they will fear that
they will be held accountable for poor throughput.
One response is to institute the Change Program to implement Function Point
Controls as a learning experience where they will be helping to transform their
organization into a world class performer. A critical component is to implement
training and coaching of Function Point Controls and communicate that the focus
is their working processes, not themselves. We can then build a team to change
the process, thereby minimizing the perceived threat to job security.
In Closing
The critical nature of this “Deficiency in IT Controls” can’t be understated. Without Function
Points, running any project or IT function is like trying to fill up your gas tank with $100.00 and
not knowing the cost per litre for gasoline – how much gas did you buy? You don’t know.
And yet, this well known deficiency persists, destroying shareholder wealth and government
program outcomes.
JVG
Business Model Program©
Deficiency in IT Controls
JVG Consulting Inc.
We specialize in the full life-cycle of Enterprise Architecture: from Strategy and
Governance, to Architecture and Controls.
Our primary service is the Business Model Program©, which helps organizations to
create and maintain a fully populated repository describing their business
operating model.
The Business Model Program© provides a foundation for Strategy, Business
Planning, Governance and improvements to any organization’s Growth, Operating
Margin and Asset Efficiency.
The Business Model Program© eliminates organizational debt (strategic,
architecture and technical), duplication of business capabilities and organizational
waste, which result in significant cost reductions and growth.
To schedule a meeting to discuss your needs, please contact:
John Gardner CMC, TOGAF
Principal Enterprise Architect
Email: john.gardner@jvgconsulting.ca
Phone: 905-933-1372
JVG

More Related Content

PPT
Finance and Technology for More Effective Systems
PPTX
Aligning IT and Business for Better Results
PDF
Genpact Systems of Engagement helps Global electronics firm reimagines order ...
PDF
Mastering DevOps with AI-powered Change Risk Prediction
PPT
It governance 13 may20102
PDF
IT Disaster Recovery & Business Continuity
PDF
Invoiceware/America Economia LATAM Survey
PDF
Industrializing Zero Application Maintenance
Finance and Technology for More Effective Systems
Aligning IT and Business for Better Results
Genpact Systems of Engagement helps Global electronics firm reimagines order ...
Mastering DevOps with AI-powered Change Risk Prediction
It governance 13 may20102
IT Disaster Recovery & Business Continuity
Invoiceware/America Economia LATAM Survey
Industrializing Zero Application Maintenance

What's hot (20)

PPTX
IT governance and bal
PDF
The 80/20 Rule for Desktop KPI's: Less is More!
PDF
Creating a Unified Data Strategy for Risk-Adjusted Payments
PDF
Tpm all you need v1.2
PDF
Getting Smart With IT Investment: IT Cost Analyses Should Link to Business Ac...
PDF
P&c claims automation solution a competitive advantage
PDF
Gear Up For Corporate Spend Automation Plan-2020
PDF
Creating IT Value-A Better Way to Make IT Investment Decisions
PDF
Modernizing Legacy Systems In Insurance-
PDF
5 case-studies-collaboration
PDF
Business Resilience
PDF
It alignment-who-is-in-charge
PPT
2009 11 Business Case For ‘Erp’ In Government
PDF
FendBend.AI Digital Claims Admin Fintech (Insurtech) Business Pitch @DVHacks
PDF
Business Continuity Strategy Benchmarking April 8th, 2009
PPTX
2018 Val Act: Session 22 - Material weakness
PPTX
It and business risk alignment guide
PPT
Identity Management: Risk Across The Enterprise
PDF
5 trends dramatically changing workforce management
PPTX
Ba online training
IT governance and bal
The 80/20 Rule for Desktop KPI's: Less is More!
Creating a Unified Data Strategy for Risk-Adjusted Payments
Tpm all you need v1.2
Getting Smart With IT Investment: IT Cost Analyses Should Link to Business Ac...
P&c claims automation solution a competitive advantage
Gear Up For Corporate Spend Automation Plan-2020
Creating IT Value-A Better Way to Make IT Investment Decisions
Modernizing Legacy Systems In Insurance-
5 case-studies-collaboration
Business Resilience
It alignment-who-is-in-charge
2009 11 Business Case For ‘Erp’ In Government
FendBend.AI Digital Claims Admin Fintech (Insurtech) Business Pitch @DVHacks
Business Continuity Strategy Benchmarking April 8th, 2009
2018 Val Act: Session 22 - Material weakness
It and business risk alignment guide
Identity Management: Risk Across The Enterprise
5 trends dramatically changing workforce management
Ba online training
Ad

Similar to Deficiency in it controls 2017 (20)

PDF
Gartner using itfm_to_improve_biz_results_2012
PDF
The Future of IT: A Zero Maintenance Strategy
PDF
Right Aligning Application Investments
PDF
Noemi, a collaborative management for ict process improvement in sme experien...
PDF
Noemi, a collaborative management for ict process improvement in sme experien...
PDF
IT Optimization: Navigation Fiscal Austerity
PDF
Technology Cost Management 4D Framework: A Smarter Way to Manage IT Costs
PPT
Understanding IT Governance and Risk Management
PDF
Executive Overview of IT Strategy and Capability Maturity Framework
PDF
BCSITv3.1
PPTX
Improving the Bottom Line - IT Financial Management Best Practices
PDF
Strategic Business IT alignment
PPTX
From PPM to Enterprise Portfolio Management - 051214
PPTX
Finance Transformation Asia - Justifying Technology Investment
PDF
Harness the power of Data using Incedo TM Lighthouse for Operational decision...
PDF
An Integrated Approach to Application Portfolio Rationalization
PDF
How to Calculate the ROI of Finance Automation.pdf
PDF
Strategy for managers - Reduce Software Costs
PDF
Roland berger managing-the-it-cost-challenge_20090522
PDF
Fool With A Tool V2
Gartner using itfm_to_improve_biz_results_2012
The Future of IT: A Zero Maintenance Strategy
Right Aligning Application Investments
Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...
IT Optimization: Navigation Fiscal Austerity
Technology Cost Management 4D Framework: A Smarter Way to Manage IT Costs
Understanding IT Governance and Risk Management
Executive Overview of IT Strategy and Capability Maturity Framework
BCSITv3.1
Improving the Bottom Line - IT Financial Management Best Practices
Strategic Business IT alignment
From PPM to Enterprise Portfolio Management - 051214
Finance Transformation Asia - Justifying Technology Investment
Harness the power of Data using Incedo TM Lighthouse for Operational decision...
An Integrated Approach to Application Portfolio Rationalization
How to Calculate the ROI of Finance Automation.pdf
Strategy for managers - Reduce Software Costs
Roland berger managing-the-it-cost-challenge_20090522
Fool With A Tool V2
Ad

Recently uploaded (20)

PDF
Hindu Circuler Economy - Model (Concept)
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
Deliverable file - Regulatory guideline analysis.pdf
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
Cours de Système d'information about ERP.pdf
PDF
How to Get Business Funding for Small Business Fast
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Comments on Crystal Cloud and Energy Star.pdf
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
IFRS Notes in your pocket for study all the time
DOCX
Business Management - unit 1 and 2
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
Hindu Circuler Economy - Model (Concept)
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
Laughter Yoga Basic Learning Workshop Manual
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
Tata consultancy services case study shri Sharda college, basrur
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Deliverable file - Regulatory guideline analysis.pdf
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
Power and position in leadershipDOC-20250808-WA0011..pdf
Cours de Système d'information about ERP.pdf
How to Get Business Funding for Small Business Fast
ICG2025_ICG 6th steering committee 30-8-24.pptx
Keppel_Proposed Divestment of M1 Limited
Comments on Crystal Cloud and Energy Star.pdf
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
IFRS Notes in your pocket for study all the time
Business Management - unit 1 and 2
Ôn tập tiếng anh trong kinh doanh nâng cao

Deficiency in it controls 2017

  • 1. Business Model Program© Deficiency in IT Controls Why Now? After decades of cost over-runs, late projects and portfolio mismanagement, it’s time to change the controls we use for managing our IT Portfolios, Projects and Outsource vendors. The major deficiency in IT Controls is the complete lack of Unit Measurement. ISO has defined a Unit Measurement for IT since 1996. The current standard is called COSMIC Function Points. This is not new, we simply don’t use it. Without Unit Measurement of IT the following devastating results impact our budgets and shareholder wealth:  Value for Money (VFM) Audits are flawed. The Cost Effectiveness and Efficiency of IT can’t be accurately measured.  Governance of IT Outsource contracts is mismanaged. The cost of a Change Order or new Project can’t be accurately measured to determine if the financial cost is reasonable.  Annual Budgeting is flawed. The time (schedule), cost and resources needed for IT can’t be accurately determined.  Financial analysis of IT Assets is flawed. The size of the assets, replacement costs, support costs and risk can’t be accurately determined.  Procurement is forced to use Time and Materials contracts with IT Vendors. A Unit Price Contract, like manufacturing, is not possible. IT Control Deficiency – How Bad is it? Without IT Unit Cost Measurement, your Outsourcing and IT Costs are probably 5X what they should be and you don’t know it. The international benchmarking organization, ISBSG, studies performance of projects and operations in all types of organizations through the application of Functional Size Measurement. Function Point sizing and analysis provide data about productivity rates, support rates and unit costs. JVG
  • 2. Business Model Program© Deficiency in IT Controls The following data provides insights into today’s IT Unit Costs, expressed in Function Points (FP) and Canadian dollars:  International Benchmark of Unit Cost = $1,000/FP  Insurance Company (1) Unit Cost = $6,300/FP  Insurance Company (2) Unit Cost = $6,700/FP  Government IT Unit Cost = $10,000/FP  Transportation Agency = $14,700/FP  Average Government Cost = 12X International Benchmark  Average Corporate Cost = 6.5X International Benchmark IT Control Deficiency – Scenario If you have outsourced all or part of your IT department:  How do you know that you are getting Value for Money?  How do you know that you are not being overcharged?  Without Unit Measurement of IT, you don’t know. The average Unit Cost of IT is summarized below:  International Benchmark Unit Cost = $1,000/FP  Average Government Unit Cost = $12,000/FP  Average Corporate Unit Cost = $6,500/FP So the critical questions to ask are:  What are your IT Unit Costs?  What are your Outsource Vendor Unit Costs? If you don’t know these Unit Costs, then the ability to control contract and IT costs has been completely lost, as demonstrated below:  Project Size = 1,000 Function Points (FP)  Project Cost (Benchmark) = $1.0M  Project Cost (Government) = $12.0M  Project Cost (Corporate) = $6.5M JVG
  • 3. Business Model Program© Deficiency in IT Controls To be blunt, the same project with a size of 1,000 FP can vary in cost between $1.0M and $12.0M. This fiscal volatility affects all IT Work – Portfolios, Projects, Maintenance, management of IT Assets. Consequently, our Annual Budgets, Capital Expenditures, Operational Expenditures, and Vendor Contracts will suffer from this massive fiscal volatility, generating tremendous business operational and regulatory risk. Is this not the situation we find ourselves in? What to do? The first step is to accept the fact that all current methods of estimation and control are inadequate, thereby supporting this fiscal volatility. The second step is to implement Functional Size Measurement and the measurement of Function Points for the following business functions:  Value for Money Audits  Procurement Contracts  Governance – executive management of IT investments  Portfolio Management – management of IT projects  Operations Management – management of IT assets The third step is to automate the collection and management of this Functional Size Measurement data. Obstacles to Overcome Evidence from 20 years of consulting projects has revealed that there are 2 main obstacles to overcome when implementing Function Point Controls to manage the Unit Costs of IT: 1. Management Resistance 2. Staff Resistance Management, especially Project Managers, will be resistant to measurement of IT Unit Costs as this will initially be seen as a threat to their position. Why? They instinctively know that their performance is significantly under par. JVG
  • 4. Business Model Program© Deficiency in IT Controls One response is to position the use of Function Point Controls as a Change Program or Transformation to move the organization to a world class level. Staff will be resistant to the measurement of IT Unit Costs because they will see this as a threat to their status and job security. They will worry that they will be seen as nothing more than automatons the produce code and, they will fear that they will be held accountable for poor throughput. One response is to institute the Change Program to implement Function Point Controls as a learning experience where they will be helping to transform their organization into a world class performer. A critical component is to implement training and coaching of Function Point Controls and communicate that the focus is their working processes, not themselves. We can then build a team to change the process, thereby minimizing the perceived threat to job security. In Closing The critical nature of this “Deficiency in IT Controls” can’t be understated. Without Function Points, running any project or IT function is like trying to fill up your gas tank with $100.00 and not knowing the cost per litre for gasoline – how much gas did you buy? You don’t know. And yet, this well known deficiency persists, destroying shareholder wealth and government program outcomes. JVG
  • 5. Business Model Program© Deficiency in IT Controls JVG Consulting Inc. We specialize in the full life-cycle of Enterprise Architecture: from Strategy and Governance, to Architecture and Controls. Our primary service is the Business Model Program©, which helps organizations to create and maintain a fully populated repository describing their business operating model. The Business Model Program© provides a foundation for Strategy, Business Planning, Governance and improvements to any organization’s Growth, Operating Margin and Asset Efficiency. The Business Model Program© eliminates organizational debt (strategic, architecture and technical), duplication of business capabilities and organizational waste, which result in significant cost reductions and growth. To schedule a meeting to discuss your needs, please contact: John Gardner CMC, TOGAF Principal Enterprise Architect Email: john.gardner@jvgconsulting.ca Phone: 905-933-1372 JVG