Intern Final Presentation
Denny Kramer, Lean Manufacturing Engineering Intern
August 5th, 2015
POLARIS INDUSTRIES INC. Ɩ Spirit Lake, IA
2
Background
Denny Kramer, Intern Presentation Summer 2015
College: Iowa State University – Mechanical Engineering
Graduation: December 2016
Hometown: Earling, Iowa
Past Work Experience: Kinze Manufacturing and Agriland FS
Hobbies: Sports, Boating, Outdoor Activities, Helping on
Family Farm
Lean Support – Day to Day
Projects
Problem Situation: Reduce Downtime
on the Slingshot line
Utilized Lean Tools (A3) and problem
solving methodology to identify Non-Value
Added Work Content
Worked with Operators to resequence
their Standard Work
Coordinated with cross functional team to
improve material presentation
Before After
Problem Situation: Reduce tapping
on Slingshot line
Kaizen Team Member - Helped collect
and analyze data
Problem Situation: Develop tooling
for MY16 Slingshot launch
Designed and implemented new battery
bracket holder
3Footer Here
Kaizen & NPI Support
A3 Process Utilized - Station 5711
Lean Tools (Spaghetti Diagram)
& Station Observations
Operator Input - what they did
not like about their process (5
why’s)
Created new material flow rack
and parts tray
Redesigned station layout
4Denny Kramer, Intern Presentation Summer 2015
ImplementationApproach
Before After
A3 Process Utilized - Station 5711
5Denny Kramer, Intern Presentation Summer 2015
Rebalance StationFollow Up on Results
Space & Time SavingsBefore & After PCT
Repeated A3 Process for 20 stations
Adjusted rack/layout until
operator was happy with
changes
Opportunity to rebalance more
Standard Work to the operator 0
100
200
300
400
500
600
Before After
Value Added Walking Unpacking PCT
0
100
200
300
400
500
600
Before After
Value Added Walking Unpacking PCT
Lean Manufacturing Team Results
Cost Savings
Before
After
Metrics May Avg. July Avg. % Improvement Annualized Savings
Delivery Incease 38.1 42.4 11.5% 4,367,833.80$
Downtime Reduction 80 46 43.0% 344,926.88$
Sum of Cycle Reduction 27204 24612 9.5% 202,494.23$
Labor Reduction 9,840.67$ 9,397.96$ 4.5% 110,677.98$
Total 5,025,932.90$
Dislikes
Likes/Dislikes
Fast paced work environment
Treated as valued team
member
Operators were open to
change
Rapid change process
Fun and exciting products
Change mentor halfway
through the internship
Never got opportunity to drive
any of the products
7Denny Kramer, Intern Presentation Summer 2015
Likes
8
Lesson’s Learned/ Future Plans
Denny Kramer, Intern Presentation Summer 2015
Lean Principles:
Better understanding of Lean Manufacturing vernacular
Utilizing Plan, Do, Check, Act – Continuous Improvement
process
Identifying if issues are really problems – knowing the
standard to measure against
Need measurables when dealing with problems – can go
back and see if there is an improvement
Utilizing different problem solving methods – A3, 5 why’s,
fishbone diagrams
Data gives direction
Future Plans:
3 semesters left at Iowa State University
1 summer internship left – Design Engineering oriented
Questions?
9
Thanks Polaris for the opportunity!
Denny Kramer, Intern Presentation Summer 2015

More Related Content

PPTX
Encuesta Ambysoft - IT Project Success 2013
DOCX
PDF
Resume SP 17
PDF
SharePoint Saturday Louisville - Designing Change for Sustained User Adoption
PPTX
Making Lean Work in Your Company
PDF
LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING
PPTX
_100 26900720052_PE-ME802I.pptx
PPT
Eg Lean Case Studies
Encuesta Ambysoft - IT Project Success 2013
Resume SP 17
SharePoint Saturday Louisville - Designing Change for Sustained User Adoption
Making Lean Work in Your Company
LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING
_100 26900720052_PE-ME802I.pptx
Eg Lean Case Studies

Similar to Final_Presentation_Denny_Kramer (1) (20)

PPT
The Lean Enterprise
PDF
Operation Excellence at Venigros
DOC
Professional_-_Resume_-_Terryl_Griffin 20150901
PDF
Lean MRO Office AVM
DOC
Resume R.Coronado
DOC
Resume R.Coronado
DOCX
Michael Olinski Resume
PPTX
Slides 2015 for contact 7
PDF
1 1leanthinking
PPTX
Lean Thinking
PPTX
Lean Management Lesson 1
PDF
Resume Fall 2016
PPTX
Lean_Introduction (What is Lean and the Toyota System).pptx
PPTX
Lean Manufacturing Overview - MBA Consulting Class
PDF
Lean Journey At C1
PPTX
Internship learnings ppt for manufacturing
DOCX
Brandon_McCarn_Senior_Resume
PPTX
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
PDF
Is lean still relevant
PDF
Lean Manufacturing Research
The Lean Enterprise
Operation Excellence at Venigros
Professional_-_Resume_-_Terryl_Griffin 20150901
Lean MRO Office AVM
Resume R.Coronado
Resume R.Coronado
Michael Olinski Resume
Slides 2015 for contact 7
1 1leanthinking
Lean Thinking
Lean Management Lesson 1
Resume Fall 2016
Lean_Introduction (What is Lean and the Toyota System).pptx
Lean Manufacturing Overview - MBA Consulting Class
Lean Journey At C1
Internship learnings ppt for manufacturing
Brandon_McCarn_Senior_Resume
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
Is lean still relevant
Lean Manufacturing Research
Ad

Final_Presentation_Denny_Kramer (1)

  • 1. Intern Final Presentation Denny Kramer, Lean Manufacturing Engineering Intern August 5th, 2015 POLARIS INDUSTRIES INC. Ɩ Spirit Lake, IA
  • 2. 2 Background Denny Kramer, Intern Presentation Summer 2015 College: Iowa State University – Mechanical Engineering Graduation: December 2016 Hometown: Earling, Iowa Past Work Experience: Kinze Manufacturing and Agriland FS Hobbies: Sports, Boating, Outdoor Activities, Helping on Family Farm
  • 3. Lean Support – Day to Day Projects Problem Situation: Reduce Downtime on the Slingshot line Utilized Lean Tools (A3) and problem solving methodology to identify Non-Value Added Work Content Worked with Operators to resequence their Standard Work Coordinated with cross functional team to improve material presentation Before After Problem Situation: Reduce tapping on Slingshot line Kaizen Team Member - Helped collect and analyze data Problem Situation: Develop tooling for MY16 Slingshot launch Designed and implemented new battery bracket holder 3Footer Here Kaizen & NPI Support
  • 4. A3 Process Utilized - Station 5711 Lean Tools (Spaghetti Diagram) & Station Observations Operator Input - what they did not like about their process (5 why’s) Created new material flow rack and parts tray Redesigned station layout 4Denny Kramer, Intern Presentation Summer 2015 ImplementationApproach Before After
  • 5. A3 Process Utilized - Station 5711 5Denny Kramer, Intern Presentation Summer 2015 Rebalance StationFollow Up on Results Space & Time SavingsBefore & After PCT Repeated A3 Process for 20 stations Adjusted rack/layout until operator was happy with changes Opportunity to rebalance more Standard Work to the operator 0 100 200 300 400 500 600 Before After Value Added Walking Unpacking PCT 0 100 200 300 400 500 600 Before After Value Added Walking Unpacking PCT
  • 6. Lean Manufacturing Team Results Cost Savings Before After Metrics May Avg. July Avg. % Improvement Annualized Savings Delivery Incease 38.1 42.4 11.5% 4,367,833.80$ Downtime Reduction 80 46 43.0% 344,926.88$ Sum of Cycle Reduction 27204 24612 9.5% 202,494.23$ Labor Reduction 9,840.67$ 9,397.96$ 4.5% 110,677.98$ Total 5,025,932.90$
  • 7. Dislikes Likes/Dislikes Fast paced work environment Treated as valued team member Operators were open to change Rapid change process Fun and exciting products Change mentor halfway through the internship Never got opportunity to drive any of the products 7Denny Kramer, Intern Presentation Summer 2015 Likes
  • 8. 8 Lesson’s Learned/ Future Plans Denny Kramer, Intern Presentation Summer 2015 Lean Principles: Better understanding of Lean Manufacturing vernacular Utilizing Plan, Do, Check, Act – Continuous Improvement process Identifying if issues are really problems – knowing the standard to measure against Need measurables when dealing with problems – can go back and see if there is an improvement Utilizing different problem solving methods – A3, 5 why’s, fishbone diagrams Data gives direction Future Plans: 3 semesters left at Iowa State University 1 summer internship left – Design Engineering oriented
  • 9. Questions? 9 Thanks Polaris for the opportunity! Denny Kramer, Intern Presentation Summer 2015

Editor's Notes

  • #4: Results from Kaizen that we came up with: new paint plugs, teflon coated nuts, changes in fixtures in weld – weld spatter in them Tooling = got to meet more people in the dept and learned how to go about getting tooling created in mantenaince New Product Implementation
  • #5: Tools used Implementation
  • #6: Follow up - Helped operator in any way I could so they would not fall behind on the line as changes were being made.