SlideShare a Scribd company logo
bridge[noun]  structure spanning and providing passage over an obstacle[verb]  to join togetherEmanuel AlforjaArash PiaMichael OlsenDamian AllenRobert BatemanThomas GribbleCalifornia State Polytechnic University, PomonaCollege of EngineeringClass of 2009Erik EllingsenSyed Masood Ul-HaqueAdvisor: Mikhail Gershfeld
scopeaccess between Bldg. 9 and 17
area for students to congregate
educational tool
sustainable materialsproject locationbldg. 17bldg. 9connect
project overviewpreliminary researchgeospatialgeotechnicalcivilstructuralreflection and conclusions
preliminary researchinterest survey
codes
existing documents
design criteriaof the broncos surveyed…65% frequently traveled between bldg. 9 and 17
30% concerned with impact on students’ costs
50% would like a bridge connecting the 2ndfloorsinterest survey
ASCE 7-05, AISC, ACI, APA, NDSCBC 2007AASHTOADAIBC 2006LA County Building Codecodes
architecturalstructuralmechanical (HVAC, Plumbing)electricalexisting documents
fire accessibility
serviceability
subsurface obstructions
loadsdesign criteria
geospatialsite survey
digital terrain model surface elevation
 floor elevation
 building corners
 relevant landmarks
 equipmentsite survey
digital terrain model
geotechnicaldesk study
exploratory boring
laboratory testing
preliminary soil reportliquefaction
under consolidated Sandy Clay
vicinity of faultsdesk study
boring A @ bldg. 9 planter
boring B @ bldg. 17 planterexploratory boring
 soil classification
Sieve analysis
Atterburg limits
Hydrometer
 soil parameters
Moisture content
Sand cone
Consolidation
Direct shear
compactionlaboratory testing
  2 borings
  GWT at 15’
  normally consolidated sandy clay
  compaction requiredfriction angle 	=  24°cohesion =  600 psfunit weight =  130 pcfsoil bearing pressure = 3900 psfpreliminary soil investigation
civilsite plan
precise grading plan
site hydrologypreliminary site plan
precise grading plan
existing flow directionsnew flow directionshydrologic evaluation
hydrologic recommendationearthwork volume50 yd3 cut, 2.2 yd3 fill, 47.8 yd3 excesscivil report
structuralconceptual investigation
preliminary design
design development
construction documentsbeamspace trussarchcableconceptual
arch

More Related Content

PDF
THESIS PRESENTATION_BIOPHILIC DESIGN
PDF
Design of Foot Over Bridge
PPTX
Staircase design
PPTX
analysis of high rise building
PDF
The space frame structure
PPTX
Buildings Structure system
PPTX
Composite construction or Composite Structure/Frame
PPTX
Retaining walls
THESIS PRESENTATION_BIOPHILIC DESIGN
Design of Foot Over Bridge
Staircase design
analysis of high rise building
The space frame structure
Buildings Structure system
Composite construction or Composite Structure/Frame
Retaining walls

What's hot (20)

PDF
Basement construction report
PPTX
Slipform construction
PPTX
Case Study: High Rise Buildings
PDF
Flat slab design
DOCX
Under Ground water tank design including estimation and costing
PDF
sustainable neighborhoods, Scott Demark, GBF2008
PPTX
Type of high rise building
PPTX
Analysis and Desin of Multi purpose Auditorium
PPTX
Lift form slab construction
PPTX
Grid/ Waffle Slabs
PPT
Prestressed construction
DOCX
Design of Multi-storey car parking
PPTX
Retaining walls
PPTX
UNDERWATER CONSTRUCTION
PDF
BUILDING CONSTRUCTION
PPTX
PRECAST BUILDING SYSTEM
PPTX
Space frames!
PDF
Thumb rules for placing column layout
PDF
2014-05-12 255 138th Street NYCTA Structural Drawings
Basement construction report
Slipform construction
Case Study: High Rise Buildings
Flat slab design
Under Ground water tank design including estimation and costing
sustainable neighborhoods, Scott Demark, GBF2008
Type of high rise building
Analysis and Desin of Multi purpose Auditorium
Lift form slab construction
Grid/ Waffle Slabs
Prestressed construction
Design of Multi-storey car parking
Retaining walls
UNDERWATER CONSTRUCTION
BUILDING CONSTRUCTION
PRECAST BUILDING SYSTEM
Space frames!
Thumb rules for placing column layout
2014-05-12 255 138th Street NYCTA Structural Drawings
Ad

Viewers also liked (20)

PPTX
Foot bridge presentation
DOCX
Design steps of foot bridge , stringer and cross girder
PDF
Samll bridge design
PPT
Bridge engineering
PDF
Universal Design proposal for footover bridges
PDF
Design manual-for-small-bridges
DOCX
Bridge engineering (super structure and substructure components)
PPT
Bridge
PPTX
Newington Road Pedestrian Bridge Replacement Project June 2014
PPTX
PPT On Bridge Construction
PDF
Final report design of a pedestrian bridge - fall 2009
PDF
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
DOCX
Design brief samples
PPT
Design of bridge component by vikas dhawan
PPT
Pile foundation
PPTX
Types of bridges.pptx 1
PPT
TYPES OF FOUNDATION(PPT)
PDF
pedestrian paths design
PDF
Manipulating Memory for Fun and Profit
PPT
ASE Conference Presentation
Foot bridge presentation
Design steps of foot bridge , stringer and cross girder
Samll bridge design
Bridge engineering
Universal Design proposal for footover bridges
Design manual-for-small-bridges
Bridge engineering (super structure and substructure components)
Bridge
Newington Road Pedestrian Bridge Replacement Project June 2014
PPT On Bridge Construction
Final report design of a pedestrian bridge - fall 2009
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
Design brief samples
Design of bridge component by vikas dhawan
Pile foundation
Types of bridges.pptx 1
TYPES OF FOUNDATION(PPT)
pedestrian paths design
Manipulating Memory for Fun and Profit
ASE Conference Presentation
Ad

Similar to Design of Pedestrian Bridge (18)

PPTX
Harlem Park Building Design Project
PPT
Lect 6 pavement design
PDF
Design Optimization of Reinforced Concrete Waffle Slab Using Genetic Algorithm
PPTX
Tom Saad of FHWA Chicago HS for Agricultural Sciences Shadow day 02-08-12
PDF
Final bcon 1 busstop
PPT
Senior Design Capstone Presentation
PDF
Machine learning techniques and multi-scale models to evaluate the impact of ...
PPTX
Engineers Club Of Memphis V2
PPTX
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)
PPTX
A CFD study of Wind Tunnel Wall Interference_Md Hasan
PPT
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
PDF
case paper
PPTX
Vertical canal fall
PPTX
RCC design using Abaqus software
PPTX
RCC design using abasqus sofware
PPTX
Autonomous non-intrusive condition assessment of structures - Kamyab Zandi, C...
PPTX
Structural Integrity of Flat Slabs
PPTX
B. Tech. Civil Engineering
Harlem Park Building Design Project
Lect 6 pavement design
Design Optimization of Reinforced Concrete Waffle Slab Using Genetic Algorithm
Tom Saad of FHWA Chicago HS for Agricultural Sciences Shadow day 02-08-12
Final bcon 1 busstop
Senior Design Capstone Presentation
Machine learning techniques and multi-scale models to evaluate the impact of ...
Engineers Club Of Memphis V2
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)
A CFD study of Wind Tunnel Wall Interference_Md Hasan
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
case paper
Vertical canal fall
RCC design using Abaqus software
RCC design using abasqus sofware
Autonomous non-intrusive condition assessment of structures - Kamyab Zandi, C...
Structural Integrity of Flat Slabs
B. Tech. Civil Engineering

Recently uploaded (20)

PPTX
22CDH01-V3-UNIT-I INTRODUCITON TO EXTENDED REALITY
PDF
How Animation is Used by Sports Teams and Leagues
PDF
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
PDF
GSH-Vicky1-Complete-Plans on Housing.pdf
PPTX
Presentation.pptx anemia in pregnancy in
PPTX
Media And Information Literacy for Grade 12
PPTX
22CDO02-IMGD-UNIT-I-MOBILE GAME DESIGN PROCESS
PDF
Architecture Design Portfolio- VICTOR OKUTU
PPTX
Necrosgwjskdnbsjdmdndmkdndndnmdndndkdmdndkdkndmdmis.pptx
PPTX
timber basics in structure mechanics (dos)
PPTX
PROPOSAL tentang PLN di metode pelaksanaan.pptx
PPTX
22CDH01-V3-UNIT III-UX-UI for Immersive Design
PPTX
UNIT III - GRAPHICS AND AUDIO FOR MOBILE
PDF
intro_to_rust.pptx_123456789012446789.pdf
PPTX
8086.pptx microprocessor and microcontroller
PPTX
VERNACULAR_DESIGN_PPT FINAL WITH PROPOSED PLAN.pptx
PPTX
LITERATURE CASE STUDY DESIGN SEMESTER 5.pptx
PPTX
Project_Presentation Bitcoin Price Prediction
PPTX
a group casestudy on architectural aesthetic and beauty
PPT
robotS AND ROBOTICSOF HUMANS AND MACHINES
22CDH01-V3-UNIT-I INTRODUCITON TO EXTENDED REALITY
How Animation is Used by Sports Teams and Leagues
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
GSH-Vicky1-Complete-Plans on Housing.pdf
Presentation.pptx anemia in pregnancy in
Media And Information Literacy for Grade 12
22CDO02-IMGD-UNIT-I-MOBILE GAME DESIGN PROCESS
Architecture Design Portfolio- VICTOR OKUTU
Necrosgwjskdnbsjdmdndmkdndndnmdndndkdmdndkdkndmdmis.pptx
timber basics in structure mechanics (dos)
PROPOSAL tentang PLN di metode pelaksanaan.pptx
22CDH01-V3-UNIT III-UX-UI for Immersive Design
UNIT III - GRAPHICS AND AUDIO FOR MOBILE
intro_to_rust.pptx_123456789012446789.pdf
8086.pptx microprocessor and microcontroller
VERNACULAR_DESIGN_PPT FINAL WITH PROPOSED PLAN.pptx
LITERATURE CASE STUDY DESIGN SEMESTER 5.pptx
Project_Presentation Bitcoin Price Prediction
a group casestudy on architectural aesthetic and beauty
robotS AND ROBOTICSOF HUMANS AND MACHINES

Design of Pedestrian Bridge

Editor's Notes

  • #2: Industry representatives, faculty, classmates, students, friends and family, thank you for attending our senior project presentation.What is a bridge?Is it just a structure providing passage over an obstacle? Over the course of this project, for us, the definition of a bridge has expanded beyond its traditional meaning. This project has bridged theory and practice, multiple disciplines, and different expertise and personalities
  • #3: I am Damian Allen, the project manager for this project and this is the team. Emanual Alforja Arash PiaMichael OlsonRobert BatemanThomas GribbleErik EllingsenSayed Masood Ul-HaqueWe did not know each other prior to this project. We all came from different backgrounds, and we all have different passions in civil engineering. Until the last week, we got along just great. On a serious note, over the course of this project, we have worked together as one team. We are excited to share with you our work.
  • #5: The project site is on campus and is an open space between two engineering buildings. Looking at the two buildings you can see a significant difference in their architectural styles, which presented some aesthetic considerations.
  • #11: The important information obtained from the preliminary research was the required fire access height clearance of 13.5’ and width clearance of 25’, bridge live load deformations were limited to L/500, lateral deformation was maximum H/200, storm drain locations were identified, and live load criteria was set to 85 psf.
  • #12: Geospatial study was an early part of the design process. This included conducting a site survey and from that, generating a digital terrain model.
  • #13: The purpose of site survey was to create a DTM so that we could extract all necessary information for the project. This includes topographic data, existing objects, building and site elevations, and the exact distance between the two buildings. The survey was performed using a Geodimeter, which accurate to __. Other basic tools such prism and surveying tape were used. We surveyed over 300 points to generate our 3D model.
  • #15: Robert BatemanplatemanDuring the preliminary geotechnical investigation, we conducted a subsurface desk study, two exploratory borings next to buildings 9 and 17, and laboratory testing. Based on obtained information, we prepared a preliminary geotechnical investigation report.
  • #16: Before drilling holes and testing soil, we collected site specific information. Documents found from sources such as the USGS provided seismic, geologic, and topographic data. This helped us to locate local faults, such as the San Jacinto and San Gabriel faults, identify expected soil type, determine liquefaction potential, and evaluate historical and archeological significance of the site.(CIRCLE THE SITE AREA, ADD LEGEND)RobertAs with any geotechnical investigation, ours began with a preliminary desk study. Through geologic, hydraulic, and geotechnical data from USGS we wer able to classify our surrounding subsurface conditions. Geologic maps indicated nearby fault lines, mainly the San Jacinto and San Gabriel, which will be significant in our seizmic design critera. Further research concluded a preliminary classification of the soil which was indicated as an under consolidated sandy clay and is considered pre quaternary. This site is also prone to liquid faction effects in the north which escaped the site area.
  • #17: We prepared and presented a boring plan to facilities during their scheduled trades meeting and received approval. We also informed DiggAlert USA and received their approval. With the help of Dr. Kitch, we were able to use department drilling equipment to conduct two exploratory borings. Boring A was located in the planter next to Building 9 in the vicinity of a planned foundation, while Boring B was located in the grassy area adjacent to Building 17.
  • #18: With the disturbed and undisturbed samples gathered from our borings, in depth geotechnical testing was performed in our lab to accurately classify our soil and retrieve the necessary parameters to conduct our footing design.
  • #19: Our lab data confirmed our desk study that the soil is a normally consolidated sandy clay. Compaction would be required if spread footings were used. Our soil unit weight was 130 pcf, cohesion 600 psf, friction angle 24^, and soil bearing pressure 3900 psf.
  • #21: Elevations, offset, drainage, building heights, existing usage, utilities == entire site plan + google earthSPAN/OFFSET5 foot offsetexplain contoursfire lane accessbuilding widthutilitiesbridge spanflow lines/pathcongregation area
  • #26: These are the 4 structural systems we considered, state them.we immediately ruled out suspension, as a large monolithic tower would overpower the buildings and not fit in the architectural context, and would require deep foundations, difficulty of construction out of wood.
  • #27: Developed and mass-produced by the Roman Empire, the arch is widely implemented in ancient and modern culture. An arch is a structural element that is able to transform its loading into compressional thrust, an ideal application for a timber structure.
  • #28: The arch bridge design consists of two cross-angled arches that support a straight walkway and implements spacious seating areas for multifunctional use.
  • #29: MasooOOOOOOoooooDDDD,In addition to adhering to the design criteria, the main objective of the beam concept was to have a design that was slender and sleek. These are some of the cross-sections and alignments sketches.beam system was attractive due to simplicity, streamline design, low material costs, and feasibility at the project site
  • #30: The solution to the vertical clearance criteria was to provide a slight arch to the bridge. To reduce the size of the girders and meet the horz clearance criteria, we had four supports, two of which branch out shortening the unsupported span. This design was inspired by the natural beauty and strength of trees.The lateral resistance system included a braced frame located at building 9, and a moment frame at building 17. For intermediate deck support, beams were shaped to mimic the moment distribution for a simply-supported cantilever beam.
  • #31: ERIKwhen evaluating the space truss system, our main objective was to optimize the space presented on the site. with ideal truss behavior, loads applied from any direction are translated axially through the frame members to the supports and foundation.
  • #32: we developed a simply-supported cantilevered three-chord truss system. some of the problems encountered with this system were the constructability issues due to crossing members and joints receiving as many as 11 members.
  • #33: As a group, we had a closed-ballot vote. based on a combination of aesthetics, feasibility, educational value, and design challenge that the system presented, the space truss was selected. based on a combination of aesthetics andfits the scope, good education tool, would be a challenge to design a 3D space truss
  • #35: We experienced some design pains in this phase transition. There were some inherited problems with the space truss concept. We learned the value of building models vs. drawing models, as there can be gaps in the comprehension of structure function. We found when building the scaled model, there would be constructability issues, as there were many crossing members in the preliminary design. We also discovered that some of the joints created were receiving too many members at difficult angles. Before we could continue with design, we needed to optimize the it.
  • #36: The factors that went into this optimized design included clearance for fire access, member demand, serviceability, and accessibility. The bridge required deflections that satisfied serviceability, and also allowed for the required clearance. In addition, sample calcs were done for the capacity of the material we planned on using, and had to keep our demand down. Also, the bridge required level landings at both ends and at the center of the bridge.
  • #37: DAMIAnEPIPHANY!!! DUH!!!after numerous iterations of 3d modeling and analysis of different member configs, depths, and # of chords, the optimal space truss member config consisted of tetrahedral and pentahedral designs. these shapes are considered to be among the strongest shapes in geometry, which added to the rigidity of the structure.Evolution3 chords, 2 feet deep2. 3 chords, symmetrical tetrahedral, 1.5 to 3 feet deep3. 5 chords, symmetrical tetrahedral, 1.5 to 3 feet deep4. 5 chords, asymmetrical tetrahedral, 1.5 to 2 feet deep  winnarSequential speakersElevations/cross section/chord callouts
  • #39: to help offset the torsional loading effects of the wing extensions, a gradual transition was made from nine nodes in the chord framing system to the concrete column supports. this located the centroidal line of the bridge. insert plan viewBridge elevations
  • #41: put in max loadsaxial demand onlyasce load combos, worst case scenariocall out types of wood used
  • #42: EMANUELPoints of Discussion:Benefits of using X-Lam Timber for Deck: visual appeal; increased strength; lighter weight compared to steel and woodExplain Manufacturer: KLH in Germany; Provided information packet; included Engineering PropertiesMethod of Selecting Product: for the largest panel size determine the required thickness and apply throughoutKLH Product: KLH TT-72-3S (VS) – 3 Layer 72mm or 2.8” thickness, Visual QualityOther Deck Consideration: spray on non-skid coating; butt-joint sealer options- extruded rubber or floor joint sealers; wood sealer
  • #43: ROBERTwith the bridge design under completion the next step is to direct the load path from the bridge supports to the soil below, via the columns. however situated, these columns would have to the meet the objectives of being: 1. aesthetically pleasing and 2. able to transmit loads from the bridge supports resisting shear, torsion, and biaxial bending. prelim conceptual designs were made and what you see before you was chosen. as you can see, the irregular polygonal cross section mimics the rhombus pattern of the bridge creating aesthetic flow, and formwork construction was considered to be much cheaper and more efficient than the other designs. pca column was used to create the prelim dimensions and rebar choice, and was later confirmed by hand calculation.
  • #48: MIKEMike is such a jerk. He likes boys. Since the beginning of this quarter he’s been cheating on his girlfriend with Arash. Mike wishes why California does not allow gay marriage.