Globalization and Indian
Railways
Railways structured on the basis of five year plans
Regrouping Princely State Railways and erstwhile
Nationalized Railway Companies into 6 zones by
the first Transport Minister of Independent India N.
Gopalswamy Iyyengar.
Adoption of Gauge Conversion Policy in 1971
Termination of Steam locomotives in 1973
Nationalization and Economic Reforms
Important Institutions and Functions
RDSO (Research, Development and Standard
Organization)
Formed in 1957
Established to consolidate all technical standard
enforcement
E.g. Coach Design, Brake Testing and Designing
RITES (Rail India Technical and Economical
Services)
Formed in 1974
Established for setting up and operating new
Railway Systems
Development, Rehabilitation and optimization of
existing railways and other transportation systems
Operational experience of over 30 countries in
Middle East, Africa and Latin America
CONCOR (Container Corporation)
Formed in 1988
Involved in handling of Container Traffic of Indian
Railways
CONRAJ Service operated by CONCOR is one
such example of the container traffic
These are High Priority Freight trains that are
operated at a speed of 100 kmph
Globalization and its impact on Railways
 1991 as a year of economical transformation.
 Liberalization, Privatization and Globalization takes
birth in India.
 Indian Railways retained the tag of a Public Sector
Undertaking.
 At the time of Economic Reforms Indian Railways was
financially weak
 Termed as a Time Bomb waiting to explode
Post Globalization effects
 Konkan Railway, Pipavav Railway Corporation ,
Rail Vikas Nigam some prominent examples.
 Introduction of schemes like OYW ( Own Your
Wagon), BOLT (Build Operate Lease Transfer)
and BOT ( Build Operate Transfer)
Are there any evidences of global
companies prior to economic reforms?
 The Swiss Elevator and Car Mfg. company set up
the first rail coach factory in Perambur
 ALCO a USA based company the first diesel
locomotive rolled out in 1964
 other companies which came into play Jessop and
Co., Burn and Co. and Braithwaite and Co. which
are now Bhari Udyog Nigam Ltd.
 Setting up of International Institute Of Railways in
New Delhi
 RITES and IRCON – The Technical and
Constructional Wing of Indian Railways have
worked on several International Projects
 Setting up of CONCOR in association with
International Union of Railways
Konkan Railways – The evolution
During the British Era Western Ghats completely
overlooked owing to dense vegetation and rainy
climatic conditions
Western Ghats remained cut off for 145 years till the
conceptualization of Konkan Railway by
E.Sreedharan in 1990
Konkan Railway inducted as a private organization
on 19th January 1990
Challenges Faced
The agrarian society through which the route was to
pass
The Religious and Cultural practices followed by the
natives
Extreme Railways – Konkan Railways
The Rocky Terrains
The climatic conditions – continuous rainfall and
hard rocks and soft soil.
Why Konkan Railways in Globalization ?
Flat trackbed – Completely ballastless. This cuts
down the journey between Mumbai and Mangalore to
22 hours
Train Speeds – The train speeds on this route at the
moment are 120kmph (100 mph) The Konkan Railway
plans to increase the speed to 170 kmph
Economizing fuel consumption – on an average a
diesel locomotive consumes 12000 litres of fuel for a
1000 km journey. But a train passing through Konkan
Railways consumes only 8000 litres
Technically ahead of other Railway Zones
ACD or Anti Collision Device spread across the
network
ROSHAN or Rolling Stock Health Analyst helps in
early detect
Konkan Railway also provides facility for delivery of
tickets in villages too!
Technical Evolution post 1991
 The first 4000 HP locomotive with State-of-the-Art
technology and was rolled out in 2002
 100% dynamic Braking
 Capable of hauling a 24 coach train at 160 kmph
 Co-Co Wheel Design
 Cost : Approx. 11.5 crores
 6000 ltrs Fuel Capacity
 In 2003 Indian Railway introduced German
Manufactured ALSTOM LHB coaches
 Maximum Operating Speed :160 kmph
 Higher seating Capacity
 Anti telescopic*
 CBC- Central Buffer Coupling
 Controlled Discharge System*
 Cost : 75 lakhs- 1.8 crores
 The Chittaranjan Locomotive Works rolled out the
first state - of Art Electric locomotives WAP5 And
WAP7
 Engine horsepower for WAP5- 5400 HP and WAP7-
6000 HP
 Maximum Operating speed- 160kmph
 Builder: CLW under ToT from Adtranz
Dedicated Freight Corridor
 Foundation stone laid in 2009
 Expected to be operational by 2016-17
 Approx., cost as per Khankodkar committee is
2,40,000 core rupees
 Speed of freight trains on this stretch estimated to
be around 100kmph
 Two corridors North- South, East to West and
diagonals. Trains will be about 100 cars long
Proposed Corridors
Corridor Origin/ Destination Route length
Eastern Dankuni - Ludhiana 1800 kms
Western Dadri – Jawaharlal Nehru Port
Trust
1500 kms
East – West - 2000 kms
North – South - 2173 kms
East Coast - 1100 kms
Southern Corridor - 890 kms
Source: Promoting low carbon transport in India (2012)
A Comparative Study – Energy
Requirements (2016 – 2031)
Business As usual (with
DFC)
Business As usual (without
DFC)
Low Carbon (with DFC)
- 797 -
- 1422 -
- 1970 -
- 2468 -
Electricity Consumption
Business As usual (with
DFC)
Business As usual (without
DFC)
Low Carbon (with DFC)
920 350 920
1360 441 1360
1720 517 1720
2400 588 2040
 Intended to reduce travel time on some of the busiest
sections
 Setting up of High Speed Rail corporation
 Company set up in 2012
 Subsidiary of Rail Vikas Nigam Limited
 Approximate cost per train set is 120 crores
High Speed Corridors
Routes undergoing Feasibility Study
Route Participating companies Total
length
Pune- Mumbai- Ahmedabad RITES, Systra (France), Italferr (Italy) 650 km
Delhi to Patna (via: Agra,
Varanasi, Lucknow)
Mott McDonald (UK) 991 km
Howrah- Haldia Ineco, Prointec, Ayesa (Spain) 135 km
Hyderabad- Dornakal-
Vijayawada-Chennai
Parsons Brickenhoff (India) 664 km
Chennai- Bangalore-Coimbatore-
Ernakulum –Thiruvananthapuram
JARTS (Japan Railway Technical
Service) and Oriental Consultants
850km
What are the bottlenecks?
 Cost of construction
 Track alignment
 Wheel Design
 Need for an elevated corridor
 Financial constraints
 Land Acquisition
 Fencing of the entire corridor
Learn more: Bullet trains
International Union of Railways
 Founded in 1922
 Objective- Unification and improvement of conditions for
establishment and operation of railways concerned with
international traffic
 Conditions to become a member of the UIC include: Having 1000
kms of tracks, gauge dimensions can be standard (4ft 8.5in) or
Broad gauge (5ft 6in)
 total railway systems who are the members of UIC as of 1979 is
39
 Remote railways concerned with information, research and
standardization is around 25 distributed all over continents
THANK
YOU

More Related Content

PPTX
Train 18
DOC
DLW TRAINING REPORT
PPTX
Indian Railway Infrastracture
PDF
Indian railway final report
PPSX
PPT On High Speed Railways
DOCX
Electric Loco Shed, Tughlakabad, New Delhi
DOCX
Summer Training Report,DIESEL LOCOMOTIVE WORKS,VARANASI(DLW)
PDF
Turnaround strategies for the Indian Railways
Train 18
DLW TRAINING REPORT
Indian Railway Infrastracture
Indian railway final report
PPT On High Speed Railways
Electric Loco Shed, Tughlakabad, New Delhi
Summer Training Report,DIESEL LOCOMOTIVE WORKS,VARANASI(DLW)
Turnaround strategies for the Indian Railways

What's hot (20)

PDF
report on loco workshop ajmer
PPTX
Indian railways - past and present
PPTX
Electric vehicles in india in 2021_economic and feasibility analysis of ownin...
PPTX
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
PDF
Training report on railways (all workshop)
DOCX
Ajmer Railway locomotive Training Report
PPTX
Bullet Train in India
PPTX
Diesel locomotive works - Truck Machine Shop
PPTX
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
DOCX
ASHOK LEYLAND
DOCX
Railay internship report
DOCX
Railway carriage workshop Ajmer
PPTX
hindustan unilever limited
PPTX
Indian Freight Trains
PPTX
Presentaion on Diesel Loco WDG4
PPTX
Automobile Industry Of Pakistan
PPTX
PM-Gati-Shakti-Master-Plan 1.pptx
DOCX
NWR summer training report
PDF
Project Report on railway workshop Jhansi
DOCX
central railway internship report
report on loco workshop ajmer
Indian railways - past and present
Electric vehicles in india in 2021_economic and feasibility analysis of ownin...
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
Training report on railways (all workshop)
Ajmer Railway locomotive Training Report
Bullet Train in India
Diesel locomotive works - Truck Machine Shop
INDIAN RAILWAYS PRESENTATION BY BHAVIK KHAKHKHAR
ASHOK LEYLAND
Railay internship report
Railway carriage workshop Ajmer
hindustan unilever limited
Indian Freight Trains
Presentaion on Diesel Loco WDG4
Automobile Industry Of Pakistan
PM-Gati-Shakti-Master-Plan 1.pptx
NWR summer training report
Project Report on railway workshop Jhansi
central railway internship report
Ad

Viewers also liked (6)

PDF
Tubular Track - Namibia
PDF
Kemal gezmis rail one
PPTX
Forest Policies of India
PPTX
Railway track:An Introduction
PPTX
Modern surveying techniques
Tubular Track - Namibia
Kemal gezmis rail one
Forest Policies of India
Railway track:An Introduction
Modern surveying techniques
Ad

Similar to Globalization and indian railways (20)

PPT
Indian railways by Meet Patel
PPTX
Railway Engineering Introduction
PDF
Vikshit Bharat by Rajesh Prasad- a detailed presentation
PDF
Talgo Paper by Rajesh Prasad, IRSE in December 2012
PPT
historical development of railways in India
PPTX
Indian railways ppt
PPTX
Railway Transportation in India & Its Development.pptx
PDF
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
PPT
Indian Railway
PPT
Indian railway
PPTX
T18.pptx
PDF
UIC High Speed Rail Brochure
PPTX
Introduction to Railway Engineering
PPTX
History of Indian Railways - the story of Growth & Modernization
PPTX
INDIAN RAILWAY.pptx
PPT
Indian railways
PPT
Presentation1
PPTX
Indian railways
PPTX
Railways
PDF
Summer training report_on_indian_railway
Indian railways by Meet Patel
Railway Engineering Introduction
Vikshit Bharat by Rajesh Prasad- a detailed presentation
Talgo Paper by Rajesh Prasad, IRSE in December 2012
historical development of railways in India
Indian railways ppt
Railway Transportation in India & Its Development.pptx
Lecture 1, introduction; history, role, classification, alignment & survey1 ....
Indian Railway
Indian railway
T18.pptx
UIC High Speed Rail Brochure
Introduction to Railway Engineering
History of Indian Railways - the story of Growth & Modernization
INDIAN RAILWAY.pptx
Indian railways
Presentation1
Indian railways
Railways
Summer training report_on_indian_railway

Recently uploaded (20)

PPTX
Travel plan and why we visit Ecuador.pptx
PPTX
Japan and its beautiful ancient history.pptx
PDF
Your Ultimate Guide to Kumbh Mela Tent Booking 2027.pdf
PDF
Private Chauffeur Service Boston – Ride in Style
PDF
Why Should You Scrape Hotel Room Rates from OTAs for Competitive Pricing.pdf
PDF
Best Camps to Stay at Kumbh Mela – Booking Tips Inside
PDF
Why Kathmandu is the Best Starting point for Kailash Mansarovar.pdf
PDF
Timeless Traditions_ Exploring Emirati Heritage in Modern Dubai - FarePayer.pdf
PPTX
Explore-the-World-Your-Ultimate-Tour-and-Travel-Guide.pptx
PDF
Why Rajasthan Luxury Tour Packages Are Today’s Most Desired Escape.pdf
PDF
Travelers in Delhi often call attractive girls for social evenings
PPTX
Copy of Japan Animated Template slidesppt.net.pptx
PDF
Explore France: Must-See Attractions & Experiences
PDF
web proposal for website building and SEO
PDF
Your Nashik Kumbh Mela Travel Packages Guide.pdf
PDF
Experience Divinity with Nashik Kumbh Mela Package 2027.pdf
PPTX
final memu ppt memu muemu emu rake training
DOCX
Below is an example of a detailed itinerary for your pilgrimage.docx
PPTX
Airline Operations Management Power point
PDF
Coordination Protocols for Multi-Agent Ecosystems.pdf
Travel plan and why we visit Ecuador.pptx
Japan and its beautiful ancient history.pptx
Your Ultimate Guide to Kumbh Mela Tent Booking 2027.pdf
Private Chauffeur Service Boston – Ride in Style
Why Should You Scrape Hotel Room Rates from OTAs for Competitive Pricing.pdf
Best Camps to Stay at Kumbh Mela – Booking Tips Inside
Why Kathmandu is the Best Starting point for Kailash Mansarovar.pdf
Timeless Traditions_ Exploring Emirati Heritage in Modern Dubai - FarePayer.pdf
Explore-the-World-Your-Ultimate-Tour-and-Travel-Guide.pptx
Why Rajasthan Luxury Tour Packages Are Today’s Most Desired Escape.pdf
Travelers in Delhi often call attractive girls for social evenings
Copy of Japan Animated Template slidesppt.net.pptx
Explore France: Must-See Attractions & Experiences
web proposal for website building and SEO
Your Nashik Kumbh Mela Travel Packages Guide.pdf
Experience Divinity with Nashik Kumbh Mela Package 2027.pdf
final memu ppt memu muemu emu rake training
Below is an example of a detailed itinerary for your pilgrimage.docx
Airline Operations Management Power point
Coordination Protocols for Multi-Agent Ecosystems.pdf

Globalization and indian railways

  • 2. Railways structured on the basis of five year plans Regrouping Princely State Railways and erstwhile Nationalized Railway Companies into 6 zones by the first Transport Minister of Independent India N. Gopalswamy Iyyengar. Adoption of Gauge Conversion Policy in 1971 Termination of Steam locomotives in 1973 Nationalization and Economic Reforms
  • 3. Important Institutions and Functions RDSO (Research, Development and Standard Organization) Formed in 1957 Established to consolidate all technical standard enforcement E.g. Coach Design, Brake Testing and Designing
  • 4. RITES (Rail India Technical and Economical Services) Formed in 1974 Established for setting up and operating new Railway Systems Development, Rehabilitation and optimization of existing railways and other transportation systems Operational experience of over 30 countries in Middle East, Africa and Latin America
  • 5. CONCOR (Container Corporation) Formed in 1988 Involved in handling of Container Traffic of Indian Railways CONRAJ Service operated by CONCOR is one such example of the container traffic These are High Priority Freight trains that are operated at a speed of 100 kmph
  • 6. Globalization and its impact on Railways  1991 as a year of economical transformation.  Liberalization, Privatization and Globalization takes birth in India.  Indian Railways retained the tag of a Public Sector Undertaking.  At the time of Economic Reforms Indian Railways was financially weak  Termed as a Time Bomb waiting to explode
  • 7. Post Globalization effects  Konkan Railway, Pipavav Railway Corporation , Rail Vikas Nigam some prominent examples.  Introduction of schemes like OYW ( Own Your Wagon), BOLT (Build Operate Lease Transfer) and BOT ( Build Operate Transfer)
  • 8. Are there any evidences of global companies prior to economic reforms?  The Swiss Elevator and Car Mfg. company set up the first rail coach factory in Perambur  ALCO a USA based company the first diesel locomotive rolled out in 1964  other companies which came into play Jessop and Co., Burn and Co. and Braithwaite and Co. which are now Bhari Udyog Nigam Ltd.
  • 9.  Setting up of International Institute Of Railways in New Delhi  RITES and IRCON – The Technical and Constructional Wing of Indian Railways have worked on several International Projects  Setting up of CONCOR in association with International Union of Railways
  • 10. Konkan Railways – The evolution During the British Era Western Ghats completely overlooked owing to dense vegetation and rainy climatic conditions Western Ghats remained cut off for 145 years till the conceptualization of Konkan Railway by E.Sreedharan in 1990 Konkan Railway inducted as a private organization on 19th January 1990
  • 11. Challenges Faced The agrarian society through which the route was to pass The Religious and Cultural practices followed by the natives Extreme Railways – Konkan Railways The Rocky Terrains The climatic conditions – continuous rainfall and hard rocks and soft soil.
  • 12. Why Konkan Railways in Globalization ? Flat trackbed – Completely ballastless. This cuts down the journey between Mumbai and Mangalore to 22 hours Train Speeds – The train speeds on this route at the moment are 120kmph (100 mph) The Konkan Railway plans to increase the speed to 170 kmph Economizing fuel consumption – on an average a diesel locomotive consumes 12000 litres of fuel for a 1000 km journey. But a train passing through Konkan Railways consumes only 8000 litres
  • 13. Technically ahead of other Railway Zones ACD or Anti Collision Device spread across the network ROSHAN or Rolling Stock Health Analyst helps in early detect Konkan Railway also provides facility for delivery of tickets in villages too!
  • 14. Technical Evolution post 1991  The first 4000 HP locomotive with State-of-the-Art technology and was rolled out in 2002  100% dynamic Braking  Capable of hauling a 24 coach train at 160 kmph  Co-Co Wheel Design  Cost : Approx. 11.5 crores  6000 ltrs Fuel Capacity
  • 15.  In 2003 Indian Railway introduced German Manufactured ALSTOM LHB coaches  Maximum Operating Speed :160 kmph  Higher seating Capacity  Anti telescopic*  CBC- Central Buffer Coupling  Controlled Discharge System*  Cost : 75 lakhs- 1.8 crores
  • 16.  The Chittaranjan Locomotive Works rolled out the first state - of Art Electric locomotives WAP5 And WAP7  Engine horsepower for WAP5- 5400 HP and WAP7- 6000 HP  Maximum Operating speed- 160kmph  Builder: CLW under ToT from Adtranz
  • 17. Dedicated Freight Corridor  Foundation stone laid in 2009  Expected to be operational by 2016-17  Approx., cost as per Khankodkar committee is 2,40,000 core rupees  Speed of freight trains on this stretch estimated to be around 100kmph  Two corridors North- South, East to West and diagonals. Trains will be about 100 cars long
  • 18. Proposed Corridors Corridor Origin/ Destination Route length Eastern Dankuni - Ludhiana 1800 kms Western Dadri – Jawaharlal Nehru Port Trust 1500 kms East – West - 2000 kms North – South - 2173 kms East Coast - 1100 kms Southern Corridor - 890 kms Source: Promoting low carbon transport in India (2012)
  • 19. A Comparative Study – Energy Requirements (2016 – 2031) Business As usual (with DFC) Business As usual (without DFC) Low Carbon (with DFC) - 797 - - 1422 - - 1970 - - 2468 - Electricity Consumption Business As usual (with DFC) Business As usual (without DFC) Low Carbon (with DFC) 920 350 920 1360 441 1360 1720 517 1720 2400 588 2040
  • 20.  Intended to reduce travel time on some of the busiest sections  Setting up of High Speed Rail corporation  Company set up in 2012  Subsidiary of Rail Vikas Nigam Limited  Approximate cost per train set is 120 crores High Speed Corridors
  • 21. Routes undergoing Feasibility Study Route Participating companies Total length Pune- Mumbai- Ahmedabad RITES, Systra (France), Italferr (Italy) 650 km Delhi to Patna (via: Agra, Varanasi, Lucknow) Mott McDonald (UK) 991 km Howrah- Haldia Ineco, Prointec, Ayesa (Spain) 135 km Hyderabad- Dornakal- Vijayawada-Chennai Parsons Brickenhoff (India) 664 km Chennai- Bangalore-Coimbatore- Ernakulum –Thiruvananthapuram JARTS (Japan Railway Technical Service) and Oriental Consultants 850km
  • 22. What are the bottlenecks?  Cost of construction  Track alignment  Wheel Design  Need for an elevated corridor  Financial constraints  Land Acquisition  Fencing of the entire corridor Learn more: Bullet trains
  • 23. International Union of Railways  Founded in 1922  Objective- Unification and improvement of conditions for establishment and operation of railways concerned with international traffic  Conditions to become a member of the UIC include: Having 1000 kms of tracks, gauge dimensions can be standard (4ft 8.5in) or Broad gauge (5ft 6in)  total railway systems who are the members of UIC as of 1979 is 39  Remote railways concerned with information, research and standardization is around 25 distributed all over continents