M. Mohamed Salman Faris
E-Mail : salman_fariseee@yahoo.com
: salman.faris33@gmail.com
Mobile no : 00966 580862754
Electrical QA/QC Engineer
Objective:
• Seven years of solid industry experience in High rise building
Construction, power plant, Oil and chemical projects.
• Experienced to meet critical conditions and to tackle them. Ability to
lead and command a team.
• Demonstrated excellent interpersonal qualities to manage and interact
with others. Sharp and strong analytical abilities and attention to
detail.
Academic Qualification:
• Bachelor of Engineering (Electrical And Electronics)
Annamalai University,
Chidambaram, Tamilnadu, India. (71.20%)
Computer Knowledge:
• Operating System : Windows 98/2000 /XP,
• Software : Auto cad basic, Ms Office.
• Languages : C, C++.
Work Experiences:
Company : NESMA AND PARTNERS.
Position : Electrical QC Inspector.
Duration : November 2015 to Until Now
Project : KBR in Thuwal.
Duties & Responsibilities:
• Checking and inspection of all materials as per the standard specification
(such as NFPA 72 & 70, SAIC, SATIP, Schedule Q, SAES)
• Preparing Inspection request (RFI) and update status and rectify the SAPID
Comment.
• Prepare Checklist (SAIC) & Explanation properly to the SAPID during our
inspection.
• Checking routing and Installation of Electrical work (Conduits, Wiring
Devices, Lighting Fixture, Grounding, Lightning System & cable tray) as per
Drawing.
• Follow up the Construction Work with site engineer & Construction Manager
(Two week ahead Schedule).
• Studies drawings and specification and checking Standards.
• Preparing the punch list and non-conformance and corrective report (NCR).
• Inspection of All kind of Conduit, Cables, Cable tray & Panels.
• Checking site irregular activities during installation and site surveillance time
and make report to construction department.
• Make the material inspection (MIR) and arrange the inspection with SAPID.
• Witness for Cable & wire testing with PID and Proponent
• Monitor Quality control on construction progress activities.
• Responsible for test packages documentation from pre-commissioning to final
hand over to client.
Company : NESMA AND PARTNERS.
Position : Electrical QA/QC Engineer.
Duration : Sep 2014 to October 2015 ( Previously June 2011 to June 2012)
Project : JODP in Makkah Phase 1 (High Rise building Construction)
Duties & Responsibilities:
• Checking and inspection of all materials as per the standard and JODP
specification (such as NEC, NFPA & NEMA)
• Preparing Inspection request (IR) and update status from consultant and
rectify the consultant Comment. Explanation properly to the consultant during
our inspection.
• Checking routing and Installation for lighting and Power System.
• Follow up the Construction Work in the site engineer.
• Inspection of cable tray, cable trunk, cable ladder, Busway, cables, panel
board & all type of Lighting Fixture (Chandelier), Power Socket. Studies
drawings and specification and checking Standards.
• Preparing the punch list and non-conformance and corrective report (NCR)
and Inspection testing plan (ITP).Checking site store report voucher (SSRV)
and make the material inspection (MIR) and arrange the inspection with
consultant.
• Inspection of lighting system, power system, central battery system and cable
routing system for Electrical works.
• Inspection of all Fire alarm System, Evacuation & Public address speaker for
low current as per standard specification.
• Excellent hands hold skills of Process automation system and BMS system,
Communication System (PABX, CCTV, SACS, PA, Intercom and
Telephone).
• Checking site irregular activities during installation and Make site
surveillance and make report to construction department.
• Inspect the installation and Commissioning for all electrical equipment such
as motor, panel board, Transformer, Switch gear, MDB and electrical device.
• Inspection of Panel Board (DP, EDP), Motor control center (MCP &EMCP),
Transformer, Switch gear, MDB and generator.
• Witness and verify Continuity, Insulation resistance test for LV, MV Cables.
• Monitor Quality control on construction progress activities.
Company : NESMA & PARTNERS, JUBAIL
Position : Electrical QA/QC Engineer
Duration : Dec 2013 to Aug 2014
Project & Client: SADARA (Chemical & Gas Plant Power Distribution Bldg.) /
Fluor
Duties & Responsibilities:
• Checking and inspection of all materials as per the standard specification
(SADARA Standards , NEMA , NFPA , NETA and Saudi Aramco Standards)
• Preparing Inspection request (RFI) and rectify the Client QC Comment.
• Prepare Checklist & Explanation properly to Client QC (Fluor) during our
inspection.
• Checking routing for Raceways and Inspection of Material & Installation for
Electrical Equipment (230 KV & 34.5 KV Transformer, 34.5 KV & 480V
Switchgear, EPMS, 480V MCC, Battery Charger, Isolation Switch, Neutral
Grounding Resistance, Power & DC Distribution Panel).
• Follow up the Construction Work with site engineer & Construction Manager
and handling team work.
• Inspection of Lux Test for Lighting Fixtures, Mandrel Test for Duct Bank &
Conduits, under conduits.
• Inspection of Lightning Protection system for Power Distribution Building.
• Inspection of Material and Installation for all kind of Conduit, Cables, Cable
tray, Lighting Fixture, Power system devices and Fire alarm system devices in
Indoor & Outdoor area.
• Preparing the punch list (Pro-Active & Surveillance Report) and non-
conformance and corrective report (NCR).
• Inspect the installation of Grounding Rod, Test Well, Embedded Pad & Bars
and grounding for all electrical equipment.
• Monitoring the work of a third party independent qualified inspection and
testing agency for the Electrical Equipment’s.
• Witness and verify Insulation Resistance test for Low Voltage Cables, HIPOT
test for Medium Voltage Cables & High Voltage Cable (34.5 KV & 230 KV)
& Bus bar.
• Witness for Pre-commissioning of Transformer, Switchgear, MCC, EPMS,
Power Panel & Circuit Breakers, Motor and Generator.
• Preparing Packages (MCDR) for Mechanical Completion certificate to final
hand over to client.
Company : PAN GULF INDUSTRIAL SERVICES, AL-KHOBAR.
Position : Electrical QC Inspector (SAUDI ARAMCO Approved).
Duration : Aug 2012 to Oct 2013
Project : BI-10-00570 (Halon phases out IT Facilities)
Duties & Responsibilities:
• Checking and inspection of all materials as per the standard specification
(such as NFPA 72 & 70, SAIC, SATIP, Schedule Q, SAES)
• Preparing Inspection request (RFI) in the QMIS and update status from the
QMIS and rectify the SAPID Comment.
• Prepare Checklist (SAIC) & Explanation properly to the SAPID during our
inspection and Make Aramco Site access for SAPID.
• Contacting MCI Walkthrough with Fire Department & Loss prevention team,
Project management Team & PID.
• Checking routing and Installation for Fire System Layout Drawing.
• Follow up the Construction Work with site engineer & Construction Manager
(Two week ahead Schedule).
• Inspection of All kind of Smoke detector, cables, panel board (FACP), Horn
& Strobe, Manual Release Station, and Manual Pull Station & Abort Station.
• Preparing the punch list and non-conformance and corrective report (NCR).
• Inspection of All kind of Conduit, Cables, Cable tray & Panels.
• Checking site irregular activities during installation and site surveillance time
and make report to construction department.
• Make the material inspection (MIR) and arrange the inspection with SAPID.
• Witness for FACP Site Acceptance test (SAT) with PID, PMT, Loss and
Prevention Team, Proponent...etc.
• Responsible for test packages documentation from pre-commissioning to final
hand over to client.
Company : SAIPEM TAQA AL_RUSHIED FABRICATION CO. LTD.(STAR),
DAMMAM PORT.
Position : Electrical Site Engineer
Duration : June 2010 to May2011
Duties & Responsibilities:
• To implement Electrical work complying with materials specification and
standard. Supervise and maintain proper method of Electrical work practices.
• To request necessary materials required during operation on site. Provide
electrical power and hydraulic tools.
• Supervise the electrical motor for safety and electrical maintenance of the whole
plant. Performs installation of single phase and three phase motor and observed
safety procedures in electrical installation.
• Preparing Method of Statement for all Electrical works. Checking all electrical
machinery and equipment control system before Installation.
• Install wiring devices for all Electrical system. Layout of wires & cables for those
equipment & terminate the name according to drawing.
• Ensuring minimum electrical faults and rectifying errors. Ensuring minimum
expenditure on power and maintenance
• Making of daily progress and monthly progress and invoice making for Electrical
works. Erection of Panel boards, Installation of Transformers, motor and cabling
of distribution lines.
• Proper utilization of given machines, Equipments, Consumables and Man power.
Recruiting Man power, Preventive maintenance, Proper utilization of given funds.
Company : Faradays Instruments Pvt. Ltd, India.
Position : Maintenance Engineer
Duration : June 2009 to April 2010
Duties & Responsibilities:
• Testing of electrical cables such as continuity test and insulation resistance
test by megger. Supervising and maintenance of electrical machines such as
motors, generator, transformer…etc. Installation of electrical machines and
makes sure the testing before installing. Supervising and monitoring the status
of machine.
• Performing testing for transformer such as insulation resistance test by
megger, winding test and Preparing Preservation list for weekly. Supervising
the installation of grounding for all electrical equipment such as motors,
generators and prepare daily work reports to the project manager.
• Supervision of Cable Termination and Cable laying. Installation of Electrical
lighting system and power system as per drawing procedure. Working of MS
conduit laying and Internal wiring. Carrying Preventive scheduling
maintenance periodically.
• Implement and adheres safety process, rules and regulations and standard
operating procedure. Making of daily progress and monthly progress and
invoice making for Electrical works.
Personal Information:
NAME : MOHAMED SALMAN FARIS
DATE OF BIRTH : 10.12.1986
SEX : Male
NATIONALITY : Indian
PASSPORT NO : M 2868428
DATE OF ISSUE : 21/10/2014
DATE OF EXPIRY : 20/10/2024
PLACE OF ISSUE : Jeddah
MARITAL STATUS : Married
LANGUAGE KNOWN : Tamil, English, Arabic & Hindi
Declaration:
I hereby declare that the above given information are true to the best of my
knowledge and belief.
Mohamed Salman Faris .M
I hereby declare that the above given information are true to the best of my
knowledge and belief.
Mohamed Salman Faris .M

More Related Content

DOC
CV Electrical QA QC Engineer
DOC
Instrumentation Engineer Resume
DOCX
JEYARAJ CV QA-QC Inspector(E &I)
DOC
JINTOMON WELDER .C.V.
DOC
QC INSPECTOR E&I
PDF
Structural & Piping QC Inspector CV - PDF
RTF
Electrical Engineer Resume
PPT
Overview of Proc Process (Presented to SA).ppt
CV Electrical QA QC Engineer
Instrumentation Engineer Resume
JEYARAJ CV QA-QC Inspector(E &I)
JINTOMON WELDER .C.V.
QC INSPECTOR E&I
Structural & Piping QC Inspector CV - PDF
Electrical Engineer Resume
Overview of Proc Process (Presented to SA).ppt

What's hot (20)

DOCX
mubashir Electrical engineer
DOC
Senior Electrical Engineer resume Jan 2016
DOC
E&I inspector cv
DOCX
MBN CV-SENIOR ELECTRICAL ENGINEER
DOC
CV - MEP Inspector Engineer Froilan Ramos Balanao
DOC
B.tech electrical engineer cv
DOCX
Resume_Inst. QC_Hasnat
DOC
Electrical Inspector CV
DOC
CV instrument (E&I) Engineer2
PDF
Electrical and Instrumentation Engineer- MZameel CV
PDF
Senior Electrical Engineer CV
DOC
Resume electrical engineer- for oil & gas
DOC
Cv for qc inspector mechanical
DOC
Electrical site Engineer
DOCX
Electrical Supervisor CV
DOC
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
PDF
ELECTRICAL SUPERVISOR CURRICULUM VITAE
PDF
Karthik Resume
DOC
Manohar CV QA-QC
DOC
Venugopal revised cv
mubashir Electrical engineer
Senior Electrical Engineer resume Jan 2016
E&I inspector cv
MBN CV-SENIOR ELECTRICAL ENGINEER
CV - MEP Inspector Engineer Froilan Ramos Balanao
B.tech electrical engineer cv
Resume_Inst. QC_Hasnat
Electrical Inspector CV
CV instrument (E&I) Engineer2
Electrical and Instrumentation Engineer- MZameel CV
Senior Electrical Engineer CV
Resume electrical engineer- for oil & gas
Cv for qc inspector mechanical
Electrical site Engineer
Electrical Supervisor CV
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
ELECTRICAL SUPERVISOR CURRICULUM VITAE
Karthik Resume
Manohar CV QA-QC
Venugopal revised cv
Ad

Viewers also liked (10)

DOCX
MAAS NEW CV - pdf
PDF
DOC
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
PDF
Study: The Future of VR, AR and Self-Driving Cars
PDF
UX, ethnography and possibilities: for Libraries, Museums and Archives
PDF
Hype vs. Reality: The AI Explainer
PDF
Designing Teams for Emerging Challenges
PDF
Visual Design with Data
PDF
3 Things Every Sales Team Needs to Be Thinking About in 2017
PDF
How to Become a Thought Leader in Your Niche
MAAS NEW CV - pdf
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Study: The Future of VR, AR and Self-Driving Cars
UX, ethnography and possibilities: for Libraries, Museums and Archives
Hype vs. Reality: The AI Explainer
Designing Teams for Emerging Challenges
Visual Design with Data
3 Things Every Sales Team Needs to Be Thinking About in 2017
How to Become a Thought Leader in Your Niche
Ad

Similar to Electrical QA QC Engineer (20)

DOC
Irfan - Elec Engr
DOC
LATEST UPDATED CV OF MR SAJEEV R
DOCX
PDF
Commission resume
PDF
Khalid -cv_electrical_engineer (1)
DOCX
Tabrez
DOCX
Tabrez
PDF
CV of Tahir Mahmood
DOC
Elect Eng. Rizwan CV
DOCX
CURRICULUM VITAE doc
DOCX
PDF
Khalid -cv_electrical_engineer (2)
DOC
SHAMSHAD QAQC RESUME
DOC
Resume mohan
DOC
DOC
CV Electrical Technician
DOCX
Noli updated Resume
DOC
CV Elect
DOC
1. Sharib Reza(CV)
DOC
E & I QA QC SUPERVISOR
Irfan - Elec Engr
LATEST UPDATED CV OF MR SAJEEV R
Commission resume
Khalid -cv_electrical_engineer (1)
Tabrez
Tabrez
CV of Tahir Mahmood
Elect Eng. Rizwan CV
CURRICULUM VITAE doc
Khalid -cv_electrical_engineer (2)
SHAMSHAD QAQC RESUME
Resume mohan
CV Electrical Technician
Noli updated Resume
CV Elect
1. Sharib Reza(CV)
E & I QA QC SUPERVISOR

Electrical QA QC Engineer

  • 1. CURRICULAM VITAE M. Mohamed Salman Faris E-Mail : salman_fariseee@yahoo.com : salman.faris33@gmail.com Mobile no : 00966 580862754 Electrical QA/QC Engineer Objective: • Seven years of solid industry experience in High rise building Construction, power plant, Oil and chemical projects. • Experienced to meet critical conditions and to tackle them. Ability to lead and command a team. • Demonstrated excellent interpersonal qualities to manage and interact with others. Sharp and strong analytical abilities and attention to detail. Academic Qualification: • Bachelor of Engineering (Electrical And Electronics) Annamalai University, Chidambaram, Tamilnadu, India. (71.20%) Computer Knowledge: • Operating System : Windows 98/2000 /XP, • Software : Auto cad basic, Ms Office. • Languages : C, C++. Work Experiences: Company : NESMA AND PARTNERS. Position : Electrical QC Inspector. Duration : November 2015 to Until Now Project : KBR in Thuwal. Duties & Responsibilities: • Checking and inspection of all materials as per the standard specification (such as NFPA 72 & 70, SAIC, SATIP, Schedule Q, SAES) • Preparing Inspection request (RFI) and update status and rectify the SAPID Comment. • Prepare Checklist (SAIC) & Explanation properly to the SAPID during our inspection. • Checking routing and Installation of Electrical work (Conduits, Wiring
  • 2. Devices, Lighting Fixture, Grounding, Lightning System & cable tray) as per Drawing. • Follow up the Construction Work with site engineer & Construction Manager (Two week ahead Schedule). • Studies drawings and specification and checking Standards. • Preparing the punch list and non-conformance and corrective report (NCR). • Inspection of All kind of Conduit, Cables, Cable tray & Panels. • Checking site irregular activities during installation and site surveillance time and make report to construction department. • Make the material inspection (MIR) and arrange the inspection with SAPID. • Witness for Cable & wire testing with PID and Proponent • Monitor Quality control on construction progress activities. • Responsible for test packages documentation from pre-commissioning to final hand over to client. Company : NESMA AND PARTNERS. Position : Electrical QA/QC Engineer. Duration : Sep 2014 to October 2015 ( Previously June 2011 to June 2012) Project : JODP in Makkah Phase 1 (High Rise building Construction) Duties & Responsibilities: • Checking and inspection of all materials as per the standard and JODP specification (such as NEC, NFPA & NEMA) • Preparing Inspection request (IR) and update status from consultant and rectify the consultant Comment. Explanation properly to the consultant during our inspection. • Checking routing and Installation for lighting and Power System. • Follow up the Construction Work in the site engineer. • Inspection of cable tray, cable trunk, cable ladder, Busway, cables, panel board & all type of Lighting Fixture (Chandelier), Power Socket. Studies drawings and specification and checking Standards. • Preparing the punch list and non-conformance and corrective report (NCR) and Inspection testing plan (ITP).Checking site store report voucher (SSRV) and make the material inspection (MIR) and arrange the inspection with consultant. • Inspection of lighting system, power system, central battery system and cable routing system for Electrical works. • Inspection of all Fire alarm System, Evacuation & Public address speaker for low current as per standard specification. • Excellent hands hold skills of Process automation system and BMS system, Communication System (PABX, CCTV, SACS, PA, Intercom and Telephone). • Checking site irregular activities during installation and Make site surveillance and make report to construction department.
  • 3. • Inspect the installation and Commissioning for all electrical equipment such as motor, panel board, Transformer, Switch gear, MDB and electrical device. • Inspection of Panel Board (DP, EDP), Motor control center (MCP &EMCP), Transformer, Switch gear, MDB and generator. • Witness and verify Continuity, Insulation resistance test for LV, MV Cables. • Monitor Quality control on construction progress activities. Company : NESMA & PARTNERS, JUBAIL Position : Electrical QA/QC Engineer Duration : Dec 2013 to Aug 2014 Project & Client: SADARA (Chemical & Gas Plant Power Distribution Bldg.) / Fluor Duties & Responsibilities: • Checking and inspection of all materials as per the standard specification (SADARA Standards , NEMA , NFPA , NETA and Saudi Aramco Standards) • Preparing Inspection request (RFI) and rectify the Client QC Comment. • Prepare Checklist & Explanation properly to Client QC (Fluor) during our inspection. • Checking routing for Raceways and Inspection of Material & Installation for Electrical Equipment (230 KV & 34.5 KV Transformer, 34.5 KV & 480V Switchgear, EPMS, 480V MCC, Battery Charger, Isolation Switch, Neutral Grounding Resistance, Power & DC Distribution Panel). • Follow up the Construction Work with site engineer & Construction Manager and handling team work. • Inspection of Lux Test for Lighting Fixtures, Mandrel Test for Duct Bank & Conduits, under conduits. • Inspection of Lightning Protection system for Power Distribution Building. • Inspection of Material and Installation for all kind of Conduit, Cables, Cable tray, Lighting Fixture, Power system devices and Fire alarm system devices in Indoor & Outdoor area. • Preparing the punch list (Pro-Active & Surveillance Report) and non- conformance and corrective report (NCR). • Inspect the installation of Grounding Rod, Test Well, Embedded Pad & Bars and grounding for all electrical equipment. • Monitoring the work of a third party independent qualified inspection and testing agency for the Electrical Equipment’s. • Witness and verify Insulation Resistance test for Low Voltage Cables, HIPOT test for Medium Voltage Cables & High Voltage Cable (34.5 KV & 230 KV) & Bus bar. • Witness for Pre-commissioning of Transformer, Switchgear, MCC, EPMS, Power Panel & Circuit Breakers, Motor and Generator. • Preparing Packages (MCDR) for Mechanical Completion certificate to final hand over to client. Company : PAN GULF INDUSTRIAL SERVICES, AL-KHOBAR.
  • 4. Position : Electrical QC Inspector (SAUDI ARAMCO Approved). Duration : Aug 2012 to Oct 2013 Project : BI-10-00570 (Halon phases out IT Facilities) Duties & Responsibilities: • Checking and inspection of all materials as per the standard specification (such as NFPA 72 & 70, SAIC, SATIP, Schedule Q, SAES) • Preparing Inspection request (RFI) in the QMIS and update status from the QMIS and rectify the SAPID Comment. • Prepare Checklist (SAIC) & Explanation properly to the SAPID during our inspection and Make Aramco Site access for SAPID. • Contacting MCI Walkthrough with Fire Department & Loss prevention team, Project management Team & PID. • Checking routing and Installation for Fire System Layout Drawing. • Follow up the Construction Work with site engineer & Construction Manager (Two week ahead Schedule). • Inspection of All kind of Smoke detector, cables, panel board (FACP), Horn & Strobe, Manual Release Station, and Manual Pull Station & Abort Station. • Preparing the punch list and non-conformance and corrective report (NCR). • Inspection of All kind of Conduit, Cables, Cable tray & Panels. • Checking site irregular activities during installation and site surveillance time and make report to construction department. • Make the material inspection (MIR) and arrange the inspection with SAPID. • Witness for FACP Site Acceptance test (SAT) with PID, PMT, Loss and Prevention Team, Proponent...etc. • Responsible for test packages documentation from pre-commissioning to final hand over to client. Company : SAIPEM TAQA AL_RUSHIED FABRICATION CO. LTD.(STAR), DAMMAM PORT. Position : Electrical Site Engineer Duration : June 2010 to May2011 Duties & Responsibilities: • To implement Electrical work complying with materials specification and standard. Supervise and maintain proper method of Electrical work practices. • To request necessary materials required during operation on site. Provide electrical power and hydraulic tools. • Supervise the electrical motor for safety and electrical maintenance of the whole plant. Performs installation of single phase and three phase motor and observed safety procedures in electrical installation. • Preparing Method of Statement for all Electrical works. Checking all electrical machinery and equipment control system before Installation. • Install wiring devices for all Electrical system. Layout of wires & cables for those equipment & terminate the name according to drawing.
  • 5. • Ensuring minimum electrical faults and rectifying errors. Ensuring minimum expenditure on power and maintenance • Making of daily progress and monthly progress and invoice making for Electrical works. Erection of Panel boards, Installation of Transformers, motor and cabling of distribution lines. • Proper utilization of given machines, Equipments, Consumables and Man power. Recruiting Man power, Preventive maintenance, Proper utilization of given funds. Company : Faradays Instruments Pvt. Ltd, India. Position : Maintenance Engineer Duration : June 2009 to April 2010 Duties & Responsibilities: • Testing of electrical cables such as continuity test and insulation resistance test by megger. Supervising and maintenance of electrical machines such as motors, generator, transformer…etc. Installation of electrical machines and makes sure the testing before installing. Supervising and monitoring the status of machine. • Performing testing for transformer such as insulation resistance test by megger, winding test and Preparing Preservation list for weekly. Supervising the installation of grounding for all electrical equipment such as motors, generators and prepare daily work reports to the project manager. • Supervision of Cable Termination and Cable laying. Installation of Electrical lighting system and power system as per drawing procedure. Working of MS conduit laying and Internal wiring. Carrying Preventive scheduling maintenance periodically. • Implement and adheres safety process, rules and regulations and standard operating procedure. Making of daily progress and monthly progress and invoice making for Electrical works. Personal Information: NAME : MOHAMED SALMAN FARIS DATE OF BIRTH : 10.12.1986 SEX : Male NATIONALITY : Indian PASSPORT NO : M 2868428 DATE OF ISSUE : 21/10/2014 DATE OF EXPIRY : 20/10/2024 PLACE OF ISSUE : Jeddah MARITAL STATUS : Married LANGUAGE KNOWN : Tamil, English, Arabic & Hindi Declaration:
  • 6. I hereby declare that the above given information are true to the best of my knowledge and belief. Mohamed Salman Faris .M