 What is Christmas tree?
 The set of valves, spools & fittings connected
to the top of the well to isolate, direct and
control the flow wellbore fluids.
 The control valves, pressure gauges and
chokes assembled at the top of the well to
control the flow of oil and gas after the well
has been drilled and completed.
 The purpose of a production
Christmas Tree:
 The purpose of an injection
Christmas Tree: Fig. Schematic of Wellhead & Christmas Tree
 Tubing Hanger
 Tubing Head Spool
 Tree piping
 Flow line connector
 Wellhead connector
 Valves and fittings
 Choke
 Safety barrier
 Safely stop produced or injected fluid
 Injection of chemicals to well or flow line
 Allow for control of down hole valves
 Allow for electrical signals to down hole gauges
 To bleed of excessive pressure from annulus
 Regulate fluid flow through a choke
 Allow for well intervention
 API 6A: Specification for Wellhead and Christmas Tree
Equipment.
 API 17D: Design and Operation of Subsea Production
Systems-Subsea Wellhead and Tree Equipment.
 ISO 13628-4: Petroleum and natural gas industries –
Design and operation of subsea production systems.
 ISO 10423:2009: Petroleum and natural gas industries -
Drilling and production equipment - Wellhead and
Christmas tree equipment.
1. Vertical Christmas Tree
2. Horizontal Christmas Tree
l Christmas Tree
Vertical Christmas Tree Horizontal Christmas Tree
Horizontal tree Vertical tree
 Production master valve (PMV) in
horizontal bore
 Single, concentric bore
 Must pull the production tubing to retrieve
the tree
 Both barriers fail if the tree is accidentally
removed
 Designed to take the load from a BOP
(increased weight)
 Batch-wise completion possible
 Tubing hanger is installed in the tree body
instead of the wellhead.
 The Horizontal tree concept can be further
defined as –
1.“Partial Drilling HT”
2.“Full Drilling HT”
 Production master valve (PMV) in vertical
bore
 Dual bore (production + annulus)
 Must pull the tree to retrieve the production
tubing
 Requires landing string to secure well before
work over
 Primary barrier is maintained if the tree is
accidentally removed
 Not designed to take the load from a BOP
 The vertical tree concept can be further defined
as –
1.“Eccentric” production flow is routed
eccentrically (dual bore configuration)
2.“Concentric” concentrically (single bore
configuration) through the tubing hanger.
 The valves are mounted on the lateral sides, allowing for simple
well intervention and tubing recovery.
 This concept is especially beneficial for wells that need a high
number of interventions.
 Swab valves are not used in the HXT since they have electrical
submersible pumps applications.
 The key feature of the HXT is that the tubing hanger is installed
in the tree body instead of the wellhead.
 This arrangement requires the tree to be installed onto the
wellhead before completion of the well.
Fig. Partial Drilling HT Fig. Full Drilling HT
 Partial Drilling HT:
 Diana, Marshall, Madison
(ExxonMobil GOM)
 Mica (ExxonMobil GOM)
 Kizomba (ExxonMobil
Angola)
 Full Drilling HT:
 Dalia (Total Fina Elf –
Block 17 Offshore Angola)
 Ross (Talisman Energy –
North Sea UK)
 The master valves are configured above the tubing hanger in the
vertical Xmas tree (VXT).
 VXT are applied commonly and widely in subsea fields due to
their flexibility of installation and operation.
 The vertical tree concept can be further defined as –
 “Eccentric” production flow is routed eccentrically (dual bore
configuration)
 “Concentric” concentrically (single bore configuration) through
the tubing hanger.
Fig. Concentric Mono-bore VTFig. Eccentric Dual Bore VT
 Eccentric VT:-
 Zinc (ExxonMobil – GOM)
 Girossol (Total Fina Elf -
Block 17 Offshore Angola)
 Balder (ExxonMobil –
North Sea Norway)
 Blackback (ExxonMobil –
Austraila)
 Concentric VT:-
 Bongo (Shell – Nigeria)
 Mensa (BP – GOM)
 Crazy Horse (BP – GOM)
 Macaroni (Shell – GOM)
 The cost of an HXT is much higher than that of a VXT; typically the purchase
price of an HXT is five to seven times more.
 A VXT is larger and heavier, which should be considered if the installation area
of the rig is limited.
 Completion of the well is another factor in selecting an HXT or VXT. If the
well is completed but the tree has not yet been prepared, a VXT is needed. Or if
an HXT is desired, then the well must be completed after installation of the tree.
 An HXT is not recommended for use in a gas field because interventions are
rarely needed.
 For the last 20 years the Horizontal Christmas tree has been the preferred
design for deepwater fields, while in recent years the focus in the industry
is returning to the conventional Vertical Christmas tree system.
 An HXT is applied in complex reservoirs or those needing frequent
workovers that require tubing retrieval, whereas a VXT is often chosen for
simple reservoirs or when the frequency of tubing retrieval workovers is
low.
 A tree often provides numerous additional functions including chemical
injection points, well intervention means, pressure relief means, monitoring
points such as pressure, temperature, corrosion, erosion, sand detection,
flow rate, flow composition, valve and choke position feedback, and
connection points for devices such as down hole pressure and temperature
transducers.
1.Towns, T. K., Deeken, D. G., Derby, L. M., Exxon Mobil Development
Company, “Diana Subsea Tree Selection and Installation Results in
4,653 Feet of Water” Deep Offshore Technology held in Rio de Janeiro,
Brazil, October 17-19, 2001.
2. Moyer, M.C., Barry, M.D., Tears, N.C., "Hoover-Diana Deepwater
Drilling and Completions", OTC 13081, Offshore Technology
Conference, Houston,, May 2001.
3. Havard Devold," Oil And Gas Production Handbook", An Introduction
to Oil And Production, ABB Oil And Gas, May (2009), Edition 2.0
Oslo,29-32.
4. Oda Ingeborg Stendebakken, NTNU Trondheim, "A reliability study of
a Deepwater Vertical Christmas Tree with attention to XT retrieval
rate", June (2014),11-32.
5. Randy J. Wester and Eric P. Ringle / FMC Energy Systems," Installation
and Work over Time Savings: Key Drivers for Deepwater Tree
Selection" ,OCT 12943, Offshore Technology Conference, May (2001).
Horizontal vertical christmas tree ppt

More Related Content

PPTX
WELLHEAD FOR OIL AND GAS WELL.pptx
PPTX
Mudline Suspension (MLS)
PPTX
Well head and christmas tress 2019.
DOCX
Report on horizontal vertical christmas tree
PPTX
Subsea completion and control system
PDF
Wellhead basics
PPT
Wellhead
PDF
Wellheads and Flow Lines.pdf
WELLHEAD FOR OIL AND GAS WELL.pptx
Mudline Suspension (MLS)
Well head and christmas tress 2019.
Report on horizontal vertical christmas tree
Subsea completion and control system
Wellhead basics
Wellhead
Wellheads and Flow Lines.pdf

What's hot (20)

PPTX
Wellhead and christmas tree components, functions and more
PDF
Completion equipment part 1
PPTX
Well Control
PDF
1. completion sequance
PDF
Wellhead function, rating and selection
PDF
Installation procedures of wellhead
PDF
Well completion equipment 2. landing nipples
PDF
Well completion 1 wleg
PDF
Scsssv surface control subsurface safety valve
DOCX
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
PDF
Side sliding door ssd
PDF
Ssd spm
PDF
perforated joint, flow coupling and blast joint
PPTX
PPTX
Well control equipment
PDF
Well Completion Design.pdf
PDF
Oil & Gas Production and Surface Facilities
PPTX
Artificial Lift Methods
PDF
Completion equipment packer part #1
Wellhead and christmas tree components, functions and more
Completion equipment part 1
Well Control
1. completion sequance
Wellhead function, rating and selection
Installation procedures of wellhead
Well completion equipment 2. landing nipples
Well completion 1 wleg
Scsssv surface control subsurface safety valve
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
Side sliding door ssd
Ssd spm
perforated joint, flow coupling and blast joint
Well control equipment
Well Completion Design.pdf
Oil & Gas Production and Surface Facilities
Artificial Lift Methods
Completion equipment packer part #1
Ad

Viewers also liked (18)

PDF
Manifold design, verification,_and_validation
DOCX
Spar Information
PDF
[Ajaya kumar gupta]_response_spectrum_method_in_se(book_zz.org)
PDF
What subsea control systems low res
PDF
Tbi peer2010 05 guidelines for performance based seismic design of tall buil...
PPT
J Ray Firsts
PPTX
Anticipation and Mitigation of Geohazards for Subsea Power Cables (and Pipeli...
PDF
ACI Provisions for Seismic Design
PDF
Lecture44
PDF
Advanced blowout and well control robert d. grace
PDF
Seismic Conceptual Design of Buildings
PDF
Spar Platforms
PDF
Norwegian subsea
PDF
Seismic Design Basics - Superstructure
PDF
Seismic Design - Introduction
PPT
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREE
PPT
Performance Based Design Presentation By Deepak Bashetty
PDF
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
Manifold design, verification,_and_validation
Spar Information
[Ajaya kumar gupta]_response_spectrum_method_in_se(book_zz.org)
What subsea control systems low res
Tbi peer2010 05 guidelines for performance based seismic design of tall buil...
J Ray Firsts
Anticipation and Mitigation of Geohazards for Subsea Power Cables (and Pipeli...
ACI Provisions for Seismic Design
Lecture44
Advanced blowout and well control robert d. grace
Seismic Conceptual Design of Buildings
Spar Platforms
Norwegian subsea
Seismic Design Basics - Superstructure
Seismic Design - Introduction
OIL AND GAS SURFACE WELLHEAD AND CHRISTMAS TREE
Performance Based Design Presentation By Deepak Bashetty
ETABS manual - Seismic design of steel buildings according to Eurocode 3 & 8
Ad

Similar to Horizontal vertical christmas tree ppt (8)

PDF
Overview of subsea production systems
PDF
Subsea Trees Manifolds & connection systems
PDF
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
PPTX
Completion equipment .pptx
PDF
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
PPT
C4 Subsea Production
PPTX
Subsea Operations and Technologies Overview
PPTX
Subsea Operations and Technologies Overview2
Overview of subsea production systems
Subsea Trees Manifolds & connection systems
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
Completion equipment .pptx
Hwayoo - Wellhead Equipment & Christmass Tree 20160802
C4 Subsea Production
Subsea Operations and Technologies Overview
Subsea Operations and Technologies Overview2

Recently uploaded (20)

PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
My India Quiz Book_20210205121199924.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
Computer Architecture Input Output Memory.pptx
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
advance database management system book.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
HVAC Specification 2024 according to central public works department
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
Complications of Minimal Access-Surgery.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
A powerpoint presentation on the Revised K-10 Science Shaping Paper
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
My India Quiz Book_20210205121199924.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
Computer Architecture Input Output Memory.pptx
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
advance database management system book.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
HVAC Specification 2024 according to central public works department
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
AI-driven educational solutions for real-life interventions in the Philippine...
Uderstanding digital marketing and marketing stratergie for engaging the digi...
Complications of Minimal Access-Surgery.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
B.Sc. DS Unit 2 Software Engineering.pptx
Chinmaya Tiranga quiz Grand Finale.pdf

Horizontal vertical christmas tree ppt

  • 1. Submitted by "Mr . AMAR M.GAIKWAD" Under the guidance of " Prof. S.A. Joshi " DEPARTMENT OF PETROLEUM ENGINEERING MAEER'S MAHARASTRA INSTITUTE OF TECHNOLOGY,PUNE UNIVERSITY OF PUNE 2015-2016
  • 2.  What is Christmas tree?  The set of valves, spools & fittings connected to the top of the well to isolate, direct and control the flow wellbore fluids.  The control valves, pressure gauges and chokes assembled at the top of the well to control the flow of oil and gas after the well has been drilled and completed.  The purpose of a production Christmas Tree:  The purpose of an injection Christmas Tree: Fig. Schematic of Wellhead & Christmas Tree
  • 3.  Tubing Hanger  Tubing Head Spool  Tree piping  Flow line connector  Wellhead connector  Valves and fittings  Choke
  • 4.  Safety barrier  Safely stop produced or injected fluid  Injection of chemicals to well or flow line  Allow for control of down hole valves  Allow for electrical signals to down hole gauges  To bleed of excessive pressure from annulus  Regulate fluid flow through a choke  Allow for well intervention
  • 5.  API 6A: Specification for Wellhead and Christmas Tree Equipment.  API 17D: Design and Operation of Subsea Production Systems-Subsea Wellhead and Tree Equipment.  ISO 13628-4: Petroleum and natural gas industries – Design and operation of subsea production systems.  ISO 10423:2009: Petroleum and natural gas industries - Drilling and production equipment - Wellhead and Christmas tree equipment.
  • 6. 1. Vertical Christmas Tree 2. Horizontal Christmas Tree l Christmas Tree Vertical Christmas Tree Horizontal Christmas Tree
  • 7. Horizontal tree Vertical tree  Production master valve (PMV) in horizontal bore  Single, concentric bore  Must pull the production tubing to retrieve the tree  Both barriers fail if the tree is accidentally removed  Designed to take the load from a BOP (increased weight)  Batch-wise completion possible  Tubing hanger is installed in the tree body instead of the wellhead.  The Horizontal tree concept can be further defined as – 1.“Partial Drilling HT” 2.“Full Drilling HT”  Production master valve (PMV) in vertical bore  Dual bore (production + annulus)  Must pull the tree to retrieve the production tubing  Requires landing string to secure well before work over  Primary barrier is maintained if the tree is accidentally removed  Not designed to take the load from a BOP  The vertical tree concept can be further defined as – 1.“Eccentric” production flow is routed eccentrically (dual bore configuration) 2.“Concentric” concentrically (single bore configuration) through the tubing hanger.
  • 8.  The valves are mounted on the lateral sides, allowing for simple well intervention and tubing recovery.  This concept is especially beneficial for wells that need a high number of interventions.  Swab valves are not used in the HXT since they have electrical submersible pumps applications.  The key feature of the HXT is that the tubing hanger is installed in the tree body instead of the wellhead.  This arrangement requires the tree to be installed onto the wellhead before completion of the well.
  • 9. Fig. Partial Drilling HT Fig. Full Drilling HT
  • 10.  Partial Drilling HT:  Diana, Marshall, Madison (ExxonMobil GOM)  Mica (ExxonMobil GOM)  Kizomba (ExxonMobil Angola)  Full Drilling HT:  Dalia (Total Fina Elf – Block 17 Offshore Angola)  Ross (Talisman Energy – North Sea UK)
  • 11.  The master valves are configured above the tubing hanger in the vertical Xmas tree (VXT).  VXT are applied commonly and widely in subsea fields due to their flexibility of installation and operation.  The vertical tree concept can be further defined as –  “Eccentric” production flow is routed eccentrically (dual bore configuration)  “Concentric” concentrically (single bore configuration) through the tubing hanger.
  • 12. Fig. Concentric Mono-bore VTFig. Eccentric Dual Bore VT
  • 13.  Eccentric VT:-  Zinc (ExxonMobil – GOM)  Girossol (Total Fina Elf - Block 17 Offshore Angola)  Balder (ExxonMobil – North Sea Norway)  Blackback (ExxonMobil – Austraila)  Concentric VT:-  Bongo (Shell – Nigeria)  Mensa (BP – GOM)  Crazy Horse (BP – GOM)  Macaroni (Shell – GOM)
  • 14.  The cost of an HXT is much higher than that of a VXT; typically the purchase price of an HXT is five to seven times more.  A VXT is larger and heavier, which should be considered if the installation area of the rig is limited.  Completion of the well is another factor in selecting an HXT or VXT. If the well is completed but the tree has not yet been prepared, a VXT is needed. Or if an HXT is desired, then the well must be completed after installation of the tree.  An HXT is not recommended for use in a gas field because interventions are rarely needed.
  • 15.  For the last 20 years the Horizontal Christmas tree has been the preferred design for deepwater fields, while in recent years the focus in the industry is returning to the conventional Vertical Christmas tree system.  An HXT is applied in complex reservoirs or those needing frequent workovers that require tubing retrieval, whereas a VXT is often chosen for simple reservoirs or when the frequency of tubing retrieval workovers is low.  A tree often provides numerous additional functions including chemical injection points, well intervention means, pressure relief means, monitoring points such as pressure, temperature, corrosion, erosion, sand detection, flow rate, flow composition, valve and choke position feedback, and connection points for devices such as down hole pressure and temperature transducers.
  • 16. 1.Towns, T. K., Deeken, D. G., Derby, L. M., Exxon Mobil Development Company, “Diana Subsea Tree Selection and Installation Results in 4,653 Feet of Water” Deep Offshore Technology held in Rio de Janeiro, Brazil, October 17-19, 2001. 2. Moyer, M.C., Barry, M.D., Tears, N.C., "Hoover-Diana Deepwater Drilling and Completions", OTC 13081, Offshore Technology Conference, Houston,, May 2001. 3. Havard Devold," Oil And Gas Production Handbook", An Introduction to Oil And Production, ABB Oil And Gas, May (2009), Edition 2.0 Oslo,29-32. 4. Oda Ingeborg Stendebakken, NTNU Trondheim, "A reliability study of a Deepwater Vertical Christmas Tree with attention to XT retrieval rate", June (2014),11-32. 5. Randy J. Wester and Eric P. Ringle / FMC Energy Systems," Installation and Work over Time Savings: Key Drivers for Deepwater Tree Selection" ,OCT 12943, Offshore Technology Conference, May (2001).