SlideShare a Scribd company logo
Holistic Efficiency: The Productization
of the Data Center
Chris Crosby, CEO, Compass Datacenters
About Us
2
• Compass Datacenters provides dedicated, standalone data
centers
• Built using our Truly
Modular™ Architecture
• Patent pending design
• Geographically independent
• The building is the module
• Simplify Capacity Planning
• Growth in 1.2MW Increments
• Control
• Ownership or lease
• Operations and security
• Expansion
What Type of Data Center
3
3
Data Center Landscape—Target
Customers
4
End Users of Public Cloud,
Private Cloud and Traditional IT
Public Cloud Applications
Servers, OS, SANs,
Virtualization, Web, DR,
Network Management
Cross Connects, Racks,
Networking, TRS/Helpdesk
Power and Cooling, Security,
Network Connectivity, Facility
Management Systems
Building Shell, Utilities,
Fiber Pathway
Permits, Entitlements,
Incentives
Cloud Providers
Managed Service Providers
Retail Colocation Providers
Enterprises
Wholesale Providers
Real Estate Developer
Land
The Common Thread: Inefficiency
5
• Distorts Total Cost of Ownership (TCO)
• Dominated by First Cost
• On-Going Cost of OpEx
Capital
6
• Bigger isn’t better
• $20-$100 million is spent on four walls and a roof
• #1 killer of new projects is the shell to hold the 20 year plan
• Capital should be allocated as needed
• Freeing funds for other uses until needed
• Not accounting, it’s common sense
Land
7
• Huge facilities aren’t land efficient
• Eliminate the option value
• Ability to use land for other purposes
• Destroys the advantage of an appreciating asset
Energy Efficiency
• This isn’t it
8
What’s 100 acres, more or less?
Materials
9
• Lack of standard designs drives materials waste
• “Standard” usually just a starting point for customization
discussions
• Reason Uptime checks every facility as part of its process
• How much concrete and steel does it take to build a
100,000 square foot facility?
• Does anyone know?
• What is known:
• Production of 1 cubic yard of concrete generates 400 lbs of CO2
• Ex: 6” slab on a 200K square foot building requires 3700 yards of concrete
• Production generates 740 tons of CO2
• Production of 1 ton of steel generates 1.9 tons of CO2
• Ex: 440 tons of steel required for a 200K square foot building
• Production generates 840 tons of CO2
Resource Inefficiency
10
• Water
• Chemical treatment requirements
• Added cost
• Eco impact
Data Center Build Trend
11
• The Data Center Industry is Here
• Can’t Drive Costs Any Lower or Quality Any Higher
• The Required Next Step
• Most Providers Can’t Make It
The Historical Foundation
"Dr. W. Edwards Deming
taught that by adopting
appropriate principles of
management, organizations
can increase quality and
simultaneously reduce costs
(by reducing waste, rework,
staff attrition and litigation
while increasing customer
loyalty). The key is to
practice continual
improvement and think of
manufacturing as a
system, not as bits and
pieces.”
12
The Key Principles
• Deming had 14 key principles
• These are the most applicable to productization
• Create constancy of purpose toward improvement of product and service, with
the aim to become competitive, stay in business and to provide jobs.
• Cease dependence on inspection to achieve quality. Eliminate the need for
massive inspection by building quality into the product in the first place.
• Improve constantly and forever the system of production and service, to improve
quality and productivity, and thus constantly decrease costs.
• Put everybody in the company to work to accomplish the transformation. The
transformation is everybody's job.
13
The Other Element: Standardization
14
• Design product for a specific market segment
• Not the entire market
• Ex: 737 vs. 747
• Elements of true standard design
• Standard Bill of Materials
• Same for every job
• The facility is built using “kits”
• All quantities pre-determined
• Reduced transportation requirements
• Volume purchase agreements reduce cost
• Reduced disposal requirements
• Standard drawings and processes
• More efficient scheduling reduces wasted manpower
• Only deviations are due to local requirements
• We don’t have to reinvent
• Many examples (auto industry, aviation, consumer electronics)
Define It: The Data Center as a Product
15
Office:
2,500 SF
Or, WYW space
(Whatever YOU Want)
Storage/Staging Room
Dedicated
1,400 SF
Security
OPEX Savings
1.2MW – 2N
Pre-Fabricated
Patent Pending
Building: 21,000 SF
Datacenter: 10,000 SF
500+ Racks
20 kw/Rack with NO containment
Inexpensive
expansion
2MW gens @ N+1
Certify It: The Data Center as a Product
16
HARDENED BUILDING
1.5 SEISMIC IMP. FACTOR
149 MPH
1.2-1.5 PUE
@ ALL LOAD LEVELS
DESIGN &
CONSTRUCTED
Level 5
Commissioning
LEED GOLD
EYP
DCIM
UL
The Value of Standardization and
Integration: Beyond First Cost
• Standard design and partners
• Simplifies and standardizes operations to drive out on-going costs
• Integration
• Provides holistic view of performance without “gaps”
• Enhances customer control and efficiency
• Training
• Spares
• Documentation
• Useful Life
17
Supply Chain
• Partner vs. Bid
• A virtual team
• Consistency
• Replicability
• Forecast vs. Quote
• Eliminate the cost and delivery inefficiencies of “one-off”
18
Why Schneider?
• Breadth of product line
• UPS
• BMS/DCiM
• Switchgear
• Security
• LV Gear
• Personnel and expertise
• TCO and supply chain
• The Common Thread
• Energy Efficiency
19
Summary
• Data center industry becoming less one-off and more application centric
• Increasing requirement for lower costs and higher quality
• Data centers are inherently inefficient
• Capital
• Land
• Materials
• Resources
• Productization is the only way to achieve paradox of higher quality at
lower price points
• Requires combination of successful manufacturing principles and standardized
product
• Most providers are not positioned to take this next step
• Majority of customers will accept a “solid” standard in place of a mis-
mash of features
• Accord vs. Cutlass Supreme
• Cannot transform an industry without partners
• Each bringing components to the table for a better system solution
20
21

More Related Content

PDF
Data centers on the Edge
PPTX
Asset Management - what are some of your top priorties?
PPTX
Ensuring your plant is secure
PPTX
Retrofit, build, or go cloud/colo? Choosing your best direction
PPTX
Essential elements of data center operations
PDF
Best Practices for Creating Your Smart Grid Network Model
PPT
Distributech 2015 - Mobile Work management
PPTX
Energy solutions for federal facilities : How to harness sustainable savings ...
Data centers on the Edge
Asset Management - what are some of your top priorties?
Ensuring your plant is secure
Retrofit, build, or go cloud/colo? Choosing your best direction
Essential elements of data center operations
Best Practices for Creating Your Smart Grid Network Model
Distributech 2015 - Mobile Work management
Energy solutions for federal facilities : How to harness sustainable savings ...

What's hot (20)

ZIP
Basic Concepts for an Integrated Steel Process Control System
PDF
Containerized Power and Cooling Modules for Data Centers
PPTX
How Process Industry takes advantage of our solutions
PPT
How green standards are changing data center design and operations
PDF
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
PPTX
Improving your PUE while consolidating into an existing live data center
PDF
How Data Center Infrastructure Management Software Improves Planning and Cuts...
PDF
Industrial sawmill solution Wood Mizer
PDF
Practical Considerations for Implementing Prefabricated Data Centers
PDF
IT Consulting & Integration Services for Energy & Utilities Sectors
PPTX
Transforming data into sustained energy performance
PPTX
Process Automation - The Future
PPTX
How Warehouse and Distribution Systems (Conveyor systems) are being designed ...
PDF
ADMS (Advanced Distribution Management System)
PPT
Simplifying Data Center Design/ Build
PPTX
The Data Center Evolution and Pre-Fab Data Centers
PDF
How Data Center Infrastructure Management Software Improves Planning and Cuts...
PDF
Essential Elements of Data Center Facility Operations
PPTX
Schneider electric automationcom pes ppt
PPTX
Cyber security: A roadmap to secure solutions
Basic Concepts for an Integrated Steel Process Control System
Containerized Power and Cooling Modules for Data Centers
How Process Industry takes advantage of our solutions
How green standards are changing data center design and operations
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Improving your PUE while consolidating into an existing live data center
How Data Center Infrastructure Management Software Improves Planning and Cuts...
Industrial sawmill solution Wood Mizer
Practical Considerations for Implementing Prefabricated Data Centers
IT Consulting & Integration Services for Energy & Utilities Sectors
Transforming data into sustained energy performance
Process Automation - The Future
How Warehouse and Distribution Systems (Conveyor systems) are being designed ...
ADMS (Advanced Distribution Management System)
Simplifying Data Center Design/ Build
The Data Center Evolution and Pre-Fab Data Centers
How Data Center Infrastructure Management Software Improves Planning and Cuts...
Essential Elements of Data Center Facility Operations
Schneider electric automationcom pes ppt
Cyber security: A roadmap to secure solutions
Ad

Viewers also liked (17)

PPT
Sustainability at AT&T
PDF
Hybrid IT Delivery Model - Loughborough University
PDF
IT Consulting and Integration Services brochure
PPTX
Aeg keynote xperience efficiency dc
PPT
Optimizing machine, line, and process efficiency in manufacturing operations
PPTX
Turning operating inefficiencies into capital investments
PPT
Trends in Control and Power Technologies and Its Impact for Mineral Recovery ...
PDF
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
PPTX
Know Before You Go, Traveler Information for Smart Cities
PDF
Field Data Gathering Services — A Cloud-Based Approach
PPTX
Retrofit, build, or go cloud/colo? Choosing your best direction
PPT
The Mine Central Control Room: From Concept to Reality
PPT
PES: An Innovative Approach to Process Control Systems (and Energy Managemen...
PDF
Underground Self-Healing Solution
PPT
New trends in video analytics and surveillance systems for the mining industry
PPTX
How to Make Smart Cities a Reality Today: Five Factors for Success
PPT
Sustainability Information in Mining: Technologies and Processes for Data Agg...
Sustainability at AT&T
Hybrid IT Delivery Model - Loughborough University
IT Consulting and Integration Services brochure
Aeg keynote xperience efficiency dc
Optimizing machine, line, and process efficiency in manufacturing operations
Turning operating inefficiencies into capital investments
Trends in Control and Power Technologies and Its Impact for Mineral Recovery ...
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
Know Before You Go, Traveler Information for Smart Cities
Field Data Gathering Services — A Cloud-Based Approach
Retrofit, build, or go cloud/colo? Choosing your best direction
The Mine Central Control Room: From Concept to Reality
PES: An Innovative Approach to Process Control Systems (and Energy Managemen...
Underground Self-Healing Solution
New trends in video analytics and surveillance systems for the mining industry
How to Make Smart Cities a Reality Today: Five Factors for Success
Sustainability Information in Mining: Technologies and Processes for Data Agg...
Ad

Similar to Holistic Efficiency (20)

PPTX
The Six Month Data Center
PPTX
Waste Not Want Not
PPTX
AME Presentation - ThP-39 - Jacksonville 2014
PPT
Productivity.op mgmt.chpt 20
PDF
Cisco presentation in RAOTM 2012, HCMC Vietnam
PDF
The Effect of new Technologies like Hyperconvergence on the Data Centre
PDF
Operational Agility for your Distribution Center
PDF
Beyond the Box: Design to Operations
PDF
Build Energy Saving into Your Datacenter
PPT
STARTGAME factory - paradigm shift in manufacturing
PPT
Session 1
PPT
Session 1_OM
PDF
Smarter Datacenter - Sanjeev Gupta
PDF
Commercial Overview DC Session 3 The Greening Of The Data Centre
PPTX
The Impact of IoT on Data Centers
PDF
What manufacturing teaches about DevOps
PPTX
Buspro infosheet1.2
PDF
Devops, The future is here, it's just not evenly distributed
PPTX
The Future of Supply Chain Managment: Imagining Supply Chain 2030
PPTX
The Stratification of Data Center Responsibilities
The Six Month Data Center
Waste Not Want Not
AME Presentation - ThP-39 - Jacksonville 2014
Productivity.op mgmt.chpt 20
Cisco presentation in RAOTM 2012, HCMC Vietnam
The Effect of new Technologies like Hyperconvergence on the Data Centre
Operational Agility for your Distribution Center
Beyond the Box: Design to Operations
Build Energy Saving into Your Datacenter
STARTGAME factory - paradigm shift in manufacturing
Session 1
Session 1_OM
Smarter Datacenter - Sanjeev Gupta
Commercial Overview DC Session 3 The Greening Of The Data Centre
The Impact of IoT on Data Centers
What manufacturing teaches about DevOps
Buspro infosheet1.2
Devops, The future is here, it's just not evenly distributed
The Future of Supply Chain Managment: Imagining Supply Chain 2030
The Stratification of Data Center Responsibilities

More from Schneider Electric (20)

PPTX
Secure Power Design Considerations
PPTX
Digital International Colo Club: Attracting Investors
PPTX
32 phaseo power supplies and transformers briefing
PDF
Key Industry Trends, M&A Valuation Trends
PPTX
EcoStruxure™ for Cloud & Service Providers
PPTX
Magelis Basic HMI Briefing
PPTX
Zelio Time Electronic Relay Briefing
PPTX
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
PPTX
Relay Control Zelio SSR Briefing
PPTX
Magelis HMI, iPC and software Briefing
PPTX
Where will the next 80% improvement in data center performance come from?
PDF
EcoStruxure for Intuitive Industries
PDF
Systems Integrator Alliance Program 2017
PDF
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
PDF
It's time to modernize your industrial controls with Modicon M580
PPTX
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
PPT
Connected Services Study – Facility Managers Respond to IoT
PDF
Telemecanqiue Cabling and Accessories Briefing
PDF
Telemecanique Photoelectric Sensors Briefing
PDF
Telemecanique Limit Switches Briefing
Secure Power Design Considerations
Digital International Colo Club: Attracting Investors
32 phaseo power supplies and transformers briefing
Key Industry Trends, M&A Valuation Trends
EcoStruxure™ for Cloud & Service Providers
Magelis Basic HMI Briefing
Zelio Time Electronic Relay Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Relay Control Zelio SSR Briefing
Magelis HMI, iPC and software Briefing
Where will the next 80% improvement in data center performance come from?
EcoStruxure for Intuitive Industries
Systems Integrator Alliance Program 2017
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
It's time to modernize your industrial controls with Modicon M580
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
Connected Services Study – Facility Managers Respond to IoT
Telemecanqiue Cabling and Accessories Briefing
Telemecanique Photoelectric Sensors Briefing
Telemecanique Limit Switches Briefing

Recently uploaded (20)

PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPT
Teaching material agriculture food technology
PDF
Machine learning based COVID-19 study performance prediction
PPTX
1. Introduction to Computer Programming.pptx
PDF
Approach and Philosophy of On baking technology
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PDF
Empathic Computing: Creating Shared Understanding
PPTX
Tartificialntelligence_presentation.pptx
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Getting Started with Data Integration: FME Form 101
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
cuic standard and advanced reporting.pdf
PDF
Encapsulation_ Review paper, used for researhc scholars
PPTX
Big Data Technologies - Introduction.pptx
PDF
Electronic commerce courselecture one. Pdf
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PPTX
Programs and apps: productivity, graphics, security and other tools
20250228 LYD VKU AI Blended-Learning.pptx
Teaching material agriculture food technology
Machine learning based COVID-19 study performance prediction
1. Introduction to Computer Programming.pptx
Approach and Philosophy of On baking technology
NewMind AI Weekly Chronicles - August'25-Week II
Empathic Computing: Creating Shared Understanding
Tartificialntelligence_presentation.pptx
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Getting Started with Data Integration: FME Form 101
Diabetes mellitus diagnosis method based random forest with bat algorithm
cuic standard and advanced reporting.pdf
Encapsulation_ Review paper, used for researhc scholars
Big Data Technologies - Introduction.pptx
Electronic commerce courselecture one. Pdf
Group 1 Presentation -Planning and Decision Making .pptx
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Mobile App Security Testing_ A Comprehensive Guide.pdf
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Programs and apps: productivity, graphics, security and other tools

Holistic Efficiency

  • 1. Holistic Efficiency: The Productization of the Data Center Chris Crosby, CEO, Compass Datacenters
  • 2. About Us 2 • Compass Datacenters provides dedicated, standalone data centers • Built using our Truly Modular™ Architecture • Patent pending design • Geographically independent • The building is the module • Simplify Capacity Planning • Growth in 1.2MW Increments • Control • Ownership or lease • Operations and security • Expansion
  • 3. What Type of Data Center 3 3
  • 4. Data Center Landscape—Target Customers 4 End Users of Public Cloud, Private Cloud and Traditional IT Public Cloud Applications Servers, OS, SANs, Virtualization, Web, DR, Network Management Cross Connects, Racks, Networking, TRS/Helpdesk Power and Cooling, Security, Network Connectivity, Facility Management Systems Building Shell, Utilities, Fiber Pathway Permits, Entitlements, Incentives Cloud Providers Managed Service Providers Retail Colocation Providers Enterprises Wholesale Providers Real Estate Developer Land
  • 5. The Common Thread: Inefficiency 5 • Distorts Total Cost of Ownership (TCO) • Dominated by First Cost • On-Going Cost of OpEx
  • 6. Capital 6 • Bigger isn’t better • $20-$100 million is spent on four walls and a roof • #1 killer of new projects is the shell to hold the 20 year plan • Capital should be allocated as needed • Freeing funds for other uses until needed • Not accounting, it’s common sense
  • 7. Land 7 • Huge facilities aren’t land efficient • Eliminate the option value • Ability to use land for other purposes • Destroys the advantage of an appreciating asset
  • 8. Energy Efficiency • This isn’t it 8 What’s 100 acres, more or less?
  • 9. Materials 9 • Lack of standard designs drives materials waste • “Standard” usually just a starting point for customization discussions • Reason Uptime checks every facility as part of its process • How much concrete and steel does it take to build a 100,000 square foot facility? • Does anyone know? • What is known: • Production of 1 cubic yard of concrete generates 400 lbs of CO2 • Ex: 6” slab on a 200K square foot building requires 3700 yards of concrete • Production generates 740 tons of CO2 • Production of 1 ton of steel generates 1.9 tons of CO2 • Ex: 440 tons of steel required for a 200K square foot building • Production generates 840 tons of CO2
  • 10. Resource Inefficiency 10 • Water • Chemical treatment requirements • Added cost • Eco impact
  • 11. Data Center Build Trend 11 • The Data Center Industry is Here • Can’t Drive Costs Any Lower or Quality Any Higher • The Required Next Step • Most Providers Can’t Make It
  • 12. The Historical Foundation "Dr. W. Edwards Deming taught that by adopting appropriate principles of management, organizations can increase quality and simultaneously reduce costs (by reducing waste, rework, staff attrition and litigation while increasing customer loyalty). The key is to practice continual improvement and think of manufacturing as a system, not as bits and pieces.” 12
  • 13. The Key Principles • Deming had 14 key principles • These are the most applicable to productization • Create constancy of purpose toward improvement of product and service, with the aim to become competitive, stay in business and to provide jobs. • Cease dependence on inspection to achieve quality. Eliminate the need for massive inspection by building quality into the product in the first place. • Improve constantly and forever the system of production and service, to improve quality and productivity, and thus constantly decrease costs. • Put everybody in the company to work to accomplish the transformation. The transformation is everybody's job. 13
  • 14. The Other Element: Standardization 14 • Design product for a specific market segment • Not the entire market • Ex: 737 vs. 747 • Elements of true standard design • Standard Bill of Materials • Same for every job • The facility is built using “kits” • All quantities pre-determined • Reduced transportation requirements • Volume purchase agreements reduce cost • Reduced disposal requirements • Standard drawings and processes • More efficient scheduling reduces wasted manpower • Only deviations are due to local requirements • We don’t have to reinvent • Many examples (auto industry, aviation, consumer electronics)
  • 15. Define It: The Data Center as a Product 15 Office: 2,500 SF Or, WYW space (Whatever YOU Want) Storage/Staging Room Dedicated 1,400 SF Security OPEX Savings 1.2MW – 2N Pre-Fabricated Patent Pending Building: 21,000 SF Datacenter: 10,000 SF 500+ Racks 20 kw/Rack with NO containment Inexpensive expansion 2MW gens @ N+1
  • 16. Certify It: The Data Center as a Product 16 HARDENED BUILDING 1.5 SEISMIC IMP. FACTOR 149 MPH 1.2-1.5 PUE @ ALL LOAD LEVELS DESIGN & CONSTRUCTED Level 5 Commissioning LEED GOLD EYP DCIM UL
  • 17. The Value of Standardization and Integration: Beyond First Cost • Standard design and partners • Simplifies and standardizes operations to drive out on-going costs • Integration • Provides holistic view of performance without “gaps” • Enhances customer control and efficiency • Training • Spares • Documentation • Useful Life 17
  • 18. Supply Chain • Partner vs. Bid • A virtual team • Consistency • Replicability • Forecast vs. Quote • Eliminate the cost and delivery inefficiencies of “one-off” 18
  • 19. Why Schneider? • Breadth of product line • UPS • BMS/DCiM • Switchgear • Security • LV Gear • Personnel and expertise • TCO and supply chain • The Common Thread • Energy Efficiency 19
  • 20. Summary • Data center industry becoming less one-off and more application centric • Increasing requirement for lower costs and higher quality • Data centers are inherently inefficient • Capital • Land • Materials • Resources • Productization is the only way to achieve paradox of higher quality at lower price points • Requires combination of successful manufacturing principles and standardized product • Most providers are not positioned to take this next step • Majority of customers will accept a “solid” standard in place of a mis- mash of features • Accord vs. Cutlass Supreme • Cannot transform an industry without partners • Each bringing components to the table for a better system solution 20
  • 21. 21