GAP 4   GAP 3
GAP3 is the inspective approach to
assess the residual life of machines
Methodology
The      methodology      employed     is
conducting      standard   and    special
electrical tests and inspection on stator
and rotor windings and accessories
Unit Condition
The machine is in assembled condition with
access covers and top half of end brackets
removed
Inspection & tests Performed
Stator winding
Electrical tests as done in MAP2
Visual and borescope inspection of stator
winding,    stator   core    laminations and
fingerplates (as accessible)
Core tightness test    (visual     indications of
looseness)
Inspection & tests Performed
Corona tests, as accessible, to determine
areas and severity of any corona activity
DC step voltage test to determine insulation
integrity
End winding basket frequency check
Rotor winding
Electrical tests as done in MAP2
Visual and borescope inspection of     rotor
winding and blocking (as accessible)
Exciter and Accessories
Electrical tests as done in MAP2
Benefits
Reveals pending faults in winding
Reveals deterioration of coil insulation by
corona or end winding vibration
Establish a base line for evaluating future
inspection
Accurately assess life and future maintenance
requirements
Record of core tightness
Preventive maintenance plan
Schedule for GAP2, GAP3 and GAP4
Final Report
Standard format provided electronically
Photographs of critical areas
Location and levels of corona activity
Plots showing frequency distribution of
end winding basket
Core tightness record
Schedule for MAP4
Expected Downtime
5-7 days
Condition Assessment
                 Risk Assessment Approach
Condition Assessment
                       Stator
Operation & Maintenance History


Physical Inspection


Insulation Test


Generator Age
DC Ramped Voltage Test


Partial Discharge Measurement


Dissipation Factor Measurement


Ozone Monitoring


Black Out Test


High Potential Withstand Test


Stator Core Inspection


Wedge Tightness Evaluation


Core Loop Test
ELCID Test


Corona Probe Test


Coupling Resistance Test


Bump test


Capacitance Measurement


Core Bolt Insulation Resistance


Winding Conductor Resistance Measurement


Impedance Measurement


Winding Dissection
Stator Condition Index




  1   2 3 4 5 6 7 8 9 10
Stator Data Quality Index




    0      4      7     10
Condition Assessment
                       Rotor
Operation & Maintenance History


Physical Inspection


Insulation Test


Generator Age
High Potential Withstand Test


Rotor Core Inspection


AC Pole Drop Test


AC Impedance Test


Winding Resistance Measurement


RSO Test
Rotor Condition Index




  1   2 3 4 5 6 7 8 9 10
Rotor Data Quality Index




    0      4      7        10
Condition Assessment
                       Generators
Generator Condition Index




  1   2 3 4 5 6 7 8 9 10
Generator Data Quality Index




   0       4      7     10
Generator Assessment Process - Level 3
THANK YOU



ध यवाद




               ‫ا‬
‫ﮨﮯ‬    ‫ﯾہ ادا‬



ந    றி

ಧನ ಾದಗಳ

More Related Content

PPTX
SCT an Advanced Pipeline Integrity Solution
PDF
Satip nde-ut-01
PPT
Prospect of non destructive testing and condition monitoring scope in bangladesh
PDF
Mostafa hussen CV
PDF
Roxtec BG Applications
PPT
PDF
infrastructure inspections go robotic
PPTX
Ipc transportation infrastructure_inspections
SCT an Advanced Pipeline Integrity Solution
Satip nde-ut-01
Prospect of non destructive testing and condition monitoring scope in bangladesh
Mostafa hussen CV
Roxtec BG Applications
infrastructure inspections go robotic
Ipc transportation infrastructure_inspections

Viewers also liked (9)

PPTX
PPT
презентация детские праздники
PPSX
Slimming ii презинтация
PPT
презентация свадьбы Sunday
PPT
презентация Sunday
PDF
Mobile templating με Joomla και K2
PDF
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
PDF
Generator Assessment Process - Level 2
PPTX
Selecting sales and marketing personnel
презентация детские праздники
Slimming ii презинтация
презентация свадьбы Sunday
презентация Sunday
Mobile templating με Joomla και K2
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
Generator Assessment Process - Level 2
Selecting sales and marketing personnel
Ad

Similar to Generator Assessment Process - Level 3 (20)

PPTX
Unit 1-2-a
PPT
13. Condition monitoring and Preventive Maintenance.ppt
PPTX
Condition monitoring part 2
PDF
Well test-procedures-manual
PDF
Well test procedures manual
PDF
Pad Cratering: Prevention, Mitigation and Detection Strategies
PDF
TURNER TG and BOP SERVICES
DOC
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
DOC
QA/QC ENGINEER
DOCX
JEYARAJ CV QA-QC Inspector(E &I)
PPTX
Mill & Kiln Gear Asset Management
PPTX
Relay service providers and dealers
DOCX
FAZIL PASHA CV 3.6.2015
DOCX
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
PDF
OCSTraining - API 577 Welding Inspection and Metallurgy
PDF
Petronas drilling operations guideline
PPTX
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
PPTX
400kV_Switchyard_Training_with_Diagrams.pptx
PPT
Flywheel Safety - Richard thompson - Jan 2011
PDF
Jh4th-sem-Scheme-and-syllabus-of-EE_.pdf
Unit 1-2-a
13. Condition monitoring and Preventive Maintenance.ppt
Condition monitoring part 2
Well test-procedures-manual
Well test procedures manual
Pad Cratering: Prevention, Mitigation and Detection Strategies
TURNER TG and BOP SERVICES
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
QA/QC ENGINEER
JEYARAJ CV QA-QC Inspector(E &I)
Mill & Kiln Gear Asset Management
Relay service providers and dealers
FAZIL PASHA CV 3.6.2015
132kV PIPAR CITY GSS - RTU Accessories Pre-SAT Procedure (1).docx
OCSTraining - API 577 Welding Inspection and Metallurgy
Petronas drilling operations guideline
6 MONTHS INDUSTRIAL TRAINING PPT EE BY KHUSHI RAM BHARDWAJ(DAVIET JALANDHAR)
400kV_Switchyard_Training_with_Diagrams.pptx
Flywheel Safety - Richard thompson - Jan 2011
Jh4th-sem-Scheme-and-syllabus-of-EE_.pdf
Ad

Recently uploaded (20)

PPT
Chapter four Project-Preparation material
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
How to Get Business Funding for Small Business Fast
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Chapter four Project-Preparation material
Principles of Marketing, Industrial, Consumers,
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
ICG2025_ICG 6th steering committee 30-8-24.pptx
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Belch_12e_PPT_Ch18_Accessible_university.pptx
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
COST SHEET- Tender and Quotation unit 2.pdf
Probability Distribution, binomial distribution, poisson distribution
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
Ôn tập tiếng anh trong kinh doanh nâng cao
Digital Marketing & E-commerce Certificate Glossary.pdf.................
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
How to Get Business Funding for Small Business Fast
unit 1 COST ACCOUNTING AND COST SHEET
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry

Generator Assessment Process - Level 3

  • 1. GAP 3 generator assessment process a solution to life assessment of large generators anilscoob@gmail.com omsaiempl@gmail.com
  • 2. 1 GAP 2 GAP GAP* GAP 4 GAP 3
  • 3. GAP3 is the inspective approach to assess the residual life of machines
  • 4. Methodology The methodology employed is conducting standard and special electrical tests and inspection on stator and rotor windings and accessories
  • 5. Unit Condition The machine is in assembled condition with access covers and top half of end brackets removed Inspection & tests Performed Stator winding Electrical tests as done in MAP2 Visual and borescope inspection of stator winding, stator core laminations and fingerplates (as accessible) Core tightness test (visual indications of looseness)
  • 6. Inspection & tests Performed Corona tests, as accessible, to determine areas and severity of any corona activity DC step voltage test to determine insulation integrity End winding basket frequency check Rotor winding Electrical tests as done in MAP2 Visual and borescope inspection of rotor winding and blocking (as accessible) Exciter and Accessories Electrical tests as done in MAP2
  • 7. Benefits Reveals pending faults in winding Reveals deterioration of coil insulation by corona or end winding vibration Establish a base line for evaluating future inspection Accurately assess life and future maintenance requirements Record of core tightness Preventive maintenance plan Schedule for GAP2, GAP3 and GAP4
  • 8. Final Report Standard format provided electronically Photographs of critical areas Location and levels of corona activity Plots showing frequency distribution of end winding basket Core tightness record Schedule for MAP4
  • 10. Condition Assessment Risk Assessment Approach
  • 12. Operation & Maintenance History Physical Inspection Insulation Test Generator Age
  • 13. DC Ramped Voltage Test Partial Discharge Measurement Dissipation Factor Measurement Ozone Monitoring Black Out Test High Potential Withstand Test Stator Core Inspection Wedge Tightness Evaluation Core Loop Test
  • 14. ELCID Test Corona Probe Test Coupling Resistance Test Bump test Capacitance Measurement Core Bolt Insulation Resistance Winding Conductor Resistance Measurement Impedance Measurement Winding Dissection
  • 15. Stator Condition Index 1 2 3 4 5 6 7 8 9 10
  • 16. Stator Data Quality Index 0 4 7 10
  • 18. Operation & Maintenance History Physical Inspection Insulation Test Generator Age
  • 19. High Potential Withstand Test Rotor Core Inspection AC Pole Drop Test AC Impedance Test Winding Resistance Measurement RSO Test
  • 20. Rotor Condition Index 1 2 3 4 5 6 7 8 9 10
  • 21. Rotor Data Quality Index 0 4 7 10
  • 22. Condition Assessment Generators
  • 23. Generator Condition Index 1 2 3 4 5 6 7 8 9 10
  • 24. Generator Data Quality Index 0 4 7 10
  • 26. THANK YOU ध यवाद ‫ا‬ ‫ﮨﮯ‬ ‫ﯾہ ادا‬ ந றி ಧನ ಾದಗಳ