SlideShare a Scribd company logo
DISASTER
MANAGEMENT
• includes sum total of all activities, programmes and
  measures which can be taken up before , during
  and after a disaster with the purpose to avoid a
  disaster, reduce its impact or recover from its losses.
Dm module ii
• Mitigation: Measures to minimize the impacts
   o Like: building codes and zoning; vulnerability analyses; public education.

• Preparedness: Planning how to respond
   o   like: preparedness plans; emergency exercises/training; warning systems.

• Response: Initial actions taken to minimize the
  hazards
   o like: evacuation; search and rescue; emergency relief.

• Recovery: Returning the community to normal
   o like: rehabilitation and reconstruction
• the actions taken to save lives and property and
  prevent further damage
• putting preparedness plans into action
   o   search and rescue
   o    immediate medical help and lifesupport
   o   assisting refugees with transport
   o   food ,clothing& temporary shelter
   o   initial repairs to damaged infrastructure
   o   Preventing immediate disaster
   o   damage assessment
• Aims of disaster response
   o To ensure the survival of the maximum possible number of victims, keeping
     them in the best possible health in the circumstances.
   o To re-establish self-sufficiency and essential services as quickly as possible
     for all population groups, with special attention to the most vulnerable
     and underprivileged.
   o To repair or replace damaged infrastructure and regenerate viable
     economic activities.
• Disaster Response Activities
• Warning- information concerning the nature of the
  danger and imminent disaster threats, to evacuate
  or secure property and prevent further damage.
• Evacuation and migration-relocation of a
  population from zones at risk of an imminent disaster
  to a safer location for protection of life of the
  community and immediate treatment of injured.
   o   For evacuation to work there must be:
   o   A timely and accurate warning system,
   o   Clear identification of escape routes,
   o   community awareness of the plan
• Search and rescue (SAR)-process of identifying the location of disaster
  victims that may be trapped or isolated and bringing them to safety and
  medical attention
o Mountain rescue -in rugged and mountainous terrain
o Ground search and rescue-for persons who are lost or in distress on land
  or inland waterways
o Urban search and rescue-location and rescue of persons from collapsed
  buildings or other urban and industrial entrapments
o Combat search and rescue-carried out during war
   o Air-sea rescue -combined use of aircraft like flying boats, helicopters and
     surface vessels

• Post-disaster assessment-to provide a clear,
  concise picture of the post-disaster situation, to
  identify relief needs and to develop strategies for
  recovery.
• Relief-provision of material aid and emergency
  medical care necessary to save and preserve
  human lives.
• also enables families to meet their basic needs for
  medical and health care, shelter, clothing, water,
  and food
• Logistics and supply-well-organized supply service
  for handling the procurement, storage, and
  dispatch of relief supplies for distribution to disaster
  victims.
• Communication and information management-the
  equipment for information flow & information
  management
• Survivor response and coping
• Security
• protection of the human rights and safety of
  displaced populations and refugees
• the actions taken to return the community to
  normal or better following a disaster.
• decisions and actions relative to rebuilding homes,
  replacing property, resuming employment, restoring
  businesses, and permanently repairing and
  rebuilding infrastructure
   o Initial Response (1-7 days)
   o Mid-Term Planning (7-30 days)
   o Long-Term Reconstruction (Several Years)
• short-term and long-term.
  o Short-term recovery
  o restore interrupted utility services, clear roads, and either fix or demolish
    severely damaged buildings.
  o provide food and temporary shelter
  o Physical and Psychological recovery
  o Long-term recovery -the complete redevelopment of damaged areas,
    restoring economic activity, community facilities and individual housing.
Dm module ii
• The Recovery Plan
  o Gathering basic information
  o Organizing recovery
  o Mobilizing resources for recovery
  o Administering recovery
  o Regulating recovery
  o Coordinating recovery activities
  o Evaluating recovery
Post Disaster Assessment
• Purpose of assessment
• identification and prioritization of needs for disaster
  relief assistance and to facilitate a timely,
  appropriate response and recovery
• help determine the extent of a disaster and its
  impact on the population and facilities
• Types of assessment
   o Initial or Rapid Assessment-response stage
   o In-Depth or Sectoral Assessment-long term recovery (15days-1month)
   o Impact Assessment
   o Needs Assessment
• Initial or Rapid Assessment
• comprises both situation and needs
  assessment in the early, critical stage of
  disaster to determine the type of relief
  needed for immediate response.
• aim to:
   o Identify the impact a disaster has had on a society and its infrastructure,
     and the ability of that society to cope
   o Identify the most vulnerable segments of the population that need to be
     targeted for assistance;
   o Identify the level of response by the affected country and its internal
     capacity to cope with the situation;
   o Identify the level of response from the international community
o  Identify the most urgent relief needs and potential methods of providing
  them most effectively;
o Make recommendations which define and set priorities on the actions
  and resources needed for immediate response
o Highlight special concerns regarding the development of the situation
o Draw attention to geographical areas / substantive sectors needing in-
  depth assessment
• In-Depth or Sectoral Assessment
  o To determine long term recovery and development requirements
  o Housing and infrastructures, livelihoods, environment and psycho social
    aspects
  o Identify needs for external assistance
• Impact Assessment
  o process of collecting information on the magnitude of the disaster and
    the extent of its impact on both the population and infrastructure of the
    society
  o The area affected by location and size
  o Causes of causalities and damage
  o Human loss and causalities
  o Damage on infrastructure and environment
  o Environmental, health and sanitation threats
  o govt and other agencies and their activities and capacity
• Needs Assessment
  o the level and type of assistance required for the affected population
  o identifies resources and services for immediate emergency measures to
    save and sustain the lives of the affected population.
  o Needs that can be met from within the community and require external
    assistance
  o conducted at the site of a disaster or at the location of a displaced
    population.
Assessment Process
• Human loss and damage
  o   Deaths
  o   Permanent disabilities
  o   Major injuries
  o   Minor injuries and missing

• Assessment Methodology
  o Informal discussions
  o Secondary sources
• Damage to housing
   o   Completely destroyed/ beyond repair
   o   Partially damaged/ repairable
   o   Minor damage
   o   Undamaged
• Data assessed
   o Geographic location
   o Urban / rural
   o Size
   o Typology on the basis of design and structural
     system
   o Types of ownership & functional usage
   o Average dwelling size,no. of inhabitants per
     dwelling
   o Status of house
• Assessment Methodology
  o Village Transect- comparative overview of different parts of community
• Habitat Mapping
• Photographic Information
• Household level Survey-Two types
• Damage category and types of construction
  materials
• Technical details of damage
• Damage to community infrastructures
• Methodology
  o Infrastructure mapping
  o Village level Survey
  o Photographic Information

• Environmental damage
  o   Landform change
  o   Change in natural drainage
  o   Soil degradation
  o   Destruction of vegetation
  o   Water contamination
  o   Loss of flora and fauna
• Methodology
  o Resource mapping
  o Village Transect
  o Village survey

• Damage to Livelihood
  o Loss to means and assets
  o Employment and Income

• Methodology
  o Wealth Ranking
  o Occupational network analysis
  o Livelihood survey-nature of assets like land, house, livestock
• Health Damage
• Due to site conditions, population concentration,
  contaminated water, lack of sanitation, lack of
  nutrition, etc
• Methodology
   o Community Health Surveillance: type, magnitude and pattern and trend
     of health problems through monitoring
   o Mobility map for health services
   o Health Risk Mapping
Dm module ii
• Health Risk Mapping
• Psycho social impact
    o Psychological disorders
    o PTSD-Post traumatic stress disorder-panic reactions, withdrawal from daily
      activities, outburst

•   Methodology
    o Listening and observing
    o Symptom prevalence matrix
    o Case card

• Women in Disaster
• House hold Survey
• Informal survey-field visit survey
• Formal survey
   o   Simple random sampling
   o   Systematic random sampling
   o   Stratified random sampling
   o   Cluster sampling
SHELTER RECONSTRUCTION
 STRATEGY     Recovery
                        shelter/housing


                          Early
                       Recover
          Emergency    y shelter
  Self       shelter
recover
   y




•Reception and transit camps- 1-5 days
•Emergency Shelters/Temporary shelters- day 5-3 month(
rehabilitation)
•Permanent Housing- 3months-3 years( reconstruction)
• Emergency Shelters/ Temporary shelters
• during the period between disaster and the
  achievement of a durable shelter solution
• Aim
  o protection and security
  o survival and health
  o social needs, such as privacy and dignity
  o livelihoods
  o natural-resource management
  o communal service infrastructure.
• Types
   odispersed settlement/host families-
    pre-existing households.
   omass shelter- public buildings and
    community Facilities
   ocamps:
       • (a) spontaneous -formed without adequate
         planning
       • (b)planned-purpose built
• dispersed settlement
   o   May not exist in affected areas
   o Relocated people are scattered
   o difficult to keep track and provide services
   o Can reinforce social isolation
• mass shelter-
   o   Cheaper
   o   May not exist in affected areas
   o   they can quickly become overcrowded
   o    sanitation and other services can become overburdened
   o    equipment and structure can be damaged
   o    buildings are no longer available for their original purpose
   o   lack of privacy and increased protection risks.
   o   difficult to keep track and provide services
   o      Can reinforce social isolation

• spontaneous -formed without adequate plan
   o re-location, as early as possible, to well-identified site
   o High density, overburden on resources
• Criteria for planned shelters:
   o   protection from an immediate danger
   o   Quick to supply
   o   Low cost
   o   Buildable- Small and light unit size
   o   Adaptable-Flexible, Cultural Acceptance
   o   Relief motivated but development driven
   o   minimization of environmental impact
   o   Durability- Fire resistance
• Types of shelter system:
• In-situ construction-locally available materials and
  techniques
   o Can evolve to permanent housing
   o Flexibility in location, materials, style
   o Community involvement
   o Requires available, safe, and undisputed land
   o Draining of resources
• Prefabricated
  o   Modular,Standard specifications
  o   Can be built in large quantities offsite
  o    Easy to keep track of relocated people
  o   Can be used for collective relocation (preserving social networks)
  o   Requires available, safe, and undisputed land
  o   Low quality and lack of comfort
  o   Often built in inconvenient locations, far from original homes
  o   If use is prolonged, risks degrading to a slum
• Standards for construction
 o accommodation: in barracks, communal tents with minimum of 3.0
   m2per person
 o sanitation: 20 persons per latrine, 50persons per shower,
 o water supply: absolute minimum provision of 7 litres/person/day plus
   water required for kitchens, cleaning and sanitation;
 o food preparation: approximately 100 m2 per 500 persons;
 o storage: 150 to 200 m3 per 1,000 persons;
 o a public address system;
 o lighting;
 o arrival and departure zones which are separated from accommodation
   zones;
 o arrival zones should include registration and medical clearance facilities
 o administrative offices and staff accommodation;
 o one health post and separate accommodation for quarantine;
 o security fencing
 o Visibility and ease of movement.
• ‘Adequate housing’
   o legal security of tenure
   o availability of services, materials, facilities, and infrastructure
   o affordability
   o habitability
   o accessibility
   o location
   o cultural adequacy.

• Onsite Reconstruction / Relocation/Repair
• Onsite reconstruction
• Approaches
   o   Cash Approach
   o   Owner driven approach
   o   Community-Driven Reconstruction
   o   Agency-Driven Reconstruction in-Situ
   o   Agency-Driven Reconstruction in Relocated Site
•   Cash Approach-Unconditional financial assistance without technical support
•   Repair, reconstruction, migration, etc
•   Owner driven approach- conditional financial assistance with regulations and
    technical support
     o Combination of cash, vouchers, technical assistance
     o construction or repair work by themselves, by
       employing family labor, by employing a local
       contractor or local laborers, or by using some
       combination of these options
• Essential prerequisites
     o Training of trades people and homeowners
     o Technical assistance and construction supervision
       and inspection
     o Updating and enforcement of building codes and
       construction guidelines
     o Mechanisms to regulate prices and facilitate access
       to building materials
     o A system for providing financial assistance in
       installments as construction progresses
Dm module ii
• Community-Driven Reconstruction: Financial and/or
  material assistance is channeled through community
  organizations that are actively involved in decision making
  and in managing reconstruction
• community involvement in the project cycle,
  complemented by the assistance of an agency.
• Role of agency
   o suggest housing designs, technologies, and/or materials,
     and delivering construction inputs and training,employ
     skilled and unskilled laborers from the community or
     facilitate the formation of construction committees.
• Roles for the community:
   o Organization and planning of the entire reconstruction
     process, including housing and infrastructure
   o Decisions regarding housing design and building
     materials
   o Production of building materials such as bricks
   o Distribution of building materials or other forms of
     housing assistance
Dm module ii
•   Agency-Driven Reconstruction in-Situ: governmental or nongovernmental
                           /contractors
    agency hires a construction company

• Design, materials, and expertise are likely to be
  imported from outside the community.
• The community may or may not be consulted
  on certain aspects of the project, such as house
  designs.
• Lack of control over quality, and opportunity to
  participate in specific tasks.
Dm module ii
• Agency-Driven Reconstruction in Relocated Site
• a governmental or nongovernmental agency
  contracts the construction of houses on a new site,
  generally with little or no involvement by the
  community
Dm module ii
Reconstruction Process
• Planning
  o understanding the context and impact of the disaster
  o understanding the regulatory framework and establishing methods of
    coordination
  o understanding funding teams and timescales
  o determining which method of assistance is most appropriate
  o establishing partnerships with other stakeholders in order to provide
    assistance
  o recognising natural hazards which pose a future risk
  o capturing the objectives, timescales, resources and risks in the
    programme plan
• Design
  o   selection of appropriate sites for reconstruction
  o   resolving issues of land tenure
  o   physical planning of settlements
  o   definition of appropriate quality for reconstruction
  o   identifying appropriate types of construction
  o   minimising the environmental impact of reconstruction
  o   incorporating disaster risk reduction strategies
  o   design of infrastructure facilities
• Construction
  o   different methods of implementation
  o   management of construction projects
  o   specification, procurement and transportation of materials
  o   management of labour and workmanship
  o   handover, maintenance and post-occupancy evaluation of completed
      projects.
• Relocation
  o Rebuilding in new site voluntarily or involuntarily.

• Happens when
  o When the old location is subject to a natural hazard
  o When the old location is completely destroyed and to move the debris
  o new plotting in the old settlement is inconvenient for rapid recovery and
    housing purposes
• Unsuccessful
  o   Inadequacy of new site
  o   Distance from livelihood and social networks
  o   Socio culturally inadequate settlement layout
  o   Lack of community living
  o   Lack of user participation in early decision-making process
  o    Lack of guidance to the beneficiaries during the construction phase of
      the houses.
Mitigation
•   measures that eliminate or reduce the probability of disaster
    occurrence, impacts and risks of hazards of unavoidable disasters
    through proactive measures taken before disaster occurs.
•   Includes
•   Understanding each hazard
    – its causes
    – its geographical distribution, magnitude or severity, and probable
    frequency of occurrence
    – the physical mechanisms of destruction
    – the elements and activities most vulnerable to destruction
    – the possible economic and social consequences of the disaster
•    Vulnerability assessment -physical vulnerability ,vulnerability of social
    institutions and economic activities
•   Mitigation Measures

More Related Content

PDF
Management of disaster
PPT
DISASTER MANAGEMENT -GENERAL
PPTX
Disaster management Dr.karthikeyan TvMCH
PPTX
SEARCH AND RESCUE POLICE
PDF
Jua Murah GPS Garmin manual gps 60
PPTX
Global navigation satellite system based positioning combined
PPTX
Map compasswacbc
PPTX
Disaster Management (1).pptx community medicine
Management of disaster
DISASTER MANAGEMENT -GENERAL
Disaster management Dr.karthikeyan TvMCH
SEARCH AND RESCUE POLICE
Jua Murah GPS Garmin manual gps 60
Global navigation satellite system based positioning combined
Map compasswacbc
Disaster Management (1).pptx community medicine

Similar to Dm module ii (20)

PPTX
Disaster management Planning and implementation.pptx
PPTX
Disaster management
PPT
3 . Disaster management.ppt
PPTX
Medical support for disaster survivors (msds) ali
PPTX
Disaster management
PPTX
Disaster Management.pptx
PPTX
disaster management in Nursing Health.pptx
PPTX
Medical support for disaster survivors (msds) ali- amal-final.
PPTX
PPTX
Unit 12 Disaster(1) culture health .pptx
PDF
Disaster management ,prepardness,mitigation.pdf
PPTX
Safety in Engineering Lecture 14.pptx
PPTX
Disaster Management
PDF
Disaster Management.pdf a PowerPoint presentation ppt
PPT
18EE753-Module3.ppt
PPTX
Disaster management system
PPTX
Disaster disaster management during emer
PPTX
Reconstruction and development
PPTX
DISASTER AND DISASTER NURSING PPT FOR NURSING STUDENTS
Disaster management Planning and implementation.pptx
Disaster management
3 . Disaster management.ppt
Medical support for disaster survivors (msds) ali
Disaster management
Disaster Management.pptx
disaster management in Nursing Health.pptx
Medical support for disaster survivors (msds) ali- amal-final.
Unit 12 Disaster(1) culture health .pptx
Disaster management ,prepardness,mitigation.pdf
Safety in Engineering Lecture 14.pptx
Disaster Management
Disaster Management.pdf a PowerPoint presentation ppt
18EE753-Module3.ppt
Disaster management system
Disaster disaster management during emer
Reconstruction and development
DISASTER AND DISASTER NURSING PPT FOR NURSING STUDENTS
Ad

More from Kris Kiran (6)

PPTX
Partition wall
PPT
Disaster resistant
PPT
Frp materials
PPT
polymers for concrete repair
PPT
damages during construction
PPT
underwater repair
Partition wall
Disaster resistant
Frp materials
polymers for concrete repair
damages during construction
underwater repair
Ad

Dm module ii

  • 2. • includes sum total of all activities, programmes and measures which can be taken up before , during and after a disaster with the purpose to avoid a disaster, reduce its impact or recover from its losses.
  • 4. • Mitigation: Measures to minimize the impacts o Like: building codes and zoning; vulnerability analyses; public education. • Preparedness: Planning how to respond o like: preparedness plans; emergency exercises/training; warning systems. • Response: Initial actions taken to minimize the hazards o like: evacuation; search and rescue; emergency relief. • Recovery: Returning the community to normal o like: rehabilitation and reconstruction
  • 5. • the actions taken to save lives and property and prevent further damage • putting preparedness plans into action o search and rescue o immediate medical help and lifesupport o assisting refugees with transport o food ,clothing& temporary shelter o initial repairs to damaged infrastructure o Preventing immediate disaster o damage assessment
  • 6. • Aims of disaster response o To ensure the survival of the maximum possible number of victims, keeping them in the best possible health in the circumstances. o To re-establish self-sufficiency and essential services as quickly as possible for all population groups, with special attention to the most vulnerable and underprivileged. o To repair or replace damaged infrastructure and regenerate viable economic activities.
  • 7. • Disaster Response Activities • Warning- information concerning the nature of the danger and imminent disaster threats, to evacuate or secure property and prevent further damage. • Evacuation and migration-relocation of a population from zones at risk of an imminent disaster to a safer location for protection of life of the community and immediate treatment of injured. o For evacuation to work there must be: o A timely and accurate warning system, o Clear identification of escape routes, o community awareness of the plan
  • 8. • Search and rescue (SAR)-process of identifying the location of disaster victims that may be trapped or isolated and bringing them to safety and medical attention o Mountain rescue -in rugged and mountainous terrain o Ground search and rescue-for persons who are lost or in distress on land or inland waterways o Urban search and rescue-location and rescue of persons from collapsed buildings or other urban and industrial entrapments
  • 9. o Combat search and rescue-carried out during war o Air-sea rescue -combined use of aircraft like flying boats, helicopters and surface vessels • Post-disaster assessment-to provide a clear, concise picture of the post-disaster situation, to identify relief needs and to develop strategies for recovery.
  • 10. • Relief-provision of material aid and emergency medical care necessary to save and preserve human lives. • also enables families to meet their basic needs for medical and health care, shelter, clothing, water, and food • Logistics and supply-well-organized supply service for handling the procurement, storage, and dispatch of relief supplies for distribution to disaster victims. • Communication and information management-the equipment for information flow & information management
  • 11. • Survivor response and coping • Security • protection of the human rights and safety of displaced populations and refugees
  • 12. • the actions taken to return the community to normal or better following a disaster. • decisions and actions relative to rebuilding homes, replacing property, resuming employment, restoring businesses, and permanently repairing and rebuilding infrastructure o Initial Response (1-7 days) o Mid-Term Planning (7-30 days) o Long-Term Reconstruction (Several Years)
  • 13. • short-term and long-term. o Short-term recovery o restore interrupted utility services, clear roads, and either fix or demolish severely damaged buildings. o provide food and temporary shelter o Physical and Psychological recovery o Long-term recovery -the complete redevelopment of damaged areas, restoring economic activity, community facilities and individual housing.
  • 15. • The Recovery Plan o Gathering basic information o Organizing recovery o Mobilizing resources for recovery o Administering recovery o Regulating recovery o Coordinating recovery activities o Evaluating recovery
  • 16. Post Disaster Assessment • Purpose of assessment • identification and prioritization of needs for disaster relief assistance and to facilitate a timely, appropriate response and recovery • help determine the extent of a disaster and its impact on the population and facilities • Types of assessment o Initial or Rapid Assessment-response stage o In-Depth or Sectoral Assessment-long term recovery (15days-1month) o Impact Assessment o Needs Assessment
  • 17. • Initial or Rapid Assessment • comprises both situation and needs assessment in the early, critical stage of disaster to determine the type of relief needed for immediate response. • aim to: o Identify the impact a disaster has had on a society and its infrastructure, and the ability of that society to cope o Identify the most vulnerable segments of the population that need to be targeted for assistance; o Identify the level of response by the affected country and its internal capacity to cope with the situation; o Identify the level of response from the international community
  • 18. o Identify the most urgent relief needs and potential methods of providing them most effectively; o Make recommendations which define and set priorities on the actions and resources needed for immediate response o Highlight special concerns regarding the development of the situation o Draw attention to geographical areas / substantive sectors needing in- depth assessment
  • 19. • In-Depth or Sectoral Assessment o To determine long term recovery and development requirements o Housing and infrastructures, livelihoods, environment and psycho social aspects o Identify needs for external assistance
  • 20. • Impact Assessment o process of collecting information on the magnitude of the disaster and the extent of its impact on both the population and infrastructure of the society o The area affected by location and size o Causes of causalities and damage o Human loss and causalities o Damage on infrastructure and environment o Environmental, health and sanitation threats o govt and other agencies and their activities and capacity
  • 21. • Needs Assessment o the level and type of assistance required for the affected population o identifies resources and services for immediate emergency measures to save and sustain the lives of the affected population. o Needs that can be met from within the community and require external assistance o conducted at the site of a disaster or at the location of a displaced population.
  • 22. Assessment Process • Human loss and damage o Deaths o Permanent disabilities o Major injuries o Minor injuries and missing • Assessment Methodology o Informal discussions o Secondary sources
  • 23. • Damage to housing o Completely destroyed/ beyond repair o Partially damaged/ repairable o Minor damage o Undamaged • Data assessed o Geographic location o Urban / rural o Size o Typology on the basis of design and structural system o Types of ownership & functional usage o Average dwelling size,no. of inhabitants per dwelling o Status of house
  • 24. • Assessment Methodology o Village Transect- comparative overview of different parts of community
  • 26. • Photographic Information • Household level Survey-Two types • Damage category and types of construction materials
  • 28. • Damage to community infrastructures • Methodology o Infrastructure mapping o Village level Survey o Photographic Information • Environmental damage o Landform change o Change in natural drainage o Soil degradation o Destruction of vegetation o Water contamination o Loss of flora and fauna
  • 29. • Methodology o Resource mapping o Village Transect o Village survey • Damage to Livelihood o Loss to means and assets o Employment and Income • Methodology o Wealth Ranking o Occupational network analysis o Livelihood survey-nature of assets like land, house, livestock
  • 30. • Health Damage • Due to site conditions, population concentration, contaminated water, lack of sanitation, lack of nutrition, etc • Methodology o Community Health Surveillance: type, magnitude and pattern and trend of health problems through monitoring o Mobility map for health services o Health Risk Mapping
  • 32. • Health Risk Mapping
  • 33. • Psycho social impact o Psychological disorders o PTSD-Post traumatic stress disorder-panic reactions, withdrawal from daily activities, outburst • Methodology o Listening and observing o Symptom prevalence matrix o Case card • Women in Disaster
  • 34. • House hold Survey • Informal survey-field visit survey • Formal survey o Simple random sampling o Systematic random sampling o Stratified random sampling o Cluster sampling
  • 35. SHELTER RECONSTRUCTION STRATEGY Recovery shelter/housing Early Recover Emergency y shelter Self shelter recover y •Reception and transit camps- 1-5 days •Emergency Shelters/Temporary shelters- day 5-3 month( rehabilitation) •Permanent Housing- 3months-3 years( reconstruction)
  • 36. • Emergency Shelters/ Temporary shelters • during the period between disaster and the achievement of a durable shelter solution • Aim o protection and security o survival and health o social needs, such as privacy and dignity o livelihoods o natural-resource management o communal service infrastructure.
  • 37. • Types odispersed settlement/host families- pre-existing households. omass shelter- public buildings and community Facilities ocamps: • (a) spontaneous -formed without adequate planning • (b)planned-purpose built • dispersed settlement o May not exist in affected areas o Relocated people are scattered o difficult to keep track and provide services o Can reinforce social isolation
  • 38. • mass shelter- o Cheaper o May not exist in affected areas o they can quickly become overcrowded o sanitation and other services can become overburdened o equipment and structure can be damaged o buildings are no longer available for their original purpose o lack of privacy and increased protection risks. o difficult to keep track and provide services o Can reinforce social isolation • spontaneous -formed without adequate plan o re-location, as early as possible, to well-identified site o High density, overburden on resources
  • 39. • Criteria for planned shelters: o protection from an immediate danger o Quick to supply o Low cost o Buildable- Small and light unit size o Adaptable-Flexible, Cultural Acceptance o Relief motivated but development driven o minimization of environmental impact o Durability- Fire resistance
  • 40. • Types of shelter system: • In-situ construction-locally available materials and techniques o Can evolve to permanent housing o Flexibility in location, materials, style o Community involvement o Requires available, safe, and undisputed land o Draining of resources
  • 41. • Prefabricated o Modular,Standard specifications o Can be built in large quantities offsite o Easy to keep track of relocated people o Can be used for collective relocation (preserving social networks) o Requires available, safe, and undisputed land o Low quality and lack of comfort o Often built in inconvenient locations, far from original homes o If use is prolonged, risks degrading to a slum
  • 42. • Standards for construction o accommodation: in barracks, communal tents with minimum of 3.0 m2per person o sanitation: 20 persons per latrine, 50persons per shower, o water supply: absolute minimum provision of 7 litres/person/day plus water required for kitchens, cleaning and sanitation; o food preparation: approximately 100 m2 per 500 persons; o storage: 150 to 200 m3 per 1,000 persons; o a public address system; o lighting; o arrival and departure zones which are separated from accommodation zones; o arrival zones should include registration and medical clearance facilities o administrative offices and staff accommodation; o one health post and separate accommodation for quarantine; o security fencing o Visibility and ease of movement.
  • 43. • ‘Adequate housing’ o legal security of tenure o availability of services, materials, facilities, and infrastructure o affordability o habitability o accessibility o location o cultural adequacy. • Onsite Reconstruction / Relocation/Repair
  • 44. • Onsite reconstruction • Approaches o Cash Approach o Owner driven approach o Community-Driven Reconstruction o Agency-Driven Reconstruction in-Situ o Agency-Driven Reconstruction in Relocated Site
  • 45. Cash Approach-Unconditional financial assistance without technical support • Repair, reconstruction, migration, etc
  • 46. Owner driven approach- conditional financial assistance with regulations and technical support o Combination of cash, vouchers, technical assistance o construction or repair work by themselves, by employing family labor, by employing a local contractor or local laborers, or by using some combination of these options • Essential prerequisites o Training of trades people and homeowners o Technical assistance and construction supervision and inspection o Updating and enforcement of building codes and construction guidelines o Mechanisms to regulate prices and facilitate access to building materials o A system for providing financial assistance in installments as construction progresses
  • 48. • Community-Driven Reconstruction: Financial and/or material assistance is channeled through community organizations that are actively involved in decision making and in managing reconstruction • community involvement in the project cycle, complemented by the assistance of an agency. • Role of agency o suggest housing designs, technologies, and/or materials, and delivering construction inputs and training,employ skilled and unskilled laborers from the community or facilitate the formation of construction committees. • Roles for the community: o Organization and planning of the entire reconstruction process, including housing and infrastructure o Decisions regarding housing design and building materials o Production of building materials such as bricks o Distribution of building materials or other forms of housing assistance
  • 50. Agency-Driven Reconstruction in-Situ: governmental or nongovernmental /contractors agency hires a construction company • Design, materials, and expertise are likely to be imported from outside the community. • The community may or may not be consulted on certain aspects of the project, such as house designs. • Lack of control over quality, and opportunity to participate in specific tasks.
  • 52. • Agency-Driven Reconstruction in Relocated Site • a governmental or nongovernmental agency contracts the construction of houses on a new site, generally with little or no involvement by the community
  • 54. Reconstruction Process • Planning o understanding the context and impact of the disaster o understanding the regulatory framework and establishing methods of coordination o understanding funding teams and timescales o determining which method of assistance is most appropriate o establishing partnerships with other stakeholders in order to provide assistance o recognising natural hazards which pose a future risk o capturing the objectives, timescales, resources and risks in the programme plan
  • 55. • Design o selection of appropriate sites for reconstruction o resolving issues of land tenure o physical planning of settlements o definition of appropriate quality for reconstruction o identifying appropriate types of construction o minimising the environmental impact of reconstruction o incorporating disaster risk reduction strategies o design of infrastructure facilities
  • 56. • Construction o different methods of implementation o management of construction projects o specification, procurement and transportation of materials o management of labour and workmanship o handover, maintenance and post-occupancy evaluation of completed projects.
  • 57. • Relocation o Rebuilding in new site voluntarily or involuntarily. • Happens when o When the old location is subject to a natural hazard o When the old location is completely destroyed and to move the debris o new plotting in the old settlement is inconvenient for rapid recovery and housing purposes
  • 58. • Unsuccessful o Inadequacy of new site o Distance from livelihood and social networks o Socio culturally inadequate settlement layout o Lack of community living o Lack of user participation in early decision-making process o Lack of guidance to the beneficiaries during the construction phase of the houses.
  • 59. Mitigation • measures that eliminate or reduce the probability of disaster occurrence, impacts and risks of hazards of unavoidable disasters through proactive measures taken before disaster occurs. • Includes • Understanding each hazard – its causes – its geographical distribution, magnitude or severity, and probable frequency of occurrence – the physical mechanisms of destruction – the elements and activities most vulnerable to destruction – the possible economic and social consequences of the disaster • Vulnerability assessment -physical vulnerability ,vulnerability of social institutions and economic activities • Mitigation Measures

Editor's Notes

  • #36: Quick glanceKEY MESSAGES to convey: The Shelter Response after a disaster is understood as a continuum process, where all the different components are overlapping and can be developed simultaneity. The first who react/response to a disaster is the people itself, later when mechanism are in place people receive support from government and agencies are they gone trough a process that include all the different components: Emergency, recovery and development. This is NOT a sequential process of one after the other, is a continuum process where each phase include the previous one. Recovery starts on day one after a disaster. Not all the people go to the same speed on this process. Some go directly from self recovery to permanent housing others go through all components/phases… (horizontal diagonal or vertical on this diagram).