Sewage Treatment Plant, RO & Sewage
Network Performance Evaluation
Kick of Meeting-22/10/2018
SAIF Zone
Presenter – Dr. H. K. Patnaik; Technical Director
Safety Moment..
Environmental International Consultants
Credentials
Established in 1994 in Georgia, Atlanta, USA
Offshore branch in Dubai opened in 1996
Became a fully independent firm in 2006
Group subsidiary: EICSS India based in Gurugram, Hyderabad &
Baroda, India
Has 30 professional consultants based in UAE & India
Approved by Dubai Municipality, Trakhees and FEA since 2006
NABET (Govt of India) approved for Hydrogeology
Key Offerings of EIC
Key Objective of the Study
• The whole study is divided into:
• Phase I
I. Comprehensive Technical/Operational Evaluation of 2 No.’s STP
II. Comprehensive Technical/Operational Evaluation of 5 No.’s RO Plants
III. Comprehensive Evaluation of Sewerage Network
• Phase II
I. Proposed Consultancy Service for the Project Execution based on the above
findings.
Scope of Works-Comprehensive Technical/Operational
Evaluation of 2 No.’s STP
I. Physical Verification of the plant and its unit operations
II. Calculating the hydraulic loading rate
III. Evaluation of individual unit operations and their efficiencies'
IV. Condition survey / Snagging of plant & plant components
V. Detailed evaluation of maintenance regime
VI. Recommendations to improve plant operation/upgradation
VII. Feasibility verification study on future expansion
VIII.Report Preparation & Submission with recommendations and details
of future expansion requirements
Scope of Works-Comprehensive Technical/Operational Evaluation
of 5 No.’s RO Plants
I. Evaluation of individual unit performance and overall plant operation
efficiency
II. Condition survey / Snagging of plant & plant components
III. Detailed evaluation of maintenance regime
IV. Recommendations on future expansion plans and efficiency
improvement
V. Report preparation & submission on overall plant
operation/upgradation / future expansions
Scope of Works-Comprehensive Evaluation of Sewerage Network
I. Reconnaissance survey of the project site
II. Physical Verification of Sewage collection system
III. Calculation of Hydraulic loading rate
IV. Verification of water balance for the facility from available data
V. Conduct a feasibility evaluation on network expansion plan by SAIF
Zone
VI. Report Preparation & submission with recommendations to improve
overall sewerage network
Activities for STP 1 & 2 Week 1 Week 2 Week 3 Week4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13
Physical Verification of the plant and its unit operations
Calculating the hydraulic loading rate
Evaluation of individual unit operations and their efficiencies'
Condition survey / Snagging of plant & components
Detailed evaluation of maintenance regime
Recommendations to improve plant operation/upgradation
Feasibility verification study on future expansion
Report Preparation & Submission with recommendations and details of future expansion
requirements
Activities for RO Plants 1 to 5
Evaluation of individual unit performance and overall plant operation efficiency
Condition survey / Snagging of plant & plant components
Detailed evaluation of maintenance regime
Recommendations on future expansion plans and efficiency improvement
Report preparation & submission on overall plant operation/upgradation / future
expansions
Activities for Sewage Network System
Reconnaissance survey of the project site
Physical Verification of Sewage collection system
Calculation of Hydraulic loading rate
Verification of water balance for the facility from available data
Conduct a feasibility evaluation on network expansion plan by SAIF Zone
Report preparation & submission with recommendations to improve overall sewerage
network
Time Chart
Deliverables for the Project
• Each Report for facilities would consist of the following:
• Reconnaissance survey data of each facility
• Analysis of the influent and effluent parameters of each STP & RO system
• Gap Analysis for each unit of the facility
• Verification of O&M practices
• Recommendations on Design & Operational Efficiency
• Submission of technical proposals based on the above recommendations
Requirements from the Client
• Access Pass
• Work Permit
• HSE Induction & Requirements from SAIF Zone
• Work Space
• Single point of contact for the entire project
• Name of contact persons for various facilities
• Data Requirement
• Existing Facility Drawings
• As built Drawings
• Process Designs of STP
• Operation & Maintenance Procedures and Manuals
• Test Records
EIC team for the Project
EIC-Project Org Chart
Dr. H K Patnaik
Project Lead
Siva Kumar
Hydrogeologist
V. Aditya
Sr. Env. Engg
Ankit
Rana
Env. Engg
Ravi Teja
Project
Coordinator
Umiar
Khan
Field Supervisor
H. Kumar
QA/QC Manager
Risu
QA/QC Engg
Muriel
QA/QC Engg
Discussions…
Regulatory Requirement- Wastewater Discharge
Parameters Stipulated Limit
Biochemical Oxygen Demand 20 mg/l
Chemical Oxygen Demand 100 mg/l
Residual Chlorine 0.5 mg/l
Ammoniacal Nitrogen 5 mg/l
Oil & Grease 5 mg/l
Total Dissolved Solids 1500 mg/l
Suspended Solids 50 mg/l
Fecal Coliforms 20 MPN/100 ml
Phosphorous 20 mg/l

More Related Content

PDF
IRJET- A Review Paper on Fabrication of Automatic Sewage Monitoring System
PPT
1. L E C T 43 Slides 120111 U R., E
DOCX
Baraa Mohd Al Sotari CV
PDF
Trenchless Rehabilitation of Sewer & Water Networks
PDF
A Management Tool for Small Community Onsite Wastewater Treatment Systems: Th...
PPTX
CE 4708 Presentation for civil engineering.pptx
PDF
Orion_profile (1)
DOC
Saeed Ahmad Infrastucture Engineer Utilities
IRJET- A Review Paper on Fabrication of Automatic Sewage Monitoring System
1. L E C T 43 Slides 120111 U R., E
Baraa Mohd Al Sotari CV
Trenchless Rehabilitation of Sewer & Water Networks
A Management Tool for Small Community Onsite Wastewater Treatment Systems: Th...
CE 4708 Presentation for civil engineering.pptx
Orion_profile (1)
Saeed Ahmad Infrastucture Engineer Utilities

Similar to gap analysis for infrastructure development (20)

PPTX
Sewage Treatment Plant
PPTX
Waste water treatment process and plant performance at 20MLD STP
PPTX
SafaiMitra_Suraksha_Webinar_Jamshedpur.pptx
PDF
Designed For Combined Common Effluent Treatment Plant Of Tarapur Midc
DOCX
final year Project (civil)
PPT
Presentation_O_M.ppt
PPT
with good 426702985-Presentation-O-M.ppt
PPT
Presentation_O&M.ppt
PPT
Presentation_O&M ppt.ppt
PPTX
Septic Systems for Homeowners
PPTX
final ppt.pptx this is used for sewage treatment plant
PPT
Infrastructure projects
PPT
Infrastructure projects
PPTX
City Council May 15, 2012 Hickory Update
PDF
DesignCriteriaManual DesignCriteriaManual.pdf
PPT
Wastewater
PDF
Onsite sewage facility
PDF
Onsite sewage facility
PDF
Onsite sewage facility
PDF
Onsite sewage facility
Sewage Treatment Plant
Waste water treatment process and plant performance at 20MLD STP
SafaiMitra_Suraksha_Webinar_Jamshedpur.pptx
Designed For Combined Common Effluent Treatment Plant Of Tarapur Midc
final year Project (civil)
Presentation_O_M.ppt
with good 426702985-Presentation-O-M.ppt
Presentation_O&M.ppt
Presentation_O&M ppt.ppt
Septic Systems for Homeowners
final ppt.pptx this is used for sewage treatment plant
Infrastructure projects
Infrastructure projects
City Council May 15, 2012 Hickory Update
DesignCriteriaManual DesignCriteriaManual.pdf
Wastewater
Onsite sewage facility
Onsite sewage facility
Onsite sewage facility
Onsite sewage facility
Ad

More from HariPatnaik4 (7)

PPTX
Lokgyanpitha the futur eof sducation ecosystem
PPTX
Root Zone Treatment for waste water treatment in Industries.pptx
PPT
TLVs.ppt for chemical Industry professionals
PPTX
safety Culture and behaviour to strengthen the HSE performance
PPTX
Change Management and its procedure and principlespptx
PPTX
HSE Audit and the effectiveness of Audit
PPTX
Emergenct Response plan for Industries- an approach
Lokgyanpitha the futur eof sducation ecosystem
Root Zone Treatment for waste water treatment in Industries.pptx
TLVs.ppt for chemical Industry professionals
safety Culture and behaviour to strengthen the HSE performance
Change Management and its procedure and principlespptx
HSE Audit and the effectiveness of Audit
Emergenct Response plan for Industries- an approach
Ad

Recently uploaded (20)

PPTX
UNIT 4 Total Quality Management .pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Well-logging-methods_new................
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPT
Total quality management ppt for engineering students
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
PPT on Performance Review to get promotions
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PDF
737-MAX_SRG.pdf student reference guides
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
UNIT 4 Total Quality Management .pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Well-logging-methods_new................
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Total quality management ppt for engineering students
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPT on Performance Review to get promotions
Fundamentals of safety and accident prevention -final (1).pptx
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
737-MAX_SRG.pdf student reference guides
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx

gap analysis for infrastructure development

  • 1. Sewage Treatment Plant, RO & Sewage Network Performance Evaluation Kick of Meeting-22/10/2018 SAIF Zone Presenter – Dr. H. K. Patnaik; Technical Director
  • 3. Environmental International Consultants Credentials Established in 1994 in Georgia, Atlanta, USA Offshore branch in Dubai opened in 1996 Became a fully independent firm in 2006 Group subsidiary: EICSS India based in Gurugram, Hyderabad & Baroda, India Has 30 professional consultants based in UAE & India Approved by Dubai Municipality, Trakhees and FEA since 2006 NABET (Govt of India) approved for Hydrogeology
  • 5. Key Objective of the Study • The whole study is divided into: • Phase I I. Comprehensive Technical/Operational Evaluation of 2 No.’s STP II. Comprehensive Technical/Operational Evaluation of 5 No.’s RO Plants III. Comprehensive Evaluation of Sewerage Network • Phase II I. Proposed Consultancy Service for the Project Execution based on the above findings.
  • 6. Scope of Works-Comprehensive Technical/Operational Evaluation of 2 No.’s STP I. Physical Verification of the plant and its unit operations II. Calculating the hydraulic loading rate III. Evaluation of individual unit operations and their efficiencies' IV. Condition survey / Snagging of plant & plant components V. Detailed evaluation of maintenance regime VI. Recommendations to improve plant operation/upgradation VII. Feasibility verification study on future expansion VIII.Report Preparation & Submission with recommendations and details of future expansion requirements
  • 7. Scope of Works-Comprehensive Technical/Operational Evaluation of 5 No.’s RO Plants I. Evaluation of individual unit performance and overall plant operation efficiency II. Condition survey / Snagging of plant & plant components III. Detailed evaluation of maintenance regime IV. Recommendations on future expansion plans and efficiency improvement V. Report preparation & submission on overall plant operation/upgradation / future expansions
  • 8. Scope of Works-Comprehensive Evaluation of Sewerage Network I. Reconnaissance survey of the project site II. Physical Verification of Sewage collection system III. Calculation of Hydraulic loading rate IV. Verification of water balance for the facility from available data V. Conduct a feasibility evaluation on network expansion plan by SAIF Zone VI. Report Preparation & submission with recommendations to improve overall sewerage network
  • 9. Activities for STP 1 & 2 Week 1 Week 2 Week 3 Week4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Physical Verification of the plant and its unit operations Calculating the hydraulic loading rate Evaluation of individual unit operations and their efficiencies' Condition survey / Snagging of plant & components Detailed evaluation of maintenance regime Recommendations to improve plant operation/upgradation Feasibility verification study on future expansion Report Preparation & Submission with recommendations and details of future expansion requirements Activities for RO Plants 1 to 5 Evaluation of individual unit performance and overall plant operation efficiency Condition survey / Snagging of plant & plant components Detailed evaluation of maintenance regime Recommendations on future expansion plans and efficiency improvement Report preparation & submission on overall plant operation/upgradation / future expansions Activities for Sewage Network System Reconnaissance survey of the project site Physical Verification of Sewage collection system Calculation of Hydraulic loading rate Verification of water balance for the facility from available data Conduct a feasibility evaluation on network expansion plan by SAIF Zone Report preparation & submission with recommendations to improve overall sewerage network Time Chart
  • 10. Deliverables for the Project • Each Report for facilities would consist of the following: • Reconnaissance survey data of each facility • Analysis of the influent and effluent parameters of each STP & RO system • Gap Analysis for each unit of the facility • Verification of O&M practices • Recommendations on Design & Operational Efficiency • Submission of technical proposals based on the above recommendations
  • 11. Requirements from the Client • Access Pass • Work Permit • HSE Induction & Requirements from SAIF Zone • Work Space • Single point of contact for the entire project • Name of contact persons for various facilities • Data Requirement • Existing Facility Drawings • As built Drawings • Process Designs of STP • Operation & Maintenance Procedures and Manuals • Test Records
  • 12. EIC team for the Project EIC-Project Org Chart Dr. H K Patnaik Project Lead Siva Kumar Hydrogeologist V. Aditya Sr. Env. Engg Ankit Rana Env. Engg Ravi Teja Project Coordinator Umiar Khan Field Supervisor H. Kumar QA/QC Manager Risu QA/QC Engg Muriel QA/QC Engg
  • 14. Regulatory Requirement- Wastewater Discharge Parameters Stipulated Limit Biochemical Oxygen Demand 20 mg/l Chemical Oxygen Demand 100 mg/l Residual Chlorine 0.5 mg/l Ammoniacal Nitrogen 5 mg/l Oil & Grease 5 mg/l Total Dissolved Solids 1500 mg/l Suspended Solids 50 mg/l Fecal Coliforms 20 MPN/100 ml Phosphorous 20 mg/l