Abstract: There is a silent revolution throughout the world in energy sector. There is a trend towards decentralized and
distributed generation of renewable energy. The steam power plants are highly capital intensive and suitable for generation
of electricity. The work of establishing the steam power plant is really revolutionary and it will create history of total change
of transforming highly centralized capitalist tool beneficial to the entire world. Steam power plant consists of Boiler, Turbine
and generator which can be used for electrification of village and community. Steam power can be used directly exhaust
steam of the steam turbine can be used for heating in the process. So steam power plants give double benefits. The steam
power plant is using steam as working fluid. Steam is produced in a boiler using LPG as fuel and is used to drive the prime
motor, namely, the steam turbine. In the steam turbine, heat energy is converted into mechanical energy which is used for
generating electric power. Generator is an electro-magnetic device which makes the power available in the form of electrical
energy. The temperature, pressure and output voltage are monitored by using lab view software programming, and the
controlling can be done by DAQ cord. The parameters interface with the Data acquisition card MCC DAQ for monitoring
purpose by means of graphical programming. The resulting models allow the implementation of various system of plant
configuration.
Keywords: Generation, Boiler, Turbine, DC motor.
I. INTRODUCTION
Electricity is modern society’s most convenient and useful form of energy. Without it, the present
social infrastructure would not be feasible. The Energy in the form of electricity is most desirable as it is easy to
transport, and can be easily converted to heat or work as per requirement Power is generated in various methods
from various resources. Out of all Thermal, Hydro and Nuclear Power generation have gained importance for
their availability in abundance &easy existence of their resources. 65% of the total installed capacity is steam
Plants.
The main objective is to design a steam power plant. The temperature, pressure and output voltage are
monitored by using Lab View Software Programming. The parameters interface with the Data Acquisition Card
MCC DAQ for monitoring purpose by means of graphical programming.
Fig 1: Block diagram of the Steam Power Plant
Fig 1 shows the Block diagram of the Steam Power Plant. The input given to the system is fuel. LPG is
used as fuel. The fuel is given to the vessel so that the chemical energy is converted into heat energy. This heat
energy is converted into mechanical energy with the help of rotating blades of the turbine. Generator converts
mechanical energy into electrical energy and it is given to the load. The remaining heat is dissipated through the
condenser and is given to the economizer. The heat is further cooled by using Feed Water Tank. Through the
analysis of real time monitoring and control, we obtained the useful information concerning plant management
from both technical and economical point of view. This is really practicable and achievable further the plant
parameters can also be controlled by Aurdino Servo Motor.
Hardware Implementation Of Steam Power Plant
10
II.THEORY OF OPERATION
Generation:
The process of power generation in a steam power plant consists of two main systems. They are:
 Steam Generation and Utilization
 Condensate System
The main fuel used in the steam power plant is LPG. The available chemical energy that is in the form
of gas is converted into thermal energy by combustion and heat energy is used to converted water into steam.
This action takes place in boiler also called as steam generator. The steam energy is converted into mechanical
energy in the turbine, which drives the rotor of the alternator, where the mechanical energy is converted into
electrical energy.
The steam energy generator or boiler is a two pass tower type, reheat natural circulation single drum,
balance draft designed for the chemical energy of LPG is transferred into thermal energy by burning it. The
resulting heat produced is used to boil water and steam thus generated is used to rotate turbines, thus converting
it to mechanical energy. The shaft connected to turbine is coupled with rotor shaft of generator and it is rotated
with a constant speed of 3200 rpm. Thus electrical power is generated which is distributed via transmission
lines.
Energy Conversion
Fig 2: Block diagram of the energy conversion
Power generation procedure:
The steam energy generator or boiler is a two pass tower type, reheat natural circulation single drum,
balance draft designed for burning of LPG as principle fuel. The complete furnace section is of welded
membrane wall type arranged as gas and pressure tight envelope. The walls of the furnace are made up of water
tubes. These are connected to headers and feed water is circulated through them. While water passes the tubes,
heat is absorbed from the furnace by radiation. The water in tubes gets converted into steam.The steam and
water mixer flows into the drum and steam is separated in the drum. This steam is called saturated steam. The
saturated steam to increase the heat energy supplied to the steam turbine.
II. DESIGN OF THE PLANT
Steam turbine:
The steam energy is converted mechanical work by expansion through the turbine. The expansion
takes place through a series of fixed blades (nozzles) and moving blades each row of fixed blades and moving
blades is called a stage. The moving blades rotate on the central turbine rotor and the fixed blades are
concentrically arranged within the circular turbine casing which is substantially designed to withstand the steam
pressure.On large output turbines the duty too large for one turbine and a number of turbine casing/rotor units
are combined to achieve the duty. These are generally arranged on a common centre line (tandem mounted) but
parallel systems can be used called cross compound systems.
Fig 3: Impulse turbine
Hardware Implementation Of Steam Power Plant
11
Design calculation:
Radius of the central core: 20mm
Length of the Blades: 20mm
Width of the Blades: 8mm
Spacing between the two blades: S = 2* pi * r / n
r – Radius of the central core = 20mm
n – Number of the blades = 12
s = 10mm
Circumference of the turbine casing: 360mm
Shaft:
Length of the Shaft: 200mm
Diameter of the Shaft: 8mm
Furnace:
Burners are set at each corner and are directed to strike an imaginary circle at the centre of the furnace.
This is called tangential firing.
Condenser:
Steam boiler has main function to convert water to high quality steam. The steam is then supplied into
turbine generator. Before supplied into turbine generator, steam should apply the requirement for both pressure
and temperature. Condenser is used in power plant to make back pressure and temperature of steam from turbine
generator is lower and then converts steam into condensate.
Economizer:
Economizer is the part of the boiler. It consists of a number of pipes through which water from the
HPH’S are circulated. This water gains temperature from the flue gases escaping out of the boiler .Therefore,
medium of heating here is flue gas.
Feed water system:
The energy streams entering and leaving the Feed Water System are as follows,
The mass of the water flow and the steam flow must be regulated so mass water flow equals the mass steam
flow to maintain drum level. The feed water control regulates the mass water flow to the boiler. The effects of
the input control actions interact, since firing rate also affects steam temperature and feed water flow affects the
steam pressure, which is the final arbiter of firing rate demand. The overall system must be applied and
coordinated in a manner to minimize the effects of these interactions. The inter actions can be greatly affected
by the control system design. If the boiler operates under varying steam pressure, the calibration of the liquid
level will also vary with steam density.
DC motor:
The DC motor can be used as generator; the turbine shaft is coupled to the DC motor shaft. As the
turbine rotates to its specified speed, Stationary permanent magnets form the stator field, produces torque, that
any current-carrying conductor placed within an external magnetic field experiences a mechanical force. In a
motor, the magnitude of this force, thus the output torque, is a function for rotor angle. When current moves
through a conductor a circular magnetic field is induced around the conductor. The Motor (armature) rotation is
caused by the simultaneous attraction and repulsion between the electromagnetic field in armature and a fixed
magnetic field. The magnetic field surrounding a current carrying conductor interacts with an existing magnetic
field which determines the direction of DC current carrying conductor in a fixed magnetic field. Thus the motor
gives an output of around 10V DC and output current capacity of 2-3 Amps. This output is connected to load.
Coupler:
A coupler is a device used to connect two shafts together at their ends for the purpose of transmitting
power. Couplings do not normally allow disconnection of shafts during operation. However, there are torques’s
limiting couplings which can slip or disconnect when some torque limit is exceeded. The primary purpose of
couplings is to join two pieces of rotating equipment while permitting some degree of misalignment or end
movement or both. To provide for the connection of shafts of units that is manufactured separately such as
motor and generator and to provide for disconnection of repairs.
Hardware Implementation Of Steam Power Plant
12
Power plant boiler:
A boiler or steam generator is a closed vessel which generates steam by heating water. The boiler or
steam generating unit is defined “As a combination of apparatus for producing, furnishing or recovering heat
together with the apparatus for transferring the heat so made available to the field being heated and vaporized”.
Boiler is the most important and crucial component in a power plant.
Water tube boiler:
In water tube boilers, water circulates through the tubes and hot products of combustion flow over
these tubes Water tube boilers require less weight of metal for a given size, are less liable to explosion, produce
higher pressure, are accessible and can respond quickly to change in steam demand. Tubes and drums of water
tube boilers are smaller than that of fire tube boilers and due to smaller size of drum higher pressure can be used
easily. Water tube boilers require lesser floor space. The efficiency of water tube boilers is more.
For that reason we prefer low pressure boiler, the steam is up to 15kg/cm2, exactly water tube boiler is choose
for our steam power plant operation.
Fig 4: Water Tube Boiler
Measurements:
The various parameters, which are measured in the steam plant as per our requirement and safety
purpose, are as follows:
Measurement of Temperature: 0 – 110 deg C.
Measurement of Pressure: 4 – 6 psi
Measurement of RPM: 3000 rpm
Measurement of output voltage: 0 – 12 V DC
IV. IMPLEMENTATION AND RESULT OF THE PLANT:
Design of the Steam Power Plant is completed. The output voltage is obtained using steam as input.
The parameters such as Pressure, temperature and Output voltage of the plant are monitored using lab view
software programming. The output is represented graphically and numerically in the front panel of the software.
The results obtained are as shown below.
Fig 5: Load connected to the plant
Hardware Implementation Of Steam Power Plant
13
Table1: Test Results
V. CONCLUSION
In power plant monitoring of temperature , pressure and output voltage was tested, this monitoring are
done through MCC DAQ 1208FS Multifunction card, with single ended mode and differential ended mode
connection. This gives an excellent results ranging from low to high temperature and pressure through VI
software. Designing of steam power plant using close loop, improves the efficiency and reduces the loses. Speed
monitoring can also be done by using lab view software. It is also helpful in the field of MEMS (Micro
Electronic Mechanical Systems) applications.
REFERENCES
[1]. The control of boiler Instrument society of America 1991 by sam G. DUKE
[2]. Power plant Engineering , Tata MC Graw hill 1984 by E. AL. Wakil
[3]. Standard Boiler operation Tata MC Graw hill 1994 by S.M. Elonka and A.L Kohal
[4]. Power plant Engineering by G.R. Nagpal, S.S. Sharma
[5]. Turbine practical design by Kearton
[6]. Virtual Instrumentation by Tata MC Graw hill, By Dr. Sanjay Gupta and Dr. Joseph John

More Related Content

DOCX
Complete report
PPTX
Vocational Training at DURGAPUR THERMAL POWER STATION
PPT
Thermal power-plant(LANCO) by ved prakash
PPTX
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
PPTX
Power generation
DOCX
Thermal power plant summer training report on Rswm ldt. report tpp.
DOCX
Summer Training Report On Kalisindh Thermal Power Plant
PPTX
Parichha thermal power point PPT
Complete report
Vocational Training at DURGAPUR THERMAL POWER STATION
Thermal power-plant(LANCO) by ved prakash
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
Power generation
Thermal power plant summer training report on Rswm ldt. report tpp.
Summer Training Report On Kalisindh Thermal Power Plant
Parichha thermal power point PPT

What's hot (20)

DOCX
Sagar mehta summer training thermal power station full report
PPT
Power plant technology
DOCX
Thermal Power plant visit Report by Amit Hinge
PPTX
NTPC DADRI.
DOCX
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
PPTX
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
DOCX
6 weeks summer Training report on thermal power plant in DCPP
PDF
GSECL TPS SIKKA
PDF
Thermal power plant term project
PPTX
Ntpc dadri ppt
PPTX
NTPC Badarpur Industrial Training Report
PPTX
Overview of ntpc power plant
DOC
thermal power plant PTTP Parichha
DOCX
report on VTPS
PPT
Steam thermal power plant(panki)
PDF
Summer Training Report on thermal power plant
PPTX
Ntpc badarpur summer training
PDF
THERMAL POWER PLANTS : Mechanical Engineering Project
PDF
OBRA THERMAL POWER PLANT
PPTX
THERMAL POWER STATION PPT.
Sagar mehta summer training thermal power station full report
Power plant technology
Thermal Power plant visit Report by Amit Hinge
NTPC DADRI.
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
6 weeks summer Training report on thermal power plant in DCPP
GSECL TPS SIKKA
Thermal power plant term project
Ntpc dadri ppt
NTPC Badarpur Industrial Training Report
Overview of ntpc power plant
thermal power plant PTTP Parichha
report on VTPS
Steam thermal power plant(panki)
Summer Training Report on thermal power plant
Ntpc badarpur summer training
THERMAL POWER PLANTS : Mechanical Engineering Project
OBRA THERMAL POWER PLANT
THERMAL POWER STATION PPT.
Ad

Similar to Hardware Implementation of Steam Power Plant (20)

DOCX
compalete file 2023 (AutoRecovered).docx
DOCX
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
DOCX
Attachment.doc
PPT
PRESENTATION.ppt
DOCX
PPTX
Thermal power plant
PPTX
NTPC Badarpur Industrial Training Report
PDF
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
PDF
power plant. engineering for btech mechanical
PPT
PPT
Ntpc dadri thermal power plant & switchyard
PDF
POWER PLANT.pdf
PDF
project_hirakpdf
DOCX
INDUSTRIAL TRAINING REPORT.docx 1 (1)
PDF
POWER GENERATION METHODS-Power Generation Power Plants
PDF
POWER SYSTEMS-1 Complete notes examples
PDF
Power System - Types of Power Plants overview
PPTX
Thermal power plant Presentation1[1].pptx
PDF
Power Plant Report
compalete file 2023 (AutoRecovered).docx
ABOUT NATIONAL THERMAL POWER PLANT COOPERATIO1
Attachment.doc
PRESENTATION.ppt
Thermal power plant
NTPC Badarpur Industrial Training Report
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
power plant. engineering for btech mechanical
Ntpc dadri thermal power plant & switchyard
POWER PLANT.pdf
project_hirakpdf
INDUSTRIAL TRAINING REPORT.docx 1 (1)
POWER GENERATION METHODS-Power Generation Power Plants
POWER SYSTEMS-1 Complete notes examples
Power System - Types of Power Plants overview
Thermal power plant Presentation1[1].pptx
Power Plant Report
Ad

More from IJERDJOURNAL (20)

PDF
Predictive Data Mining with Normalized Adaptive Training Method for Neural Ne...
PDF
The development of the Islamic Heritage in Southeast Asia tradition and futur...
PDF
An Iot Based Smart Manifold Attendance System
PDF
A Novel Approach To Detect Trustworthy Nodes Using Audit Based Scheme For WSN
PDF
Human Resource Competencies: An Empirical Assessment
PDF
Prospects and Problems of Non-Governmental Organizations in Poverty Alleviati...
PDF
Development of Regression Model Using Lasso And Optimisation of Process Param...
PDF
Use of Satellite Data for Feasibility Study And Preliminary Design Project Re...
PDF
Microwave Assisted Sol Gel Synthesis of Magnesium Oxide(Mgo)
PDF
Development of Enhanced Frequency Drive for 3-Phase Induction Motors Submitte...
PDF
Short-Term Load Forecasting Using ARIMA Model For Karnataka State Electrical ...
PDF
Optimal Pricing Policy for a Manufacturing Inventory Model with Two Productio...
PDF
Analysis of failure behavior of shear connection in push-out specimen by thre...
PDF
Discrete Time Batch Arrival Queue with Multiple Vacations
PDF
Regional Rainfall Frequency Analysis By L-Moments Approach For Madina Region,...
PDF
Implementing Oracle Utility-Meter Data Management For Power Consumption
PDF
Business Intelligence - A Gift for Decision Maker for the Effective Decision ...
PDF
Effect of Water And Ethyl Alcohol Mixed Solvent System on the Stability of Be...
PDF
Design of Synthesizable Asynchronous FIFO And Implementation on FPGA
PDF
Prospect and Challenges of Renewable Energy Resources Exploration, Exploitati...
Predictive Data Mining with Normalized Adaptive Training Method for Neural Ne...
The development of the Islamic Heritage in Southeast Asia tradition and futur...
An Iot Based Smart Manifold Attendance System
A Novel Approach To Detect Trustworthy Nodes Using Audit Based Scheme For WSN
Human Resource Competencies: An Empirical Assessment
Prospects and Problems of Non-Governmental Organizations in Poverty Alleviati...
Development of Regression Model Using Lasso And Optimisation of Process Param...
Use of Satellite Data for Feasibility Study And Preliminary Design Project Re...
Microwave Assisted Sol Gel Synthesis of Magnesium Oxide(Mgo)
Development of Enhanced Frequency Drive for 3-Phase Induction Motors Submitte...
Short-Term Load Forecasting Using ARIMA Model For Karnataka State Electrical ...
Optimal Pricing Policy for a Manufacturing Inventory Model with Two Productio...
Analysis of failure behavior of shear connection in push-out specimen by thre...
Discrete Time Batch Arrival Queue with Multiple Vacations
Regional Rainfall Frequency Analysis By L-Moments Approach For Madina Region,...
Implementing Oracle Utility-Meter Data Management For Power Consumption
Business Intelligence - A Gift for Decision Maker for the Effective Decision ...
Effect of Water And Ethyl Alcohol Mixed Solvent System on the Stability of Be...
Design of Synthesizable Asynchronous FIFO And Implementation on FPGA
Prospect and Challenges of Renewable Energy Resources Exploration, Exploitati...

Recently uploaded (20)

PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
CyberSecurity Mobile and Wireless Devices
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
Soil Improvement Techniques Note - Rabbi
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
Amdahl’s law is explained in the above power point presentations
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PPTX
Software Engineering and software moduleing
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
communication and presentation skills 01
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
August -2025_Top10 Read_Articles_ijait.pdf
Exploratory_Data_Analysis_Fundamentals.pdf
CyberSecurity Mobile and Wireless Devices
Fundamentals of Mechanical Engineering.pptx
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Soil Improvement Techniques Note - Rabbi
August 2025 - Top 10 Read Articles in Network Security & Its Applications
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Amdahl’s law is explained in the above power point presentations
Categorization of Factors Affecting Classification Algorithms Selection
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Software Engineering and software moduleing
Abrasive, erosive and cavitation wear.pdf
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
"Array and Linked List in Data Structures with Types, Operations, Implementat...
communication and presentation skills 01
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems

Hardware Implementation of Steam Power Plant

  • 1. International Journal of Engineering Research and Development e-ISSN: 2278-067X, p-ISSN: 2278-800X, www.ijerd.com Volume 13, Issue 2 (February 2017), PP.09-13 9 Hardware Implementation of Steam Power Plant 1 Kruthi Jayaram 1 assistant Professor, Dept Of Eee, Bnmit, Bangalore Abstract: There is a silent revolution throughout the world in energy sector. There is a trend towards decentralized and distributed generation of renewable energy. The steam power plants are highly capital intensive and suitable for generation of electricity. The work of establishing the steam power plant is really revolutionary and it will create history of total change of transforming highly centralized capitalist tool beneficial to the entire world. Steam power plant consists of Boiler, Turbine and generator which can be used for electrification of village and community. Steam power can be used directly exhaust steam of the steam turbine can be used for heating in the process. So steam power plants give double benefits. The steam power plant is using steam as working fluid. Steam is produced in a boiler using LPG as fuel and is used to drive the prime motor, namely, the steam turbine. In the steam turbine, heat energy is converted into mechanical energy which is used for generating electric power. Generator is an electro-magnetic device which makes the power available in the form of electrical energy. The temperature, pressure and output voltage are monitored by using lab view software programming, and the controlling can be done by DAQ cord. The parameters interface with the Data acquisition card MCC DAQ for monitoring purpose by means of graphical programming. The resulting models allow the implementation of various system of plant configuration. Keywords: Generation, Boiler, Turbine, DC motor. I. INTRODUCTION Electricity is modern society’s most convenient and useful form of energy. Without it, the present social infrastructure would not be feasible. The Energy in the form of electricity is most desirable as it is easy to transport, and can be easily converted to heat or work as per requirement Power is generated in various methods from various resources. Out of all Thermal, Hydro and Nuclear Power generation have gained importance for their availability in abundance &easy existence of their resources. 65% of the total installed capacity is steam Plants. The main objective is to design a steam power plant. The temperature, pressure and output voltage are monitored by using Lab View Software Programming. The parameters interface with the Data Acquisition Card MCC DAQ for monitoring purpose by means of graphical programming. Fig 1: Block diagram of the Steam Power Plant Fig 1 shows the Block diagram of the Steam Power Plant. The input given to the system is fuel. LPG is used as fuel. The fuel is given to the vessel so that the chemical energy is converted into heat energy. This heat energy is converted into mechanical energy with the help of rotating blades of the turbine. Generator converts mechanical energy into electrical energy and it is given to the load. The remaining heat is dissipated through the condenser and is given to the economizer. The heat is further cooled by using Feed Water Tank. Through the analysis of real time monitoring and control, we obtained the useful information concerning plant management from both technical and economical point of view. This is really practicable and achievable further the plant parameters can also be controlled by Aurdino Servo Motor.
  • 2. Hardware Implementation Of Steam Power Plant 10 II.THEORY OF OPERATION Generation: The process of power generation in a steam power plant consists of two main systems. They are:  Steam Generation and Utilization  Condensate System The main fuel used in the steam power plant is LPG. The available chemical energy that is in the form of gas is converted into thermal energy by combustion and heat energy is used to converted water into steam. This action takes place in boiler also called as steam generator. The steam energy is converted into mechanical energy in the turbine, which drives the rotor of the alternator, where the mechanical energy is converted into electrical energy. The steam energy generator or boiler is a two pass tower type, reheat natural circulation single drum, balance draft designed for the chemical energy of LPG is transferred into thermal energy by burning it. The resulting heat produced is used to boil water and steam thus generated is used to rotate turbines, thus converting it to mechanical energy. The shaft connected to turbine is coupled with rotor shaft of generator and it is rotated with a constant speed of 3200 rpm. Thus electrical power is generated which is distributed via transmission lines. Energy Conversion Fig 2: Block diagram of the energy conversion Power generation procedure: The steam energy generator or boiler is a two pass tower type, reheat natural circulation single drum, balance draft designed for burning of LPG as principle fuel. The complete furnace section is of welded membrane wall type arranged as gas and pressure tight envelope. The walls of the furnace are made up of water tubes. These are connected to headers and feed water is circulated through them. While water passes the tubes, heat is absorbed from the furnace by radiation. The water in tubes gets converted into steam.The steam and water mixer flows into the drum and steam is separated in the drum. This steam is called saturated steam. The saturated steam to increase the heat energy supplied to the steam turbine. II. DESIGN OF THE PLANT Steam turbine: The steam energy is converted mechanical work by expansion through the turbine. The expansion takes place through a series of fixed blades (nozzles) and moving blades each row of fixed blades and moving blades is called a stage. The moving blades rotate on the central turbine rotor and the fixed blades are concentrically arranged within the circular turbine casing which is substantially designed to withstand the steam pressure.On large output turbines the duty too large for one turbine and a number of turbine casing/rotor units are combined to achieve the duty. These are generally arranged on a common centre line (tandem mounted) but parallel systems can be used called cross compound systems. Fig 3: Impulse turbine
  • 3. Hardware Implementation Of Steam Power Plant 11 Design calculation: Radius of the central core: 20mm Length of the Blades: 20mm Width of the Blades: 8mm Spacing between the two blades: S = 2* pi * r / n r – Radius of the central core = 20mm n – Number of the blades = 12 s = 10mm Circumference of the turbine casing: 360mm Shaft: Length of the Shaft: 200mm Diameter of the Shaft: 8mm Furnace: Burners are set at each corner and are directed to strike an imaginary circle at the centre of the furnace. This is called tangential firing. Condenser: Steam boiler has main function to convert water to high quality steam. The steam is then supplied into turbine generator. Before supplied into turbine generator, steam should apply the requirement for both pressure and temperature. Condenser is used in power plant to make back pressure and temperature of steam from turbine generator is lower and then converts steam into condensate. Economizer: Economizer is the part of the boiler. It consists of a number of pipes through which water from the HPH’S are circulated. This water gains temperature from the flue gases escaping out of the boiler .Therefore, medium of heating here is flue gas. Feed water system: The energy streams entering and leaving the Feed Water System are as follows, The mass of the water flow and the steam flow must be regulated so mass water flow equals the mass steam flow to maintain drum level. The feed water control regulates the mass water flow to the boiler. The effects of the input control actions interact, since firing rate also affects steam temperature and feed water flow affects the steam pressure, which is the final arbiter of firing rate demand. The overall system must be applied and coordinated in a manner to minimize the effects of these interactions. The inter actions can be greatly affected by the control system design. If the boiler operates under varying steam pressure, the calibration of the liquid level will also vary with steam density. DC motor: The DC motor can be used as generator; the turbine shaft is coupled to the DC motor shaft. As the turbine rotates to its specified speed, Stationary permanent magnets form the stator field, produces torque, that any current-carrying conductor placed within an external magnetic field experiences a mechanical force. In a motor, the magnitude of this force, thus the output torque, is a function for rotor angle. When current moves through a conductor a circular magnetic field is induced around the conductor. The Motor (armature) rotation is caused by the simultaneous attraction and repulsion between the electromagnetic field in armature and a fixed magnetic field. The magnetic field surrounding a current carrying conductor interacts with an existing magnetic field which determines the direction of DC current carrying conductor in a fixed magnetic field. Thus the motor gives an output of around 10V DC and output current capacity of 2-3 Amps. This output is connected to load. Coupler: A coupler is a device used to connect two shafts together at their ends for the purpose of transmitting power. Couplings do not normally allow disconnection of shafts during operation. However, there are torques’s limiting couplings which can slip or disconnect when some torque limit is exceeded. The primary purpose of couplings is to join two pieces of rotating equipment while permitting some degree of misalignment or end movement or both. To provide for the connection of shafts of units that is manufactured separately such as motor and generator and to provide for disconnection of repairs.
  • 4. Hardware Implementation Of Steam Power Plant 12 Power plant boiler: A boiler or steam generator is a closed vessel which generates steam by heating water. The boiler or steam generating unit is defined “As a combination of apparatus for producing, furnishing or recovering heat together with the apparatus for transferring the heat so made available to the field being heated and vaporized”. Boiler is the most important and crucial component in a power plant. Water tube boiler: In water tube boilers, water circulates through the tubes and hot products of combustion flow over these tubes Water tube boilers require less weight of metal for a given size, are less liable to explosion, produce higher pressure, are accessible and can respond quickly to change in steam demand. Tubes and drums of water tube boilers are smaller than that of fire tube boilers and due to smaller size of drum higher pressure can be used easily. Water tube boilers require lesser floor space. The efficiency of water tube boilers is more. For that reason we prefer low pressure boiler, the steam is up to 15kg/cm2, exactly water tube boiler is choose for our steam power plant operation. Fig 4: Water Tube Boiler Measurements: The various parameters, which are measured in the steam plant as per our requirement and safety purpose, are as follows: Measurement of Temperature: 0 – 110 deg C. Measurement of Pressure: 4 – 6 psi Measurement of RPM: 3000 rpm Measurement of output voltage: 0 – 12 V DC IV. IMPLEMENTATION AND RESULT OF THE PLANT: Design of the Steam Power Plant is completed. The output voltage is obtained using steam as input. The parameters such as Pressure, temperature and Output voltage of the plant are monitored using lab view software programming. The output is represented graphically and numerically in the front panel of the software. The results obtained are as shown below. Fig 5: Load connected to the plant
  • 5. Hardware Implementation Of Steam Power Plant 13 Table1: Test Results V. CONCLUSION In power plant monitoring of temperature , pressure and output voltage was tested, this monitoring are done through MCC DAQ 1208FS Multifunction card, with single ended mode and differential ended mode connection. This gives an excellent results ranging from low to high temperature and pressure through VI software. Designing of steam power plant using close loop, improves the efficiency and reduces the loses. Speed monitoring can also be done by using lab view software. It is also helpful in the field of MEMS (Micro Electronic Mechanical Systems) applications. REFERENCES [1]. The control of boiler Instrument society of America 1991 by sam G. DUKE [2]. Power plant Engineering , Tata MC Graw hill 1984 by E. AL. Wakil [3]. Standard Boiler operation Tata MC Graw hill 1994 by S.M. Elonka and A.L Kohal [4]. Power plant Engineering by G.R. Nagpal, S.S. Sharma [5]. Turbine practical design by Kearton [6]. Virtual Instrumentation by Tata MC Graw hill, By Dr. Sanjay Gupta and Dr. Joseph John