Basic Lean Training
FUNDAMENTALS OF LEAN
HISTORY OF MANUFACTURING
• Made to customer specifications
• Single piece mfg… each product unique
• Variable quality
• Little inventory
• High cost … made for the rich
Craft
 Interchangeable parts
 Division of labor
 Assembly lines
 Labor strife
Mass Production
 High variety
 Small batch sizes
 PPM quality
 Engaged workforce
“Lean” Enterprise
WHY ARE WE HERE??
LONG-TERM
“HEALTH”
CUSTOMER
SATISFACTION
SALESAND
PROFITS
It’s About Performance!
KEY RESULTS TO BE EXPECTED
Immediate
 20%+ Productivity Improvement
 30%+ Floor Space Reduction
 25%+ Quality Improvements
 75%+ WIP Inventory Reduction
 35%+ Set-Up Time Reduction
KEY RESULTS TO BE EXPECTED
Longer Term
 Lead times cut from weeks to hours
 Quality approaches zero defects
 Significant improvement in employee and
customer satisfaction
 Continually reduced unit costs
5 PRINCIPLES OF LEAN THINKING
• Key principles of “Lean Thinking”:
VALUE - what customers are willing to pay
for
VALUE STREAM - the steps that deliver
value
FLOW - organizing the Value Stream to be
continuous
PULL – triggering flow from customer
needs
PERFECTION - continuous improvement
forever (culture)
(from Lean Thinking, Womack and
Jones, 1996)
VALUE STREAMS ARE FINANCIAL
items in
items out
value
added
KEY
ASSETS
COSTS
PROFIT
items in
items out
value
added
KEY
ASSETS
COSTS
PROFIT
RETURN ON
KEY ASSETS
• Key Assets
̵ Inventory
̵ Receivables
̵ Fixed assets
• equipment
• facilities
• Goals
̵ More profits
̵ With less assets
RAPID CONTINUOUS IMPROVEMENT (RCI)
• A Rapid Continuous Improvement Event is
̵ An intense, focused activity (4.5 days)
̵ A team focused on a specific area
• Specific Lean Tools used to identify waste
̵ Roots: Toyota Production System
̵ Applied wherever work is done
• Lean is a Learn by Doing process
̵ Learn the tools by using them
̵ Measurable improvement expected
THE 7-WEEK CYCLE OF AN RCI EVENT
• 3 weeks before – Value Stream review, Event Selection, Select
Team Leader/Co-Leader … Financial Impact?
• 1-2 weeks before – RCI Checklist, preparation .. Cell
Communication
 day 1 - current conditions
 day 2 - big changes
 day 3 - run the cell
 day 4 - standard work
 day 5 - presentation
 1st week after - Capture the savings
 2nd week after – Update Standard
Work
 3rd week after – CFO validation
•Step 1 “Identify” waste
•Step 2 “Eliminate” waste
• “Value-Adding” changes the value of an item
•Drilling
•Assembling
•Painting
•Cutting
•Welding
VALUE ADDING
NON-VALUE ADDING
• Consumes time and money
• Does not change the value of an item
•Sorting
•Counting
•Stacking
•Expediting
•Checking
VALUE-ADDING / NON-VALUE-ADDING
• Value-adding:
̵ Any activity that contributes directly to satisfying
the need of a customer, e.g.,
• Airline transportation service (actually flying)
• Admin. process for hiring (interviewing a candidate)
• Remodeling service (attaching drywall panels)
• Admin. process for payables (reconciling Invoices
with purchases)
VALUE-ADDING / NON-VALUE-ADDING
• Non-value adding:
̵ Any activity that takes time or resources but does
not contribute directly to satisfying the need of a
customer, e.g.,
• Airline transportation service (lining up to check in)
• Admin. hiring process (scheduling the interview)
• Remodeling service (waiting for materials)
• Admin. process for payables (finding and sorting
purchase orders)
All value streams are a combination of value
adding and non value adding
Value
added
Lead Time
PROBLEM WITH TRADITIONAL IMPROVEMENTS
Total Lead Time to Customer
Un-changed
97.5 % NVA
95 % NVA
V.A. Time 2.5%
5%
Value Adding
“Lets make improvements” (e.g. faster machines)
Existing Batch Operations
Order
Order
Ship
Ship
Improvement will be easier and more likely to
succeed by focusing on & removing the non-value
added activities (waste)
THE ‘BIG IDEA’ OF LEAN THINKING ?
Total Lead Time to Customer
95 % NVA 5%
Value
Adding
Order Ship
Profit = Price - Costs
WHY LEAN THINKING ?
The world has changed!
We can no longer sell everything we make.
Competition is everywhere!
Capacity = Work + Waste
WHAT ARE THE BENEFITS?
TRADITIONAL FLOW VS. CELLULAR FLOW
Traditional flow Cellular flowDept 1
Dept 2
Dept 4
OUT
DONE
OUT
OUT
OUT
IN
IN
IN
IN
DONE
IN
•Natural
Groups in
each cell
•Work
sequence
may be
different
from part
flow
sequence
4 3
1 2
Out
In
Dept 3
RCI IS ABOUT SEEING WASTE (8 WASTES)
• Wasted Human Talent – Damage to people
• Defects – Material that isn’t right & needs to be fixed
• Inventory – Material waiting to be worked
• Overproduction – Too much / too early
• Waiting Time – People waiting for material to arrive
• Motion – Unnecessary human movement
• Transportation – Moving people & material
• Processing Waste – Tasks we have to do that don’t add
value to the material we are producing!
TPS – THE ROOTS OF “LEAN”
TOYOTA
PRODUCTION SYSTEM (“TPS”)
JUST-IN-TIME
- what’s needed
- when needed
- in the quantity
needed
LEVELING (of overall volume and of mix variation)
AUTONOMATION
(JIDOKA)
- autonomous
- defect-free
- detects abnormal
conditions
INVOLVEMENT:
Flexible, Motivated,
team members
always looking for a
better way
T.P.S
TAKT TIME TIME OBS. BARCHART 6S
PROD. CONTROL SPAGHETTI STANDARD STD WIP
BOARD DIAGRAM WORK SHEET
KEY POINTS CAPACITY COMBINATION LOAD-LOAD
SHEET SHEET
PULL SYSTEM TPM POKA-YOKE ONE PIECE FLOW
(KANBAN)
SETUP LEVELING
REDUCTION
WASTE ELIMINATION
TOOLS
IMPROVEMENT TOOLS COME FROM TPS
9 KEY TOOLS FOR SEEING WASTE
• The key to eliminating waste is to first be able to see it
• These 9 tools help us identify waste:
Takt Time
Time observation
Bar chart
Spaghetti diagram
Flow diagram
Standard work sheet
Standard work combination sheet
Production control board
Standard WIP
TAKT TIME
• Takt Time = (available time) / (customer demand)
What is the Takt Time?
Are we producing at Takt Time?
Why not?
Takt Time is the first tool which distinguishes between
“faster is better” from “how many do I need”?
TAKT TIME CALCULATION
8 hour shift
- 20 min breaks
- 10 min c/u
450 min
27,000
257
105 Sec.
total time
available
real demand per shift
with backup data
TAKT TIME
convert to seconds for
Takt Time calculation
8 hr. shift x 60 min/hr = 480 min
(breaks) - 20 min
(clean up) - 10 min
450 min
450 min x 60 sec/min = 27,000 sec.
426
63
TAKT TIME
• Takt time tells you how much time you “get”
Takt Time will be different in all areas of your plant
Available time can vary by department or cell
Takt Time can vary by day …. Or shift …
Customer demand is based on actual demand
Do you know your customer demand? Does your
supervisor?
Takt Time drives product cost!
• Staffing (Productivity)
• Size of cell (Floor Space)
• Capital equipment (Burden)
• Inventory (Turns/Cash Flow)
TIME OBSERVATION
• The time observation determines how long it takes to do
the task
̵ Time observations are not time studies
̵ The time observation is a tool to help you see waste
̵ Time observations help you see the non-value-adding steps in
detail
TIME OBSERVATION
• Time observations help you identify the waste
• Look for opportunities to eliminate “work” when
observing someone
• Selecting the “lowest repeated” time, when observing
someone, provides Step 1 in improvement
̵ Make every unit repeat in the “lowest repeated” time
̵ Break down the steps into Value-Added and Non-Value-Added
steps
̵ Eliminate the Non-Value-Added tasks
BAR CHART
• Bar Charts show time observation data:
̵ Place line showing Takt Time
̵ 1 bar for each person (1 time observation for each person)
̵ Look for waste Identified by the Bar Char
̵ How many people do we need?
SPAGHETTI DIAGRAM
• Purpose: To help see movement
of people
• Makes motion and transportation
waste obvious
• Stand back and observe the
operator
̵ Where do they go?
̵ Why?
• 1 Spaghetti Diagram per person
in the cell
FLOW DIAGRAM
• Flow diagrams often help us see how “material” flows
̵ VA and NVA steps
̵ Total process … before and after your cell
̵ Use Value Stream Maps for detailed diagram
• See the flow, see the waste, and develop a vision
Weld Paint
Cut Punch BendStore
QC
Store
Cut Punch BendStore Store
Store Store
FLOW DIAGRAM
STANDARD WORK SHEET
• Standard Work Sheets show the “current best way”
̵ Layout of the cell
̵ How many people in the cell
̵ Work sequence of each person
̵ Standard WIP
• quantity and locations
STANDARD WORK SHEET
# peopleSafety Hazards
Quality
Checks
Standard WIP
• Production Control boards help us achieve Takt Time
̵ Visually monitor Output vs. Takt Time
̵ Operators communicate problems/issues
̵ Supervisors responsible for resolution
̵ Problems/solutions are visible and documented
PRODUCTION CONTROL BOARD
• Standard WIP is a calculated number
• Standard WIP highlights where the problems are
Where should the Standard WIP be located?
Is it there now? If not, what has happened?
Use the Standard WIP to make problems visible
STANDARD WIP
• Standard WIP is a calculated number
• Standard WIP is used to manage obstacles to “flow”
̵ Examples:
• Glue drying
• Yield
• Heat treating (monuments)
• Parts used as pairs or sets
• Timing of complex flows
STANDARD WIP
STANDARD WORK BOARD
- TIME OBSERVATION SHEET
(on file in the cell)
- BAR CHART (1 per cell)
- STANDARD WORK SHEET
(1 per cell)
- STANDARD WORK
COMBINATION SHEET
(1 per person in the cell)
- KEY POINTS SHEET
(1 per work station in the cell)
- CAPACITY SHEET
(1 per cell)
AT T/T
W
HINE
R.I. EVENT GOALS: INCREASE PRODUCTIVITY 30%
WHERE TO USE THESE TOOLS
 TAKT TIME
 TIME OBSERVATION
 BAR CHART
 SPAGHETTI DIAGRAM
 FLOW DIAGRAM
 COMBINATION SHEET
 STANDARD WORK
SHEET
 PRODUCTION
CONTROL BOARD
 STANDARD WIP
documenting
Standard Work
RI Event
current
conditions
Visual
Management
of a cell
MANAGEMENT DECISIONS
• Managers/Supervisors make decisions that create
results
• Good decisions create good results (measurements)
̵ Key decisions
• How many people do I need?
• Who does what?
̵ Critical skills
• Seeing problems (visual management)
• Resolving problems
ADJUST FOR CHANGES
• Cell managers maintain and update Standard Work
• When Takt Time changes...
̵ Determine staffing
̵ Add or redeploy people … what happens if you overstaff?
̵ Standard Work documents should exist for different staffing
• When the cell is improved
̵ Update all Standard Work documents
Encourage Improvements!!!
WALK, STOP AND LOOK
• Management succeeds or fails at the cell level first
• Spend at least 30 minutes, 2 times per day
• Take the time to stop and observe:
̵ Production Control Boards
̵ Standard WIP
̵ Standard Work sequence
• 10 second rule!!
• Is anyone capturing the “Golden Nuggets”?
• What’s being done to resolve them?
• Is anyone Identifying waste?
• Is anyone eliminating waste?
CELLS
• Cells are the building block of Lean
• To establish a cell you need:
̵ One Piece Flow
̵ Standard work
̵ 6S
̵ Pull Systems
ONE-PIECE FLOW (CELLS)
• Natural groups of parts or steps
• One piece flow inside the cell
• One operator may run the cell
• No birdcages or barriers
• U-shaped design
• Multi-skilled people
• Layout based on flow steps
Work sequence based on
output required!
DONE
IN
4
3
1 2
5

 




Batch size of 300 vs. Batch size of 1
A
B
C
1
minute
2
minutes
3
minutes
• First Piece Done - 3 Minutes
(can move on to next step)
• 300th Piece Done - 302 Minutes
• WIP = 3 Pieces
A
B
C
300
minutes
600
minutes
900
minutes
• First Piece Done - 601 Minutes
(but waits for other 299 pieces)
• 300 Pieces Done - 900 Minutes
• WIP = 900 Pieces
Reduced Batch Sizes
• Standard Work is a management system
̵ TAKT TIME (available time / customer demand)
̵ WORK SEQUENCE (assign one Takt Time to each person)
̵ STANDARD WIP (minimum amount needed to run the cell)
• Standard Work has a standardized documentation
• Standard Work enables Visual Management
̵ Production Control Boards
̵ Standard WIP Levels
̵ Standard Work Board
STANDARD WORK
see and resolve
problems
6S
1. SAFETY (see and fix unsafe conditions)
2. SORT OUT (get rid of what’s not needed)
3. STRAIGHTEN (organize what belongs)
4. SCRUB (clean up, see and solve problems)
5. STANDARDIZE (who does what to keep it up)
6. SUSTAIN (be disciplined… keep it orderly)
6S is the foundation for all future improvements
VISUAL MANAGEMENT (SUPPORTS ALL TOOLS)
APPLY VISUAL TOOLS
VISUAL WIP
INDICATORS
STATUS
UNITS VS PLAN
ALARMS
LOCATIONS
CORRECTIVE ACTION /
6-SIGMA
OWNED BY THE PEOPLE WHO WORK IN THE AREA
SEE
AT-A-GLANCE
(5 seconds)
NORMAL
ABNORMAL
VISUAL MANAGEMENT (SUPPORTS ALL TOOLS)
PULL SYSTEMS
• Pull Systems link cells together
̵ Only when a single cell is not possible
• All Pull Systems have three elements:
̵ Upstream “ready” - pulled when needed
̵ Downstream “in use” - being consumed "now"
̵ Trigger - a signal (what, where, when, how many)
PULL SYSTEMS
BASICS OF LEAN FOR MANUFACTURING
On-Demand, Defect-Free,
One-By-One at the Lowest
Cost
Philosophy
(Long Term Thinking)
Process
(Eliminate Waste)
People & Partners
(Respect, Challenge and Grow Them)
Problem
Solving
(Continuous
Improvement and
Learning)
•Continual Organizational Learning
•Go see For Yourself To Fully Understand The Situation
•Make Decisions Slowly By Consensus, Thoroughly Considering All
Options; Implement Rapidly
•Grow Leaders Who Live The Philosophy
•Respect, Challenge, And Grow Your People And Teams
•Respect, Challenge, and Help Your Suppliers
•Base Management Decisions On Long-Term
Philosophy,
4P Model Of
The Toyota Way
•Create Process Flow to Surface Problems
•Use Pull Systems To Avoid Overproduction
•Level Out The Workload
•Stop When There Is A Quality Problem
•Standardize Tasks For Continual Improvement
•Use Visual Controls So No Problems Are Hidden
•Use Only Reliable, Thoroughly Tested Technology
HEXAGON LINCOLN
K. Hazen

More Related Content

PPTX
Lean basics
PPT
Lean manufacturing
PDF
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
PPT
LEAN MANUFACTURING USES
PDF
Manufacturing wastes
PPT
Hourly Lean Introduction
PPTX
Lean manufacturing
PPSX
Types of waste - lean Concept Krishna Heda
Lean basics
Lean manufacturing
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
LEAN MANUFACTURING USES
Manufacturing wastes
Hourly Lean Introduction
Lean manufacturing
Types of waste - lean Concept Krishna Heda

What's hot (20)

PPTX
Lean manufacturing ppt
PPTX
Tools of lean mfg
PPTX
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
PPTX
Lean Manufacturing PowerPoint Presentation Sample
PPTX
Lean Fundamentals Overview Webinar
PDF
Lean Quick Changeover (SMED) Training Module
PDF
Value Stream Mapping
PPT
PPT
Lean Manufacturing Training
PPTX
Value Stream Mapping
PPT
Lean manufacturing overview
PPTX
Visual Management
PPTX
Lean manufacturing
PDF
Jidoka - An Improvement Tool of Lean
PPT
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
PPT
16 lean manufacturing
PDF
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
PPT
SMED-Observation Training
PPTX
Mistake proofing for web1
PPTX
Principle 4 heijunka
Lean manufacturing ppt
Tools of lean mfg
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Manufacturing PowerPoint Presentation Sample
Lean Fundamentals Overview Webinar
Lean Quick Changeover (SMED) Training Module
Value Stream Mapping
Lean Manufacturing Training
Value Stream Mapping
Lean manufacturing overview
Visual Management
Lean manufacturing
Jidoka - An Improvement Tool of Lean
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
16 lean manufacturing
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
SMED-Observation Training
Mistake proofing for web1
Principle 4 heijunka
Ad

Viewers also liked (14)

PDF
QAAET Conference -Continuous Improvement - David Sherlock
PPTX
8 Wastes of LEAN Construction
PPT
Lean Fundamentals Rev A
ODP
Lean em 15 minutos
PDF
Lecture 4b
PDF
TPM CYCLE A
PDF
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
PPTX
Introduction to jidoka november 2016
PPTX
Poka Yoka
PPTX
Poka Yoke Final Ppt
PPT
Toyota production system
PDF
Lean Process Improvement Techniques
PPT
Sistema Poka Yoke
QAAET Conference -Continuous Improvement - David Sherlock
8 Wastes of LEAN Construction
Lean Fundamentals Rev A
Lean em 15 minutos
Lecture 4b
TPM CYCLE A
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Introduction to jidoka november 2016
Poka Yoka
Poka Yoke Final Ppt
Toyota production system
Lean Process Improvement Techniques
Sistema Poka Yoke
Ad

Similar to Fundamentals of Lean (20)

PPTX
MARMAC MANUFACTURING LEAN PRESENTATION (1)
PPT
MANT 265 S01.ppt
PPTX
Lean Introduction.pptx
PPTX
Lean In Manufacturing
PDF
Lesson 10 - Value stream mapping
PPT
Presentation on Lean Manufacturing and waste elimination
PPTX
Awareness To Lean & 7 Qc Tools
PPTX
Lean 101 2 Hour 2011
PDF
5 Steps to implementing Lean
PPTX
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
PPT
introduction dans les prarique de Lean.ppt
PPTX
Value Stream Mapping ( Lean manufacturing )
PPT
Lean Transformation with Value stream mapping
PDF
Using lean to reduce prototype lead time 2006
PDF
Lean six sigma 3d
PPT
Generic Lean Overview For Future Employer Of Alan S Desrocher
PDF
Introduction To Lean
PDF
Lean logistics and warehousing final
PPT
Lean Manufacturing 2009 - By Jerry Helms
MARMAC MANUFACTURING LEAN PRESENTATION (1)
MANT 265 S01.ppt
Lean Introduction.pptx
Lean In Manufacturing
Lesson 10 - Value stream mapping
Presentation on Lean Manufacturing and waste elimination
Awareness To Lean & 7 Qc Tools
Lean 101 2 Hour 2011
5 Steps to implementing Lean
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
introduction dans les prarique de Lean.ppt
Value Stream Mapping ( Lean manufacturing )
Lean Transformation with Value stream mapping
Using lean to reduce prototype lead time 2006
Lean six sigma 3d
Generic Lean Overview For Future Employer Of Alan S Desrocher
Introduction To Lean
Lean logistics and warehousing final
Lean Manufacturing 2009 - By Jerry Helms

Fundamentals of Lean

  • 2. HISTORY OF MANUFACTURING • Made to customer specifications • Single piece mfg… each product unique • Variable quality • Little inventory • High cost … made for the rich Craft  Interchangeable parts  Division of labor  Assembly lines  Labor strife Mass Production  High variety  Small batch sizes  PPM quality  Engaged workforce “Lean” Enterprise
  • 3. WHY ARE WE HERE?? LONG-TERM “HEALTH” CUSTOMER SATISFACTION SALESAND PROFITS It’s About Performance!
  • 4. KEY RESULTS TO BE EXPECTED Immediate  20%+ Productivity Improvement  30%+ Floor Space Reduction  25%+ Quality Improvements  75%+ WIP Inventory Reduction  35%+ Set-Up Time Reduction
  • 5. KEY RESULTS TO BE EXPECTED Longer Term  Lead times cut from weeks to hours  Quality approaches zero defects  Significant improvement in employee and customer satisfaction  Continually reduced unit costs
  • 6. 5 PRINCIPLES OF LEAN THINKING • Key principles of “Lean Thinking”: VALUE - what customers are willing to pay for VALUE STREAM - the steps that deliver value FLOW - organizing the Value Stream to be continuous PULL – triggering flow from customer needs PERFECTION - continuous improvement forever (culture) (from Lean Thinking, Womack and Jones, 1996)
  • 7. VALUE STREAMS ARE FINANCIAL items in items out value added KEY ASSETS COSTS PROFIT items in items out value added KEY ASSETS COSTS PROFIT RETURN ON KEY ASSETS • Key Assets ̵ Inventory ̵ Receivables ̵ Fixed assets • equipment • facilities • Goals ̵ More profits ̵ With less assets
  • 8. RAPID CONTINUOUS IMPROVEMENT (RCI) • A Rapid Continuous Improvement Event is ̵ An intense, focused activity (4.5 days) ̵ A team focused on a specific area • Specific Lean Tools used to identify waste ̵ Roots: Toyota Production System ̵ Applied wherever work is done • Lean is a Learn by Doing process ̵ Learn the tools by using them ̵ Measurable improvement expected
  • 9. THE 7-WEEK CYCLE OF AN RCI EVENT • 3 weeks before – Value Stream review, Event Selection, Select Team Leader/Co-Leader … Financial Impact? • 1-2 weeks before – RCI Checklist, preparation .. Cell Communication  day 1 - current conditions  day 2 - big changes  day 3 - run the cell  day 4 - standard work  day 5 - presentation  1st week after - Capture the savings  2nd week after – Update Standard Work  3rd week after – CFO validation •Step 1 “Identify” waste •Step 2 “Eliminate” waste
  • 10. • “Value-Adding” changes the value of an item •Drilling •Assembling •Painting •Cutting •Welding VALUE ADDING
  • 11. NON-VALUE ADDING • Consumes time and money • Does not change the value of an item •Sorting •Counting •Stacking •Expediting •Checking
  • 12. VALUE-ADDING / NON-VALUE-ADDING • Value-adding: ̵ Any activity that contributes directly to satisfying the need of a customer, e.g., • Airline transportation service (actually flying) • Admin. process for hiring (interviewing a candidate) • Remodeling service (attaching drywall panels) • Admin. process for payables (reconciling Invoices with purchases)
  • 13. VALUE-ADDING / NON-VALUE-ADDING • Non-value adding: ̵ Any activity that takes time or resources but does not contribute directly to satisfying the need of a customer, e.g., • Airline transportation service (lining up to check in) • Admin. hiring process (scheduling the interview) • Remodeling service (waiting for materials) • Admin. process for payables (finding and sorting purchase orders)
  • 14. All value streams are a combination of value adding and non value adding Value added Lead Time
  • 15. PROBLEM WITH TRADITIONAL IMPROVEMENTS Total Lead Time to Customer Un-changed 97.5 % NVA 95 % NVA V.A. Time 2.5% 5% Value Adding “Lets make improvements” (e.g. faster machines) Existing Batch Operations Order Order Ship Ship
  • 16. Improvement will be easier and more likely to succeed by focusing on & removing the non-value added activities (waste) THE ‘BIG IDEA’ OF LEAN THINKING ? Total Lead Time to Customer 95 % NVA 5% Value Adding Order Ship
  • 17. Profit = Price - Costs WHY LEAN THINKING ? The world has changed! We can no longer sell everything we make. Competition is everywhere!
  • 18. Capacity = Work + Waste WHAT ARE THE BENEFITS?
  • 19. TRADITIONAL FLOW VS. CELLULAR FLOW Traditional flow Cellular flowDept 1 Dept 2 Dept 4 OUT DONE OUT OUT OUT IN IN IN IN DONE IN •Natural Groups in each cell •Work sequence may be different from part flow sequence 4 3 1 2 Out In Dept 3
  • 20. RCI IS ABOUT SEEING WASTE (8 WASTES) • Wasted Human Talent – Damage to people • Defects – Material that isn’t right & needs to be fixed • Inventory – Material waiting to be worked • Overproduction – Too much / too early • Waiting Time – People waiting for material to arrive • Motion – Unnecessary human movement • Transportation – Moving people & material • Processing Waste – Tasks we have to do that don’t add value to the material we are producing!
  • 21. TPS – THE ROOTS OF “LEAN” TOYOTA PRODUCTION SYSTEM (“TPS”) JUST-IN-TIME - what’s needed - when needed - in the quantity needed LEVELING (of overall volume and of mix variation) AUTONOMATION (JIDOKA) - autonomous - defect-free - detects abnormal conditions INVOLVEMENT: Flexible, Motivated, team members always looking for a better way
  • 22. T.P.S TAKT TIME TIME OBS. BARCHART 6S PROD. CONTROL SPAGHETTI STANDARD STD WIP BOARD DIAGRAM WORK SHEET KEY POINTS CAPACITY COMBINATION LOAD-LOAD SHEET SHEET PULL SYSTEM TPM POKA-YOKE ONE PIECE FLOW (KANBAN) SETUP LEVELING REDUCTION WASTE ELIMINATION TOOLS IMPROVEMENT TOOLS COME FROM TPS
  • 23. 9 KEY TOOLS FOR SEEING WASTE • The key to eliminating waste is to first be able to see it • These 9 tools help us identify waste: Takt Time Time observation Bar chart Spaghetti diagram Flow diagram Standard work sheet Standard work combination sheet Production control board Standard WIP
  • 24. TAKT TIME • Takt Time = (available time) / (customer demand) What is the Takt Time? Are we producing at Takt Time? Why not? Takt Time is the first tool which distinguishes between “faster is better” from “how many do I need”?
  • 25. TAKT TIME CALCULATION 8 hour shift - 20 min breaks - 10 min c/u 450 min 27,000 257 105 Sec. total time available real demand per shift with backup data TAKT TIME convert to seconds for Takt Time calculation 8 hr. shift x 60 min/hr = 480 min (breaks) - 20 min (clean up) - 10 min 450 min 450 min x 60 sec/min = 27,000 sec. 426 63
  • 26. TAKT TIME • Takt time tells you how much time you “get” Takt Time will be different in all areas of your plant Available time can vary by department or cell Takt Time can vary by day …. Or shift … Customer demand is based on actual demand Do you know your customer demand? Does your supervisor? Takt Time drives product cost! • Staffing (Productivity) • Size of cell (Floor Space) • Capital equipment (Burden) • Inventory (Turns/Cash Flow)
  • 27. TIME OBSERVATION • The time observation determines how long it takes to do the task ̵ Time observations are not time studies ̵ The time observation is a tool to help you see waste ̵ Time observations help you see the non-value-adding steps in detail
  • 28. TIME OBSERVATION • Time observations help you identify the waste • Look for opportunities to eliminate “work” when observing someone • Selecting the “lowest repeated” time, when observing someone, provides Step 1 in improvement ̵ Make every unit repeat in the “lowest repeated” time ̵ Break down the steps into Value-Added and Non-Value-Added steps ̵ Eliminate the Non-Value-Added tasks
  • 29. BAR CHART • Bar Charts show time observation data: ̵ Place line showing Takt Time ̵ 1 bar for each person (1 time observation for each person) ̵ Look for waste Identified by the Bar Char ̵ How many people do we need?
  • 30. SPAGHETTI DIAGRAM • Purpose: To help see movement of people • Makes motion and transportation waste obvious • Stand back and observe the operator ̵ Where do they go? ̵ Why? • 1 Spaghetti Diagram per person in the cell
  • 31. FLOW DIAGRAM • Flow diagrams often help us see how “material” flows ̵ VA and NVA steps ̵ Total process … before and after your cell ̵ Use Value Stream Maps for detailed diagram • See the flow, see the waste, and develop a vision Weld Paint Cut Punch BendStore QC Store Cut Punch BendStore Store Store Store
  • 33. STANDARD WORK SHEET • Standard Work Sheets show the “current best way” ̵ Layout of the cell ̵ How many people in the cell ̵ Work sequence of each person ̵ Standard WIP • quantity and locations
  • 34. STANDARD WORK SHEET # peopleSafety Hazards Quality Checks Standard WIP
  • 35. • Production Control boards help us achieve Takt Time ̵ Visually monitor Output vs. Takt Time ̵ Operators communicate problems/issues ̵ Supervisors responsible for resolution ̵ Problems/solutions are visible and documented PRODUCTION CONTROL BOARD
  • 36. • Standard WIP is a calculated number • Standard WIP highlights where the problems are Where should the Standard WIP be located? Is it there now? If not, what has happened? Use the Standard WIP to make problems visible STANDARD WIP
  • 37. • Standard WIP is a calculated number • Standard WIP is used to manage obstacles to “flow” ̵ Examples: • Glue drying • Yield • Heat treating (monuments) • Parts used as pairs or sets • Timing of complex flows STANDARD WIP
  • 38. STANDARD WORK BOARD - TIME OBSERVATION SHEET (on file in the cell) - BAR CHART (1 per cell) - STANDARD WORK SHEET (1 per cell) - STANDARD WORK COMBINATION SHEET (1 per person in the cell) - KEY POINTS SHEET (1 per work station in the cell) - CAPACITY SHEET (1 per cell) AT T/T W HINE R.I. EVENT GOALS: INCREASE PRODUCTIVITY 30%
  • 39. WHERE TO USE THESE TOOLS  TAKT TIME  TIME OBSERVATION  BAR CHART  SPAGHETTI DIAGRAM  FLOW DIAGRAM  COMBINATION SHEET  STANDARD WORK SHEET  PRODUCTION CONTROL BOARD  STANDARD WIP documenting Standard Work RI Event current conditions Visual Management of a cell
  • 40. MANAGEMENT DECISIONS • Managers/Supervisors make decisions that create results • Good decisions create good results (measurements) ̵ Key decisions • How many people do I need? • Who does what? ̵ Critical skills • Seeing problems (visual management) • Resolving problems
  • 41. ADJUST FOR CHANGES • Cell managers maintain and update Standard Work • When Takt Time changes... ̵ Determine staffing ̵ Add or redeploy people … what happens if you overstaff? ̵ Standard Work documents should exist for different staffing • When the cell is improved ̵ Update all Standard Work documents Encourage Improvements!!!
  • 42. WALK, STOP AND LOOK • Management succeeds or fails at the cell level first • Spend at least 30 minutes, 2 times per day • Take the time to stop and observe: ̵ Production Control Boards ̵ Standard WIP ̵ Standard Work sequence • 10 second rule!! • Is anyone capturing the “Golden Nuggets”? • What’s being done to resolve them? • Is anyone Identifying waste? • Is anyone eliminating waste?
  • 43. CELLS • Cells are the building block of Lean • To establish a cell you need: ̵ One Piece Flow ̵ Standard work ̵ 6S ̵ Pull Systems
  • 44. ONE-PIECE FLOW (CELLS) • Natural groups of parts or steps • One piece flow inside the cell • One operator may run the cell • No birdcages or barriers • U-shaped design • Multi-skilled people • Layout based on flow steps Work sequence based on output required! DONE IN 4 3 1 2 5       
  • 45. Batch size of 300 vs. Batch size of 1 A B C 1 minute 2 minutes 3 minutes • First Piece Done - 3 Minutes (can move on to next step) • 300th Piece Done - 302 Minutes • WIP = 3 Pieces A B C 300 minutes 600 minutes 900 minutes • First Piece Done - 601 Minutes (but waits for other 299 pieces) • 300 Pieces Done - 900 Minutes • WIP = 900 Pieces Reduced Batch Sizes
  • 46. • Standard Work is a management system ̵ TAKT TIME (available time / customer demand) ̵ WORK SEQUENCE (assign one Takt Time to each person) ̵ STANDARD WIP (minimum amount needed to run the cell) • Standard Work has a standardized documentation • Standard Work enables Visual Management ̵ Production Control Boards ̵ Standard WIP Levels ̵ Standard Work Board STANDARD WORK see and resolve problems
  • 47. 6S 1. SAFETY (see and fix unsafe conditions) 2. SORT OUT (get rid of what’s not needed) 3. STRAIGHTEN (organize what belongs) 4. SCRUB (clean up, see and solve problems) 5. STANDARDIZE (who does what to keep it up) 6. SUSTAIN (be disciplined… keep it orderly) 6S is the foundation for all future improvements
  • 48. VISUAL MANAGEMENT (SUPPORTS ALL TOOLS) APPLY VISUAL TOOLS VISUAL WIP INDICATORS STATUS UNITS VS PLAN ALARMS LOCATIONS CORRECTIVE ACTION / 6-SIGMA OWNED BY THE PEOPLE WHO WORK IN THE AREA SEE AT-A-GLANCE (5 seconds) NORMAL ABNORMAL
  • 50. PULL SYSTEMS • Pull Systems link cells together ̵ Only when a single cell is not possible • All Pull Systems have three elements: ̵ Upstream “ready” - pulled when needed ̵ Downstream “in use” - being consumed "now" ̵ Trigger - a signal (what, where, when, how many)
  • 52. BASICS OF LEAN FOR MANUFACTURING On-Demand, Defect-Free, One-By-One at the Lowest Cost
  • 53. Philosophy (Long Term Thinking) Process (Eliminate Waste) People & Partners (Respect, Challenge and Grow Them) Problem Solving (Continuous Improvement and Learning) •Continual Organizational Learning •Go see For Yourself To Fully Understand The Situation •Make Decisions Slowly By Consensus, Thoroughly Considering All Options; Implement Rapidly •Grow Leaders Who Live The Philosophy •Respect, Challenge, And Grow Your People And Teams •Respect, Challenge, and Help Your Suppliers •Base Management Decisions On Long-Term Philosophy, 4P Model Of The Toyota Way •Create Process Flow to Surface Problems •Use Pull Systems To Avoid Overproduction •Level Out The Workload •Stop When There Is A Quality Problem •Standardize Tasks For Continual Improvement •Use Visual Controls So No Problems Are Hidden •Use Only Reliable, Thoroughly Tested Technology