AACE Symposium, April 16th, 2011



                                                         Thank you all for coming to the work
                                                         shop today.
                                                         The title of the Work Shop title speaks
                                                         about the Performance Measurement
                                                         Baseline.
                                                         This may be a new term for some of
                                                         you. After our four hours today, I’m
                                                         hoping it will be a term you'll be using
                                                         back on your own projects.
                                                         Let’s define what we mean at this point
                                                         in the work shop. At the first slide.
                                                         The Performance Measurement
                                                         Baseline is a time-phased budget plan
                                                         for accomplishing work, against which
                                                         the project performance is measured.
                                                         It includes the budgets assigned to
                                                         scheduled work , their budget spreads,
                                                         and the applicable indirect budgets.
                                                         This budget plan is derived from a
                                                         resource loaded Master Schedule.
                                                         These resource loads, along with other
                                                         information, are contained in Work
                                                         Packages.
                                                         You’ll hear many times the phrase
                                                         “cost and schedule.” I want you to start
                                                         thinking about what it sounds like when
                                                         you say “schedule and cost.”
                                                         It’s the schedule – the sequence of the
                                                         Work Packages – that is the basis of
                                                         the cost.




Copyright ©, 2011, Lewis & Fowler, All Rights Reserved                                       1/34
AACE Symposium, April 16th, 2011



                                                         There are four words that we’ll connect
                                                         together today. These words – when
                                                         they are connected, will describe how
                                                         to increase the probability of success
                                                         for your projects.
                                                         Any project, doesn’t matter the
                                                         domain, the context in that domain, the
                                                         methods used to manage the project,
                                                         the specific technology of the products
                                                         in the projects.
                                                         If you don’t have these four words in
                                                         your vocabulary, you’re going to
                                                         reduce the probability of success.
                                                         This doesn’t mean the project will fail.
                                                         This doesn’t mean the project will be
                                                         challenged.
                                                         All it means is the Probability of
                                                         Project Success will be reduced.
                                                         These four words are here in front of
                                                         us.
                                                          Credible
                                                          Performance
                                                          Measurement
                                                          Baseline
                                                         The title of this talk puts the words
                                                         together. But they also stand alone.
                                                         Let’s look at one as a standalone word
                                                         first.




Copyright ©, 2011, Lewis & Fowler, All Rights Reserved                                        2/34
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)
Establishing the performance measurement baseline (v4)

More Related Content

PDF
How To Build A Credible Performance Measurement Baseline
PDF
Establishing the performance measurement baseline (pmi northern utah)(v1)
PPT
Establishing the Performance Measurement Baseline
PDF
June 21 2012 Process Performance Metrics Presentation
PDF
Establishing the performance measurement baseline (pmi fort worth)(v4)
PDF
PMI chapter meeting (v4)
PDF
Immutable principles of project management (fw pmi)(v4)
PDF
Project Management - Keep it simple
How To Build A Credible Performance Measurement Baseline
Establishing the performance measurement baseline (pmi northern utah)(v1)
Establishing the Performance Measurement Baseline
June 21 2012 Process Performance Metrics Presentation
Establishing the performance measurement baseline (pmi fort worth)(v4)
PMI chapter meeting (v4)
Immutable principles of project management (fw pmi)(v4)
Project Management - Keep it simple

Similar to Establishing the performance measurement baseline (v4) (20)

PDF
Increasing The Probability Of Success For Your Project
PPTX
Spirit of Kanban
DOC
Journal Rubric
PPTX
Brocade Applied OpenFlow (10 26-11)
PDF
U Xmagic Agile Presentation
PPT
Bridging the communication gap
PPTX
DevOps Masterclass Bundle at just $20!
PDF
Kashvi Consultants Technology SBU Profile
PPTX
Tpl agile processes
PDF
5 immutable principles webinar
PDF
Devops Training in Delhi
PPTX
How to Implement Domain Driven Design in Real Life SDLC
PDF
10 tips for chartering a project (v2)
PDF
Specification by example - course summary
PPT
Methodology for Information System Project Management
PDF
7 ways to improve your PMO performance
PDF
Practices of an agile developer
PDF
Kaizen, Nemawashi and a Project Management Work Cell
PDF
11 Reasons Oracle E-Business Suite projects fail and how to fix them
Increasing The Probability Of Success For Your Project
Spirit of Kanban
Journal Rubric
Brocade Applied OpenFlow (10 26-11)
U Xmagic Agile Presentation
Bridging the communication gap
DevOps Masterclass Bundle at just $20!
Kashvi Consultants Technology SBU Profile
Tpl agile processes
5 immutable principles webinar
Devops Training in Delhi
How to Implement Domain Driven Design in Real Life SDLC
10 tips for chartering a project (v2)
Specification by example - course summary
Methodology for Information System Project Management
7 ways to improve your PMO performance
Practices of an agile developer
Kaizen, Nemawashi and a Project Management Work Cell
11 Reasons Oracle E-Business Suite projects fail and how to fix them
Ad

More from Glen Alleman (20)

PDF
Managing risk with deliverables planning
PDF
A Gentle Introduction to the IMP/IMS
PDF
Increasing the Probability of Project Success
PDF
Process Flow and Narrative for Agile+PPM
PDF
Practices of risk management
PDF
Principles of Risk Management
PDF
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
PDF
From Principles to Strategies for Systems Engineering
PDF
NAVAIR Integrated Master Schedule Guide guide
PDF
Building a Credible Performance Measurement Baseline
PDF
Integrated master plan methodology (v2)
PDF
IMP / IMS Step by Step
PDF
DHS - Using functions points to estimate agile development programs (v2)
PDF
Making the impossible possible
PDF
Heliotropic Abundance
PDF
Capabilities based planning
PDF
Process Flow and Narrative for Agile
PDF
Building the Performance Measurement Baseline
PPTX
Program Management Office Lean Software Development and Six Sigma
PDF
Policy and Procedure Rollout
Managing risk with deliverables planning
A Gentle Introduction to the IMP/IMS
Increasing the Probability of Project Success
Process Flow and Narrative for Agile+PPM
Practices of risk management
Principles of Risk Management
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
From Principles to Strategies for Systems Engineering
NAVAIR Integrated Master Schedule Guide guide
Building a Credible Performance Measurement Baseline
Integrated master plan methodology (v2)
IMP / IMS Step by Step
DHS - Using functions points to estimate agile development programs (v2)
Making the impossible possible
Heliotropic Abundance
Capabilities based planning
Process Flow and Narrative for Agile
Building the Performance Measurement Baseline
Program Management Office Lean Software Development and Six Sigma
Policy and Procedure Rollout
Ad

Recently uploaded (20)

PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PPTX
Portfolio Example- Market & Consumer Insights – Strategic Entry for BYD UK.pptx
PDF
Cross-Cultural Leadership Practices in Education (www.kiu.ac.ug)
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PDF
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PPTX
operations management : demand supply ch
PDF
Stacey L Stevens - Canada's Most Influential Women Lawyers Revolutionizing Th...
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
PDF
Engaging Stakeholders in Policy Discussions: A Legal Framework (www.kiu.ac.ug)
PPTX
Project Management_ SMART Projects Class.pptx
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PPTX
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
DOCX
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PPTX
IMM marketing mix of four ps give fjcb jjb
PDF
MBA2024 CGE 1.pdf file presentation 2025
PPTX
Market and Demand Analysis.pptx for Management students
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
IITM - FINAL Option - 01 - 12.08.25.pptx
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
Portfolio Example- Market & Consumer Insights – Strategic Entry for BYD UK.pptx
Cross-Cultural Leadership Practices in Education (www.kiu.ac.ug)
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
operations management : demand supply ch
Stacey L Stevens - Canada's Most Influential Women Lawyers Revolutionizing Th...
Chapter 2 - AI chatbots and prompt engineering.pdf
Engaging Stakeholders in Policy Discussions: A Legal Framework (www.kiu.ac.ug)
Project Management_ SMART Projects Class.pptx
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
Hand book of Entrepreneurship 4 Chapters.docx
IMM marketing mix of four ps give fjcb jjb
MBA2024 CGE 1.pdf file presentation 2025
Market and Demand Analysis.pptx for Management students
CTG - Business Update 2Q2025 & 6M2025.pptx

Establishing the performance measurement baseline (v4)

  • 1. AACE Symposium, April 16th, 2011 Thank you all for coming to the work shop today. The title of the Work Shop title speaks about the Performance Measurement Baseline. This may be a new term for some of you. After our four hours today, I’m hoping it will be a term you'll be using back on your own projects. Let’s define what we mean at this point in the work shop. At the first slide. The Performance Measurement Baseline is a time-phased budget plan for accomplishing work, against which the project performance is measured. It includes the budgets assigned to scheduled work , their budget spreads, and the applicable indirect budgets. This budget plan is derived from a resource loaded Master Schedule. These resource loads, along with other information, are contained in Work Packages. You’ll hear many times the phrase “cost and schedule.” I want you to start thinking about what it sounds like when you say “schedule and cost.” It’s the schedule – the sequence of the Work Packages – that is the basis of the cost. Copyright ©, 2011, Lewis & Fowler, All Rights Reserved 1/34
  • 2. AACE Symposium, April 16th, 2011 There are four words that we’ll connect together today. These words – when they are connected, will describe how to increase the probability of success for your projects. Any project, doesn’t matter the domain, the context in that domain, the methods used to manage the project, the specific technology of the products in the projects. If you don’t have these four words in your vocabulary, you’re going to reduce the probability of success. This doesn’t mean the project will fail. This doesn’t mean the project will be challenged. All it means is the Probability of Project Success will be reduced. These four words are here in front of us.  Credible  Performance  Measurement  Baseline The title of this talk puts the words together. But they also stand alone. Let’s look at one as a standalone word first. Copyright ©, 2011, Lewis & Fowler, All Rights Reserved 2/34