1. Sewage Treatment Plant, RO & Sewage
Network Performance Evaluation
Kick of Meeting-22/10/2018
SAIF Zone
Presenter – Dr. H. K. Patnaik; Technical Director
3. Environmental International Consultants
Credentials
Established in 1994 in Georgia, Atlanta, USA
Offshore branch in Dubai opened in 1996
Became a fully independent firm in 2006
Group subsidiary: EICSS India based in Gurugram, Hyderabad &
Baroda, India
Has 30 professional consultants based in UAE & India
Approved by Dubai Municipality, Trakhees and FEA since 2006
NABET (Govt of India) approved for Hydrogeology
5. Key Objective of the Study
• The whole study is divided into:
• Phase I
I. Comprehensive Technical/Operational Evaluation of 2 No.’s STP
II. Comprehensive Technical/Operational Evaluation of 5 No.’s RO Plants
III. Comprehensive Evaluation of Sewerage Network
• Phase II
I. Proposed Consultancy Service for the Project Execution based on the above
findings.
6. Scope of Works-Comprehensive Technical/Operational
Evaluation of 2 No.’s STP
I. Physical Verification of the plant and its unit operations
II. Calculating the hydraulic loading rate
III. Evaluation of individual unit operations and their efficiencies'
IV. Condition survey / Snagging of plant & plant components
V. Detailed evaluation of maintenance regime
VI. Recommendations to improve plant operation/upgradation
VII. Feasibility verification study on future expansion
VIII.Report Preparation & Submission with recommendations and details
of future expansion requirements
7. Scope of Works-Comprehensive Technical/Operational Evaluation
of 5 No.’s RO Plants
I. Evaluation of individual unit performance and overall plant operation
efficiency
II. Condition survey / Snagging of plant & plant components
III. Detailed evaluation of maintenance regime
IV. Recommendations on future expansion plans and efficiency
improvement
V. Report preparation & submission on overall plant
operation/upgradation / future expansions
8. Scope of Works-Comprehensive Evaluation of Sewerage Network
I. Reconnaissance survey of the project site
II. Physical Verification of Sewage collection system
III. Calculation of Hydraulic loading rate
IV. Verification of water balance for the facility from available data
V. Conduct a feasibility evaluation on network expansion plan by SAIF
Zone
VI. Report Preparation & submission with recommendations to improve
overall sewerage network
9. Activities for STP 1 & 2 Week 1 Week 2 Week 3 Week4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13
Physical Verification of the plant and its unit operations
Calculating the hydraulic loading rate
Evaluation of individual unit operations and their efficiencies'
Condition survey / Snagging of plant & components
Detailed evaluation of maintenance regime
Recommendations to improve plant operation/upgradation
Feasibility verification study on future expansion
Report Preparation & Submission with recommendations and details of future expansion
requirements
Activities for RO Plants 1 to 5
Evaluation of individual unit performance and overall plant operation efficiency
Condition survey / Snagging of plant & plant components
Detailed evaluation of maintenance regime
Recommendations on future expansion plans and efficiency improvement
Report preparation & submission on overall plant operation/upgradation / future
expansions
Activities for Sewage Network System
Reconnaissance survey of the project site
Physical Verification of Sewage collection system
Calculation of Hydraulic loading rate
Verification of water balance for the facility from available data
Conduct a feasibility evaluation on network expansion plan by SAIF Zone
Report preparation & submission with recommendations to improve overall sewerage
network
Time Chart
10. Deliverables for the Project
• Each Report for facilities would consist of the following:
• Reconnaissance survey data of each facility
• Analysis of the influent and effluent parameters of each STP & RO system
• Gap Analysis for each unit of the facility
• Verification of O&M practices
• Recommendations on Design & Operational Efficiency
• Submission of technical proposals based on the above recommendations
11. Requirements from the Client
• Access Pass
• Work Permit
• HSE Induction & Requirements from SAIF Zone
• Work Space
• Single point of contact for the entire project
• Name of contact persons for various facilities
• Data Requirement
• Existing Facility Drawings
• As built Drawings
• Process Designs of STP
• Operation & Maintenance Procedures and Manuals
• Test Records
12. EIC team for the Project
EIC-Project Org Chart
Dr. H K Patnaik
Project Lead
Siva Kumar
Hydrogeologist
V. Aditya
Sr. Env. Engg
Ankit
Rana
Env. Engg
Ravi Teja
Project
Coordinator
Umiar
Khan
Field Supervisor
H. Kumar
QA/QC Manager
Risu
QA/QC Engg
Muriel
QA/QC Engg