ESP PERFORMANCE ASSIGNMRNT
OKPOKORO 13
Drilling operations on Okpokoro 13 commenced on 19th
March 1972 and ended on 2nd
July 1972.
Completion operations ended on the 10th
July 1972. It is an oil development well, on Okpokoro
R5000M reservoir to develop 5.9 MMstb and 5.8 Bscf of oil and associated gas reserves
respectively at an expected potential of 2500 bopd. The 6” drain-hole was drilled from 10,734ftah to
10778ftah. Oil formation factor is estimated to be 1.3 rb/stb and the annulus and tubing is displaced
to 9.0ppg inhibitedbrine. Reservoirtemperature isgiventobe 200⁰F.
OKPOKORO 13 was completed as a Single String Single (SSS) oil producer with 3-1/2” carbon steel
tubing equipped with Tubing Retrievable Surface-Controlled Subsurface Safety Valve (TRSCSSSV) and
Baker model-D ESP. Reslink screen was deployed as sand control mechanism across the drain-
hole (10,724 to 10778 ftah) which was displaced to 0.62 psi/ft pseudo-oil based. The annulus and the
tubingis displacedto0.47 psi/ftinhibitedbrine.
Using the charts/curves and tables as contained in the text/materials already provided, answer the
followingquestions:
1. How muchoil (inrate) can flowwithoutartificial lift?
2. If a pump required to boost production to 4000stb/d is chosen, calculate the pump pressure
increase required andthe total headrequired
3. From the charts/curvesprovided,estimatethe total numberof pumpstagesrequired.
4. Calculate the actual workdone by the pumpand deduce the resultantpumpefficiency.
5. If the pumpisdeliveringzeroheadandzerorates,whatis the pumpefficiency?
6. What will be the effectof runningthe pump’smotorbelow itsmaximumcurrentratings?
7. Giventhe actual work done as calculated,determinethe following:
a. Motor speed
b. Motor efficiency
c. Powerfactorof the motor
d. The electrical powermotorinkilowatts(kW)
8. Calculate the apparentpowerandthe phase angle
9. If the wire gauge requiredisgiventobe 1, calculate the following:
a. Wire diameterininches
b. Cable resistance withtemperature
c. Inductive resistance @6o Hz
d. Cable voltage drop/1000ftand the total voltage dropIf the cable lengthis15000ft
e. If a 2260V, 82A is chosen to drive our pump, what is the total volatage requirement
at the surface.
10. What isthe advantage of heatgenerationbythe motor.

More Related Content

PDF
Catálogo Bombas Blackmer _ XL Series
PDF
Computational analysis of heat transfer through four-stroke S. I. engine fins
PDF
Me ies-2014-conventional-i
PPTX
BUCN-189H_Lower Completion Operation.pptx
PPTX
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
PDF
Engineering thermodynamics
PDF
Me6301 engineering thermodynamics uq - may june 2016
PDF
Design of pulse jet engine for UAV - 2
Catálogo Bombas Blackmer _ XL Series
Computational analysis of heat transfer through four-stroke S. I. engine fins
Me ies-2014-conventional-i
BUCN-189H_Lower Completion Operation.pptx
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
Engineering thermodynamics
Me6301 engineering thermodynamics uq - may june 2016
Design of pulse jet engine for UAV - 2

Similar to Esp performance assignment 2018 (20)

PDF
50 watt sterling engine
PDF
X10699 (me8493)
PDF
ALSTOM TECHNICAL PAPER - 2005 EPRI Pulliam #6 HP Rotor Forging Section Replac...
PDF
Assignment 2
PDF
400 bpm dual filling sytem(completed)
PDF
X10705 (me8595)
PDF
Answer to Final Exam Micro hyudro powerplant
DOCX
final#2.jpgfina#1.pdfME370 Final(fall-TuTh-2013).doc.docx
PPTX
caemd_ppt_by mayank&rajarshi_updated.pptx
PPTX
caemd_ppt_by mayank&rajarshi_updated.pptx
PDF
Microsoft PowerPoint - DEV of Dual Filling
PDF
IRJET- Certain Investigation on Induction Motor Performance with Variable Fre...
PDF
IRJET- Design and Thermal Analysis of Steam Turbine Blade
PDF
Hydraulics and hydraulic_machinery(1)
PDF
IRJET- Analysis of Cooling Techniques of a Gas Turbine Blade
PDF
X10694 (me8391)
PDF
CESC SGS project report
PDF
Me6301 engineering thermodynamics uq - nov dec 2014
PDF
DOCX
Mech 0036 exam 12 13 with answers (revision)
50 watt sterling engine
X10699 (me8493)
ALSTOM TECHNICAL PAPER - 2005 EPRI Pulliam #6 HP Rotor Forging Section Replac...
Assignment 2
400 bpm dual filling sytem(completed)
X10705 (me8595)
Answer to Final Exam Micro hyudro powerplant
final#2.jpgfina#1.pdfME370 Final(fall-TuTh-2013).doc.docx
caemd_ppt_by mayank&rajarshi_updated.pptx
caemd_ppt_by mayank&rajarshi_updated.pptx
Microsoft PowerPoint - DEV of Dual Filling
IRJET- Certain Investigation on Induction Motor Performance with Variable Fre...
IRJET- Design and Thermal Analysis of Steam Turbine Blade
Hydraulics and hydraulic_machinery(1)
IRJET- Analysis of Cooling Techniques of a Gas Turbine Blade
X10694 (me8391)
CESC SGS project report
Me6301 engineering thermodynamics uq - nov dec 2014
Mech 0036 exam 12 13 with answers (revision)
Ad

More from OYLex LMS (8)

DOCX
Assignment 1 artificial lift
PDF
Glr curves
PPTX
Pet 513 subsea development
PPTX
Log acquisition and processing
PPTX
Classification of logs
PPTX
Cement additives
PPT
Log interpretation slidepack
PPTX
Well Control Equipments 1
Assignment 1 artificial lift
Glr curves
Pet 513 subsea development
Log acquisition and processing
Classification of logs
Cement additives
Log interpretation slidepack
Well Control Equipments 1
Ad

Recently uploaded (20)

PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
Geodesy 1.pptx...............................................
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PPTX
web development for engineering and engineering
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPT
Mechanical Engineering MATERIALS Selection
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PDF
PPT on Performance Review to get promotions
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Geodesy 1.pptx...............................................
Foundation to blockchain - A guide to Blockchain Tech
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
web development for engineering and engineering
bas. eng. economics group 4 presentation 1.pptx
Mechanical Engineering MATERIALS Selection
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Automation-in-Manufacturing-Chapter-Introduction.pdf
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPT on Performance Review to get promotions
UNIT 4 Total Quality Management .pptx
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
OOP with Java - Java Introduction (Basics)
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026

Esp performance assignment 2018

  • 1. ESP PERFORMANCE ASSIGNMRNT OKPOKORO 13 Drilling operations on Okpokoro 13 commenced on 19th March 1972 and ended on 2nd July 1972. Completion operations ended on the 10th July 1972. It is an oil development well, on Okpokoro R5000M reservoir to develop 5.9 MMstb and 5.8 Bscf of oil and associated gas reserves respectively at an expected potential of 2500 bopd. The 6” drain-hole was drilled from 10,734ftah to 10778ftah. Oil formation factor is estimated to be 1.3 rb/stb and the annulus and tubing is displaced to 9.0ppg inhibitedbrine. Reservoirtemperature isgiventobe 200⁰F. OKPOKORO 13 was completed as a Single String Single (SSS) oil producer with 3-1/2” carbon steel tubing equipped with Tubing Retrievable Surface-Controlled Subsurface Safety Valve (TRSCSSSV) and Baker model-D ESP. Reslink screen was deployed as sand control mechanism across the drain- hole (10,724 to 10778 ftah) which was displaced to 0.62 psi/ft pseudo-oil based. The annulus and the tubingis displacedto0.47 psi/ftinhibitedbrine. Using the charts/curves and tables as contained in the text/materials already provided, answer the followingquestions: 1. How muchoil (inrate) can flowwithoutartificial lift? 2. If a pump required to boost production to 4000stb/d is chosen, calculate the pump pressure increase required andthe total headrequired 3. From the charts/curvesprovided,estimatethe total numberof pumpstagesrequired. 4. Calculate the actual workdone by the pumpand deduce the resultantpumpefficiency. 5. If the pumpisdeliveringzeroheadandzerorates,whatis the pumpefficiency? 6. What will be the effectof runningthe pump’smotorbelow itsmaximumcurrentratings? 7. Giventhe actual work done as calculated,determinethe following: a. Motor speed b. Motor efficiency c. Powerfactorof the motor d. The electrical powermotorinkilowatts(kW) 8. Calculate the apparentpowerandthe phase angle 9. If the wire gauge requiredisgiventobe 1, calculate the following: a. Wire diameterininches b. Cable resistance withtemperature c. Inductive resistance @6o Hz d. Cable voltage drop/1000ftand the total voltage dropIf the cable lengthis15000ft e. If a 2260V, 82A is chosen to drive our pump, what is the total volatage requirement at the surface. 10. What isthe advantage of heatgenerationbythe motor.