INTRODUCTION OF CIVIL ENGINEERING QUANTITIES
WEEK 1
LEARNING OUTCOMES (CO1-PO3)
Understand the definition of civil engineering quantities
Understand the construction stages and where is bill of quantity being produced
Understand the purpose of bill of quantities
@nurkamaliahmustaffa2013
What is civil engineering quantities?
It can be defined from two words :
• civil engineering
Civil engineering is a professional engineering discipline which deals with the design,
construction and maintenance of the physical and natural built environment, cover a large of
different jobs such as bridge,highway, canals, dams and building.
In general, civil engineering is concerned with the overall interface of human created fixed projects with the
greater world. General civil engineers work closely with surveyors and specialized civil engineers to design
grading, drainage, pavement, water supply, sewer service, dams, electric and communications supply.
General civil engineering is also referred to as site engineering, a branch of civil engineering that primarily
focuses on converting a tract of land from one usage to another. Site engineers spend time visiting project
sites, meeting with stakeholders, and preparing construction plans. Civil engineers apply the principles of
geotechnical engineering, structural engineering, environmental engineering, transportation engineering
and construction engineering to residential, commercial, industrial and public works projects of all sizes
and levels of construction.
• quantities
The amount of labor, equipment and materials to carry out the project under various item of works.
@nurkamaliahmustaffa2013
PICTORIALS OF PAVILLION MALL, KUALA LUMPUR
@nurkamaliahmustaffa2013
PAVILLION MALL CONSTRUCTION STAGE
@nurkamaliahmustaffa2013
ce
@nurkamaliahmustaffa2013
You must understand the Sequence of Construction
HOW TO CALCULATE THE QUANTITIES?
m3 ?
kg ?
@nurkamaliahmustaffa2013
HOW TO CALCULATE THE QUANTITIES?
m3 ?
@nurkamaliahmustaffa2013
Who responsible for civil engineering quantities?
If the job done by quantity surveyor , why civil engineer
needs to study the civil engineering quantities?
Let’s discuss…..
Quantity Surveyor
– the application of expert knowledge in measure the
quantity and estimation of the cost and prices of labour,
materials and plant required.
Why?
achieve project’s objective within the scope of
quality, time and cost.
@nurkamaliahmustaffa2013
Quantity surveyor
@nurkamaliahmustaffa2013
Objectives of Construction Project
@nurkamaliahmustaffa2013
• Discuss on the concept & the requirement of the
project (Client-Architect-Local authority)
• E.g. Environmental impact assessment , traffic
impact assessment (Consultant Engineer)
• Produce Architecture drawing
Conceptual &
feasibility study
• Architect design the concept of the project on the
client’s requirement
• Consultant Engineer will design and provide detail
drawing based on the client concept & feasibility
• Produce Engineering drawing and specification
Engineering &
design
• Taking off based on Eng. Drawing, Arc Drawing and
Specification
• Preparation of tender document-(Taking off and BQ)
• Call for tender & selecting the contractor
• Awarding the contract to winning contractor
Procurement
• Winning Contractor will construct the project as per
contract
• Architect and Consultant engineer will monitor
progress of work and the quality of the project
Construction
• Upon the completion of the project, contractor will
handing over the project to the client
• Client will continue to operate & maintain a building
Operate &
maintain
Construction Stages
-example-Building
Why quantities is carried out after design stage?
Because to carry out taking off,
detail drawings from design
stage is needed.
Let’s see example… @nurkamaliahmustaffa2013
From the above sketch, calculate :
Excavation in cubic meter
Concrete volume in cubic meter
Reinforcement in Kg.
Formwork
Insert all the above answer in “bill of quantities”
Notes: R10 – 0.616 kg/m
Y10 – 0.616 kg/m
Y12 – 0.888 kg/m
Assuming : cover = 25 mm for column
= 50 mm for footing
Leave blank
@nurkamaliahmustaffa2013
How quantities can be carried out?
TAKING OFF
•It is the process of measuring from drawings and
recording all dimensions in recognized form on
a special ruled paper called “Dimension Paper”
BILL OF QUANTITIES
•A list of items giving the quantities and brief description of
work to be carried out with is respective quantity and unit
cost for carrying out each work.
@nurkamaliahmustaffa2013
What is taking off sheet?
A process of measuring from drawings, recording all dimensions in recognized form called
taking of sheet or “dimension paper”
Taking off sheet
No Dimens
ion
Final Quantity Description of item Unit
@nurkamaliahmustaffa2013
What is “bill of quantities” ?
A list of items giving the quantities and brief description of work to be carried out with its
respective quantity and unit cost for carrying out each work.
Bill of Quantities
Leave blank
Item Description Quantity Unit Rate Amount (RM)
@nurkamaliahmustaffa2013
The purpose of Bill of Quantities (BQ):
1. To set down the various items of works in a logical sequence so that it readily priced by
contractor.
2. Enables all the contractors to tender on the same information.
3. Provide a convenient basis for valuation of stage payments during the contract, before the
accurate remeasurement figure are available.
4. Provide an approximate checklist for the contractor to order materials and plan for other
resources.
5. Provide data for cost analyses for use in cost planning of future projects.
6. Contractors are saved the costly exercise of each having to take off quantities for themselves.
@nurkamaliahmustaffa2013
In normal practice, quantities is carried out after design stage and before
construction stage.
Why after design stage ?
Because to carry out taking off, detail drawings from design stage is needed.
Let’s see example :
3m
5m
2m
@nurkamaliahmustaffa2013
Quantities Take off Sheet
2/10 5.00
3.00
2.00
600.00
3m
5m
2m
If 2 rows of column bases
with 10 columns in each
row?
No Dimension Final Quantity Description of item
@nurkamaliahmustaffa2013
Ecm442 lecture 1 latest
1. Briefly explain why taking off quantities is carried out after design stage?
2. What is the purpose of Bill of Quantities?
3. How quantities can be carried out? and define taking off and bill of quantities
4. Explain how to carried out the estimation of the project. for example take concrete
column for example?
Material
Equipment
labor
Tutorial-Answer all question
Q.2 Briefly explain why taking off quantities is carried out after design stage?
@nurkamaliahmustaffa2013
Because to carry out taking off, detail drawings from
design stage is needed. All information on the dimension
of the physical project, specification and standard for
material and equipment are need to consider before
taking off can be carried out.
What is the purpose of ‘Bill of Quantities’?
1. To set down the various items of works in a logical sequence so that it
readily priced by contractor.
2. Enables all the contractors to tender on the same information.
3. Provide a convenient basis for valuation of stage payments during the
contract, before the accurate remeasurement figure are available.
4. Provide an approximate checklist for the contractor to order materials and
plan for other resources.
5. Provide data for cost analyses for use in cost planning of future projects.
6. Contractors are saved the costly exercise of each having to take off
quantities for themselves
RECAP AND TUTORIAL
How quantities can be carried out?
Retrieved all detail information from the design drawings,
specification and other information related to the project. Then,
do the taking off. After done all taking off, transfer all the
quantities to bill of quantities (actract).
1. TAKING OFF
•It is the process of measuring from drawings and
recording all dimensions in recognized form on
a special ruled paper called “Dimension Paper”
2. BILL OF QUANTITIES
•A list of items giving the quantities and brief
description of work to be carried out with is
respective quantity and unit cost for carrying out
each work.
Explain how to carried out the estimation of the project. for example take
concrete column for example?
For example to construct concrete column we need:
Material – Concrete, Formwork, Reinforcement bar
Equipment-Crane, concrete vibrator
Labor – Carpenter, concreter
Quantities are define as the estimate the amount of labor, equipment
and material used to carry out the project under various item of works.
So, to carry out the estimation of the construction (1 item only) concrete
column, all material, equipment and labor are need to count

More Related Content

PDF
50451783 taking-off-quantity
PPTX
Quantity take off
PDF
5.1 quantity take-off
PDF
ITD Presentation
PDF
Quantity Surveyor presentation
DOCX
Taking off qs
PDF
Quantity surveying drawing FNBE 2014
PPTX
Preliminary estimate
50451783 taking-off-quantity
Quantity take off
5.1 quantity take-off
ITD Presentation
Quantity Surveyor presentation
Taking off qs
Quantity surveying drawing FNBE 2014
Preliminary estimate

What's hot (20)

PPTX
Quantity surveying -scope and purpose
PDF
Costing for-civil-engineering-project
PPTX
Introduction to estimation
PDF
An introduction to taking off building quantities
PDF
Qs(ici&itd)
PDF
Civil Quantity Survey and Estimation
PPTX
Quantity surveyor
DOCX
Concrete Footing Worksheet
DOC
type of cost Estimation
PPTX
Qs(ici&itd)
PPTX
PDF
Estimation And Costing Of A Building
PDF
Quantity-Surveyor (ICI+ITD)-pdf.pdf
PDF
Qs(ici&itd) (1)
PPT
Estimation (power point)
PPTX
Estimation and Costing
PDF
B.arch Estimation and Costing
PPTX
Estimating and costing
PPT
Estimation
PPTX
Quantity surveyor
Quantity surveying -scope and purpose
Costing for-civil-engineering-project
Introduction to estimation
An introduction to taking off building quantities
Qs(ici&itd)
Civil Quantity Survey and Estimation
Quantity surveyor
Concrete Footing Worksheet
type of cost Estimation
Qs(ici&itd)
Estimation And Costing Of A Building
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Qs(ici&itd) (1)
Estimation (power point)
Estimation and Costing
B.arch Estimation and Costing
Estimating and costing
Estimation
Quantity surveyor
Ad

Similar to Ecm442 lecture 1 latest (16)

PPT
Lecture 1 Introduction Eng Quantities.ppt
PDF
QuantityTakeoff in engineering surverpdf
DOCX
Bills of quantities
PPTX
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
PDF
chapter-3-quantity-surveying.pdf Addis Ababa university
PDF
Preparation of bill sandeep
PPTX
Cost Estimation for civil engineering .pptx
PDF
Lesson-1.-Introduction.pdfsirndixjkmiibb
PPT
ITD Presentation Slides
PPT
Itd project one (a) 4 m
PPT
ACH 216 Lecture 04a (Estimating)
PPTX
Estimation Costing and Valuation Unit 1
PPT
lecture ppt for contract administration and governing
 
PPTX
ammu new ppt.pptxhhjshusagugsgsgsaugsuaaugug
PPTX
Unit-3_Measurement and payment
PDF
Estimating_costing_and_valuation
Lecture 1 Introduction Eng Quantities.ppt
QuantityTakeoff in engineering surverpdf
Bills of quantities
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
chapter-3-quantity-surveying.pdf Addis Ababa university
Preparation of bill sandeep
Cost Estimation for civil engineering .pptx
Lesson-1.-Introduction.pdfsirndixjkmiibb
ITD Presentation Slides
Itd project one (a) 4 m
ACH 216 Lecture 04a (Estimating)
Estimation Costing and Valuation Unit 1
lecture ppt for contract administration and governing
 
ammu new ppt.pptxhhjshusagugsgsgsaugsuaaugug
Unit-3_Measurement and payment
Estimating_costing_and_valuation
Ad

Recently uploaded (20)

PPTX
Current and future trends in Computer Vision.pptx
PDF
Well-logging-methods_new................
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
Construction Project Organization Group 2.pptx
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
web development for engineering and engineering
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
additive manufacturing of ss316l using mig welding
PDF
PPT on Performance Review to get promotions
DOCX
573137875-Attendance-Management-System-original
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPT
introduction to datamining and warehousing
PPTX
Artificial Intelligence
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Current and future trends in Computer Vision.pptx
Well-logging-methods_new................
Lecture Notes Electrical Wiring System Components
Construction Project Organization Group 2.pptx
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
OOP with Java - Java Introduction (Basics)
web development for engineering and engineering
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Operating System & Kernel Study Guide-1 - converted.pdf
Safety Seminar civil to be ensured for safe working.
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Embodied AI: Ushering in the Next Era of Intelligent Systems
additive manufacturing of ss316l using mig welding
PPT on Performance Review to get promotions
573137875-Attendance-Management-System-original
Foundation to blockchain - A guide to Blockchain Tech
introduction to datamining and warehousing
Artificial Intelligence
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Mitigating Risks through Effective Management for Enhancing Organizational Pe...

Ecm442 lecture 1 latest

  • 1. INTRODUCTION OF CIVIL ENGINEERING QUANTITIES WEEK 1 LEARNING OUTCOMES (CO1-PO3) Understand the definition of civil engineering quantities Understand the construction stages and where is bill of quantity being produced Understand the purpose of bill of quantities @nurkamaliahmustaffa2013
  • 2. What is civil engineering quantities? It can be defined from two words : • civil engineering Civil engineering is a professional engineering discipline which deals with the design, construction and maintenance of the physical and natural built environment, cover a large of different jobs such as bridge,highway, canals, dams and building. In general, civil engineering is concerned with the overall interface of human created fixed projects with the greater world. General civil engineers work closely with surveyors and specialized civil engineers to design grading, drainage, pavement, water supply, sewer service, dams, electric and communications supply. General civil engineering is also referred to as site engineering, a branch of civil engineering that primarily focuses on converting a tract of land from one usage to another. Site engineers spend time visiting project sites, meeting with stakeholders, and preparing construction plans. Civil engineers apply the principles of geotechnical engineering, structural engineering, environmental engineering, transportation engineering and construction engineering to residential, commercial, industrial and public works projects of all sizes and levels of construction. • quantities The amount of labor, equipment and materials to carry out the project under various item of works. @nurkamaliahmustaffa2013
  • 3. PICTORIALS OF PAVILLION MALL, KUALA LUMPUR @nurkamaliahmustaffa2013
  • 4. PAVILLION MALL CONSTRUCTION STAGE @nurkamaliahmustaffa2013
  • 5. ce @nurkamaliahmustaffa2013 You must understand the Sequence of Construction
  • 6. HOW TO CALCULATE THE QUANTITIES? m3 ? kg ? @nurkamaliahmustaffa2013
  • 7. HOW TO CALCULATE THE QUANTITIES? m3 ? @nurkamaliahmustaffa2013
  • 8. Who responsible for civil engineering quantities? If the job done by quantity surveyor , why civil engineer needs to study the civil engineering quantities? Let’s discuss….. Quantity Surveyor – the application of expert knowledge in measure the quantity and estimation of the cost and prices of labour, materials and plant required. Why? achieve project’s objective within the scope of quality, time and cost. @nurkamaliahmustaffa2013
  • 10. Objectives of Construction Project @nurkamaliahmustaffa2013
  • 11. • Discuss on the concept & the requirement of the project (Client-Architect-Local authority) • E.g. Environmental impact assessment , traffic impact assessment (Consultant Engineer) • Produce Architecture drawing Conceptual & feasibility study • Architect design the concept of the project on the client’s requirement • Consultant Engineer will design and provide detail drawing based on the client concept & feasibility • Produce Engineering drawing and specification Engineering & design • Taking off based on Eng. Drawing, Arc Drawing and Specification • Preparation of tender document-(Taking off and BQ) • Call for tender & selecting the contractor • Awarding the contract to winning contractor Procurement • Winning Contractor will construct the project as per contract • Architect and Consultant engineer will monitor progress of work and the quality of the project Construction • Upon the completion of the project, contractor will handing over the project to the client • Client will continue to operate & maintain a building Operate & maintain Construction Stages -example-Building
  • 12. Why quantities is carried out after design stage? Because to carry out taking off, detail drawings from design stage is needed. Let’s see example… @nurkamaliahmustaffa2013
  • 13. From the above sketch, calculate : Excavation in cubic meter Concrete volume in cubic meter Reinforcement in Kg. Formwork Insert all the above answer in “bill of quantities” Notes: R10 – 0.616 kg/m Y10 – 0.616 kg/m Y12 – 0.888 kg/m Assuming : cover = 25 mm for column = 50 mm for footing Leave blank @nurkamaliahmustaffa2013
  • 14. How quantities can be carried out? TAKING OFF •It is the process of measuring from drawings and recording all dimensions in recognized form on a special ruled paper called “Dimension Paper” BILL OF QUANTITIES •A list of items giving the quantities and brief description of work to be carried out with is respective quantity and unit cost for carrying out each work. @nurkamaliahmustaffa2013
  • 15. What is taking off sheet? A process of measuring from drawings, recording all dimensions in recognized form called taking of sheet or “dimension paper” Taking off sheet No Dimens ion Final Quantity Description of item Unit @nurkamaliahmustaffa2013
  • 16. What is “bill of quantities” ? A list of items giving the quantities and brief description of work to be carried out with its respective quantity and unit cost for carrying out each work. Bill of Quantities Leave blank Item Description Quantity Unit Rate Amount (RM) @nurkamaliahmustaffa2013
  • 17. The purpose of Bill of Quantities (BQ): 1. To set down the various items of works in a logical sequence so that it readily priced by contractor. 2. Enables all the contractors to tender on the same information. 3. Provide a convenient basis for valuation of stage payments during the contract, before the accurate remeasurement figure are available. 4. Provide an approximate checklist for the contractor to order materials and plan for other resources. 5. Provide data for cost analyses for use in cost planning of future projects. 6. Contractors are saved the costly exercise of each having to take off quantities for themselves. @nurkamaliahmustaffa2013
  • 18. In normal practice, quantities is carried out after design stage and before construction stage. Why after design stage ? Because to carry out taking off, detail drawings from design stage is needed. Let’s see example : 3m 5m 2m @nurkamaliahmustaffa2013
  • 19. Quantities Take off Sheet 2/10 5.00 3.00 2.00 600.00 3m 5m 2m If 2 rows of column bases with 10 columns in each row? No Dimension Final Quantity Description of item @nurkamaliahmustaffa2013
  • 21. 1. Briefly explain why taking off quantities is carried out after design stage? 2. What is the purpose of Bill of Quantities? 3. How quantities can be carried out? and define taking off and bill of quantities 4. Explain how to carried out the estimation of the project. for example take concrete column for example? Material Equipment labor Tutorial-Answer all question
  • 22. Q.2 Briefly explain why taking off quantities is carried out after design stage? @nurkamaliahmustaffa2013 Because to carry out taking off, detail drawings from design stage is needed. All information on the dimension of the physical project, specification and standard for material and equipment are need to consider before taking off can be carried out.
  • 23. What is the purpose of ‘Bill of Quantities’? 1. To set down the various items of works in a logical sequence so that it readily priced by contractor. 2. Enables all the contractors to tender on the same information. 3. Provide a convenient basis for valuation of stage payments during the contract, before the accurate remeasurement figure are available. 4. Provide an approximate checklist for the contractor to order materials and plan for other resources. 5. Provide data for cost analyses for use in cost planning of future projects. 6. Contractors are saved the costly exercise of each having to take off quantities for themselves
  • 24. RECAP AND TUTORIAL How quantities can be carried out? Retrieved all detail information from the design drawings, specification and other information related to the project. Then, do the taking off. After done all taking off, transfer all the quantities to bill of quantities (actract). 1. TAKING OFF •It is the process of measuring from drawings and recording all dimensions in recognized form on a special ruled paper called “Dimension Paper” 2. BILL OF QUANTITIES •A list of items giving the quantities and brief description of work to be carried out with is respective quantity and unit cost for carrying out each work.
  • 25. Explain how to carried out the estimation of the project. for example take concrete column for example? For example to construct concrete column we need: Material – Concrete, Formwork, Reinforcement bar Equipment-Crane, concrete vibrator Labor – Carpenter, concreter Quantities are define as the estimate the amount of labor, equipment and material used to carry out the project under various item of works. So, to carry out the estimation of the construction (1 item only) concrete column, all material, equipment and labor are need to count

Editor's Notes

  • #3: ROLLOVER CIVIL ENGINEERING-Civil engineering is a professional engineering discipline which deals with the design, construction and maintenance of the physical and natural built environment, cover a large of different jobs such as bridges ,highway, canals, dams and building. POP UP- page 6 POP UP-PAGE 7 2)ROLLOVER QUANTITIES -Quantities is the estimated amount of labor, equipment and materials to carry out the project under various item of works. POPUP-page 8 POP UP-page 9& 10
  • #6: 1st- cycle of material, shows one by one - animation 2nd –construction picture
  • #9: 1)Shows the question…Who responsible for civil engineering quantities? 2)Pop up quantity surveyor-page 12 3)Roll over.. The application of expert knowledge…… 4) Shows Why? 5)Popup objectives-page 13
  • #13: 1) Pop up example –page 16
  • #16: 1)Shows what is…. 2)Roll over taking off sheet
  • #17: 1)Shows what is…. 2)Roll over Bill of Quantities
  • #18: Bill of Quantities: file GI compatibility mode. Microsoft excel