SE 492: Supply Chain Systems Modeling Delayed Product Differentiation
Approaches Standardization Modular Design Process Restructuring
Standardization Using common components or processes Reduces the complexity of the manufacturing system Increases the flexibility of use of the WIP and improves the service level of the system (risk pooling)
Modular design Decomposing the complete product into sub-modules that can be easily assembled together The point of product differentiation is delayed
Process restructuring Resequencing process steps in making a product Common process steps are performed before the product specific process steps
Model Products 1 and 2 assume their identity after operation k   operation buffer 1 2 k K+1 N N K+1
 
Assumptions Sufficient buffer inventories so that the entire system can be decoupled onto N single-stage systems Safety stock   at each buffer is replenished according to an order-up-to level policy Service levels for different buffers are the same Quality at each stage is nor affected by delayed product dofferentiation
Notation S i   :  average investment cost per period if operation  i   became a common operation n i (k)   :  lead time of operation  i  when operation  k  is the last common operation p i (k)   :  processing cost per unit for   operation  i  when operation  k  is the last common operation h i (k)   :  inventory holding cost for holding one unit in inventory at buffer  i  for one period when operation  k  is the last common operation
Let  z  be the safety factor associated with the service level at each buffer. Each buffer faces normal demand with mean  µ  and standard deviation  σ Average on-order inventory is  nµ  and  the average buffer inventory is  µ/2 + z  σ (n+1) 1/2 n:  lead time of this stage
Model Z(k)   :  total relevant cost per period for the case when operation  k  is the last common operation
Standardization Computer manufacturer that manufactures two types of printers Mono printers Color printers Major manufacturing steps Printed circuit board assembly (PCA) Final assembly and test (FA&T) Final customization N=3  k=0 Standardize PCA or both PCA and FA&T
PCA FA&T Customization Customization FA&T PCA Customization Standardization of Parts Mono Printer Color Printer color Printer Mono Printer
Standardization of components S 1   >>  S 2  >0 n i (k) = n i  for each  i β i  >= 0  Captures the additional material and processing costs when  operation  i  is standardized
Standardization of components β 1  >  β 2  > 0 b i   : captures the cumulative value added at each operation δ i  : additional value added at stage  i  when it is standardized
Standardization of components δ 1   >> 0 because the value of the common head driver is high δ 2   ~  0   easy to standardize We can evaluate  Z(0), Z(1),   and   Z(2)
Standardization of components
Modular Design Dishwashers in different colors Manufacturing steps Fabrication Integration & Shipping Distribution N=3  k=1 Modular design of the metal frame
Modular Design of Parts Fabrication Integration +Shipping Distribution Black dishwasher White dishwasher Fabrication Integration +Shipping Distribution + Panel assembly Black dishwasher White dishwasher After modular design of the metal frame
Process restructuring Postponement of Operation Manufacturing & distribution of electronic devices Manufacturing steps Manufacturing of components Bundling of components distribution Production  center Distribution center
Process restructuring Postponement of Operation Component Mfg Bundling +Shipping Distribution Device A Device B Shipping Bundling + Distribution Device A Device B After delayed product differentiation Component Mfg
Process restructuring Reversal of Operations Benetton Sweater making process Dyeing Knitting Distribution N=3, k=0
dye knit distribution Process restructuring Reversal of operations knit dye dye distribution distribution Red sweater Blue sweater With delayed product differentiation Red sweater Blue sweater

More Related Content

PPT
Concurrent engineering
PPTX
Quantity discount
PPT
Production Presentation
PPTX
types of production system
DOCX
Lean manufacturing report
PPTX
7_production-activity-control.pptx
PDF
A Case Study on Just in Time (JIT)
PDF
LEAN STANDARDIZED WORK TOOL
Concurrent engineering
Quantity discount
Production Presentation
types of production system
Lean manufacturing report
7_production-activity-control.pptx
A Case Study on Just in Time (JIT)
LEAN STANDARDIZED WORK TOOL

What's hot (20)

PPT
Kanban Pull System
PPTX
Product design and development by Karl T. Ulrich
PPTX
Cycle inventory
PPTX
Measurement System Analysis (MSA)
PDF
What is cellular manufacturing?
PPT
Cellular Manufacturing
PPT
Product design and development ch2
PPTX
Single Minute Exchange of Dies (SMED)
PDF
BOM Management - How to manage data about parts in the Bill of Materials.
PPTX
Manufacturing & operations management
PPT
Flexible manufacturing systems
PPTX
Presentation on Just in Time
PDF
A Study Report on Value Analysis and Value Engineering (VAVE)
PPT
Quality Function Deployment (QFD) Seminar Presentation
PDF
Dol status for suppliers
PPT
manufacturing operations
PPTX
PPT
Plant layout and its types
Kanban Pull System
Product design and development by Karl T. Ulrich
Cycle inventory
Measurement System Analysis (MSA)
What is cellular manufacturing?
Cellular Manufacturing
Product design and development ch2
Single Minute Exchange of Dies (SMED)
BOM Management - How to manage data about parts in the Bill of Materials.
Manufacturing & operations management
Flexible manufacturing systems
Presentation on Just in Time
A Study Report on Value Analysis and Value Engineering (VAVE)
Quality Function Deployment (QFD) Seminar Presentation
Dol status for suppliers
manufacturing operations
Plant layout and its types
Ad

Similar to Delayed Product Differentiation (20)

PDF
U1 p2 breakeven analysis
PPT
Woop - Workflow Optimizer
PPTX
RAPID MANUFACTURING RK.pptx............................
PDF
Introducción al Planeamiento agregado - Teoría y ejemplo
PDF
Gv3512031207
PDF
High Speed and Time Efficient 1-D DWT on Xilinx Virtex4 DWT Using 9/7 Filter ...
PDF
CIM report - final
PDF
CIM report - final
PDF
CIM Report
PPT
Jde e1 technical change mgmt
PDF
Modelling for Linear and Radial Heat Transfer using 3D Experience
PPTX
Analysis and subsequent optimization of a microcontroller program
 
PPT
ch1_010902 (1).ppt
PPT
Introduction to Embedded System Chapter Intro
PDF
Ac2017 6. output based contracting
PDF
DOC-20250224aaaaaaaaaaawwwwwkkkllllllllj
PPT
Design notes5
PPT
Design notes5
PPTX
technical report presents a comprehensive study. .pptx
PPT
Lca avancis for icv
U1 p2 breakeven analysis
Woop - Workflow Optimizer
RAPID MANUFACTURING RK.pptx............................
Introducción al Planeamiento agregado - Teoría y ejemplo
Gv3512031207
High Speed and Time Efficient 1-D DWT on Xilinx Virtex4 DWT Using 9/7 Filter ...
CIM report - final
CIM report - final
CIM Report
Jde e1 technical change mgmt
Modelling for Linear and Radial Heat Transfer using 3D Experience
Analysis and subsequent optimization of a microcontroller program
 
ch1_010902 (1).ppt
Introduction to Embedded System Chapter Intro
Ac2017 6. output based contracting
DOC-20250224aaaaaaaaaaawwwwwkkkllllllllj
Design notes5
Design notes5
technical report presents a comprehensive study. .pptx
Lca avancis for icv
Ad

More from 3abooodi (20)

PPT
Winters Method
PDF
PPT
Value Of Information
PPT
Trend Based + Reg And Holtns
PPT
Supply Chain Integration
PPT
Single Facility Lot Size Model Elsp
PDF
Set Covering
PPT
Push And Pull Production Systems Chap7 Ppt)
PPT
Newsboy
PDF
Multi Echelon Inventories
PDF
Delayed Differantiation
PDF
Maximum Covering
PPT
Introduction To Scm
PPT
Forecasting
PPT
Inventory Control
PPT
Continuous Review Inventory System
PPT
An Integrated Location Inventory Model
PPT
Aggregate Production Planning
PPT
Vmi1
PPT
Role Of Robots
Winters Method
Value Of Information
Trend Based + Reg And Holtns
Supply Chain Integration
Single Facility Lot Size Model Elsp
Set Covering
Push And Pull Production Systems Chap7 Ppt)
Newsboy
Multi Echelon Inventories
Delayed Differantiation
Maximum Covering
Introduction To Scm
Forecasting
Inventory Control
Continuous Review Inventory System
An Integrated Location Inventory Model
Aggregate Production Planning
Vmi1
Role Of Robots

Recently uploaded (20)

DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
PPTX
Astra-Investor- business Presentation (1).pptx
PDF
How to Get Business Funding for Small Business Fast
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PDF
Tata consultancy services case study shri Sharda college, basrur
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PPTX
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PDF
Introduction to Generative Engine Optimization (GEO)
PPT
Lecture notes on Business Research Methods
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Hand book of Entrepreneurship 4 Chapters.docx
1911 Gold Corporate Presentation Aug 2025.pdf
Astra-Investor- business Presentation (1).pptx
How to Get Business Funding for Small Business Fast
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
Lecture 3344;;,,(,(((((((((((((((((((((((
Keppel_Proposed Divestment of M1 Limited
Charisse Litchman: A Maverick Making Neurological Care More Accessible
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
Tata consultancy services case study shri Sharda college, basrur
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
Solaris Resources Presentation - Corporate August 2025.pdf
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Daniels 2024 Inclusive, Sustainable Development
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
Introduction to Generative Engine Optimization (GEO)
Lecture notes on Business Research Methods
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx

Delayed Product Differentiation

  • 1. SE 492: Supply Chain Systems Modeling Delayed Product Differentiation
  • 2. Approaches Standardization Modular Design Process Restructuring
  • 3. Standardization Using common components or processes Reduces the complexity of the manufacturing system Increases the flexibility of use of the WIP and improves the service level of the system (risk pooling)
  • 4. Modular design Decomposing the complete product into sub-modules that can be easily assembled together The point of product differentiation is delayed
  • 5. Process restructuring Resequencing process steps in making a product Common process steps are performed before the product specific process steps
  • 6. Model Products 1 and 2 assume their identity after operation k operation buffer 1 2 k K+1 N N K+1
  • 7.  
  • 8. Assumptions Sufficient buffer inventories so that the entire system can be decoupled onto N single-stage systems Safety stock at each buffer is replenished according to an order-up-to level policy Service levels for different buffers are the same Quality at each stage is nor affected by delayed product dofferentiation
  • 9. Notation S i : average investment cost per period if operation i became a common operation n i (k) : lead time of operation i when operation k is the last common operation p i (k) : processing cost per unit for operation i when operation k is the last common operation h i (k) : inventory holding cost for holding one unit in inventory at buffer i for one period when operation k is the last common operation
  • 10. Let z be the safety factor associated with the service level at each buffer. Each buffer faces normal demand with mean µ and standard deviation σ Average on-order inventory is nµ and the average buffer inventory is µ/2 + z σ (n+1) 1/2 n: lead time of this stage
  • 11. Model Z(k) : total relevant cost per period for the case when operation k is the last common operation
  • 12. Standardization Computer manufacturer that manufactures two types of printers Mono printers Color printers Major manufacturing steps Printed circuit board assembly (PCA) Final assembly and test (FA&T) Final customization N=3 k=0 Standardize PCA or both PCA and FA&T
  • 13. PCA FA&T Customization Customization FA&T PCA Customization Standardization of Parts Mono Printer Color Printer color Printer Mono Printer
  • 14. Standardization of components S 1 >> S 2 >0 n i (k) = n i for each i β i >= 0 Captures the additional material and processing costs when operation i is standardized
  • 15. Standardization of components β 1 > β 2 > 0 b i : captures the cumulative value added at each operation δ i : additional value added at stage i when it is standardized
  • 16. Standardization of components δ 1 >> 0 because the value of the common head driver is high δ 2 ~ 0 easy to standardize We can evaluate Z(0), Z(1), and Z(2)
  • 18. Modular Design Dishwashers in different colors Manufacturing steps Fabrication Integration & Shipping Distribution N=3 k=1 Modular design of the metal frame
  • 19. Modular Design of Parts Fabrication Integration +Shipping Distribution Black dishwasher White dishwasher Fabrication Integration +Shipping Distribution + Panel assembly Black dishwasher White dishwasher After modular design of the metal frame
  • 20. Process restructuring Postponement of Operation Manufacturing & distribution of electronic devices Manufacturing steps Manufacturing of components Bundling of components distribution Production center Distribution center
  • 21. Process restructuring Postponement of Operation Component Mfg Bundling +Shipping Distribution Device A Device B Shipping Bundling + Distribution Device A Device B After delayed product differentiation Component Mfg
  • 22. Process restructuring Reversal of Operations Benetton Sweater making process Dyeing Knitting Distribution N=3, k=0
  • 23. dye knit distribution Process restructuring Reversal of operations knit dye dye distribution distribution Red sweater Blue sweater With delayed product differentiation Red sweater Blue sweater