Decision Matrix – Floating Dwelling
                                               Criteria
                  Complexity Development Materials Longevity Buoyant         Cost
                             Time                            Effectiveness
          Ideas                                                                     Totals
Air Mattress      3           5            4              2    5             5      24




2-Liter Bottles   2           4           4               5   5              5      25




Plastic Bags      1           3            3              3    4             5      19
1. Air mattress




2. 2-litter
bottles




                                3. Plastic
                                Bags
Scale: The greater, the better
Complexity: 1 most complex, 5 least complex
        A more complex design will be inefficient to build, whereas a less complicated design is
able to be build in must less time.
Development Time: 1 most amount of time, 5 least time
        A design that needs more time to organize the details will not be worth the time put into it
while a simple design will be easy to follow.
Materials: 1 most amount of materials, 5 least amount of materials
        Being conservative, even in a recyclable project is very important. The less waste the
better. As the number of materials and the quantity of materials becomes less, the efficiency of
the design is increased, making the eco-project even more environmentally friendly.
Longevity: 1 lasts for a short period of time, 5 lasts for a long period of time
        Even the lifespan is important for a product. If the product will not last for more than a
few months than it isn’t worth the small cost put into it on top of the materials cost. The product
lifespan is to be maximized.
Buoyant Effectiveness: 1 not very effective, 5 very effective
        The goal of the eco-project: Floating Dwelling is to float a small residence, if the design
is unable to float very much weight, then the design is not a good one.
Cost: 1 not very cost effective, 5 very cost effective
        A net cost of the project, including outside materials, which is not ideal, shows how truly
eco-friendly the project is.

                 1             2                   3                4                5
Complexity       Most complex More                 Complex          Less complex     Least
                               complex                                               complex
Development      Most time     More time           Medium time      Less time        Least time
time             A week         5 days             3 days           A day            2 hours
Materials        Most amount Medium                Decent           Less amount      Least amount
                 of materials  amount of           amount of        of materials     of materials
                 100 pieces    materials           materials        25 pieces        17 pieces
                               50 pieces           30 pieces
Longevity        Lasts for the Lasts for less      Lasts for a      Lasts for        Last for the
                 less amount   amount of           medium           more amount      most amount
                 of time- a    time – a year       amount of        of time- 10      of time- 20
                 month                             time- 5 years    years            years
Buoyant          Least         Semi                Effective        More             Very effective
Effectiveness    effective     effective           100 Ibs.         effective        250 Ibs.
                 50 Ibs.       100 Ibs.                             150 Ibs.
Cost             $300- $250    $200                $150             $120             $75 and under


By: John Tobias, Brian Jestice, Anthony Cairns, Diane Kohlin

More Related Content

PDF
Eco project design brief
PDF
PDF
Rocking chair assembly fea brian j, eric t
PDF
Page 290 drawing template
PDF
Eco defined problem
DOCX
Logan norm.agreement
PDF
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
PDF
Gantt chart
Eco project design brief
Rocking chair assembly fea brian j, eric t
Page 290 drawing template
Eco defined problem
Logan norm.agreement
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
Gantt chart

Similar to Eco project decision matrix (6)

ODT
Decision matrix kohlin
DOCX
Decision matrix kohlin
DOCX
Decision matrix kohlin
DOCX
Decision matrix kohlin
PDF
Decision matrix thompson
PDF
Decision matrix rocking chair
Decision matrix kohlin
Decision matrix kohlin
Decision matrix kohlin
Decision matrix kohlin
Decision matrix thompson
Decision matrix rocking chair
Ad

More from jestice7882 (20)

PDF
Activity3 2 1_product_observation
PDF
Cordflexer drawings sean h r brian j
PPTX
Cord flexor presentation
PDF
Design brief
PDF
Disassembly chart
PDF
Rocking chair assembly fea brian j, eric t
PDF
Rocking chair
PDF
PDF
Eco project drawings jestice, tobias, cairns, kohlin
PDF
Eco project drawings jestice, tobias, cairns, kohlin
PDF
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
PDF
Eco defined problem
PDF
Train research
PDF
Eco defined problem
DOCX
Eco defined problem
PDF
Eco project drawings jestice, tobias, cairns, kohlin
DOCX
PDF
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
PPTX
Floatable foundation
DOCX
Design brief
Activity3 2 1_product_observation
Cordflexer drawings sean h r brian j
Cord flexor presentation
Design brief
Disassembly chart
Rocking chair assembly fea brian j, eric t
Rocking chair
Eco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlin
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco defined problem
Train research
Eco defined problem
Eco defined problem
Eco project drawings jestice, tobias, cairns, kohlin
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
Floatable foundation
Design brief
Ad

Recently uploaded (20)

PDF
Approach and Philosophy of On baking technology
PDF
August Patch Tuesday
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PPTX
cloud_computing_Infrastucture_as_cloud_p
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Encapsulation theory and applications.pdf
PPTX
Tartificialntelligence_presentation.pptx
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Empathic Computing: Creating Shared Understanding
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PPT
Teaching material agriculture food technology
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
SOPHOS-XG Firewall Administrator PPT.pptx
Approach and Philosophy of On baking technology
August Patch Tuesday
Programs and apps: productivity, graphics, security and other tools
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Building Integrated photovoltaic BIPV_UPV.pdf
cloud_computing_Infrastucture_as_cloud_p
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Encapsulation theory and applications.pdf
Tartificialntelligence_presentation.pptx
Per capita expenditure prediction using model stacking based on satellite ima...
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
gpt5_lecture_notes_comprehensive_20250812015547.pdf
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Empathic Computing: Creating Shared Understanding
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
MIND Revenue Release Quarter 2 2025 Press Release
Teaching material agriculture food technology
Mobile App Security Testing_ A Comprehensive Guide.pdf
SOPHOS-XG Firewall Administrator PPT.pptx

Eco project decision matrix

  • 1. Decision Matrix – Floating Dwelling Criteria Complexity Development Materials Longevity Buoyant Cost Time Effectiveness Ideas Totals Air Mattress 3 5 4 2 5 5 24 2-Liter Bottles 2 4 4 5 5 5 25 Plastic Bags 1 3 3 3 4 5 19
  • 2. 1. Air mattress 2. 2-litter bottles 3. Plastic Bags
  • 3. Scale: The greater, the better Complexity: 1 most complex, 5 least complex A more complex design will be inefficient to build, whereas a less complicated design is able to be build in must less time. Development Time: 1 most amount of time, 5 least time A design that needs more time to organize the details will not be worth the time put into it while a simple design will be easy to follow. Materials: 1 most amount of materials, 5 least amount of materials Being conservative, even in a recyclable project is very important. The less waste the better. As the number of materials and the quantity of materials becomes less, the efficiency of the design is increased, making the eco-project even more environmentally friendly. Longevity: 1 lasts for a short period of time, 5 lasts for a long period of time Even the lifespan is important for a product. If the product will not last for more than a few months than it isn’t worth the small cost put into it on top of the materials cost. The product lifespan is to be maximized. Buoyant Effectiveness: 1 not very effective, 5 very effective The goal of the eco-project: Floating Dwelling is to float a small residence, if the design is unable to float very much weight, then the design is not a good one. Cost: 1 not very cost effective, 5 very cost effective A net cost of the project, including outside materials, which is not ideal, shows how truly eco-friendly the project is. 1 2 3 4 5 Complexity Most complex More Complex Less complex Least complex complex Development Most time More time Medium time Less time Least time time A week 5 days 3 days A day 2 hours Materials Most amount Medium Decent Less amount Least amount of materials amount of amount of of materials of materials 100 pieces materials materials 25 pieces 17 pieces 50 pieces 30 pieces Longevity Lasts for the Lasts for less Lasts for a Lasts for Last for the less amount amount of medium more amount most amount of time- a time – a year amount of of time- 10 of time- 20 month time- 5 years years years Buoyant Least Semi Effective More Very effective Effectiveness effective effective 100 Ibs. effective 250 Ibs. 50 Ibs. 100 Ibs. 150 Ibs. Cost $300- $250 $200 $150 $120 $75 and under By: John Tobias, Brian Jestice, Anthony Cairns, Diane Kohlin