April 3rd, 2019
How to preserve the created data during Lifetime?
3–7 year
Capex spend
(Project & Stops)
30-50 year
Opex spend
(Operations & Maintenance)
Conceptual
Design &
FEED
Engineering
&
Procure
Fabrication &
Construction
Start-up &
Commissioning
Operations, Maintenance &
Modification
Shutdown
&
Turnaround
Relocation &
Decommission
Creation Owning & Maintain & Enrich Archiving
30% data
90% process knowledge
70% data
10% process knowledge
A
BI: Internal &
External
Experience II: Statistics
III: Sensors
IV: Monitoring
V: Simulation
(A) or
Training (B)
Why is it so difficult to collect data which need to be
validated and used for optimal decision making?
Data available at many partners and many systems!
Example: Inspections & Auditing is one of the Challenges!
Case:
Terminal with;
• 40 tanks,
• 3 jetty
• 6 delivery units
Business Challenges also on;
• Operations
• HSEQ
• Maintenance
• Projects
We need today approx. 6 FTE to execute an audit or inspection
and 8 FTE to prepare / work-out the inspections
In total 14 FTE!
Inspection & Auditing moments
Inspection &
Audit duration
time in days
Preparation &
work-out time
in days
Seveso / BRZO / API 10 30
Security 1 3
ISO / NEN 365 365
Fire Department NFPE 5 15
Insurance 5 15
Share Holders 30 60
ATEX (Explosion related installations) 10 30
Labor 30 90
KiWA (Water related installations) 2 6
Gas Installation 2 6
SCIOS (Steam related installations) 5 15
PED Inspection 180 365
Mine Inspection 10 30
Trainings compliancy 365 365
Marine audit 60 120
Tank-inspection and calibration services 60 120
Environmental 5 35
Days 1140 1670
8hours
Hours required to prepare & attend & follow up 9120 13360
1600
hours per year
available
FTE required personell 6 8
Example: Inspections & Auditing is one of the Challenges!
Case:
Terminal with;
• 40 tanks,
• 3 jetty
• 6 delivery units
Example: CEA Systems can help you with your challenges!
We decrease the required amount from 14 FTE as current
situation into 9 FTE with a centralized datacentric solution for
prepare / execution and work-out data
Inspection & Auditing moments
Inspection &
Audit
duration time
in days
By use of
Plant4D in
days
Seveso / BRZO / API 6 10
Security 1 2
ISO / NEN 300 150
Fire Department NFPE 5 5
Insurance 5 5
Share Holders 25 15
ATEX (Explosion related installations) 5 10
Labor 30 15
KiWA (Water related installations) 2 2
Gas Installation 2 2
SCIOS (Steam related installations) 5 5
PED Inspection 120 200
Mine Inspection 10 10
Trainings compliancy 365 150
Marine audit 60 60
Tank-inspection and calibration services 60 60
Environmental 5 10
Days 1001 711
8hours
Hours required to prepare & attend & follow up 8008 5688
1600
hours per
year available
FTE required personell 5 4
Case:
Terminal with;
• 40 tanks,
• 3 jetty
• 6 delivery units
Asset Lifecycle
Make data smart
Digitize Data
Utilize data
Accurate As-Built
Digital Twin
Real-time information
Convert & enrich existing 3D/2D CAD & EAM Content
Integrate Construct & Commissioning & Maintenance & Inspection Documents
Connect Data Sources & Processes
2D, PFD, P&ID, LOOPS, 3D…
Data Sheets, Certifications, Manuals…
DCS, EAM, RBI, HSEQ software
How to move to the digital world?
Conceptual
Design &
FEED
Engineering
&
Procure
Fabrication &
Construction
Start-up &
Commissioning
Operations, Maintenance &
Modification
Shutdown
&
Turnaround
Relocation &
Decommission
Test plane Test points
Plane selection: A Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8
test 1
test 2
test 3
test 4
test 5
test 6
test 7
test 8
test 9
test 10
Test plane Test points
Plane selection: B Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8
test 1
test 2
test 3
test 4
test 5
test 6
test 7
test 8
test 9
test 10
Test plane Test points
Plane selection: C Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8
test 1
test 2
test 3
test 4
test 5
test 6
test 7
test 8
test 9
test 10
Test plane Test points
Plane selection: …..... Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8
test 1
test 2
test 3
test 4
test 5
test 6
test 7
test 8
test 9
test 10
Upload sheet up-bold points and planes
Up-bold number: 10 Barcode
ISO-metric drawingno.: PL-720-02-01-(8/20) Barcode
Inspection Date: 25/02/2019 today
Inspector: Ton Klinkenberg or number Barcode
Plane
Point 1 2 3 4 5 6 7 8
test results
Plane
Point 1 2 3 4 5 6 7 8
test results
Plane
Point 1 2 3 4 5 6 7 8
test results
Plane
Point 1 2 3 4 5 6 7 8
test results
Plane
Point 1 2 3 4 5 6 7 8
A
B
C
D
E
What needs to be available for Inspection & data updates?
ISO
Input
Output
Input
Initial Data - Information Generated Data - Information
UPG
RAD
E
AS-
BUIL
T
Select the Pipe system
Select the Line Tag (Floc code)
Search the related pipelines
Search for the required ISO template
See the object info / process / design / classification metadata
Search for the Inspection data by; Up-bold, ISO template, Floc code, Line System
How can you find your data – information?
Search for the required up-bolds
on the selected ISO(‘s) template
Initial Data - Information
Generated Data - Information
Select the Pipe system
Select the Line Tag (Floc code)
Can every question be answered by reporting?
Yes, but it needs an integrated datacentric data solution
Baseline information set
How to utilize the available information – data during your
operations?
2D & 3D Simulation & Training purposes
The main steps in the journey to the digital world requires one source
of the truth, followed by the visualization and simulations in 2D / 3D
models.
New tools come to the market which enables this!
The journey to the digital world
Digitizing Asset Management
One source of truth

More Related Content

DOCX
Resume_Dave Taysom_May 2011 (2)
PPT
0082010 19200 00007 C Hds Leica User Conf2006
PDF
Petrochemical Infographic
DOCX
2014 Alan Sinclair Resume 10-14
PPTX
OM-JSON - a JSON implementation of O&M
DOC
Argus plakat[1]
PDF
EPMS5397 Elite Expansion Project Summary
PDF
PEMS.PDF
Resume_Dave Taysom_May 2011 (2)
0082010 19200 00007 C Hds Leica User Conf2006
Petrochemical Infographic
2014 Alan Sinclair Resume 10-14
OM-JSON - a JSON implementation of O&M
Argus plakat[1]
EPMS5397 Elite Expansion Project Summary
PEMS.PDF

Similar to Digitizing Asset Management (20)

PDF
From Zero to Hero in 205 Days!
PDF
SUOKAS Kuwait s-2015 slides_FINAL
PPTX
EWU BI Overview 2014_07-09
PDF
ICCC21 2021 statistics report
PDF
Architecting Design Development Test Request System in Aras
PDF
Vtech cms divisonal presentation may 2014 represented by htcs
PPTX
Selenium Success
PPTX
How to apply machine learning into your CI/CD pipeline
PDF
CERTIFIED DATA CENTRE EXPERT
PPTX
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
PPTX
Project mgt lesson plan
PDF
2016 06-07-flexible-and-efficient-production-with-am-sirris-intro
PDF
DSD-INT 2020 Web based online Forecast Verification Tool - Zijderveld
PDF
AVEVA presents at the Rice Global Forum 2017
PPTX
Omron Blackbird webinar-with voice recording_19112019
PPT
Test Metrics
PDF
Wolfgang Epting – IT-Tage 2015 – Testdaten – versteckte Geschäftschance oder ...
PDF
Work measurement
PDF
Taming the Beast: Test/QA on Large-scale Projects
PDF
From Zero to Hero in 205 Days!
SUOKAS Kuwait s-2015 slides_FINAL
EWU BI Overview 2014_07-09
ICCC21 2021 statistics report
Architecting Design Development Test Request System in Aras
Vtech cms divisonal presentation may 2014 represented by htcs
Selenium Success
How to apply machine learning into your CI/CD pipeline
CERTIFIED DATA CENTRE EXPERT
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
Project mgt lesson plan
2016 06-07-flexible-and-efficient-production-with-am-sirris-intro
DSD-INT 2020 Web based online Forecast Verification Tool - Zijderveld
AVEVA presents at the Rice Global Forum 2017
Omron Blackbird webinar-with voice recording_19112019
Test Metrics
Wolfgang Epting – IT-Tage 2015 – Testdaten – versteckte Geschäftschance oder ...
Work measurement
Taming the Beast: Test/QA on Large-scale Projects
Ad

Recently uploaded (20)

PDF
Electronic commerce courselecture one. Pdf
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Spectral efficient network and resource selection model in 5G networks
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PPTX
Tartificialntelligence_presentation.pptx
PDF
Encapsulation theory and applications.pdf
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
Approach and Philosophy of On baking technology
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Encapsulation_ Review paper, used for researhc scholars
PPTX
Big Data Technologies - Introduction.pptx
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Electronic commerce courselecture one. Pdf
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Spectral efficient network and resource selection model in 5G networks
“AI and Expert System Decision Support & Business Intelligence Systems”
Tartificialntelligence_presentation.pptx
Encapsulation theory and applications.pdf
Accuracy of neural networks in brain wave diagnosis of schizophrenia
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Approach and Philosophy of On baking technology
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Building Integrated photovoltaic BIPV_UPV.pdf
Group 1 Presentation -Planning and Decision Making .pptx
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Encapsulation_ Review paper, used for researhc scholars
Big Data Technologies - Introduction.pptx
Unlocking AI with Model Context Protocol (MCP)
NewMind AI Weekly Chronicles - August'25-Week II
Assigned Numbers - 2025 - Bluetooth® Document
gpt5_lecture_notes_comprehensive_20250812015547.pdf
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Ad

Digitizing Asset Management

  • 1. Digitizing Asset Management One source of truth Ton Klinkenberg NISTM conference, Orlando April 3rd, 2019
  • 2. How to preserve the created data during Lifetime? 3–7 year Capex spend (Project & Stops) 30-50 year Opex spend (Operations & Maintenance) Conceptual Design & FEED Engineering & Procure Fabrication & Construction Start-up & Commissioning Operations, Maintenance & Modification Shutdown & Turnaround Relocation & Decommission Creation Owning & Maintain & Enrich Archiving 30% data 90% process knowledge 70% data 10% process knowledge
  • 3. A BI: Internal & External Experience II: Statistics III: Sensors IV: Monitoring V: Simulation (A) or Training (B) Why is it so difficult to collect data which need to be validated and used for optimal decision making? Data available at many partners and many systems!
  • 4. Example: Inspections & Auditing is one of the Challenges! Case: Terminal with; • 40 tanks, • 3 jetty • 6 delivery units Business Challenges also on; • Operations • HSEQ • Maintenance • Projects
  • 5. We need today approx. 6 FTE to execute an audit or inspection and 8 FTE to prepare / work-out the inspections In total 14 FTE! Inspection & Auditing moments Inspection & Audit duration time in days Preparation & work-out time in days Seveso / BRZO / API 10 30 Security 1 3 ISO / NEN 365 365 Fire Department NFPE 5 15 Insurance 5 15 Share Holders 30 60 ATEX (Explosion related installations) 10 30 Labor 30 90 KiWA (Water related installations) 2 6 Gas Installation 2 6 SCIOS (Steam related installations) 5 15 PED Inspection 180 365 Mine Inspection 10 30 Trainings compliancy 365 365 Marine audit 60 120 Tank-inspection and calibration services 60 120 Environmental 5 35 Days 1140 1670 8hours Hours required to prepare & attend & follow up 9120 13360 1600 hours per year available FTE required personell 6 8 Example: Inspections & Auditing is one of the Challenges! Case: Terminal with; • 40 tanks, • 3 jetty • 6 delivery units
  • 6. Example: CEA Systems can help you with your challenges! We decrease the required amount from 14 FTE as current situation into 9 FTE with a centralized datacentric solution for prepare / execution and work-out data Inspection & Auditing moments Inspection & Audit duration time in days By use of Plant4D in days Seveso / BRZO / API 6 10 Security 1 2 ISO / NEN 300 150 Fire Department NFPE 5 5 Insurance 5 5 Share Holders 25 15 ATEX (Explosion related installations) 5 10 Labor 30 15 KiWA (Water related installations) 2 2 Gas Installation 2 2 SCIOS (Steam related installations) 5 5 PED Inspection 120 200 Mine Inspection 10 10 Trainings compliancy 365 150 Marine audit 60 60 Tank-inspection and calibration services 60 60 Environmental 5 10 Days 1001 711 8hours Hours required to prepare & attend & follow up 8008 5688 1600 hours per year available FTE required personell 5 4 Case: Terminal with; • 40 tanks, • 3 jetty • 6 delivery units
  • 7. Asset Lifecycle Make data smart Digitize Data Utilize data Accurate As-Built Digital Twin Real-time information Convert & enrich existing 3D/2D CAD & EAM Content Integrate Construct & Commissioning & Maintenance & Inspection Documents Connect Data Sources & Processes 2D, PFD, P&ID, LOOPS, 3D… Data Sheets, Certifications, Manuals… DCS, EAM, RBI, HSEQ software How to move to the digital world? Conceptual Design & FEED Engineering & Procure Fabrication & Construction Start-up & Commissioning Operations, Maintenance & Modification Shutdown & Turnaround Relocation & Decommission
  • 8. Test plane Test points Plane selection: A Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8 test 1 test 2 test 3 test 4 test 5 test 6 test 7 test 8 test 9 test 10 Test plane Test points Plane selection: B Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8 test 1 test 2 test 3 test 4 test 5 test 6 test 7 test 8 test 9 test 10 Test plane Test points Plane selection: C Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8 test 1 test 2 test 3 test 4 test 5 test 6 test 7 test 8 test 9 test 10 Test plane Test points Plane selection: …..... Inspection date Inspection Company Inspector 1 2 3 4 5 6 7 8 test 1 test 2 test 3 test 4 test 5 test 6 test 7 test 8 test 9 test 10 Upload sheet up-bold points and planes Up-bold number: 10 Barcode ISO-metric drawingno.: PL-720-02-01-(8/20) Barcode Inspection Date: 25/02/2019 today Inspector: Ton Klinkenberg or number Barcode Plane Point 1 2 3 4 5 6 7 8 test results Plane Point 1 2 3 4 5 6 7 8 test results Plane Point 1 2 3 4 5 6 7 8 test results Plane Point 1 2 3 4 5 6 7 8 test results Plane Point 1 2 3 4 5 6 7 8 A B C D E What needs to be available for Inspection & data updates? ISO Input Output Input Initial Data - Information Generated Data - Information
  • 9. UPG RAD E AS- BUIL T Select the Pipe system Select the Line Tag (Floc code) Search the related pipelines Search for the required ISO template See the object info / process / design / classification metadata Search for the Inspection data by; Up-bold, ISO template, Floc code, Line System How can you find your data – information? Search for the required up-bolds on the selected ISO(‘s) template Initial Data - Information Generated Data - Information
  • 10. Select the Pipe system Select the Line Tag (Floc code) Can every question be answered by reporting? Yes, but it needs an integrated datacentric data solution Baseline information set
  • 11. How to utilize the available information – data during your operations? 2D & 3D Simulation & Training purposes
  • 12. The main steps in the journey to the digital world requires one source of the truth, followed by the visualization and simulations in 2D / 3D models. New tools come to the market which enables this! The journey to the digital world