SlideShare a Scribd company logo
Slide Design© Duarte, Inc. 2014
LEAN ENTERPRISE AND
CONTINUOUS IMPROVEMENT
ENGINEERING
​ Thinking Lean
​ From Design To Production
​ MARK KREITINGER
Slide Design© Duarte, Inc. 2014
Lean and Continuous Improvement Engineering
+Apply Six Sigma
and Lean Tools
from design to
production
+Improve
processes and
product
development
+Investigate and
troubleshoot
production
difficulties
+Identify and
reduce waste
Improve​Think Lean Troubleshoot ​Eliminate
02 03 0401
Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014
THINK LEAN
01
Slide Design© Duarte, Inc. 2014
Think Lean
​Throughout the product life cycle, from design to production
At Munro and Associates,
a study of a client’s
product showed that
complying with regulations
had caused ineffective
fixes
Developed a solution
for the client that
allowed to redesign
their product to meet
current and new
regulations and
reduce parts
​The proposed
redesign represented
$8M in savings to the
client by using a new
design.
A study of the Cummins
generator, and the
competitor’s product
revealed significant
design differences
Demonstrated a way
to reduce cost per unit
by reducing number
of parts, using
analytics from Design
Profit Software
​The information from
comparative analysis
positioned the
company’s product to
better compete in the
market.
Polaris acquired
Timbersled, a
snowmobile kit
manufacturer whose
product had high
production costs
Conducted a study of
one part of the
product and analyzed
for cost reduction and
part reduction
opportunities by using
Design Profit
​The result of the
study demonstrated
savings of $140K.
With further analysis,
there is potential for
exponential savings.
Work area layout and
engine tear-down
procedures at Polaris,
offered opportunities for
improvement
Conducted Kaizen
events with team
members across
multiple functional
groups
​As a result of the
events, we were able to
implement an
improved work area
layout and created
documentation for the
tear-down procedure
Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014
IMPROVE
02
Slide Design© Duarte, Inc. 2014
Improve
​Seek opportunities to improve processes using changes to product specifications and test to verify results
Collection boxes at the
Post Office made
handling mail
cumbersome
Suggested an
improvement to mail
box design in order to
make the process of
handling mail more
efficient
​Obtained a degree in
Mechanical
Engineering, since it
was the Post Office’s
requirement to
redesign mail collection
boxes
TMI, a casework and
countertop
manufacturing company
needed to improve their
assembly process
Gathered over 100
ideas by performing
tasks at all work and
assembly stations.
​Project revealed
potential risks to
worker safety. To solve
it, designed an
automatic stop to
increase efficiency and
prevent injury
At the metal paint
department at Polaris,
their paint line was setup
in a limited space and had
to handle loading and
unloading of parts, which
caused significant
downtime
Designed a new
layout and moved
loading and unloading
offline and in a
different location
​Material movement
was improved and
the need for
downtime was
eliminated
At Cirrus Design, their
aircraft build rate was
not meeting their goal of
two per day
Analyzed workflow
and identified the
need to add one more
ply cutter
​The addition of
another ply cutter
allowed to reach the
goal of building two
aircraft per day
Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014
TROUBLESHOOT
03
Slide Design© Duarte, Inc. 2014
Troubleshoot
​Seek opportunities to identify, troubleshoot and correct production difficulties
The metal paint
department at Polaris had
an issue with an
inadequate oven stop on
the conveyor line in which
parts had to cure for a
certain amount of time
Redesigned the stop to work at a 45
degree angle, opposed to working
completely horizontally.
This resolved the issue that was
causing the stop to fail.
​The solution was effective,
even though the supplier of
the conveyor line had
communicated to Polaris
that it could not be done
Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014
ELIMINATE
04
Slide Design© Duarte, Inc. 2014
Eliminate
​Use analysis to identify opportunities to eliminate waste throughout the organization
Eclipse Aviation, a startup
company, was trying to
obtain type certification for
their Eclipse 500 aircraft
Conducted a company-
wide process audit
​After implementing the
process and training
the organization,
Eclipse Aviation
obtained type
certification for the
Eclipse 500 six months
ahead of schedule
Audit revealed substantial
gaps in communication
between functional
groups. There was a
breakdown in the hand-off
process from group to
group.
Discovered that most
employees were not
aware of how to establish
a relationship with the
FAA for aircraft type
certification
Wrote a procedure to eliminate
gaps, which caused waste of
time and resources
Documented the procedure
manually, before automating it
using SAP
Obtained buy-in from senior
leadership and trained 250+
employees in how to implement it
Slide Design© Duarte, Inc. 2014
MARK KREITINGER
Over 20 years of
comprehensive
experience in multiple
industries such as
manufacturing, aviation,
automotive, emission
solutions, power
generation and sports
and utility vehicles.
Lean Engineering and Continuous Improvement Professional
Highly knowledgeable in
lean enterprise
processes, focused on
cost reduction and
weight reduction
practices applied in end-
to-end product design.
An innovative individual
with a proven 7-step
process to assist
organizations and
facilitate the intersection
between engineering
and manufacturing.
608.609.0032
mark.kreitinger@gmail.com
Linkedin.com/in/markkreitinger
Image source www.icons8.com

More Related Content

DOCX
Resume - Manufacturing Engineer
PPT
BOEING
DOC
Venugopala Rao resume
DOC
din_CVM2[2]
DOC
PDF
DuraVent Case Study
DOCX
PDF
VAC Report
Resume - Manufacturing Engineer
BOEING
Venugopala Rao resume
din_CVM2[2]
DuraVent Case Study
VAC Report

What's hot (20)

DOC
chetan sharma 2
PDF
Innoval Brochure What we do - WEB2
DOCX
G28 dec8 ASR Resu
PDF
Responding to R&D Challenges in a Changing Industry
PDF
Resume arvind-manufacturing engineer-california
DOCX
prashat resume
DOCX
Vinay 2016
PDF
Innoval Technology Newsletter 2020
PDF
VirendraResume
DOC
Resume_K.L.Neelakandan
PDF
Industrializing innovative aluminum solutions for the aerospace industry - Si...
DOC
Jayaprakash Resume 2015
DOC
Harikesh
DOCX
Muhammad mohsin updated resume
PDF
Tech Company 8 08
PDF
Designing, Manning & Operating a World-Class Downstream Business
PDF
Industrial_Manufacturing_Engineer_Resume
chetan sharma 2
Innoval Brochure What we do - WEB2
G28 dec8 ASR Resu
Responding to R&D Challenges in a Changing Industry
Resume arvind-manufacturing engineer-california
prashat resume
Vinay 2016
Innoval Technology Newsletter 2020
VirendraResume
Resume_K.L.Neelakandan
Industrializing innovative aluminum solutions for the aerospace industry - Si...
Jayaprakash Resume 2015
Harikesh
Muhammad mohsin updated resume
Tech Company 8 08
Designing, Manning & Operating a World-Class Downstream Business
Industrial_Manufacturing_Engineer_Resume
Ad

Viewers also liked (13)

PDF
Lean Engineering: Engineering for Learning & Experimentation in the Enterpris...
PDF
Lean Re Pres Rudorfer Vector Forum V1
PPTX
Kalyani technologies corporate presentation
PDF
Making Indian Engineering World class - Theme talk on Engineer's day 2014
PDF
Randstad White Paper - "Human Factors Engineering as a supportive tool for Le...
PDF
World-class Engineering Organization
PDF
Sogefi : Du produit au lean engineering
PDF
Lean Quality & Engineering
PDF
Lean Engineering: How to make Engineering a full Lean UX partner
PPTX
Lean Startup at GE
PPTX
Customer Service Call Center Benchmark Study
PDF
Lean Engineering. Applying Lean Principles to Building Experiences
PPTX
Best Presentation About Infosys
Lean Engineering: Engineering for Learning & Experimentation in the Enterpris...
Lean Re Pres Rudorfer Vector Forum V1
Kalyani technologies corporate presentation
Making Indian Engineering World class - Theme talk on Engineer's day 2014
Randstad White Paper - "Human Factors Engineering as a supportive tool for Le...
World-class Engineering Organization
Sogefi : Du produit au lean engineering
Lean Quality & Engineering
Lean Engineering: How to make Engineering a full Lean UX partner
Lean Startup at GE
Customer Service Call Center Benchmark Study
Lean Engineering. Applying Lean Principles to Building Experiences
Best Presentation About Infosys
Ad

Similar to LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING (20)

PDF
ME_currycj
PDF
Cody Litzenberg Resume
DOC
Resume__GARY_SHELTON
PDF
How CDK, a Global Brand, Leveraged End-User Monitoring to Drive Customer Deli...
DOCX
Craig Smith resume
DOCX
Resume 16-3
PDF
Oracle Service Cloud - Fixed Scope Implementation Presentation
DOCX
Drew.Rowe.Resume
PPT
TPT Presentation 2009
PPTX
Introduction to Agile Software Development
PDF
Getting buy in bluebeam e xtreme con 2016
PDF
Portfolio - Badre Maktari - Generic
PDF
Jay Portfolio - Engineering Manager
PPTX
Customer centric delivery to the cloud
PPT
GainShare Consultants Company Overview - Q1'2015
PPT
PPTX
Making the Business a First-Class Citizen During the Application Modernizatio...
DOCX
Uribe Res Program 12-01-15
DOC
CV Czech
ME_currycj
Cody Litzenberg Resume
Resume__GARY_SHELTON
How CDK, a Global Brand, Leveraged End-User Monitoring to Drive Customer Deli...
Craig Smith resume
Resume 16-3
Oracle Service Cloud - Fixed Scope Implementation Presentation
Drew.Rowe.Resume
TPT Presentation 2009
Introduction to Agile Software Development
Getting buy in bluebeam e xtreme con 2016
Portfolio - Badre Maktari - Generic
Jay Portfolio - Engineering Manager
Customer centric delivery to the cloud
GainShare Consultants Company Overview - Q1'2015
Making the Business a First-Class Citizen During the Application Modernizatio...
Uribe Res Program 12-01-15
CV Czech

LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING

  • 1. Slide Design© Duarte, Inc. 2014 LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING ​ Thinking Lean ​ From Design To Production ​ MARK KREITINGER
  • 2. Slide Design© Duarte, Inc. 2014 Lean and Continuous Improvement Engineering +Apply Six Sigma and Lean Tools from design to production +Improve processes and product development +Investigate and troubleshoot production difficulties +Identify and reduce waste Improve​Think Lean Troubleshoot ​Eliminate 02 03 0401
  • 3. Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014 THINK LEAN 01
  • 4. Slide Design© Duarte, Inc. 2014 Think Lean ​Throughout the product life cycle, from design to production At Munro and Associates, a study of a client’s product showed that complying with regulations had caused ineffective fixes Developed a solution for the client that allowed to redesign their product to meet current and new regulations and reduce parts ​The proposed redesign represented $8M in savings to the client by using a new design. A study of the Cummins generator, and the competitor’s product revealed significant design differences Demonstrated a way to reduce cost per unit by reducing number of parts, using analytics from Design Profit Software ​The information from comparative analysis positioned the company’s product to better compete in the market. Polaris acquired Timbersled, a snowmobile kit manufacturer whose product had high production costs Conducted a study of one part of the product and analyzed for cost reduction and part reduction opportunities by using Design Profit ​The result of the study demonstrated savings of $140K. With further analysis, there is potential for exponential savings. Work area layout and engine tear-down procedures at Polaris, offered opportunities for improvement Conducted Kaizen events with team members across multiple functional groups ​As a result of the events, we were able to implement an improved work area layout and created documentation for the tear-down procedure
  • 5. Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014 IMPROVE 02
  • 6. Slide Design© Duarte, Inc. 2014 Improve ​Seek opportunities to improve processes using changes to product specifications and test to verify results Collection boxes at the Post Office made handling mail cumbersome Suggested an improvement to mail box design in order to make the process of handling mail more efficient ​Obtained a degree in Mechanical Engineering, since it was the Post Office’s requirement to redesign mail collection boxes TMI, a casework and countertop manufacturing company needed to improve their assembly process Gathered over 100 ideas by performing tasks at all work and assembly stations. ​Project revealed potential risks to worker safety. To solve it, designed an automatic stop to increase efficiency and prevent injury At the metal paint department at Polaris, their paint line was setup in a limited space and had to handle loading and unloading of parts, which caused significant downtime Designed a new layout and moved loading and unloading offline and in a different location ​Material movement was improved and the need for downtime was eliminated At Cirrus Design, their aircraft build rate was not meeting their goal of two per day Analyzed workflow and identified the need to add one more ply cutter ​The addition of another ply cutter allowed to reach the goal of building two aircraft per day
  • 7. Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014 TROUBLESHOOT 03
  • 8. Slide Design© Duarte, Inc. 2014 Troubleshoot ​Seek opportunities to identify, troubleshoot and correct production difficulties The metal paint department at Polaris had an issue with an inadequate oven stop on the conveyor line in which parts had to cure for a certain amount of time Redesigned the stop to work at a 45 degree angle, opposed to working completely horizontally. This resolved the issue that was causing the stop to fail. ​The solution was effective, even though the supplier of the conveyor line had communicated to Polaris that it could not be done
  • 9. Slide Design© Duarte, Inc. 2014© Duarte, Inc. 2014 ELIMINATE 04
  • 10. Slide Design© Duarte, Inc. 2014 Eliminate ​Use analysis to identify opportunities to eliminate waste throughout the organization Eclipse Aviation, a startup company, was trying to obtain type certification for their Eclipse 500 aircraft Conducted a company- wide process audit ​After implementing the process and training the organization, Eclipse Aviation obtained type certification for the Eclipse 500 six months ahead of schedule Audit revealed substantial gaps in communication between functional groups. There was a breakdown in the hand-off process from group to group. Discovered that most employees were not aware of how to establish a relationship with the FAA for aircraft type certification Wrote a procedure to eliminate gaps, which caused waste of time and resources Documented the procedure manually, before automating it using SAP Obtained buy-in from senior leadership and trained 250+ employees in how to implement it
  • 11. Slide Design© Duarte, Inc. 2014 MARK KREITINGER Over 20 years of comprehensive experience in multiple industries such as manufacturing, aviation, automotive, emission solutions, power generation and sports and utility vehicles. Lean Engineering and Continuous Improvement Professional Highly knowledgeable in lean enterprise processes, focused on cost reduction and weight reduction practices applied in end- to-end product design. An innovative individual with a proven 7-step process to assist organizations and facilitate the intersection between engineering and manufacturing. 608.609.0032 mark.kreitinger@gmail.com Linkedin.com/in/markkreitinger Image source www.icons8.com