UNITY MALL, GANDAMUNDA
CONCEPTUAL DESIGN PRESENTATION
CONTENTS
PROJECT BACKGROUND AND CONTEXT
PROJECT VISION
PROJECT OBJECTIVE
COMPARATIVE ANALYSIS
SITE LOCATION AND CATCHMENT
EXISTING SITE CONDITION
DESIGN PRINCIPLES AND MASTER PLAN
PROPOSED VIEWS
PROJECT COMPONENTS AND COST
OPERATION AND MAINTENANCE APPROACH
OCCUPANCY MANAGEMENT
PROJECT TIMELINES
1
2
3
4
5
6
7
8
9
10
11
12
Project vision
The initiative aims to select, brand, and promote at
least One Product from each District (One District -
One Product) of the country for enabling holistic
socio-economic-cultural growth across all regions.
Connecting to
Cultures
Learning and
Valuing
Interacting Engaging
Inspiring
Performing
PROJECT COMPONENTS
UNI TY M ALL
The Unity Mall will have
provisions for sales outlet
for selling GI Tag and
handicraft products of
other States and Union
Territories as well as those
of every district of the
respective states
36 States and Union
Territories – 36 Outlet
400 Sqft Each
30 Districts – 30 Outlets
200 Sqft Each
As per circular received on 06.05.2023
Other features:
AM ENI TI ES
Food court: 500 sq.ft
Parking
Toilets
circulation
PROJECT OBJECTIVE
P R O M O T E
As per supplementary guideline issued on 16.06.2023
G E N E R A T E E M P L O Y M E N T E M P O W E R L O C A L A R T I S A N S P R O D U C T B R A N D I N G
P R O M O T E M A K E I N I N D I A
P R O M O T E N A T I O N A L
I N T E G R A T I O N O N E D I S T R I C T O N E P R O D U C T
PROJECT COMPONENTS
R E C R E A T I O N A L
As per supplementary guideline issued on 16.06.2023
I N T E R A C T I V E K I O S K S
C O M M E R C I A L L A N D S C A P I N G F O O D C O U R T G R A N D F A C A D E S
V I R T U A L R E A L I T Y A U D I O G U I D E S
PROJECT COMPONENTS
As per supplementary guideline issued on 16.06.2023
P R A Y E R R O O M C R E C H E
P L A Y A R E A
C H A N G I N G R O O M
U N I V E R S A L S I G N A G E
B A R R I E R F R E E A C C E S S
C O N F E R E N C E R O O M
E X H I B I T I O N
COMPARATIVE ANALYSIS – PROJECT COMPONENT
INITIAL CONCEPT REVISED CONCEPT
States and Union territories – 36 outlets States and Union territories – 36 outlets
Districts – 30 outlets Districts – 30 outlets
Food court Food court
Parking Parking
Circulation Circulation (lifts, ramps)
Signage (multilingual and braille)
User experience (virtual , augmented reality, audio guides)
Creche, play area, changing room, prayer room
Exhibitions, Conference halls
UNITY MALL AT BHUBANESWAR
SITE LOCATION AND CATCHMENT
Airport
Udaygiri
caves
Khandagiri
caves
Kala Bhoomi Odisha
Crafts Museum
NH 16
Proposed Site for
Unity Mall
Khandagiri
square
Jagamara-Sundarpada Road
• The site is abutting 30 m wide Jagamara
– Sundarpada Road connecting NH 16 at
Khandagiri
• The site is strategically located
• On the south western boundary
of Biju Patnaik International
Airport
• The nearest Railway Station is
Bhubaneswar Railway Station
located at distance of 10 kms
• The state owned craft Museum and
interpretation center ‘ Kala Bhumi’ is
located opposite site of the proposed
Unity Mall
• The area in and around are major
tourist attraction with the world
famous rock cut caves of Khandagiri –
Udayagiri are located at a distance of
around 3 Kms from the site
• Buddha Jayanti Park is another major
attraction near the site.
Proposed project area
Proposed Portion
For Unity Mall
Biju Patnaik
International
Airport
Existing structure at site
Biju Patnaik
International
Airport
Existing
structures on
site
1
2
4
3
EXISTING SITE CONDITION
Building no.1 Building no.2
Building no. 1, 2 & 3 shall be demolished
EXISTING SITE CONDITION
Building no.3 Building no.4
Building no. 1, 2 & 3 shall be demolished
EXISTING SITE CONDITION
Approach to the site
Existing Vegitation at Site
Existing built structures on site
Height restriction - COLOUR CODED ZONING MAP OF BHUBANESWAR
Proposed Site
Since the plot is located in the red zone, the maximum
height allowed for construction will be 57.3M AMSL
The existing site is at 32.1M AMSL
Therefore, permissible building height shall be 15M.
Height restriction - COLOUR CODED ZONING MAP OF BHUBANESWAR
Unique Socio-Cultural
Arena
Sustainable User Experience Local Vegetation Micro-climate
Gathering Spaces
Art and Craft Display Zones
Outdoor interactive spaces
Cultural pavilions
Knowledge dissemination and
interpretation Halls
Use of Passive Solar
Architecture
Achieving Thermal Comfort
through use of appropriate
material
Use of Solar Panels/solar
canopy
Strategies for Green Waste
Management.
Rainwater harvesting
Covered/Shaded Walkways
Shorter Movement Pattern
Encourage pedestrian
Movement
Seats along Walkways
Amphitheatre for performing
arts
Thematic food courts
promoting local cuisine
Barrier free approach
Retaining existing present
Green Cover through strategic
planning
Vegetation compatible to
existing soil type.
Support Indigenous Ecology.
Reduce Large Lawn areas to
conserver water, Reduce
Maintenance
Plantation patches and
corridors
Large canopy trees
Mist systems at strategic
locations
Pergolas and Trellis
Developing comfortable
micro-climate
DESIGN PRINCIPLES
APPLICABLE BUILDING BYE LAWS
• Means of access : 30 m wide road.
• Base F.A.R : 1
• Max Permissible F.A.R: 5 (subject to NOC From AAI)
• Site located within funnel zone of Biju Patnaik International Airport
• Open Spaces: Minimum 9m on all sides.
• Parking: 50% of the proposed Built-up area.
GREEN
REFLECTION
CONGREGATION
Mania bandha saree with
Odia script from Athagarh
DESIGN INSPIRATIONS – FAÇADE DESIGN
Use of Earthy tones for the building
façade to compliment the concept of
‘Indigenous Products’
Ganjappa cards from
Ganjam district
DESIGN PROPOSAL
SITE PLAN
Total built up of the proposed Unity Mall: 14471 Sq. mt
(Ground floor, First floor, Second floor)
No. of Shops - 87
Other built ups on site:
Exhibition area/ Multipurpose Halls/ Cenference
Multipurpose building : 2390 sqmt
N
FLOOR PLANS – ground floor
Amenities
1. Shops: 30 no.s
2. Interactive kiosks: 2 Nos.
3. Congregation space
4. Food court: 4 Counters
GROUND FLOOR PLAN
Built up area: 5325.9 sqmt
Occupant Load: 888 Persons
Drop off
5. Exhibit spaces
6. Prayer Room
Congregation Area
Provided 3 Fire Towers with 1 Fire Lift and 1
Service Lift on the Exterior Walls. Locations
fixed considering maximum travel
distance 30 m for egress.
2 General Staircase and Lift Lobbies with
Natural Ventilation.
FLOOR PLANS – FIRST floor
FIRST FLOOR PLAN
Built up area: 4535.4 sqmt
Occupant Load: 756 Persons
Connection
Triple height void
Changing
room
Amenities
1. Shops: 44 no.s
2. Interactive kiosks, 2 Nos.
3. Toilets
4. Services
FLOOR PLANS – SECOND floor
Amenities
1. Shops: 13 no.s
2. Interactive kiosks, 2 Nos.
3. Conference halls
4. Virtual reality
5. Augmented reality
SECOND FLOOR PLAN
Built up area: 4609.7 sqmt
Occupant Load: 768 Persons
FLOOR PLANS – BASEMENT floor
Amenities
1. Parking (113 car park)
2. Services (Electrical, AHU, IBMS)
3. Back Office
4. Locker Room
BASEMENT FLOOR PLAN
Floor Area: 5873 sqmt
Parking Capacity: 113 Cars
3 Staircases provided continuing till the
Ground Floor.
2 Fire Lifts and 2 Service Lifts provided.
FLOOR PLANS – ground floor (MULTIPURPOSE BUILDING)
Amenities
1. Creche
2. Kitchen
3. Dining
GROUND FLOOR PLAN
Built up area: 797.96 sqmt
Key plan
FLOOR PLANS – FIRST floor (MULTIPURPOSE BUILDING)
Amenities
1. Dormitories (8 no.s)
2. Toilets
FIRST FLOOR PLAN
Built up area: 797.96 sqmt
Key plan
FLOOR PLANS – SECOND floor (MULTIPURPOSE BUILDING)
Amenities
1. Rooms (8 no.s)
2. Office
3. Store room
SECOND FLOOR PLAN
Built up area: 797.96 sqmt
Key plan
project OVERVIEW
1. Total Land area for the proposed project – 4.01 acre (16265.3 sq. mt)
2. No. of Floors – G+2
3. FAR Achieved – 1
4. Provision for parking (40%) – Off street and Basement parking : 145 Cars (113 Basement Parking, 27 Off Street Parking)
5. FLOOR WISE FACILITIES
• Basement Floor : Parking and service
• Ground Floor : 30 Shops @ 518 Sq. ft , 2 Interactive Kiosks
• First Floor: 44 Shops @ 518 Sq. ft , 2 Interactive Kiosks
• Second Floor: 13 shops @ 518 Sq. ft , 2 Interactive Kiosks, Office space/ admin / workshop & conference, virtual
reality and augmented reality
6. COMMON AREAS
• Food court
• Exhibition spaces
7. MULTIPURPOSE BUILDING
• Dormitories ( 8 no.s)
• Rooms (8 No.s)
• Kitchen
• Dining • Creche
Indicative VIEWS – PLAY AREA & RECREATIONAL
Indicative SIGNAGE
A
2m
Area: 6,392 Sq.m.
B
3m
C
20m
D
5m
A: 2m wide planters/hedge along the pathway
B: 3m wide pathway paved with khondalite stone
C: 20m wide landscaped space for visitors to sit & relax
D: 5m wide plantation space to be used as buffer space
LANDSCAPING AND GREEN COVER
Bioswales /Bioretention for drainage
management
- landscape islands
- 4'-10'+ between open parking rows
- 8'-10' for double loaded pathways
Landscape Infiltration
SUSTAINABLE APPROACH
PROPOSED Views and ELEVATIONS
T O P V I E W
M A L L E N T R A N C E
M A L L E N T R A N C E
F R O N T F A Ç A D E - F E A T U R E S
Project Branding
1. Make In India
2. Make in Odisha
Exposed
Fire staircase
Scripted Façade
design inspired from
Maniabandha Saree
, Odisha
Vertical light strips to
accentuate the ambiance
Replication of
Make in India logo
through the use of
Konark Chakra
Use of Green walls as a tribute to
the dense vegetation on site
Project Branding
1. Unity Mall
2. ODOP
F R O N T F A C A D E
F R O N T F A C A D E
F O O D C O U R T A N D B A N Y A N C O U R T Y A R D
F O O D C O U R T A N D B A N Y A N C O U R T Y A R D
F O O D C O U R T A N D B A N Y A N C O U R T Y A R D
M U L T I P U R P O S E B L O C K
M U L T I P U R P O S E B L O C K
F R O N T F A C A D E - N I G H T V I E W
C O N G R E G A T I O N S P A C E
C o n g r e g a t i o n S p a c e – E l e m e n t s
1 . M i n i a t u r e O A T
2 . G a n j a p p a c a r d s i n s p i r e d w a l l a r t
3 . G r e e n w a l l s
4 . J a l i c o v e r e d r o o f i n g s y s t e m
F R O N T F A C A D E
F R O N T F A Ç A D E - N I G H T V I E W
F R O N T F A Ç A D E - N I G H T V I E W
F R O N T F A Ç A D E - N I G H T V I E W
F R O N T F A Ç A D E – D U S K V I E W
D i s p l a y s c r e e n f r o m C o n g r e g a t i o n S p a c e
COST ABSTRACT – CPWD PAR 2021
S.No. Description of Items Amount (In Rs.) Amount (In cr.) Ref.
A Construction Work
a Civil Work BUA (in Sqm) Rate/Sqm
I. Unity Mall
1 Raft Foundation 8413.13 @ 10700.00 /Sqm Rs. 90,020,491.00 9.00 CPWD PAR-21/1.3.6
2 Basement Floor 8413.13 @ 20750.00 /Sqm Rs. 174,572,448.00 17.50 CPWD PAR-21/1.4.1
3 Ground Floor 5116.12 @ 27090.00 /Sqm Rs. 138,595,691.00 13.90 CPWD PAR-21/1.1.1
4 First Floor 5116.12 @ 27090.00 /Sqm Rs. 138,595,691.00 13.90 CPWD PAR-21/1.1.1
4 Second Floor 5116.12 @ 27090.00 /Sqm Rs. 138,595,691.00 13.90 CPWD PAR-21/1.1.1
5 Terrace Floor 5116.12 @ 5000.00 /Sqm Rs. 25,580,600.00 2.60 As per Market Rate
Sub-Total(I) Rs. 705,960,612.00 70.60
II. Multi purpose Building
1 Ground Floor 796.76 @ 20685.00 /Sqm Rs. 16,480,981.00 1.60 CPWD PAR-21/1.1.2
2 First Floor 796.76 @ 20685.00 /Sqm Rs. 16,480,981.00 1.60 CPWD PAR-21/1.1.2
3 Second Floor 796.76 @ 20685.00 /Sqm Rs. 16,480,981.00 1.60 CPWD PAR-21/1.1.2
Sub-Total(II) Rs. 49,442,943.00 4.90
Total (I+II) 755,403,555.00 75.50
b SERVICES
1 Internal Water Supply & Sanitary System 4.00% of Civil, Works. Rs. 30,216,142.20 3.00 CPWD PAR-21/2.1
2 Electrical external service connection 3.75% of Civil, Works. Rs. 28,327,633.31 2.80 CPWD PAR-21/2.2.1
3 Civil External Service Connections. 1.25% of Civil, Works. Rs. 9,442,544.44 0.90 CPWD PAR-21/2.2.2
4 Local body approvals including tree cutting etc. 1.25% of Civil, Works. Rs. 9,442,544.44 0.90 CPWD PAR-21/2.2.3
5 Internal Electric installation. 12.50% of Civil, Works. Rs. 94,425,444.38 9.40 CPWD PAR-21/2.3
6 Power wiring and plugs 4.00% of Civil, Works. Rs. 30,216,142.20 3.00 CPWD PAR-21/2.4.1
7 Lightning conductors 0.25% of Civil, Works. Rs. 1,888,508.89 0.20 CPWD PAR-21/2.4.1
8 Telephone conduits 0.25% of Civil, Works. Rs. 1,888,508.89 0.20 CPWD PAR-21/2.4.1
9 Thirdy party quality assurance. 1.00% of Civil, Works. Rs. 7,554,035.55 0.80 CPWD PAR-21/2.4.1
10 External Electrical Service (Substation,DG,Street Light etc) 15% of Civil, Works. Rs. 113,310,533.25 11.30 L.S
11 CCTV System 28877.61 @ 300.00 /Sqm Rs. 8,663,283.00 0.90 CPWD PAR-21/6.15.2
12 Central AC System 1100.99 @ 85000.00 /TR Rs. 93,584,067.00 9.40 CPWD PAR-21/6.5.1
c Fire Fighting Work
1 Downcomer System 2390.28 @ 400.00 /Sqm Rs. 956,112.00 0.10 CPWD PAR-21/3.1.4
2 With wet riser and sprinkler System 23761.49 @ 1200.00 /Sqm Rs. 28,513,788.00 2.90 CPWD PAR-21/3.1.4
3 Automatic Fire Alarm System 26151.77 @ 600.00 /Sqm Rs. 15,691,062.00 1.60 CPWD PAR-21/3.1.4
d Passenger Lift (8 Nos) 8.00 @ 2000000.00/Sqm Rs. 16,000,000.00 1.60 CPWD PAR-21/3.1.4
COST ABSTRACT – CPWD PAR 2021
e Development Of Site
1 Levelling 14875.00 @ 300.00 /Sqm Rs. 4,462,500.00 0.40 CPWD PAR-21/5.1
2
Internal road with PCC Base,60mm thick paver blocks and kerb stone
edging
5741.00 @2600.00 /Sqm Rs. 14,926,600.00 1.50 CPWD PAR-21/5.2.4
3 Storm water Drain 1050.00 @8920.00 /Rmt Rs. 9,366,000.00 0.90 CPWD PAR-21/5.5
3 External Sewerage 700.00 @8920.00 /Rmt Rs. 6,244,000.00 0.60 CPWD PAR-21/5.5
3 Filtered Water Supply 700.00 @8920.00 /Rmt Rs. 6,244,000.00 0.60 CPWD PAR-21/5.5
3 Rain water harvesting(RWH) 1000.00 @8920.00 /Rmt Rs. 8,920,000.00 0.90 CPWD PAR-21/5.5
4 Compound wall 600.00 @9550.00 /Rmt Rs. 5,730,000.00 0.60 CPWD PAR-21/5.8.1
4 Underground Sump With pump house 200000.00 @ 20.00 /ltr Rs. 4,000,000.00 0.40 CPWD PAR-21/4.5
5 Horticulture Works 2504.00 @ 275.00 /Sqm Rs. 688,600.00 0.10 CPWD PAR-21/5.9.1
5 Motorized Steel Gate up to 6.00 mtr width 2.00 @
500000.
00
/No Rs. 1,000,000.00 0.10 CPWD PAR-21/6.29
6 Area Lighting,Beautification,cafeteria furniture etc. L.S Rs. 8,000,000.00 0.80 L.S
f Signage Design L.S Rs. 5,000,000.00 0.50 L.S
g Augmented Reality & virtual reality 15348.36 @3228.00 /Sqm Rs. 49,544,506.00 5.00 L.S
h Solar System L.S Rs. 10,000,000.00 1.00 L.S
i Interior Work L.S Rs. 100,000,000.00 10.00 L.S
j External Facade Work L.S Rs. 80,000,000.00 8.00 L.S
k Dismantling Work L.S Rs. 4,000,000.00 0.40 L.S
Total Cost of Construction - A ( Inclusive GST ) Rs. 1,563,650,110.55 156.40
Total Cost of Construction - A (Exclusive GST @ 12%) Rs. 1,396,116,170.13 139.60
B Other Work
a. Cost of Branding and Production L.S Rs. 35,000,000.00 3.50 L.S
b. Cost of Marketing and Exhibition L.S Rs. 75,000,000.00 7.50 L.S
Total Cost of Other Work -B ( Inclusive GST) Rs. 110,000,000.00 11.00
C Project Cost
Total Project Cost A+B (Inclusive GST) Rs. 1,673,650,110.55 167.40
a Add 1% Contigency & Add 1% Quality Control on (A) @ 2% Rs. 31,273,002.00 3.10
b Add IDCO Charge @10% over (A). @ 10.0% Rs. 156,365,011.06 15.60
c Add Supervision Charges 1.8% on (A) @ 1.8% Rs. 28,145,701.99 2.80
D Total Project Cost Rs. 1,889,433,825.60 188.9
Say Rs. 1,889,434,000.00 188.90
Operation and Maintenance
Operation and Maintenance partner shall be appointed
though PPP Tender (Public – Private Partnership)
• The private firm, under contract, operates a publicly
owned asset for a specific period. The public partner
after the concession period shall retains ownership of
the assets for upkeeping.
• Government agencies represent the public partner at
a local, state and/or national level.
• The private partner can be a privately-owned
business, public corporation or consortium of
companies with a specific area of expertise.
Advantage PPP project include:
• Value for money - It ensures project appraisals and
considers the cost along with the risks and service
quality.
• Public standard - It involves adequate and prior
consultation with end-users and other stakeholders of
an infrastructure project as standard. The government
remains accountable for the quality and costs of the
services.
• Innovation - The combined effect of the public and
private sector harnesses the efficiency and innovation
of the public sector for establishing a sustainable
infrastructure.
Operation and Maintenance – Expense / revenue
Assessment of Expenses and Revenue Streams (Unity Mall)
Expense Heads:
• Wages and salaries.
• Accounting and legal fees.
• Property taxes.
• Interest paid on debt.
• Electricity, and Connectivity Charges
• Repair costs for non-production facilities
• Tools and Accessories
Revenue Heads:
• Rental from Shops and Kiosks
• Rental from Open Air Theatre/ Congregation Area
• Rental from Food court/Kitchen/Dining Spaces
• Rental from Dormitory
• Advertising and Signages
• Rental from Parking
Operation and Maintenance – Concession Agreement
• A concession is a license given by the government authorities to private parties for the execution and
implementation of the public services which are exclusively held by the government authorities under the law.
• Concessions effectively shift the cost of building, developing, and maintaining infrastructure to the private
sector, relieving some of the pressure on public sector finances.
• During the concession period, the government’s responsibility is primarily to function as a regulator and
monitor the concessionaire’s performance. The term of a concession agreement is typically 25-30 years.
The purpose of a concession agreement is to:
• Vest the concessionaire with all the rights necessary to implement the project and obtain the agreed returns
in accordance with the terms of the concession agreement.
• Achieve an appropriate allocation of risks.
Operation and Maintenance – Concession Agreement
General obligation of the concession holder
It obligates the concession holder to perform the task,
provide the services which have been mentioned under
the agreement.
• The concession holder shall arrange for and
procure, at its own cost and risk.
• The concession holder shall arrange all
infrastructure facilities and utilities for the authority.
• The concession holder shall obtain relevant
government instrumentalities, applicable permits to
be obtained by the authority.
• The concession holder shall pay the concession
fee to the authority.
General obligation of the authority
It obligates the authority to perform the task or provide
the services which have been mentioned under the
agreement.
• The Authority upon written request from the
concession holder provides reasonable assistance
to the concession holder in obtaining access to all
necessary infrastructure facilities and utilities.
• Authority shall pay the salary and allowances to the
employees, retainers, and staff of the concession
holder.
• Authority shall not omit to do an act, deed or thing
which may in any manner violate the provisions of
this agreement.
Occupancy management
• Reservation of Shops/Commercial Spaces as per ODOP guidelines for uniform representation of each District
of Odisha, State/UT.
• Public Awareness Campaign to attract competitive bidders for setting up Shops at Unity Mall
• Preparation of Draft Lease agreement between State and Parties interested for occupying space in Unity Mall.
• Finalization of Draft Agreement and Legal Opinions, if necessary.
• Notice Inviting Tender for Commercial Spaces/Shops at Unity Mall.
• Assessment of Proposals as per ODOP policy, Technical and Financial parameters as per NIT
Project timelines – 30 Months
THANK YOU

More Related Content

PDF
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
PPTX
5.1 Mixed use building
PPT
Mlr convention centre, bangloor.
PPTX
Acoustic Case Study
PDF
Resort design , architectural projects, Hand drawn
PDF
Neighborhood planning case study
PPTX
Urban studies case study townships
PDF
Amanora housing
Shanmukhananda hall, sion - ACOUSTICS - AUDITORIUM - MUMBAI
5.1 Mixed use building
Mlr convention centre, bangloor.
Acoustic Case Study
Resort design , architectural projects, Hand drawn
Neighborhood planning case study
Urban studies case study townships
Amanora housing

What's hot (20)

PDF
Kongu Convention Center
PDF
Urban Entertainment Center, introduction, live case study, literature case st...
PPTX
Case study -zaveriben popatlal sabhagraha-air conditioning
PDF
Bhendi bazaar
PDF
final thesis presynopsis
PPTX
Hyderabad international convention centre
PPTX
litrature study convention center
PPTX
Auditorium Architecture planning
PDF
Street Design Workshop - F C Road,Pune
PPTX
Case study of an auditorium
PPTX
Suzlon One Earth Case Study by Ameya Gumaste
PPTX
Hyderabad international convention center
PDF
Self Sustainable Integrated Township : A resource-based planning to improve t...
PDF
Urban study of Adyar
PPTX
NCPA , MUMBAI
PPTX
Ppt case study
PDF
Performing Arts Centre final
PDF
ISB HYDERABAD
PPT
Concept study of mahindra united world college,pune and pearl academy of fash...
PPTX
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
Kongu Convention Center
Urban Entertainment Center, introduction, live case study, literature case st...
Case study -zaveriben popatlal sabhagraha-air conditioning
Bhendi bazaar
final thesis presynopsis
Hyderabad international convention centre
litrature study convention center
Auditorium Architecture planning
Street Design Workshop - F C Road,Pune
Case study of an auditorium
Suzlon One Earth Case Study by Ameya Gumaste
Hyderabad international convention center
Self Sustainable Integrated Township : A resource-based planning to improve t...
Urban study of Adyar
NCPA , MUMBAI
Ppt case study
Performing Arts Centre final
ISB HYDERABAD
Concept study of mahindra united world college,pune and pearl academy of fash...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
Ad

Similar to Design Presentation of Unity Mall at Bhubaneswar (20)

PPTX
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
PDF
Portfolio
PDF
Retail Environment Design for ucma studio
PDF
Buchmann, Abby_Immersive Learning Kitchen Master Book
PDF
Blurring the Llines - Dibakar Chintala
PPT
Rgp Business Brochure
PPSX
Ar. Bhumika Chudiwala portfolio
PPSX
Bhumika chudiwala portfolio
PPTX
Market Case Study by the Group Led by Priyam Group
PPTX
finaldesignpresentation-181230145312.pptx
PPSX
Selected Projects Updated29th Oct2009
PDF
PORTFOLIO Golam Kibria Khan — architect with a passion for thoughtful design...
PDF
Project bowstring : A perspective on revitalizing Janata Bazaar
PDF
Ogechukwu Ukpabia
PDF
PDF
The centrum club case study
PDF
12-13 Options Lecture
PPTX
Forum mall banglore case study
PDF
AR3511 DESIGN BRIEF URBAN ARCHITECTURE DESIGN STUDIO COMMERCIAL CUM MID RISE ...
PDF
B.Arch Course Portfolio
case study of World Trade Park, jaipur, rajasthan & Logix City Centre Noida.
Portfolio
Retail Environment Design for ucma studio
Buchmann, Abby_Immersive Learning Kitchen Master Book
Blurring the Llines - Dibakar Chintala
Rgp Business Brochure
Ar. Bhumika Chudiwala portfolio
Bhumika chudiwala portfolio
Market Case Study by the Group Led by Priyam Group
finaldesignpresentation-181230145312.pptx
Selected Projects Updated29th Oct2009
PORTFOLIO Golam Kibria Khan — architect with a passion for thoughtful design...
Project bowstring : A perspective on revitalizing Janata Bazaar
Ogechukwu Ukpabia
The centrum club case study
12-13 Options Lecture
Forum mall banglore case study
AR3511 DESIGN BRIEF URBAN ARCHITECTURE DESIGN STUDIO COMMERCIAL CUM MID RISE ...
B.Arch Course Portfolio
Ad

Recently uploaded (20)

PDF
Himalayan Nature and Tibetan Buddhist Culture in Arunachal -- Kazuharu Mizuno...
PPTX
Chemical Reactions in Our Lives.pptxyyyyyyyyy
PPTX
Cloud Computing ppt.ppt1QU4FFIWEKWEIFRRGx
PDF
15901922083_PQA.pdf................................
PDF
2025_Mohammad Mahbub KxXxáacscascsacabir.pdf
PPTX
National_Artists_for_Dance_with_Examples-1.pptx
PPTX
WEEK-3_TOPIC_Photographic_Rays__Its_Nature_and_Characteristics.pptx
PPTX
WATER RESOURCE-1.pptx ssssdsedsddsssssss
PDF
Dating-Courtship-Marriage-and-Responsible-Parenthood.pdf
PPTX
400kV_Switchyardasdsfesfewffwefrrwewew_Training_Module.pptx
PPTX
GREEN BUILDINGS are eco friendly for environment
PPTX
Contemporary Arts and the Potter of Thep
PPTX
Lc 10hhjkhhjjkkkkjhhuiooopojjjoookjji.pptx
PPTX
ST-05 final ppt.pptxbjbvcdiuchiudhciuhdiudhexiuh
PPTX
IOT Unit 6 PPT ( ~ By Prof. Simran Ahuja ).pptx
PDF
Arts and Crats of Cagayan and Central Luzon.pdf
PPTX
Understanding APIs_ Types Purposes and Implementation.pptx
PDF
Landscape Architecture: Shaping the World Between Buildings
PDF
witch fraud storyboard sequence-_1x1.pdf
PPTX
WEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEK
Himalayan Nature and Tibetan Buddhist Culture in Arunachal -- Kazuharu Mizuno...
Chemical Reactions in Our Lives.pptxyyyyyyyyy
Cloud Computing ppt.ppt1QU4FFIWEKWEIFRRGx
15901922083_PQA.pdf................................
2025_Mohammad Mahbub KxXxáacscascsacabir.pdf
National_Artists_for_Dance_with_Examples-1.pptx
WEEK-3_TOPIC_Photographic_Rays__Its_Nature_and_Characteristics.pptx
WATER RESOURCE-1.pptx ssssdsedsddsssssss
Dating-Courtship-Marriage-and-Responsible-Parenthood.pdf
400kV_Switchyardasdsfesfewffwefrrwewew_Training_Module.pptx
GREEN BUILDINGS are eco friendly for environment
Contemporary Arts and the Potter of Thep
Lc 10hhjkhhjjkkkkjhhuiooopojjjoookjji.pptx
ST-05 final ppt.pptxbjbvcdiuchiudhciuhdiudhexiuh
IOT Unit 6 PPT ( ~ By Prof. Simran Ahuja ).pptx
Arts and Crats of Cagayan and Central Luzon.pdf
Understanding APIs_ Types Purposes and Implementation.pptx
Landscape Architecture: Shaping the World Between Buildings
witch fraud storyboard sequence-_1x1.pdf
WEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEK

Design Presentation of Unity Mall at Bhubaneswar

  • 1. UNITY MALL, GANDAMUNDA CONCEPTUAL DESIGN PRESENTATION
  • 2. CONTENTS PROJECT BACKGROUND AND CONTEXT PROJECT VISION PROJECT OBJECTIVE COMPARATIVE ANALYSIS SITE LOCATION AND CATCHMENT EXISTING SITE CONDITION DESIGN PRINCIPLES AND MASTER PLAN PROPOSED VIEWS PROJECT COMPONENTS AND COST OPERATION AND MAINTENANCE APPROACH OCCUPANCY MANAGEMENT PROJECT TIMELINES 1 2 3 4 5 6 7 8 9 10 11 12
  • 3. Project vision The initiative aims to select, brand, and promote at least One Product from each District (One District - One Product) of the country for enabling holistic socio-economic-cultural growth across all regions. Connecting to Cultures Learning and Valuing Interacting Engaging Inspiring Performing
  • 4. PROJECT COMPONENTS UNI TY M ALL The Unity Mall will have provisions for sales outlet for selling GI Tag and handicraft products of other States and Union Territories as well as those of every district of the respective states 36 States and Union Territories – 36 Outlet 400 Sqft Each 30 Districts – 30 Outlets 200 Sqft Each As per circular received on 06.05.2023 Other features: AM ENI TI ES Food court: 500 sq.ft Parking Toilets circulation
  • 5. PROJECT OBJECTIVE P R O M O T E As per supplementary guideline issued on 16.06.2023 G E N E R A T E E M P L O Y M E N T E M P O W E R L O C A L A R T I S A N S P R O D U C T B R A N D I N G P R O M O T E M A K E I N I N D I A P R O M O T E N A T I O N A L I N T E G R A T I O N O N E D I S T R I C T O N E P R O D U C T
  • 6. PROJECT COMPONENTS R E C R E A T I O N A L As per supplementary guideline issued on 16.06.2023 I N T E R A C T I V E K I O S K S C O M M E R C I A L L A N D S C A P I N G F O O D C O U R T G R A N D F A C A D E S V I R T U A L R E A L I T Y A U D I O G U I D E S
  • 7. PROJECT COMPONENTS As per supplementary guideline issued on 16.06.2023 P R A Y E R R O O M C R E C H E P L A Y A R E A C H A N G I N G R O O M U N I V E R S A L S I G N A G E B A R R I E R F R E E A C C E S S C O N F E R E N C E R O O M E X H I B I T I O N
  • 8. COMPARATIVE ANALYSIS – PROJECT COMPONENT INITIAL CONCEPT REVISED CONCEPT States and Union territories – 36 outlets States and Union territories – 36 outlets Districts – 30 outlets Districts – 30 outlets Food court Food court Parking Parking Circulation Circulation (lifts, ramps) Signage (multilingual and braille) User experience (virtual , augmented reality, audio guides) Creche, play area, changing room, prayer room Exhibitions, Conference halls
  • 9. UNITY MALL AT BHUBANESWAR
  • 10. SITE LOCATION AND CATCHMENT Airport Udaygiri caves Khandagiri caves Kala Bhoomi Odisha Crafts Museum NH 16 Proposed Site for Unity Mall Khandagiri square Jagamara-Sundarpada Road • The site is abutting 30 m wide Jagamara – Sundarpada Road connecting NH 16 at Khandagiri • The site is strategically located • On the south western boundary of Biju Patnaik International Airport • The nearest Railway Station is Bhubaneswar Railway Station located at distance of 10 kms • The state owned craft Museum and interpretation center ‘ Kala Bhumi’ is located opposite site of the proposed Unity Mall • The area in and around are major tourist attraction with the world famous rock cut caves of Khandagiri – Udayagiri are located at a distance of around 3 Kms from the site • Buddha Jayanti Park is another major attraction near the site.
  • 11. Proposed project area Proposed Portion For Unity Mall Biju Patnaik International Airport
  • 12. Existing structure at site Biju Patnaik International Airport Existing structures on site 1 2 4 3
  • 13. EXISTING SITE CONDITION Building no.1 Building no.2 Building no. 1, 2 & 3 shall be demolished
  • 14. EXISTING SITE CONDITION Building no.3 Building no.4 Building no. 1, 2 & 3 shall be demolished
  • 15. EXISTING SITE CONDITION Approach to the site Existing Vegitation at Site Existing built structures on site
  • 16. Height restriction - COLOUR CODED ZONING MAP OF BHUBANESWAR
  • 17. Proposed Site Since the plot is located in the red zone, the maximum height allowed for construction will be 57.3M AMSL The existing site is at 32.1M AMSL Therefore, permissible building height shall be 15M. Height restriction - COLOUR CODED ZONING MAP OF BHUBANESWAR
  • 18. Unique Socio-Cultural Arena Sustainable User Experience Local Vegetation Micro-climate Gathering Spaces Art and Craft Display Zones Outdoor interactive spaces Cultural pavilions Knowledge dissemination and interpretation Halls Use of Passive Solar Architecture Achieving Thermal Comfort through use of appropriate material Use of Solar Panels/solar canopy Strategies for Green Waste Management. Rainwater harvesting Covered/Shaded Walkways Shorter Movement Pattern Encourage pedestrian Movement Seats along Walkways Amphitheatre for performing arts Thematic food courts promoting local cuisine Barrier free approach Retaining existing present Green Cover through strategic planning Vegetation compatible to existing soil type. Support Indigenous Ecology. Reduce Large Lawn areas to conserver water, Reduce Maintenance Plantation patches and corridors Large canopy trees Mist systems at strategic locations Pergolas and Trellis Developing comfortable micro-climate DESIGN PRINCIPLES
  • 19. APPLICABLE BUILDING BYE LAWS • Means of access : 30 m wide road. • Base F.A.R : 1 • Max Permissible F.A.R: 5 (subject to NOC From AAI) • Site located within funnel zone of Biju Patnaik International Airport • Open Spaces: Minimum 9m on all sides. • Parking: 50% of the proposed Built-up area. GREEN REFLECTION CONGREGATION
  • 20. Mania bandha saree with Odia script from Athagarh DESIGN INSPIRATIONS – FAÇADE DESIGN Use of Earthy tones for the building façade to compliment the concept of ‘Indigenous Products’ Ganjappa cards from Ganjam district
  • 22. SITE PLAN Total built up of the proposed Unity Mall: 14471 Sq. mt (Ground floor, First floor, Second floor) No. of Shops - 87 Other built ups on site: Exhibition area/ Multipurpose Halls/ Cenference Multipurpose building : 2390 sqmt N
  • 23. FLOOR PLANS – ground floor Amenities 1. Shops: 30 no.s 2. Interactive kiosks: 2 Nos. 3. Congregation space 4. Food court: 4 Counters GROUND FLOOR PLAN Built up area: 5325.9 sqmt Occupant Load: 888 Persons Drop off 5. Exhibit spaces 6. Prayer Room Congregation Area Provided 3 Fire Towers with 1 Fire Lift and 1 Service Lift on the Exterior Walls. Locations fixed considering maximum travel distance 30 m for egress. 2 General Staircase and Lift Lobbies with Natural Ventilation.
  • 24. FLOOR PLANS – FIRST floor FIRST FLOOR PLAN Built up area: 4535.4 sqmt Occupant Load: 756 Persons Connection Triple height void Changing room Amenities 1. Shops: 44 no.s 2. Interactive kiosks, 2 Nos. 3. Toilets 4. Services
  • 25. FLOOR PLANS – SECOND floor Amenities 1. Shops: 13 no.s 2. Interactive kiosks, 2 Nos. 3. Conference halls 4. Virtual reality 5. Augmented reality SECOND FLOOR PLAN Built up area: 4609.7 sqmt Occupant Load: 768 Persons
  • 26. FLOOR PLANS – BASEMENT floor Amenities 1. Parking (113 car park) 2. Services (Electrical, AHU, IBMS) 3. Back Office 4. Locker Room BASEMENT FLOOR PLAN Floor Area: 5873 sqmt Parking Capacity: 113 Cars 3 Staircases provided continuing till the Ground Floor. 2 Fire Lifts and 2 Service Lifts provided.
  • 27. FLOOR PLANS – ground floor (MULTIPURPOSE BUILDING) Amenities 1. Creche 2. Kitchen 3. Dining GROUND FLOOR PLAN Built up area: 797.96 sqmt Key plan
  • 28. FLOOR PLANS – FIRST floor (MULTIPURPOSE BUILDING) Amenities 1. Dormitories (8 no.s) 2. Toilets FIRST FLOOR PLAN Built up area: 797.96 sqmt Key plan
  • 29. FLOOR PLANS – SECOND floor (MULTIPURPOSE BUILDING) Amenities 1. Rooms (8 no.s) 2. Office 3. Store room SECOND FLOOR PLAN Built up area: 797.96 sqmt Key plan
  • 30. project OVERVIEW 1. Total Land area for the proposed project – 4.01 acre (16265.3 sq. mt) 2. No. of Floors – G+2 3. FAR Achieved – 1 4. Provision for parking (40%) – Off street and Basement parking : 145 Cars (113 Basement Parking, 27 Off Street Parking) 5. FLOOR WISE FACILITIES • Basement Floor : Parking and service • Ground Floor : 30 Shops @ 518 Sq. ft , 2 Interactive Kiosks • First Floor: 44 Shops @ 518 Sq. ft , 2 Interactive Kiosks • Second Floor: 13 shops @ 518 Sq. ft , 2 Interactive Kiosks, Office space/ admin / workshop & conference, virtual reality and augmented reality 6. COMMON AREAS • Food court • Exhibition spaces 7. MULTIPURPOSE BUILDING • Dormitories ( 8 no.s) • Rooms (8 No.s) • Kitchen • Dining • Creche
  • 31. Indicative VIEWS – PLAY AREA & RECREATIONAL
  • 33. A 2m Area: 6,392 Sq.m. B 3m C 20m D 5m A: 2m wide planters/hedge along the pathway B: 3m wide pathway paved with khondalite stone C: 20m wide landscaped space for visitors to sit & relax D: 5m wide plantation space to be used as buffer space LANDSCAPING AND GREEN COVER
  • 34. Bioswales /Bioretention for drainage management - landscape islands - 4'-10'+ between open parking rows - 8'-10' for double loaded pathways Landscape Infiltration SUSTAINABLE APPROACH
  • 35. PROPOSED Views and ELEVATIONS
  • 36. T O P V I E W
  • 37. M A L L E N T R A N C E
  • 38. M A L L E N T R A N C E
  • 39. F R O N T F A Ç A D E - F E A T U R E S Project Branding 1. Make In India 2. Make in Odisha Exposed Fire staircase Scripted Façade design inspired from Maniabandha Saree , Odisha Vertical light strips to accentuate the ambiance Replication of Make in India logo through the use of Konark Chakra Use of Green walls as a tribute to the dense vegetation on site Project Branding 1. Unity Mall 2. ODOP
  • 40. F R O N T F A C A D E
  • 41. F R O N T F A C A D E
  • 42. F O O D C O U R T A N D B A N Y A N C O U R T Y A R D
  • 43. F O O D C O U R T A N D B A N Y A N C O U R T Y A R D
  • 44. F O O D C O U R T A N D B A N Y A N C O U R T Y A R D
  • 45. M U L T I P U R P O S E B L O C K
  • 46. M U L T I P U R P O S E B L O C K
  • 47. F R O N T F A C A D E - N I G H T V I E W
  • 48. C O N G R E G A T I O N S P A C E
  • 49. C o n g r e g a t i o n S p a c e – E l e m e n t s 1 . M i n i a t u r e O A T 2 . G a n j a p p a c a r d s i n s p i r e d w a l l a r t 3 . G r e e n w a l l s 4 . J a l i c o v e r e d r o o f i n g s y s t e m
  • 50. F R O N T F A C A D E
  • 51. F R O N T F A Ç A D E - N I G H T V I E W
  • 52. F R O N T F A Ç A D E - N I G H T V I E W
  • 53. F R O N T F A Ç A D E - N I G H T V I E W
  • 54. F R O N T F A Ç A D E – D U S K V I E W
  • 55. D i s p l a y s c r e e n f r o m C o n g r e g a t i o n S p a c e
  • 56. COST ABSTRACT – CPWD PAR 2021 S.No. Description of Items Amount (In Rs.) Amount (In cr.) Ref. A Construction Work a Civil Work BUA (in Sqm) Rate/Sqm I. Unity Mall 1 Raft Foundation 8413.13 @ 10700.00 /Sqm Rs. 90,020,491.00 9.00 CPWD PAR-21/1.3.6 2 Basement Floor 8413.13 @ 20750.00 /Sqm Rs. 174,572,448.00 17.50 CPWD PAR-21/1.4.1 3 Ground Floor 5116.12 @ 27090.00 /Sqm Rs. 138,595,691.00 13.90 CPWD PAR-21/1.1.1 4 First Floor 5116.12 @ 27090.00 /Sqm Rs. 138,595,691.00 13.90 CPWD PAR-21/1.1.1 4 Second Floor 5116.12 @ 27090.00 /Sqm Rs. 138,595,691.00 13.90 CPWD PAR-21/1.1.1 5 Terrace Floor 5116.12 @ 5000.00 /Sqm Rs. 25,580,600.00 2.60 As per Market Rate Sub-Total(I) Rs. 705,960,612.00 70.60 II. Multi purpose Building 1 Ground Floor 796.76 @ 20685.00 /Sqm Rs. 16,480,981.00 1.60 CPWD PAR-21/1.1.2 2 First Floor 796.76 @ 20685.00 /Sqm Rs. 16,480,981.00 1.60 CPWD PAR-21/1.1.2 3 Second Floor 796.76 @ 20685.00 /Sqm Rs. 16,480,981.00 1.60 CPWD PAR-21/1.1.2 Sub-Total(II) Rs. 49,442,943.00 4.90 Total (I+II) 755,403,555.00 75.50 b SERVICES 1 Internal Water Supply & Sanitary System 4.00% of Civil, Works. Rs. 30,216,142.20 3.00 CPWD PAR-21/2.1 2 Electrical external service connection 3.75% of Civil, Works. Rs. 28,327,633.31 2.80 CPWD PAR-21/2.2.1 3 Civil External Service Connections. 1.25% of Civil, Works. Rs. 9,442,544.44 0.90 CPWD PAR-21/2.2.2 4 Local body approvals including tree cutting etc. 1.25% of Civil, Works. Rs. 9,442,544.44 0.90 CPWD PAR-21/2.2.3 5 Internal Electric installation. 12.50% of Civil, Works. Rs. 94,425,444.38 9.40 CPWD PAR-21/2.3 6 Power wiring and plugs 4.00% of Civil, Works. Rs. 30,216,142.20 3.00 CPWD PAR-21/2.4.1 7 Lightning conductors 0.25% of Civil, Works. Rs. 1,888,508.89 0.20 CPWD PAR-21/2.4.1 8 Telephone conduits 0.25% of Civil, Works. Rs. 1,888,508.89 0.20 CPWD PAR-21/2.4.1 9 Thirdy party quality assurance. 1.00% of Civil, Works. Rs. 7,554,035.55 0.80 CPWD PAR-21/2.4.1 10 External Electrical Service (Substation,DG,Street Light etc) 15% of Civil, Works. Rs. 113,310,533.25 11.30 L.S 11 CCTV System 28877.61 @ 300.00 /Sqm Rs. 8,663,283.00 0.90 CPWD PAR-21/6.15.2 12 Central AC System 1100.99 @ 85000.00 /TR Rs. 93,584,067.00 9.40 CPWD PAR-21/6.5.1 c Fire Fighting Work 1 Downcomer System 2390.28 @ 400.00 /Sqm Rs. 956,112.00 0.10 CPWD PAR-21/3.1.4 2 With wet riser and sprinkler System 23761.49 @ 1200.00 /Sqm Rs. 28,513,788.00 2.90 CPWD PAR-21/3.1.4 3 Automatic Fire Alarm System 26151.77 @ 600.00 /Sqm Rs. 15,691,062.00 1.60 CPWD PAR-21/3.1.4 d Passenger Lift (8 Nos) 8.00 @ 2000000.00/Sqm Rs. 16,000,000.00 1.60 CPWD PAR-21/3.1.4
  • 57. COST ABSTRACT – CPWD PAR 2021 e Development Of Site 1 Levelling 14875.00 @ 300.00 /Sqm Rs. 4,462,500.00 0.40 CPWD PAR-21/5.1 2 Internal road with PCC Base,60mm thick paver blocks and kerb stone edging 5741.00 @2600.00 /Sqm Rs. 14,926,600.00 1.50 CPWD PAR-21/5.2.4 3 Storm water Drain 1050.00 @8920.00 /Rmt Rs. 9,366,000.00 0.90 CPWD PAR-21/5.5 3 External Sewerage 700.00 @8920.00 /Rmt Rs. 6,244,000.00 0.60 CPWD PAR-21/5.5 3 Filtered Water Supply 700.00 @8920.00 /Rmt Rs. 6,244,000.00 0.60 CPWD PAR-21/5.5 3 Rain water harvesting(RWH) 1000.00 @8920.00 /Rmt Rs. 8,920,000.00 0.90 CPWD PAR-21/5.5 4 Compound wall 600.00 @9550.00 /Rmt Rs. 5,730,000.00 0.60 CPWD PAR-21/5.8.1 4 Underground Sump With pump house 200000.00 @ 20.00 /ltr Rs. 4,000,000.00 0.40 CPWD PAR-21/4.5 5 Horticulture Works 2504.00 @ 275.00 /Sqm Rs. 688,600.00 0.10 CPWD PAR-21/5.9.1 5 Motorized Steel Gate up to 6.00 mtr width 2.00 @ 500000. 00 /No Rs. 1,000,000.00 0.10 CPWD PAR-21/6.29 6 Area Lighting,Beautification,cafeteria furniture etc. L.S Rs. 8,000,000.00 0.80 L.S f Signage Design L.S Rs. 5,000,000.00 0.50 L.S g Augmented Reality & virtual reality 15348.36 @3228.00 /Sqm Rs. 49,544,506.00 5.00 L.S h Solar System L.S Rs. 10,000,000.00 1.00 L.S i Interior Work L.S Rs. 100,000,000.00 10.00 L.S j External Facade Work L.S Rs. 80,000,000.00 8.00 L.S k Dismantling Work L.S Rs. 4,000,000.00 0.40 L.S Total Cost of Construction - A ( Inclusive GST ) Rs. 1,563,650,110.55 156.40 Total Cost of Construction - A (Exclusive GST @ 12%) Rs. 1,396,116,170.13 139.60 B Other Work a. Cost of Branding and Production L.S Rs. 35,000,000.00 3.50 L.S b. Cost of Marketing and Exhibition L.S Rs. 75,000,000.00 7.50 L.S Total Cost of Other Work -B ( Inclusive GST) Rs. 110,000,000.00 11.00 C Project Cost Total Project Cost A+B (Inclusive GST) Rs. 1,673,650,110.55 167.40 a Add 1% Contigency & Add 1% Quality Control on (A) @ 2% Rs. 31,273,002.00 3.10 b Add IDCO Charge @10% over (A). @ 10.0% Rs. 156,365,011.06 15.60 c Add Supervision Charges 1.8% on (A) @ 1.8% Rs. 28,145,701.99 2.80 D Total Project Cost Rs. 1,889,433,825.60 188.9 Say Rs. 1,889,434,000.00 188.90
  • 58. Operation and Maintenance Operation and Maintenance partner shall be appointed though PPP Tender (Public – Private Partnership) • The private firm, under contract, operates a publicly owned asset for a specific period. The public partner after the concession period shall retains ownership of the assets for upkeeping. • Government agencies represent the public partner at a local, state and/or national level. • The private partner can be a privately-owned business, public corporation or consortium of companies with a specific area of expertise. Advantage PPP project include: • Value for money - It ensures project appraisals and considers the cost along with the risks and service quality. • Public standard - It involves adequate and prior consultation with end-users and other stakeholders of an infrastructure project as standard. The government remains accountable for the quality and costs of the services. • Innovation - The combined effect of the public and private sector harnesses the efficiency and innovation of the public sector for establishing a sustainable infrastructure.
  • 59. Operation and Maintenance – Expense / revenue Assessment of Expenses and Revenue Streams (Unity Mall) Expense Heads: • Wages and salaries. • Accounting and legal fees. • Property taxes. • Interest paid on debt. • Electricity, and Connectivity Charges • Repair costs for non-production facilities • Tools and Accessories Revenue Heads: • Rental from Shops and Kiosks • Rental from Open Air Theatre/ Congregation Area • Rental from Food court/Kitchen/Dining Spaces • Rental from Dormitory • Advertising and Signages • Rental from Parking
  • 60. Operation and Maintenance – Concession Agreement • A concession is a license given by the government authorities to private parties for the execution and implementation of the public services which are exclusively held by the government authorities under the law. • Concessions effectively shift the cost of building, developing, and maintaining infrastructure to the private sector, relieving some of the pressure on public sector finances. • During the concession period, the government’s responsibility is primarily to function as a regulator and monitor the concessionaire’s performance. The term of a concession agreement is typically 25-30 years. The purpose of a concession agreement is to: • Vest the concessionaire with all the rights necessary to implement the project and obtain the agreed returns in accordance with the terms of the concession agreement. • Achieve an appropriate allocation of risks.
  • 61. Operation and Maintenance – Concession Agreement General obligation of the concession holder It obligates the concession holder to perform the task, provide the services which have been mentioned under the agreement. • The concession holder shall arrange for and procure, at its own cost and risk. • The concession holder shall arrange all infrastructure facilities and utilities for the authority. • The concession holder shall obtain relevant government instrumentalities, applicable permits to be obtained by the authority. • The concession holder shall pay the concession fee to the authority. General obligation of the authority It obligates the authority to perform the task or provide the services which have been mentioned under the agreement. • The Authority upon written request from the concession holder provides reasonable assistance to the concession holder in obtaining access to all necessary infrastructure facilities and utilities. • Authority shall pay the salary and allowances to the employees, retainers, and staff of the concession holder. • Authority shall not omit to do an act, deed or thing which may in any manner violate the provisions of this agreement.
  • 62. Occupancy management • Reservation of Shops/Commercial Spaces as per ODOP guidelines for uniform representation of each District of Odisha, State/UT. • Public Awareness Campaign to attract competitive bidders for setting up Shops at Unity Mall • Preparation of Draft Lease agreement between State and Parties interested for occupying space in Unity Mall. • Finalization of Draft Agreement and Legal Opinions, if necessary. • Notice Inviting Tender for Commercial Spaces/Shops at Unity Mall. • Assessment of Proposals as per ODOP policy, Technical and Financial parameters as per NIT