EXPLOSIVE DESTRUCTION WORKING
GROUP UPDATE
Presented by
Craig Williams, EDT co-chair
11 June 2014
KY EDT Working Group Members Tour Anniston EDT
18 March: Four members of the Kentucky EDT Working Group toured the
Anniston, Alabama EDT facility. Members included: Rev. Robert Blythe
(2nd from left); Leslie Kaylor (4th from left); Craig Williams (5th from left);
and, Terry House (6th from left).
6 May 2014
30% Design
EDT Working Group Meeting
In attendance were the following:
Robert Blythe, CDCAB; Jeff Brubaker, BGCAPP; Joe Elliott, Blue Grass Army Depot;
Doug Hindman, Kentucky Chemical Demilitarization Citizens' Advisory Commission
(CAC)/CDCAB; Debbie Hogan, BGCAPP; Terry House, CDCAB; Scott Jackson, CDCAB;
Leslie Kaylor, CDCAB; John McArthur, Bechtel Parsons Blue Grass (BPBG); Sarah Parke,
BGCAPP; Stephanie Parrett, BGCAPP; Chester Powell, CDCAB; Kevin Roberts, BPBG;
Regina Stivers, CDCAB; Daniel Walker, Kentucky Department for Environmental
Protection (KDEP); April Webb, KDEP; Craig Williams, CAC/CDCAB; Todd Williams, Blue
Grass Chemical Activity (BGCA).
Excerpts from this briefing include
O2SF Outside Operations Support Facility
ESB EDT Support Building
MH Monitoring House
ESM EDT Service Magazine
EEB EDT Enclosure Building
CON Control Room
TOF Treaty Office Facility
4
EDT and OPS Facilities
5
ESM
ESB
EEB
MH
O2SFO2SF
BGCAPP Site Plan / EDT Site
Location
6
EDT Enclosure Building (EEB)
Layout is based
on the Vendor’s
Preliminary
Design and Equipment
Layout Drawings
7
Note: Our Scrap Conveyor
is turned 90 degrees from
the Cool Down Conveyor
Feed
Conveyor
Munitions
Lift
Dust
Collection
Scrap
Bin
Belt
Conveyor
Secondary
Containment
Buffer Tank
EDT Process Equipment Layout
8
1
4
3
2
EDT Feeding Cycle
Air
Heater
9
DC Empting Cycle / Scrap Removal
& Cooling
Reverse angle
Spray Dryer Dosing Station
Spray Dryer Waste Drum
Quench Venturi
Bag House Waste Drum
Emergency
Water Tank
Bag House Filter
Spray Dryer
Thermal
Oxidizer
Scrubbers
10
OTS Process Equipment Layout
Activity Date
EDT CW Operations Jan – Oct 2017
Ramp-Up Period
Full Rate Period
Regulatory Testing
Over-Pack Processing
EDT Closure and Turn-Over Nov 2017 – May 2018
Decontamination
Restoration
De-staffing
System / Facility Turn Over
Main Plant CW Operations (forecasted Start date) Jan 2018
11
EDT Schedule and Key Milestones
Location: Anniston BGCAPP
Description SDC 1200 CM (Chemical Mobile) SDC 1200 C (Chemical)
Transportable unit Fix Facility unit
CW Net Explosive Wt. (NEW) 2.2 lb HE / 6.61 Propellant TBD (min, 2.2 lb HE / 6.61 Propellant)
Fragment Shield: Tube Shaped (sides only) Bowl Shaped (sides with a bottom)
DC Heater: 3 on the bottom of the DC 3 on the bottom plus additional on sides
Cooling Fan for Locking Ring: None Yes (added to minimize binding at high temps.)
LC1 and LC2 Vents to THO: No Yes
(to minimize/prevent agent migration to the Process
Ventilation)
Bypass valve around off-gas No Yes orifice:
(to minimize press in the chamber to minimize agent
migration to LC2)
Off-Gas Treatment System (OTS): Has a SDC 1200 sized OTS Has a larger SDC 2000 OTS (75% larger)
Thermal Oxidizer (THO): 162 ft3 321 ft3 (98% larger)
Bleed Water Tank: No Yes (added to support 24/7 operations)
Chiller to remove Condensate: No (collection pump to recycle H2O) Yes (added after the Neutral Scrubber)
Re-Heater after Chiller: None initially – installed later Included
Carbon Filter System: IONEX CD2000 IONEX CD4000
Building Type: Sprung Structure Steel Building
Building HVAC: No - Portable AC unit added Yes
Cascading Ventilation System: Vapor containment only Yes (with Category A, B, C, and D areas)
Number of Mustard Projectiles: 2,737 CW munitions processed Approx. 16,000 munitions to be processed
Agent Types: HD and HT Mustard H Mustard (with solids and heels)
DOT Bottles: None processed Two (2) are planned
12
EDT Unit Differences
(Anniston vs. BGCAPP)
The preceding slides are meant to highlight certain aspects of the 30%
design discussed at the EDT meeting.
A complete set of EDT slides from the 6 May meeting is available by
contacting the Outreach Office @ 626- 8944
-----
ADDITIONAL EDT ISSUE – What is the amount and the disposal plan for
Projectile Bodies resulting from EDT processing of Mustard.
Answer: Approximately 729 tons of “clean-for-release” scrap metal will
be generated from EDT processing and will be managed under the
Kentucky Administrative Regulations scrap metals exemption and sent
to a metal recycling facility.
EDT PERMIT MODIFICATION
Permit Issuance Timeframe
Part B, Class 3 Permit Modification to add a Subpart X typically have a
375 day regulatory review timeframe.
Potential time to review the EDT modification is contingent upon the
number of noticed of deficiency and technical completeness
of the application
EDT PERMIT STATUS
Post NEPA EA/FONSI
--
EDT Application Submitted: 14 March
Public Meeting Held: 14 April
CAC/CDCAB Comments Submitted: 14 May
Current Status: Comments Under Review (30 Days)
- -
Next Milestone
DRAFT Permit Issued = Begins 45 Day Comment Period
QUESTIONS/DISCUSSION

More Related Content

PPTX
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
PDF
Snehesh-Presentation-PDF
PPTX
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
PPTX
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
PPTX
29 reed synergies
PPTX
27 kuhlman sand2016 8647 c hydrologic-modeling-v2
PDF
BGCAPP Meeting with EDT Working Group Members 08 January 2014
PDF
Pipeline Design Philosophy
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
Snehesh-Presentation-PDF
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
29 reed synergies
27 kuhlman sand2016 8647 c hydrologic-modeling-v2
BGCAPP Meeting with EDT Working Group Members 08 January 2014
Pipeline Design Philosophy

Similar to Explosive Destruction Working Group Update 11 June 2014 (20)

PPTX
EIA presentation-Riverside Final for plant.pptx
PDF
rrt_semi_annual_meeting_summary_2013_may
PPT
Water / Environmental Engineering Senior Design _ USF 2013 _ Wastewater Team
PDF
Innovative Techonolgies - Membrane and Moving Bed Biofilm Reactor
PPTX
Internet2: How Your Network Can Help Reduce Your Carbon Footprint and Create...
PPT
Processes controlling carbon dioxide and oxygen in Southern Ocean ecosystems
PPT
Applied Administrative Law: Water Law
DOCX
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docx
PDF
Nasa Advanced Life Support 20110023229.pdf
PPTX
Kashi - Energy Generation and Renewables
PPTX
HGSC Technique Presentation2.pptx
PDF
Predicting Operational Life of ZVI 2012
PDF
Long Term Monitoring Data 2013
PPTX
Combustion Turbine Efficiency Impact
PPTX
Oil & Gas Meet Greenhouse Gas
PDF
Pipeline Design
PPT
Incorporation of Carbon Footprint Estimates into Remedial Alternatives Evalua...
PPTX
P&U Operations Review Presentation_14032019.pptx
PPT
Natural gas
PPTX
GEO's Presentation on In Situ Thermal Remediation to EPA Region 9
EIA presentation-Riverside Final for plant.pptx
rrt_semi_annual_meeting_summary_2013_may
Water / Environmental Engineering Senior Design _ USF 2013 _ Wastewater Team
Innovative Techonolgies - Membrane and Moving Bed Biofilm Reactor
Internet2: How Your Network Can Help Reduce Your Carbon Footprint and Create...
Processes controlling carbon dioxide and oxygen in Southern Ocean ecosystems
Applied Administrative Law: Water Law
Enforcement Penalty ProcessUniversity of HartfordApril 16,.docx
Nasa Advanced Life Support 20110023229.pdf
Kashi - Energy Generation and Renewables
HGSC Technique Presentation2.pptx
Predicting Operational Life of ZVI 2012
Long Term Monitoring Data 2013
Combustion Turbine Efficiency Impact
Oil & Gas Meet Greenhouse Gas
Pipeline Design
Incorporation of Carbon Footprint Estimates into Remedial Alternatives Evalua...
P&U Operations Review Presentation_14032019.pptx
Natural gas
GEO's Presentation on In Situ Thermal Remediation to EPA Region 9
Ad

More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

PPTX
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
PPTX
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
PPTX
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
PPTX
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
PPTX
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
PPTX
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
PPTX
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
PPTX
Economic Development Working Group 11 September 2013
PPTX
PPTX
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
PPTX
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
Economic Development Working Group 11 September 2013
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
Ad

Recently uploaded (20)

PPTX
Chapter 1: Philippines constitution laws
PPTX
Workshop introduction and objectives. SK.pptx
PPTX
Reactivity of metals with oxygen, rusting.pptx
PPTX
True Fruits_ reportcccccccccccccccc.pptx
PDF
2024-Need-Assessment-Report-March-2025.pdf
PDF
Item # 8 - 218 Primrose Place variance req.
PDF
AAAAAAAAAAAAAAAAAaaaaaaaAAAAAAAt - ĐV.pdf
PPTX
Part I CSO Conference and AVP Overview.pptx
PDF
Abhay Bhutada Foundation’s ESG Compliant Initiatives
PDF
ESG Alignment in Action - The Abhay Bhutada Foundation
PPTX
SUKANYA SAMRIDDHI YOJANA RESEARCH REPORT AIMS OBJECTIVES ITS PROVISION AND IM...
PDF
4_Key Concepts Structure and Governance plus UN.pdf okay
PDF
Item # 10 -- Set Proposed 2025 Tax Rate
PPTX
Core Humanitarian Standard Presentation by Abraham Lebeza
PPTX
International Tracking Project Unloading Guidance Manual V1 (1) 1.pptx
PPTX
Parliamentary procedure in meeting that can be use
PDF
eVerify Overview and Detailed Instructions to Set up an account
PPTX
Part II LGU Accreditation of CSOs and Selection of Reps to LSBs ver2.pptx
PPT
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
PPTX
ANALYSIS OF THE PROCLAMATION OF THE PHILIPPHINE INDEPENDENCE.pptx
Chapter 1: Philippines constitution laws
Workshop introduction and objectives. SK.pptx
Reactivity of metals with oxygen, rusting.pptx
True Fruits_ reportcccccccccccccccc.pptx
2024-Need-Assessment-Report-March-2025.pdf
Item # 8 - 218 Primrose Place variance req.
AAAAAAAAAAAAAAAAAaaaaaaaAAAAAAAt - ĐV.pdf
Part I CSO Conference and AVP Overview.pptx
Abhay Bhutada Foundation’s ESG Compliant Initiatives
ESG Alignment in Action - The Abhay Bhutada Foundation
SUKANYA SAMRIDDHI YOJANA RESEARCH REPORT AIMS OBJECTIVES ITS PROVISION AND IM...
4_Key Concepts Structure and Governance plus UN.pdf okay
Item # 10 -- Set Proposed 2025 Tax Rate
Core Humanitarian Standard Presentation by Abraham Lebeza
International Tracking Project Unloading Guidance Manual V1 (1) 1.pptx
Parliamentary procedure in meeting that can be use
eVerify Overview and Detailed Instructions to Set up an account
Part II LGU Accreditation of CSOs and Selection of Reps to LSBs ver2.pptx
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
ANALYSIS OF THE PROCLAMATION OF THE PHILIPPHINE INDEPENDENCE.pptx

Explosive Destruction Working Group Update 11 June 2014

  • 1. EXPLOSIVE DESTRUCTION WORKING GROUP UPDATE Presented by Craig Williams, EDT co-chair 11 June 2014
  • 2. KY EDT Working Group Members Tour Anniston EDT 18 March: Four members of the Kentucky EDT Working Group toured the Anniston, Alabama EDT facility. Members included: Rev. Robert Blythe (2nd from left); Leslie Kaylor (4th from left); Craig Williams (5th from left); and, Terry House (6th from left).
  • 3. 6 May 2014 30% Design EDT Working Group Meeting In attendance were the following: Robert Blythe, CDCAB; Jeff Brubaker, BGCAPP; Joe Elliott, Blue Grass Army Depot; Doug Hindman, Kentucky Chemical Demilitarization Citizens' Advisory Commission (CAC)/CDCAB; Debbie Hogan, BGCAPP; Terry House, CDCAB; Scott Jackson, CDCAB; Leslie Kaylor, CDCAB; John McArthur, Bechtel Parsons Blue Grass (BPBG); Sarah Parke, BGCAPP; Stephanie Parrett, BGCAPP; Chester Powell, CDCAB; Kevin Roberts, BPBG; Regina Stivers, CDCAB; Daniel Walker, Kentucky Department for Environmental Protection (KDEP); April Webb, KDEP; Craig Williams, CAC/CDCAB; Todd Williams, Blue Grass Chemical Activity (BGCA). Excerpts from this briefing include
  • 4. O2SF Outside Operations Support Facility ESB EDT Support Building MH Monitoring House ESM EDT Service Magazine EEB EDT Enclosure Building CON Control Room TOF Treaty Office Facility 4 EDT and OPS Facilities
  • 6. 6 EDT Enclosure Building (EEB) Layout is based on the Vendor’s Preliminary Design and Equipment Layout Drawings
  • 7. 7 Note: Our Scrap Conveyor is turned 90 degrees from the Cool Down Conveyor Feed Conveyor Munitions Lift Dust Collection Scrap Bin Belt Conveyor Secondary Containment Buffer Tank EDT Process Equipment Layout
  • 9. Air Heater 9 DC Empting Cycle / Scrap Removal & Cooling
  • 10. Reverse angle Spray Dryer Dosing Station Spray Dryer Waste Drum Quench Venturi Bag House Waste Drum Emergency Water Tank Bag House Filter Spray Dryer Thermal Oxidizer Scrubbers 10 OTS Process Equipment Layout
  • 11. Activity Date EDT CW Operations Jan – Oct 2017 Ramp-Up Period Full Rate Period Regulatory Testing Over-Pack Processing EDT Closure and Turn-Over Nov 2017 – May 2018 Decontamination Restoration De-staffing System / Facility Turn Over Main Plant CW Operations (forecasted Start date) Jan 2018 11 EDT Schedule and Key Milestones
  • 12. Location: Anniston BGCAPP Description SDC 1200 CM (Chemical Mobile) SDC 1200 C (Chemical) Transportable unit Fix Facility unit CW Net Explosive Wt. (NEW) 2.2 lb HE / 6.61 Propellant TBD (min, 2.2 lb HE / 6.61 Propellant) Fragment Shield: Tube Shaped (sides only) Bowl Shaped (sides with a bottom) DC Heater: 3 on the bottom of the DC 3 on the bottom plus additional on sides Cooling Fan for Locking Ring: None Yes (added to minimize binding at high temps.) LC1 and LC2 Vents to THO: No Yes (to minimize/prevent agent migration to the Process Ventilation) Bypass valve around off-gas No Yes orifice: (to minimize press in the chamber to minimize agent migration to LC2) Off-Gas Treatment System (OTS): Has a SDC 1200 sized OTS Has a larger SDC 2000 OTS (75% larger) Thermal Oxidizer (THO): 162 ft3 321 ft3 (98% larger) Bleed Water Tank: No Yes (added to support 24/7 operations) Chiller to remove Condensate: No (collection pump to recycle H2O) Yes (added after the Neutral Scrubber) Re-Heater after Chiller: None initially – installed later Included Carbon Filter System: IONEX CD2000 IONEX CD4000 Building Type: Sprung Structure Steel Building Building HVAC: No - Portable AC unit added Yes Cascading Ventilation System: Vapor containment only Yes (with Category A, B, C, and D areas) Number of Mustard Projectiles: 2,737 CW munitions processed Approx. 16,000 munitions to be processed Agent Types: HD and HT Mustard H Mustard (with solids and heels) DOT Bottles: None processed Two (2) are planned 12 EDT Unit Differences (Anniston vs. BGCAPP)
  • 13. The preceding slides are meant to highlight certain aspects of the 30% design discussed at the EDT meeting. A complete set of EDT slides from the 6 May meeting is available by contacting the Outreach Office @ 626- 8944 ----- ADDITIONAL EDT ISSUE – What is the amount and the disposal plan for Projectile Bodies resulting from EDT processing of Mustard. Answer: Approximately 729 tons of “clean-for-release” scrap metal will be generated from EDT processing and will be managed under the Kentucky Administrative Regulations scrap metals exemption and sent to a metal recycling facility.
  • 14. EDT PERMIT MODIFICATION Permit Issuance Timeframe Part B, Class 3 Permit Modification to add a Subpart X typically have a 375 day regulatory review timeframe. Potential time to review the EDT modification is contingent upon the number of noticed of deficiency and technical completeness of the application
  • 15. EDT PERMIT STATUS Post NEPA EA/FONSI -- EDT Application Submitted: 14 March Public Meeting Held: 14 April CAC/CDCAB Comments Submitted: 14 May Current Status: Comments Under Review (30 Days) - - Next Milestone DRAFT Permit Issued = Begins 45 Day Comment Period