This document analyzes delays in current mode threshold logic gate designs. It proposes a new implementation of current mode threshold functions that improves gate delay and switching energy. Simulation results using the Tanner tool show that gates implemented with the optimum sensor size using the proposed method outperform existing implementations in delay and switching energy.