SlideShare a Scribd company logo
An Economical and Efficient Approach
to Electrical Survey Data and Creation
              of Topology
Scope of work
•   GIS Survey(Support).
•   Export of survey data to NA tool
•   Network Analysis
•   BOQ Generation and approval
Offerings


• Topo Bridge Tab for survey
• Data Conversion Service
• Network Analysis Service
• Topo Bridge NA for Network
  Analysis
GIS Survey
   •   Survey of HT
   •   Survey of DT
   •   Survey of LT
   •   Survey of CI
   •   Marking of Poles
   •   Excel preparation
Data Export and NA


1. Preparation of Network model for
   Network analysis software
2. Existing Analysis and proposal
   Analysis
3. BOQ and Proposal AUTOCAD
   Diagrams preparation.
 
  Preparation Network model for 
    Network analysis software
• Checking of GIS Survey of HT, LT, DT, and CI for
  Data Anamolies.
• Preparation of topology from GIS Survey data using
  “TOPOBRIDGE”.
• Checking for Disconnections and Long lines.
• Extraction of Topology data into Network Analysis
  Software’s like Cymdist/Neplan/etc through
  “TOPOBRIDGE”.
• Preparation of DTR wise Loading data and Loading
  percentage according to AG, DOM Loads through
  “TOPOBRIDGE”.
Existing Analysis and proposal Analysis


• Performing Existing analysis and calculating
  Technical Losses
• Calculation including LT network for Existing
  Feeder and preparation of its analysis report
  which includes
• DT Loading profile.
• Feeder wise Analysis.
• Technical Loss report
• Proposal Analysis for separation of AG and NON-
  AG Loads.
BOQ and Proposal’s AUTOCAD Diagrams 
              preparation.


• Creation of Existing and proposed full HT
  Diagrams
• Creation of Individual and Proposed DTR
  diagrams
• Digitization of SOI Map.
• Preparation of BOQ
Inputs required:
Survey Data of 
         LT
         HT
         DT
         CI 
SOI MAPS
Analysis Report Templates(optional)
Autocad templates(optional)
BOQ Template(optional)
Sample Project Plan
Assuming a feeder with following particulars
•Length of Feeder: 30kM
•No of HT poles: 155
•No of DT: 20
•No of LT poles: 300
•No of CI:1200
GIS Survey
  S.No       Activity                   SVTS                Convetional        You save            How?
                                        (Man days)          Method             (Man days)
                                                            (Man days)

  1          GIS Survey                 60                  60                 0                   Using “Topo
                                                                                                   Bridge Tab”
  2          Data Transfer              1min                5                  5                   Using “Topo
                                                                                                   Bridge Tab”

  3          Resurvey                   0                   15                 15                  Using “Topo
                                                                                                   Bridge Tab”
  4          Other                      0                   15                 15

  5          Total                      60                  95                 35                  Using “Topo
                                                                                                   Bridge Tab”
*These figures are approximations and considered depending on our past study. Values may vary depending on field
conditions
Data Transfer and NA
S.No   Activity          SVTS         Convetional   You save     How?
                         (Man days)   Method        (Man days)
                                      (Man days)
1      Excel to NA       1min         3             3            Using “Topo
                                                                 Bridge NA”
2      Analysis          7            11            4            Using “Topo
                                                                 Bridge NA”
3      BOQ & Approval    1            1             0            Using “Topo
                                                                 Bridge NA”
4      Incase of resurvey NA          15            15           Using “Topo
                                                                 Bridge NA”
5      Total             8            30            22           Using “Topo
                                                                 Bridge NA”
Manday Savings/feeder
Financial Savings/Feeder
Man day savings for 100 similar
          feeders
Financial savings for 100 similar
            feeders
Project plan for 100 feeders
Perticulars                            Target
No of feeders                          100
Team size                              4
No of days required                    180
No of teams required                   8
No of “Topo Bridge tab” required       16


Analysis team required                 4
No of feeders can be completed/month   16
Deliverables
•   Network GIS Shape Files
•   NA software (Cymdist, Neplan like) compliant files
•   DTR wise List
•   Existing Analysis Report for technical Losses
•   DTR Loading profile
•   Feeder Technical Loss report
•   Listing of Overloaded transformers and overloading conductors
•   DTR-Wise Technical parameters comparison List(After and Before {Feeder
    Separation}).
•   PDF’s of all the DT & downstream LT Networks whose network was subjected for
    change in the proposal analysis (Existing DT & LT Network Diagrams).
•   Full HT Network which includes HT points, HT Lines, DT’s of Existing network.
•   Full HT Network which includes proposed HT points, HT Lines and DT’s.
•   BOQ
•   Digitized SOI Map.
    (All deliverables are soft copies only)
Thanking you

More Related Content

PDF
Looking into the past - feature extraction from historic maps using Python, O...
PDF
On Extending MapReduce - Survey and Experiments
PPTX
Use FME To Efficiently Create National-Scale Vector Contours From High-Resolu...
PPTX
Large-Margin Multiple Kernel Learning for Discriminative Features Selection a...
PPTX
Traffic Flow Forecasting with Spatial-Temporal Graph Diffusion Network
PDF
FME World Tour 2015 - FME & LIDAR - Glen Bambrick
PDF
Spatial Data Science with R
PDF
AMS 250 - High-Performance, Massively Parallel Computing with FLASH
Looking into the past - feature extraction from historic maps using Python, O...
On Extending MapReduce - Survey and Experiments
Use FME To Efficiently Create National-Scale Vector Contours From High-Resolu...
Large-Margin Multiple Kernel Learning for Discriminative Features Selection a...
Traffic Flow Forecasting with Spatial-Temporal Graph Diffusion Network
FME World Tour 2015 - FME & LIDAR - Glen Bambrick
Spatial Data Science with R
AMS 250 - High-Performance, Massively Parallel Computing with FLASH

What's hot (15)

PDF
Vf sift
PDF
cnsm2011_slide
PPTX
Moving object databases
PDF
FHWA C10 DynusT+CT-RAMP Integration on ARC and MORPC
PPTX
1 catchment delineation.ppt
PPTX
PDF
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
PDF
Introduction of flood evacuation route search system using QGIS,PostGIS,GRASS...
PDF
A Lightweight Infrastructure for Graph Analytics
PDF
OpenHistoricMap: overview
PDF
OTB-FOSS4G-2010
 
PDF
Berkeley Performance Tuning
PDF
위성이미지 객체 검출 대회 - 2등
PDF
SFBay Area Bike Share Analysis
PDF
Training and hands-on SNAP Sentinel-1 IW SLC Interferogram and Displacement
Vf sift
cnsm2011_slide
Moving object databases
FHWA C10 DynusT+CT-RAMP Integration on ARC and MORPC
1 catchment delineation.ppt
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Introduction of flood evacuation route search system using QGIS,PostGIS,GRASS...
A Lightweight Infrastructure for Graph Analytics
OpenHistoricMap: overview
OTB-FOSS4G-2010
 
Berkeley Performance Tuning
위성이미지 객체 검출 대회 - 2등
SFBay Area Bike Share Analysis
Training and hands-on SNAP Sentinel-1 IW SLC Interferogram and Displacement
Ad

Similar to Feeder Separation Project (20)

PDF
Graph500 and Green Graph500 benchmarks on SGI UV2000 @ SGI UG SC14
PDF
PDF
Processing Big Data in Real-Time - Yanai Franchi, Tikal
PPTX
Global Map Matching using BLE Beacons for Indoor Route and Stay Estimation
PDF
Implementing Netezza Spatial
PDF
TomTom Dynamic Routing
PDF
Data-Intensive Computing for Competent Genetic Algorithms: A Pilot Study us...
PPT
TcpTunnel
PPTX
Watershed Delineation Using ArcMap
PDF
Bigdata roundtable-storm
PPTX
Seaborn.pptx
PDF
MapReduce with Hadoop
PDF
The Matsu Project - Open Source Software for Processing Satellite Imagery Data
PDF
Google_A_Behind_the_Scenes_Tour_-_Jeff_Dean
PDF
Bryan Thompson, Chief Scientist and Founder at SYSTAP, LLC at MLconf NYC
PPTX
NGA’s Position on “Web-Mercator”
PDF
PLNOG 3: John Evans - Best Practices in Network Planning
PDF
Graph Theory and Databases
PPTX
Crash course on data streaming (with examples using Apache Flink)
PDF
Partitioning SKA Dataflows for Optimal Graph Execution
Graph500 and Green Graph500 benchmarks on SGI UV2000 @ SGI UG SC14
Processing Big Data in Real-Time - Yanai Franchi, Tikal
Global Map Matching using BLE Beacons for Indoor Route and Stay Estimation
Implementing Netezza Spatial
TomTom Dynamic Routing
Data-Intensive Computing for Competent Genetic Algorithms: A Pilot Study us...
TcpTunnel
Watershed Delineation Using ArcMap
Bigdata roundtable-storm
Seaborn.pptx
MapReduce with Hadoop
The Matsu Project - Open Source Software for Processing Satellite Imagery Data
Google_A_Behind_the_Scenes_Tour_-_Jeff_Dean
Bryan Thompson, Chief Scientist and Founder at SYSTAP, LLC at MLconf NYC
NGA’s Position on “Web-Mercator”
PLNOG 3: John Evans - Best Practices in Network Planning
Graph Theory and Databases
Crash course on data streaming (with examples using Apache Flink)
Partitioning SKA Dataflows for Optimal Graph Execution
Ad

Recently uploaded (20)

PDF
A comparative study of natural language inference in Swahili using monolingua...
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
WOOl fibre morphology and structure.pdf for textiles
PDF
Enhancing emotion recognition model for a student engagement use case through...
PDF
Encapsulation theory and applications.pdf
PPTX
1. Introduction to Computer Programming.pptx
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
Mushroom cultivation and it's methods.pdf
PDF
Getting Started with Data Integration: FME Form 101
PDF
Heart disease approach using modified random forest and particle swarm optimi...
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PDF
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
PDF
August Patch Tuesday
PDF
A comparative analysis of optical character recognition models for extracting...
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PDF
project resource management chapter-09.pdf
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
Hindi spoken digit analysis for native and non-native speakers
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
A comparative study of natural language inference in Swahili using monolingua...
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
WOOl fibre morphology and structure.pdf for textiles
Enhancing emotion recognition model for a student engagement use case through...
Encapsulation theory and applications.pdf
1. Introduction to Computer Programming.pptx
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Mushroom cultivation and it's methods.pdf
Getting Started with Data Integration: FME Form 101
Heart disease approach using modified random forest and particle swarm optimi...
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Univ-Connecticut-ChatGPT-Presentaion.pdf
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
August Patch Tuesday
A comparative analysis of optical character recognition models for extracting...
NewMind AI Weekly Chronicles - August'25-Week II
project resource management chapter-09.pdf
gpt5_lecture_notes_comprehensive_20250812015547.pdf
Hindi spoken digit analysis for native and non-native speakers
Accuracy of neural networks in brain wave diagnosis of schizophrenia

Feeder Separation Project

  • 1. An Economical and Efficient Approach to Electrical Survey Data and Creation of Topology
  • 2. Scope of work • GIS Survey(Support). • Export of survey data to NA tool • Network Analysis • BOQ Generation and approval
  • 3. Offerings • Topo Bridge Tab for survey • Data Conversion Service • Network Analysis Service • Topo Bridge NA for Network Analysis
  • 4. GIS Survey • Survey of HT • Survey of DT • Survey of LT • Survey of CI • Marking of Poles • Excel preparation
  • 5. Data Export and NA 1. Preparation of Network model for Network analysis software 2. Existing Analysis and proposal Analysis 3. BOQ and Proposal AUTOCAD Diagrams preparation.
  • 6.   Preparation Network model for  Network analysis software • Checking of GIS Survey of HT, LT, DT, and CI for Data Anamolies. • Preparation of topology from GIS Survey data using “TOPOBRIDGE”. • Checking for Disconnections and Long lines. • Extraction of Topology data into Network Analysis Software’s like Cymdist/Neplan/etc through “TOPOBRIDGE”. • Preparation of DTR wise Loading data and Loading percentage according to AG, DOM Loads through “TOPOBRIDGE”.
  • 7. Existing Analysis and proposal Analysis • Performing Existing analysis and calculating Technical Losses • Calculation including LT network for Existing Feeder and preparation of its analysis report which includes • DT Loading profile. • Feeder wise Analysis. • Technical Loss report • Proposal Analysis for separation of AG and NON- AG Loads.
  • 8. BOQ and Proposal’s AUTOCAD Diagrams  preparation. • Creation of Existing and proposed full HT Diagrams • Creation of Individual and Proposed DTR diagrams • Digitization of SOI Map. • Preparation of BOQ
  • 9. Inputs required: Survey Data of   LT  HT  DT  CI  SOI MAPS Analysis Report Templates(optional) Autocad templates(optional) BOQ Template(optional)
  • 10. Sample Project Plan Assuming a feeder with following particulars •Length of Feeder: 30kM •No of HT poles: 155 •No of DT: 20 •No of LT poles: 300 •No of CI:1200
  • 11. GIS Survey S.No Activity SVTS Convetional You save How? (Man days) Method (Man days) (Man days) 1 GIS Survey 60 60 0 Using “Topo Bridge Tab” 2 Data Transfer 1min 5 5 Using “Topo Bridge Tab” 3 Resurvey 0 15 15 Using “Topo Bridge Tab” 4 Other 0 15 15 5 Total 60 95 35 Using “Topo Bridge Tab” *These figures are approximations and considered depending on our past study. Values may vary depending on field conditions
  • 12. Data Transfer and NA S.No Activity SVTS Convetional You save How? (Man days) Method (Man days) (Man days) 1 Excel to NA 1min 3 3 Using “Topo Bridge NA” 2 Analysis 7 11 4 Using “Topo Bridge NA” 3 BOQ & Approval 1 1 0 Using “Topo Bridge NA” 4 Incase of resurvey NA 15 15 Using “Topo Bridge NA” 5 Total 8 30 22 Using “Topo Bridge NA”
  • 15. Man day savings for 100 similar feeders
  • 16. Financial savings for 100 similar feeders
  • 17. Project plan for 100 feeders Perticulars Target No of feeders 100 Team size 4 No of days required 180 No of teams required 8 No of “Topo Bridge tab” required 16 Analysis team required 4 No of feeders can be completed/month 16
  • 18. Deliverables • Network GIS Shape Files • NA software (Cymdist, Neplan like) compliant files • DTR wise List • Existing Analysis Report for technical Losses • DTR Loading profile • Feeder Technical Loss report • Listing of Overloaded transformers and overloading conductors • DTR-Wise Technical parameters comparison List(After and Before {Feeder Separation}). • PDF’s of all the DT & downstream LT Networks whose network was subjected for change in the proposal analysis (Existing DT & LT Network Diagrams). • Full HT Network which includes HT points, HT Lines, DT’s of Existing network. • Full HT Network which includes proposed HT points, HT Lines and DT’s. • BOQ • Digitized SOI Map. (All deliverables are soft copies only)