VIDYA PRATISHTHAN’S
KAMALNAYAN BAJAJ INSTITUTE OF ENGINEERING AND
TECHNOLOGY, BARAMATI
DEPARTMENT OF ELECTRICAL ENGINEERING
A
PRESENTATION ON
Internship Review
Presented by – YADAV AKHILESH
Roll No. - 243663.
GUIDE BY Mr.
A. B. AKHADE
1
 INDEX
• Introduction
• Methodology
• Conclusion
• Attendance Record
• Internship acceptance & Reference
Letter
2
 Introduction
3
The creation of Maharashtra State Electricity Distribution
Company Limited (MSEDCL) on June 06, 2005 is the result of
power sector reforms and restructuring in Maharashtra (India)
which is the focal point of the Power Sector, responsible for
planning and managing the sector through its transmission,
distribution and supply of electricity.
MSEDCL will be professionally managed utility supplying
reliable and cost-efficient electricity to every citizen of the state
through highly motivated employees and state of art technologies,
providing an economic return to our owners and maintaining
leadership in the country.
ELECTRICAL ENGINEERING ELECTRICAL ENGINEERING
Autocad Drawing
 Methodology
1. Planning & Design Load demand assessment and feasibility
study.
2. Electrical Equipment Installation Erection of 33 kV
incoming and 11 kV outgoing switchgear.
3. Protection & Control System Installation of CTs (Current
Transformers) and PTs (Potential Transformers).
4. Earthing & Lightning Protection Laying of earthing grid and
installation of earthing.
5. Cabling & Testing Laying and termination of power and
control.
4
33/11kV SUBSTATION
33 kV line is incoming line on the 33/11 kV sub station it is
further step down at 11 kV with the help of step-down
transformer at the sub-station. And transmit it with the 11 kV
feeder to the village or consumer.
POWER TRANSFORMER
Generator transformers are at
the top of the
5MVA transformer parts list,
followed by distribution
transformers. A generator 5
MVA 33/11kv transformer is
directly linked to the engine of
the power plant. Generally, a
5MVA transformer current
score has a power level that
exceeds 1000 MVA.
VACCUM CIRCUIT BREAKER
A vacuum circuit breaker is a
type of breaker that employs
a vacuum as the medium for
extinguishing arcs. The
permanently sealed vacuum
interrupter of this circuit
breaker houses both the
fixed and movable contacts.
The separation of contacts
within a high vacuum
ensures the extinction of the
arc.
ISOLATOR
In electrical power systems,
an isolator is a type
of switchgear device which is
mainly used for ensuring that
the circuit is completely
disconnected from the source
of power supply. Since its
main function is to provide
isolation in the circuit, hence it
is termed as an isolator.
CURREN TRANSFORMER
A current transformer is an instrument
transformer that generates an
alternating current in the secondary
winding of the transformer. Because it is
connected in series with the circuit for
measuring various aspects of electric power,
this is also known as a series transformer.
Here, the secondary winding's current is
inversely correlated with the primary
winding's current. High voltage currents are
converted to low voltage currents using
these.
.A current transformer is a device that measures electric
current in a power system by transforming high current into a
smaller, more manageable value that can be safely measured.
POTENTIAL TRANSFORMER
Potential transformers (PT) or
voltage transformers
are instrument transformers
used for voltage measurements.
They are connected in parallel to
the line and operates under the
same principle of power
transformers. They cannot be
used used to supply raw power
to the loads.
LIGHTENING ARRESTER
The lightning arrestor, known as
a lightning isolator, comes with an
air gap between the electrical wire
and ground used on electrical
power transmission and
telecommunication systems for
protection insulation and
conductors of a system through
the effect of lightning.
CAPACITOR BANK
A capacitor bank is a group of several
capacitors of the same rating that are
connected in series or parallel to store
electrical energy in an electric
power system. Capacitors are devices
that can store electric charge by creating
an electric field between two metal
plates separated by an insulating
material. Capacitor banks are used for
various purposes, such as power factor
correction, voltage regulation, harmonic
filtering, and transient suppression.
EARTHING SYSTEM
Earthing is the instantaneous
discharge of electrical energy by
passing charges directly to the
earth using a low-resistance
cable. Different types of the
earth are used to link the
metallic parts of electrical
appliances or installations to the
earth to prevent or lessen the
risk of electrocution.
BUSBARS
A busbar is a metallic bar
in a switchgear
panel used to carry
electric power from
incoming feeders and
distributes to the
outgoing feeders. In
simple terms, busbar is a
electrical junction where
incoming and outgoing
currents exchange.
CONTROL AND RELAY PANEL
The Control and Relay panel is designed
for indoor application with controlling
and protecting the transformer and
outdoor VCB. The panel comes with
fault indication and alarm. Johns Electric
Company is the best 11 KV and 33 KV
Control and Relay panel manufacturers
and suppliers in India.
BATTERY BANK AND CHARGER
The battery bank provides the
DC supply to load only in case
the Battery charger breaks
down or the AC supply to
the battery charger breaks
down. So in normal conditions,
it is the charger that supplies
DC power to protection,
communication,
control, and measurement
devices running in the
Electrical substation
METERS AND MEASURING INSTRUMENTS
An energy meter is a device
used for measuring the
amount of electrical energy
consumed by a load over a
certain period of time. This
device is essential for
recording
the electricity usages so that
consumers can monitor and
change the energy
consumption patterns to
reduce energy consumption
and hence the bill amount.
• I am able to check the mechanical inspection.
• I am able to draw a single line diagram for any substation.
• I am able to identify the any types of conductors (for ex. Disc, suspension, or pin
etc.)
• I am able to identify the parts of transformer for any types of transformers (for ex.
Power or distribution transformers).
• I am able to take a reading for any kwh meter or any Incomer.
• I am able to identify the CT and PT.
• I am able to ON or OFF any feeder and their process:
i) We had closed the VCB (breaker).
ii) We had to close the outdoing Isolator.
ii) We had closed the Incoming Isolator.
iii) We had to take the proper earthing to incoming Isolator.
• I am able to use megger for checking CT PT and VCB for they are in good
condition or bad condition.
• I am able to reset Relay (numerical and master relay) and I able to identify
problems on
line for ex. single line to ground fault (SLGF), double line to ground fault (DLGF),
line to line fault (LLF) and three-phase to ground fault (LLLGF).
Particulars of Practical Experiences in
Industry
 Conclusion
22
4-week industrial training at Maharashtra State Electricity
Distribution Company Limited (MSEDCL) is the best thing I have
done in this industrial training. I have learnt lots of things from this
training. This training helped me to develop practical skills.
I could understand more about the definition of engineer which
helped me to prepare myself to become a good engineer in future. I
got practical application of theory in the company.
The training helped me to clear concepts. I got motivated to
pursuit for knowledge of electrical engineering due to this training.
Overall, my internship at Maharashtra State Electricity
Distribution Company Limited (MSEDCL) has been successful.
 Attendence Record
 Internship Acceptance, Reference
Completion
letter

More Related Content

PPTX
Industrial training is an important in industry
PPTX
PPT ON 220KV GSS
PPTX
Details of different types of substation.pptx
PPTX
Ashwani kumar
PPTX
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
PPTX
sub subsation seminar ppt.pptx
PPTX
1909998877889943 566798 Mayur Mishra.pptx
Industrial training is an important in industry
PPT ON 220KV GSS
Details of different types of substation.pptx
Ashwani kumar
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
sub subsation seminar ppt.pptx
1909998877889943 566798 Mayur Mishra.pptx

Similar to ELECTRICAL ENGINEERING ELECTRICAL ENGINEERING (20)

PPTX
Manish Kumar Gangey- 19ESKEE095.pptx
PPTX
CSPDCL voccational training report PPT.pptx
PDF
Switchyard design overview
PPTX
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
PPTX
Sree_mullapudi_venkataraya_memorial_polytechnic_-_tanuku[1] (2).pptx
DOCX
A vocational summer training at Jindal Steel and Power Limited
PPTX
West bengal state electricity distribution limited vocational traning
PPTX
Tanuj sharma on industrial training 2.pptx
PPTX
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
PPTX
ELECTRIC SUB-STATION IN BRIEF
PPT
Substation Training presentation
PPTX
switchyard-151103200304-lva1-app6891-1.pptx
PPTX
Presentation (1 for electrical engineering).pptx
PPTX
ANJALI KUMARI.pptxjsjjdjsjajeidikakakxjjcjdj
PPTX
RPPT.pptx
PPTX
220 kv gss sitapua ppt sk95
PPTX
REPORT ON SUMMER TRAINING UPPTCL (MOHAMMAD FAIZ)2024.pptx
PPTX
Presentation on 132/33 KVSubstation Training
PPTX
INDUSTRIAL TRAINING PPT on 220/132 Kv substation at hamirpur.pptx
PPTX
Industrial Training in 2×3.14MVA 33/11 KV substation.
Manish Kumar Gangey- 19ESKEE095.pptx
CSPDCL voccational training report PPT.pptx
Switchyard design overview
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
Sree_mullapudi_venkataraya_memorial_polytechnic_-_tanuku[1] (2).pptx
A vocational summer training at Jindal Steel and Power Limited
West bengal state electricity distribution limited vocational traning
Tanuj sharma on industrial training 2.pptx
INTERNSHhjjhuhjjkhhjhjjhhjhhIP ppt-1.pptx
ELECTRIC SUB-STATION IN BRIEF
Substation Training presentation
switchyard-151103200304-lva1-app6891-1.pptx
Presentation (1 for electrical engineering).pptx
ANJALI KUMARI.pptxjsjjdjsjajeidikakakxjjcjdj
RPPT.pptx
220 kv gss sitapua ppt sk95
REPORT ON SUMMER TRAINING UPPTCL (MOHAMMAD FAIZ)2024.pptx
Presentation on 132/33 KVSubstation Training
INDUSTRIAL TRAINING PPT on 220/132 Kv substation at hamirpur.pptx
Industrial Training in 2×3.14MVA 33/11 KV substation.
Ad

More from lovemovies4747 (13)

PPTX
AKHIL[1][1].pdf[1].pptx electrical engineering
PPTX
SANKET SHIPALKAR (PRESENTATION).pptx electrical engineering
DOCX
Report FINAL 01.docx engineering lectricl
PPTX
Review 4.pptx electrical engineering ppt
PDF
Unit 02 Capacitance of Transmission Line.pdf
PDF
Unit 01 (A) Resistance of Transmission Line_updated.pdf
PPTX
GSM Based Agricultural Motor Control used in electrical
PPTX
smart meter used in electrical engineering
PDF
OPGW Optical Ground Wire used in electrical engineering
PPTX
material science ppt for electrical engineering
PPTX
material science project ppt on magnatization
PPTX
material science ppt presentation ppt.pptx
PPTX
automatic room light control using application
AKHIL[1][1].pdf[1].pptx electrical engineering
SANKET SHIPALKAR (PRESENTATION).pptx electrical engineering
Report FINAL 01.docx engineering lectricl
Review 4.pptx electrical engineering ppt
Unit 02 Capacitance of Transmission Line.pdf
Unit 01 (A) Resistance of Transmission Line_updated.pdf
GSM Based Agricultural Motor Control used in electrical
smart meter used in electrical engineering
OPGW Optical Ground Wire used in electrical engineering
material science ppt for electrical engineering
material science project ppt on magnatization
material science ppt presentation ppt.pptx
automatic room light control using application
Ad

Recently uploaded (20)

PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPTX
Current and future trends in Computer Vision.pptx
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
Design Guidelines and solutions for Plastics parts
PPTX
Safety Seminar civil to be ensured for safe working.
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
introduction to high performance computing
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPT
Total quality management ppt for engineering students
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Fundamentals of safety and accident prevention -final (1).pptx
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Current and future trends in Computer Vision.pptx
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Design Guidelines and solutions for Plastics parts
Safety Seminar civil to be ensured for safe working.
Information Storage and Retrieval Techniques Unit III
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
introduction to high performance computing
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Total quality management ppt for engineering students
Exploratory_Data_Analysis_Fundamentals.pdf
R24 SURVEYING LAB MANUAL for civil enggi
Automation-in-Manufacturing-Chapter-Introduction.pdf
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...

ELECTRICAL ENGINEERING ELECTRICAL ENGINEERING

  • 1. VIDYA PRATISHTHAN’S KAMALNAYAN BAJAJ INSTITUTE OF ENGINEERING AND TECHNOLOGY, BARAMATI DEPARTMENT OF ELECTRICAL ENGINEERING A PRESENTATION ON Internship Review Presented by – YADAV AKHILESH Roll No. - 243663. GUIDE BY Mr. A. B. AKHADE 1
  • 2.  INDEX • Introduction • Methodology • Conclusion • Attendance Record • Internship acceptance & Reference Letter 2
  • 3.  Introduction 3 The creation of Maharashtra State Electricity Distribution Company Limited (MSEDCL) on June 06, 2005 is the result of power sector reforms and restructuring in Maharashtra (India) which is the focal point of the Power Sector, responsible for planning and managing the sector through its transmission, distribution and supply of electricity. MSEDCL will be professionally managed utility supplying reliable and cost-efficient electricity to every citizen of the state through highly motivated employees and state of art technologies, providing an economic return to our owners and maintaining leadership in the country.
  • 6.  Methodology 1. Planning & Design Load demand assessment and feasibility study. 2. Electrical Equipment Installation Erection of 33 kV incoming and 11 kV outgoing switchgear. 3. Protection & Control System Installation of CTs (Current Transformers) and PTs (Potential Transformers). 4. Earthing & Lightning Protection Laying of earthing grid and installation of earthing. 5. Cabling & Testing Laying and termination of power and control. 4
  • 7. 33/11kV SUBSTATION 33 kV line is incoming line on the 33/11 kV sub station it is further step down at 11 kV with the help of step-down transformer at the sub-station. And transmit it with the 11 kV feeder to the village or consumer.
  • 8. POWER TRANSFORMER Generator transformers are at the top of the 5MVA transformer parts list, followed by distribution transformers. A generator 5 MVA 33/11kv transformer is directly linked to the engine of the power plant. Generally, a 5MVA transformer current score has a power level that exceeds 1000 MVA.
  • 9. VACCUM CIRCUIT BREAKER A vacuum circuit breaker is a type of breaker that employs a vacuum as the medium for extinguishing arcs. The permanently sealed vacuum interrupter of this circuit breaker houses both the fixed and movable contacts. The separation of contacts within a high vacuum ensures the extinction of the arc.
  • 10. ISOLATOR In electrical power systems, an isolator is a type of switchgear device which is mainly used for ensuring that the circuit is completely disconnected from the source of power supply. Since its main function is to provide isolation in the circuit, hence it is termed as an isolator.
  • 11. CURREN TRANSFORMER A current transformer is an instrument transformer that generates an alternating current in the secondary winding of the transformer. Because it is connected in series with the circuit for measuring various aspects of electric power, this is also known as a series transformer. Here, the secondary winding's current is inversely correlated with the primary winding's current. High voltage currents are converted to low voltage currents using these.
  • 12. .A current transformer is a device that measures electric current in a power system by transforming high current into a smaller, more manageable value that can be safely measured.
  • 13. POTENTIAL TRANSFORMER Potential transformers (PT) or voltage transformers are instrument transformers used for voltage measurements. They are connected in parallel to the line and operates under the same principle of power transformers. They cannot be used used to supply raw power to the loads.
  • 14. LIGHTENING ARRESTER The lightning arrestor, known as a lightning isolator, comes with an air gap between the electrical wire and ground used on electrical power transmission and telecommunication systems for protection insulation and conductors of a system through the effect of lightning.
  • 15. CAPACITOR BANK A capacitor bank is a group of several capacitors of the same rating that are connected in series or parallel to store electrical energy in an electric power system. Capacitors are devices that can store electric charge by creating an electric field between two metal plates separated by an insulating material. Capacitor banks are used for various purposes, such as power factor correction, voltage regulation, harmonic filtering, and transient suppression.
  • 16. EARTHING SYSTEM Earthing is the instantaneous discharge of electrical energy by passing charges directly to the earth using a low-resistance cable. Different types of the earth are used to link the metallic parts of electrical appliances or installations to the earth to prevent or lessen the risk of electrocution.
  • 17. BUSBARS A busbar is a metallic bar in a switchgear panel used to carry electric power from incoming feeders and distributes to the outgoing feeders. In simple terms, busbar is a electrical junction where incoming and outgoing currents exchange.
  • 18. CONTROL AND RELAY PANEL The Control and Relay panel is designed for indoor application with controlling and protecting the transformer and outdoor VCB. The panel comes with fault indication and alarm. Johns Electric Company is the best 11 KV and 33 KV Control and Relay panel manufacturers and suppliers in India.
  • 19. BATTERY BANK AND CHARGER The battery bank provides the DC supply to load only in case the Battery charger breaks down or the AC supply to the battery charger breaks down. So in normal conditions, it is the charger that supplies DC power to protection, communication, control, and measurement devices running in the Electrical substation
  • 20. METERS AND MEASURING INSTRUMENTS An energy meter is a device used for measuring the amount of electrical energy consumed by a load over a certain period of time. This device is essential for recording the electricity usages so that consumers can monitor and change the energy consumption patterns to reduce energy consumption and hence the bill amount.
  • 21. • I am able to check the mechanical inspection. • I am able to draw a single line diagram for any substation. • I am able to identify the any types of conductors (for ex. Disc, suspension, or pin etc.) • I am able to identify the parts of transformer for any types of transformers (for ex. Power or distribution transformers). • I am able to take a reading for any kwh meter or any Incomer. • I am able to identify the CT and PT. • I am able to ON or OFF any feeder and their process: i) We had closed the VCB (breaker). ii) We had to close the outdoing Isolator. ii) We had closed the Incoming Isolator. iii) We had to take the proper earthing to incoming Isolator. • I am able to use megger for checking CT PT and VCB for they are in good condition or bad condition. • I am able to reset Relay (numerical and master relay) and I able to identify problems on line for ex. single line to ground fault (SLGF), double line to ground fault (DLGF), line to line fault (LLF) and three-phase to ground fault (LLLGF). Particulars of Practical Experiences in Industry
  • 22.  Conclusion 22 4-week industrial training at Maharashtra State Electricity Distribution Company Limited (MSEDCL) is the best thing I have done in this industrial training. I have learnt lots of things from this training. This training helped me to develop practical skills. I could understand more about the definition of engineer which helped me to prepare myself to become a good engineer in future. I got practical application of theory in the company. The training helped me to clear concepts. I got motivated to pursuit for knowledge of electrical engineering due to this training. Overall, my internship at Maharashtra State Electricity Distribution Company Limited (MSEDCL) has been successful.