ICBRR: An Approach to Building Disaster Resilient Communities Shesh Kanta Kafle IDRC, Davos May 31, 2010
Presentation Outline Key Features of ICBRR  Key Achievements of ICBRR Program Contributions to Building Disaster Resilient Communities Measuring Disaster Resilient Communities (Using process and outcome indicators)
Map of Indonesia   Nias Island Aceh Province
Key Features of ICBRR  Addresses all hazards, vulnerabilities and risks; Considers all aspects of the disaster management cycle (Preparedness, prevention/mitigation, response and recovery); Includes cooperation and collaboration with other sectors/stakeholders;
ICBRR Approach Enhances organizational capacity building Adopts participatory process Focuses on empowering vulnerable community and individuals Is gender sensitive Gives emphasis on linking community risk reduction plans to Local Government Planning
Baseline survey; Knowledge, Attitude and Practice (KAP) Survey Rapport building, Form/Activate Community Based Action Team (CBAT), CBAT training. Mobilization of Disaster Response Team (SATGANA), CBATs and Community Risk Assessment (HVCA) Participatory planning Community awareness on disaster risk and impacts Advocacy and Socialization of Risk Assessment results and Plans Risk reduction/ mitigation Participatory monitoring and evaluation Formation of working group, Conduct Pre-VCA, Area Selection ICBDRR Flow Diagram
Key Achievements Formed/trained CBATs Risk Assessment and risk reduction plans Involvement of women and elderly Involvement of local government Linking CBEWS to national EWS Community Preparedness- implementation of risk reduction plans
Key achievements of ICBRR Program 95 43 Implementation of RR plans by CBATs 100 43 EWS focal points at CBATs appointed and trained 100 432 Number of PMI staff, volunteers and potential facilitators received training 100 43 Program support villages linked with PMI EWS 100 43 Villages submitted proposals for the community risk reduction plan implementation 100 1060 CBATs members including vulnerable groups and women involved in the plan formulation process 100 43 HVCA completed in participatory process including representatives of all vulnerable groups 100 6000 Persons in the community (both village and schools) with knowledge of hazards, vulnerability and risk.  100 860 CBATs as PMI volunteers/facilitators trained 100 43 CBATs are able to recruit, train, support and motivate community volunteers for DRR and work together to do so. Achieved (%) Planned (Number) Key Performance Indicators (KPIs)
 
 
 
IFRC Geneva IFRC AP Zone IFRC Regional Office PMI NHQ PMI Chapter PMI Branch International  community UN agencies ICRC PNSs INGOs Source of  Information BNPB BMKG CVS Other governmental  departments EWS message  Dissemination Disaster response team CBAT Community Institutions IFRC Jakarta ICRC Jakarta PNSs NGOs CBAT and community Disaster National Global EWS information and communication system at PMI
BMKG PMI NHQ PMI branch Hazard  information CBATs/ communities Telephone Radio SMS Email Newspaper TV Telephone Radio/TV SMS Email Information and communication system
Measuring Disaster Resilient Communities
A disaster resilient community can be defined as a community which has the capacity (Twigg 2005): To absorb stress and destructive forces through resistance or adaptation; To manage or maintain certain basic functions and structures during disastrous events; and To recover or ‘bounce back’ with specific behaviour, strategies and measures for risk reduction.  Disaster Resilient Community
Disaster Resilient Communities   Ability to bounce back  Ability to recover rapidly Ability to resist hazards to become    disasters
Resilient community
Elements of resilient communities Safe ‘Critical Facilities’ Cash Reserves Disaster Preparedness Local Institutions/CBAT Ethical Standards Contingency Plans Memory of  Past Events Trained Staff Coping  Abilities Trained volunteers Local Leadership External Support Diversified  Local Economy Responsible  Governments Hazard, vulnerability and Capacity assessments Awareness and basic and health infrastructures
i=10, j=5   i =10, j=5 Overall Resilience Score  =  ∑   P (Wi*Rj) +  ∑   O (Wi*Rj)     i=1, j=  i=1, j=1 Measuring Disaster Resilient Communities
173 (275)  (63%) 5 55 Overall score 6 (15) 2 3 Monitoring of program activities being done by PMI Branch and Chapters.  10.Participatory monitoring and evaluation 12 (30) 2 6 CBATs are actively involved in the implementation of risk reduction plans. 9. Mitigation activities 24 (40) 3 8 Community awareness raising materials prepared and distributed to communities; training on gender, early warning system, community based first aid (CBFA) organised; 8. Awareness raising/training 12 (20) 3 4 Risk reduction plans and HVCA results socialized among local government authorities; 7. Advocacy/ Socialisation 27 (45) 3 9 Community risk reduction plans prepared by CBATs mobilizing communities; 6. Risk reduction planning 40 (50) 4 10 Detailed risk assessment of all villages done mobilising CBATs 5. Risk assessment (HVCA) 15 (25) 3 5 SATGANA, VDMC and CBATs training organised and community mobilisation done.  4. Community mobilisation (SATGANA, VC, CBATs, communities) 28 (35) 4 7 Socialization was done for local leaders, PMI staff, board members; Formation of village committees (VDMC) and CBATs were done as per the standard process 3. Rapport building, social capital building, Form village committees and CBATs 3 (5) 3 1 PMI volunteers were involved  2. Baseline survey/KAP 6 (10) 3 2 Detailed pre-HVCA was done but was used for proposal writing and not for area selection.  1. Area selection, Pre-HVCA, comprehensive assessment Total score (Wi*Rj) Value (1-5)(Rj) Weight (Rank) (Wi) Status Process indicators (steps)
Output indicators 30 (50) 3 5*2=10 3. Level of participation of vulnerable groups in the risk assessment 15 (25) 3 5*1=5 2. Knowledge of risk and risk reduction system among CBATs, community and local governments 60 (75) 4 5*3=15 1. Conduct of baseline survey, risk assessment (HVCA), establishment of disaster database.  Risk Assessment (5) 3 (5) 3 1*1=1 6. Popular participation (linkage with PMI, private sector, NGOs, civil society and other agencies.  20 (25) 4 1*5=5 5. Capacity of CBATs and CDMC in disaster response and risk mitigation 16 (20) 4 1*4=4 4. Ownership of risk community reduction plans by local government planning 6 (10) 3 1*2=2 3. Linkage with the local government agencies, Private sectors and other NGOs/stakeholders 6 (15) 2 1*3=3 2. Access or influence of vulnerable groups to policy making and programming 30 (30) 5 1*6=6 1. A community organisation Governance (1) Score (Wi*Rj) Value (Rj) Weight (Wi) Standards/Indicators Thematic areas as per HFA
Output indicators (cont’d) 48 (120) 2 4*6=24 7. Social protection (health, livelihoods etc) provisions  12 (20) 3 4*1=4 6. Environment and natural resources management 24 (40) 3 4*2=8 5. Diversified local economy (livelihoods) 24 (60) 2 4*3=12 4. Quality of houses, physical location 84 (140) 3 4*7=28 3. Monitoring and evaluation system in place 80 (100) 4 4*5=20 2. Implementation of RR plans 80 (80) 5 4*4=16 1. A DRR and disaster preparedness plan Risk management and vulnerability reduction (4) 8 (10) 4 2*1=2 5. Documentation of traditional, existing DRR practices and early warning systems in the community 16 (40) 2 2*4=8 4. DRR activities in schools 16 (20) 4 2*2=4 3. Formulation of SOP for early warning system and emergency communications 12 (30) 2 2*3=6 2. Awareness raising materials and activities 40 (50) 4 2*5=10 1. Trained volunteers and community members Knowledge and Education (2)
Output indicators (cont’d) 717 (1165) (62% of the maximum attainable score) 5 233 Total score 24 (30) 4 3*2=6 4. PMI (SATGANA) and CBAT capacity 36 (40) 4 3*3=9 3. Volunteerism/Participation 9 (15) 3 3*1=3 2. Contingency plans 48 (60) 4 3*4=12 1. An effective community early warning system Disaster preparedness and response (3)
The overall score 62% should not be loosely used and generalised. The score is contextual, and values mentioned in the tables are program and site specific. However, this can be used for comparing the status of any programs and measuring the outcomes in line with building disaster resilient communities.   Conclusions (1)
Process standards are important for the community understanding, ownership and sustainability of the Program; where as outcome standards are important for the real achievements in terms of community empowerment and capacity building.   Conclusion (2)
The ICBRR program was aimed at increasing community resilience through enhancing disaster preparedness and response capacities of PMI. A close link between CBATs, local government and PMI Branch with the support from Chapter is necessary for sustaining the outcomes of the program. Conclusions (3)
DISCUSSION
THANK YOU

More Related Content

PPT
Lecture 4 bm tool
PDF
Part1 disaster-management-risk-mitigation
PDF
Community Risk Assessment (CRA)
DOCX
Community based disaster management
PDF
Ifrc south east asia vca guidelines in english
PPTX
Chapter 6 UNISDR Initiative
PDF
Chapter 5 global assessment report
PPT
HFA Monitoring and Review -Key Questions Guidance
Lecture 4 bm tool
Part1 disaster-management-risk-mitigation
Community Risk Assessment (CRA)
Community based disaster management
Ifrc south east asia vca guidelines in english
Chapter 6 UNISDR Initiative
Chapter 5 global assessment report
HFA Monitoring and Review -Key Questions Guidance

What's hot (19)

PDF
Chapter 2 unisdr from 1960
PPTX
module1.disaster risk reduction and management plans and strategies
PDF
Early Warning & Decision Support
PPT
ICT for Development
PPT
Flood Management in Pakistan final
PDF
Integrating Gender Into C B D R M Training Manual
PPTX
Presentation DIPECHO Program on Disaster Risk Reduction in Bangladesh
PPT
Overview of Programme 1002
PPT
ICT for Disaster Risk Management-Managing Disaster Information-Global Risk Id...
PDF
Disaster Management Systems: Building Capacity for Developing Countries and ...
ODP
Disaster Management Systems: Building Capacity for Developing Countries and ...
PPTX
Disaster management through community participation
PPT
Emi study and other docs
PDF
Sendai framework for_disaster_risk_reduction_2015-2030
PPTX
Frame work for country based capacity development on Resilient Infrastructure
PDF
Disaster Risk Reduction: The Sendai Framework
DOC
DRR prodoc -2 for UN women -final draft
PPT
Bridging Anti-corruption and Social Accountability – The role of Civil Socie...
Chapter 2 unisdr from 1960
module1.disaster risk reduction and management plans and strategies
Early Warning & Decision Support
ICT for Development
Flood Management in Pakistan final
Integrating Gender Into C B D R M Training Manual
Presentation DIPECHO Program on Disaster Risk Reduction in Bangladesh
Overview of Programme 1002
ICT for Disaster Risk Management-Managing Disaster Information-Global Risk Id...
Disaster Management Systems: Building Capacity for Developing Countries and ...
Disaster Management Systems: Building Capacity for Developing Countries and ...
Disaster management through community participation
Emi study and other docs
Sendai framework for_disaster_risk_reduction_2015-2030
Frame work for country based capacity development on Resilient Infrastructure
Disaster Risk Reduction: The Sendai Framework
DRR prodoc -2 for UN women -final draft
Bridging Anti-corruption and Social Accountability – The role of Civil Socie...
Ad

Viewers also liked (18)

PPTX
Building community resilience by integrating disaster risk reduction and heal...
PPS
The Resilient Community Partnership: Building Disaster Resilient Communities.
PPTX
Disaster resistant architecture
PPTX
Community Based Adaptation and Resilience in East and Southern Africa’s Dryla...
PPTX
Six Foundations for Building Community Resilience
PPTX
Who Day Presentation 07
PPT
Community Resilience to Disasters
PPT
How Ready is Your Hospital for Disasters? Outbreaks? Mass Injuries?
PPTX
Community Mobilisation and Capacity Building
PPTX
Design and disaster mitigation
PPT
Capacity Building: What it is and Why it Works!
PPTX
Community Capacity Building
PDF
Introduction to GIS
PDF
What is GIS
PPT
Gis (geographic information system)
PDF
What Is GIS?
PPTX
Disaster Risk Reduction and Management
Building community resilience by integrating disaster risk reduction and heal...
The Resilient Community Partnership: Building Disaster Resilient Communities.
Disaster resistant architecture
Community Based Adaptation and Resilience in East and Southern Africa’s Dryla...
Six Foundations for Building Community Resilience
Who Day Presentation 07
Community Resilience to Disasters
How Ready is Your Hospital for Disasters? Outbreaks? Mass Injuries?
Community Mobilisation and Capacity Building
Design and disaster mitigation
Capacity Building: What it is and Why it Works!
Community Capacity Building
Introduction to GIS
What is GIS
Gis (geographic information system)
What Is GIS?
Disaster Risk Reduction and Management
Ad

Similar to ICBRR: An Approach to Building Disaster Resilient Communities (20)

PPT
Unicef Indranarayanpur Nazrul Smriti Sangha On Cbdp 2008
PPT
Final Session: Making cities resilient campaign by UNISDR
PPT
Presentation on Community based Early Warning System & CBDRM
PDF
Disaster preparedness of the selected Barangays in Rizal, Nueva Ecija
PPT
HFA and NRCS (Pitamber Aryal)
PPTX
2024 CBDRRM Training for BDRRMCs_Plannings.pptx
PPTX
Tools to support RBD in practice_UNCT workshop by Naresh Singh_June2014
PPT
Community Based Disaster Risk Management (CBDRM)
DOCX
Develop a disaster recovery plan to lessen health disparities an.docx
PPTX
DRRR-Powerpoint.pptx
PPTX
Financing Locally-Led Climate Action (FLLoCA) Program p.2
PDF
Gender & DDR _Work plan and implementation Matrix
PDF
2Disaster-Risk-Reduction---Risk-Assessment.pdf
PPTX
BRACC Impact Evaluation Design_Dan Gilligan_BRACC resilience learning event_1...
PDF
DRR-SRH-Facilitator-Guide
PDF
Topic-3-Disaster-Management-Cycle-Disaster-Preparedness (1).pdf
PDF
Ian Noble: Lessons from the PPCR and GFDRR
PPTX
PPTX
Module-4.-DRRM-Concept NSTP subject 1st year college.pptx
PDF
Flyer of-burdan-project
Unicef Indranarayanpur Nazrul Smriti Sangha On Cbdp 2008
Final Session: Making cities resilient campaign by UNISDR
Presentation on Community based Early Warning System & CBDRM
Disaster preparedness of the selected Barangays in Rizal, Nueva Ecija
HFA and NRCS (Pitamber Aryal)
2024 CBDRRM Training for BDRRMCs_Plannings.pptx
Tools to support RBD in practice_UNCT workshop by Naresh Singh_June2014
Community Based Disaster Risk Management (CBDRM)
Develop a disaster recovery plan to lessen health disparities an.docx
DRRR-Powerpoint.pptx
Financing Locally-Led Climate Action (FLLoCA) Program p.2
Gender & DDR _Work plan and implementation Matrix
2Disaster-Risk-Reduction---Risk-Assessment.pdf
BRACC Impact Evaluation Design_Dan Gilligan_BRACC resilience learning event_1...
DRR-SRH-Facilitator-Guide
Topic-3-Disaster-Management-Cycle-Disaster-Preparedness (1).pdf
Ian Noble: Lessons from the PPCR and GFDRR
Module-4.-DRRM-Concept NSTP subject 1st year college.pptx
Flyer of-burdan-project

More from Global Risk Forum GRFDavos (20)

PPTX
Disaster Risk Management Knowledge Centre, Brian Doherty
PPTX
Disaster risk reduction and nursing - human science research the view of surv...
PPTX
Global alliance of disaster research institutes (GADRI) discussion session, A...
PPTX
Towards a safe, secure and sustainable energy supply the role of resilience i...
PDF
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
PPTX
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
PPT
C&A Save the Children Urban DRR Project, Ray KANCHARLA
PPT
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
PPTX
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
PPTX
Training and awareness raising in Critical Infrastructure Protection & Resili...
PPTX
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
PPTX
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
PPTX
Capacity Development for DRR, Beatrice PROGIDA
PPTX
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
PPTX
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
PPTX
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
PPTX
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
PPTX
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
PPTX
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
PPTX
A Holistic Approach Towards International Disaster Resilient Architecture by ...
Disaster Risk Management Knowledge Centre, Brian Doherty
Disaster risk reduction and nursing - human science research the view of surv...
Global alliance of disaster research institutes (GADRI) discussion session, A...
Towards a safe, secure and sustainable energy supply the role of resilience i...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
C&A Save the Children Urban DRR Project, Ray KANCHARLA
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Training and awareness raising in Critical Infrastructure Protection & Resili...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Capacity Development for DRR, Beatrice PROGIDA
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
A Holistic Approach Towards International Disaster Resilient Architecture by ...

Recently uploaded (20)

PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PPTX
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
PDF
Module 2 - Modern Supervison Challenges - Student Resource.pdf
PDF
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
PPTX
operations management : demand supply ch
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
How to Get Business Funding for Small Business Fast
PDF
Introduction to Generative Engine Optimization (GEO)
PPTX
Astra-Investor- business Presentation (1).pptx
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PPTX
Project Management_ SMART Projects Class.pptx
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PDF
Cours de Système d'information about ERP.pdf
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
Hand book of Entrepreneurship 4 Chapters.docx
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Solaris Resources Presentation - Corporate August 2025.pdf
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
Module 2 - Modern Supervison Challenges - Student Resource.pdf
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
operations management : demand supply ch
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
How to Get Business Funding for Small Business Fast
Introduction to Generative Engine Optimization (GEO)
Astra-Investor- business Presentation (1).pptx
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
Project Management_ SMART Projects Class.pptx
Keppel_Proposed Divestment of M1 Limited
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
Cours de Système d'information about ERP.pdf

ICBRR: An Approach to Building Disaster Resilient Communities

  • 1. ICBRR: An Approach to Building Disaster Resilient Communities Shesh Kanta Kafle IDRC, Davos May 31, 2010
  • 2. Presentation Outline Key Features of ICBRR Key Achievements of ICBRR Program Contributions to Building Disaster Resilient Communities Measuring Disaster Resilient Communities (Using process and outcome indicators)
  • 3. Map of Indonesia Nias Island Aceh Province
  • 4. Key Features of ICBRR Addresses all hazards, vulnerabilities and risks; Considers all aspects of the disaster management cycle (Preparedness, prevention/mitigation, response and recovery); Includes cooperation and collaboration with other sectors/stakeholders;
  • 5. ICBRR Approach Enhances organizational capacity building Adopts participatory process Focuses on empowering vulnerable community and individuals Is gender sensitive Gives emphasis on linking community risk reduction plans to Local Government Planning
  • 6. Baseline survey; Knowledge, Attitude and Practice (KAP) Survey Rapport building, Form/Activate Community Based Action Team (CBAT), CBAT training. Mobilization of Disaster Response Team (SATGANA), CBATs and Community Risk Assessment (HVCA) Participatory planning Community awareness on disaster risk and impacts Advocacy and Socialization of Risk Assessment results and Plans Risk reduction/ mitigation Participatory monitoring and evaluation Formation of working group, Conduct Pre-VCA, Area Selection ICBDRR Flow Diagram
  • 7. Key Achievements Formed/trained CBATs Risk Assessment and risk reduction plans Involvement of women and elderly Involvement of local government Linking CBEWS to national EWS Community Preparedness- implementation of risk reduction plans
  • 8. Key achievements of ICBRR Program 95 43 Implementation of RR plans by CBATs 100 43 EWS focal points at CBATs appointed and trained 100 432 Number of PMI staff, volunteers and potential facilitators received training 100 43 Program support villages linked with PMI EWS 100 43 Villages submitted proposals for the community risk reduction plan implementation 100 1060 CBATs members including vulnerable groups and women involved in the plan formulation process 100 43 HVCA completed in participatory process including representatives of all vulnerable groups 100 6000 Persons in the community (both village and schools) with knowledge of hazards, vulnerability and risk. 100 860 CBATs as PMI volunteers/facilitators trained 100 43 CBATs are able to recruit, train, support and motivate community volunteers for DRR and work together to do so. Achieved (%) Planned (Number) Key Performance Indicators (KPIs)
  • 9.  
  • 10.  
  • 11.  
  • 12. IFRC Geneva IFRC AP Zone IFRC Regional Office PMI NHQ PMI Chapter PMI Branch International community UN agencies ICRC PNSs INGOs Source of Information BNPB BMKG CVS Other governmental departments EWS message Dissemination Disaster response team CBAT Community Institutions IFRC Jakarta ICRC Jakarta PNSs NGOs CBAT and community Disaster National Global EWS information and communication system at PMI
  • 13. BMKG PMI NHQ PMI branch Hazard information CBATs/ communities Telephone Radio SMS Email Newspaper TV Telephone Radio/TV SMS Email Information and communication system
  • 15. A disaster resilient community can be defined as a community which has the capacity (Twigg 2005): To absorb stress and destructive forces through resistance or adaptation; To manage or maintain certain basic functions and structures during disastrous events; and To recover or ‘bounce back’ with specific behaviour, strategies and measures for risk reduction. Disaster Resilient Community
  • 16. Disaster Resilient Communities Ability to bounce back Ability to recover rapidly Ability to resist hazards to become disasters
  • 18. Elements of resilient communities Safe ‘Critical Facilities’ Cash Reserves Disaster Preparedness Local Institutions/CBAT Ethical Standards Contingency Plans Memory of Past Events Trained Staff Coping Abilities Trained volunteers Local Leadership External Support Diversified Local Economy Responsible Governments Hazard, vulnerability and Capacity assessments Awareness and basic and health infrastructures
  • 19. i=10, j=5 i =10, j=5 Overall Resilience Score = ∑ P (Wi*Rj) + ∑ O (Wi*Rj) i=1, j= i=1, j=1 Measuring Disaster Resilient Communities
  • 20. 173 (275) (63%) 5 55 Overall score 6 (15) 2 3 Monitoring of program activities being done by PMI Branch and Chapters. 10.Participatory monitoring and evaluation 12 (30) 2 6 CBATs are actively involved in the implementation of risk reduction plans. 9. Mitigation activities 24 (40) 3 8 Community awareness raising materials prepared and distributed to communities; training on gender, early warning system, community based first aid (CBFA) organised; 8. Awareness raising/training 12 (20) 3 4 Risk reduction plans and HVCA results socialized among local government authorities; 7. Advocacy/ Socialisation 27 (45) 3 9 Community risk reduction plans prepared by CBATs mobilizing communities; 6. Risk reduction planning 40 (50) 4 10 Detailed risk assessment of all villages done mobilising CBATs 5. Risk assessment (HVCA) 15 (25) 3 5 SATGANA, VDMC and CBATs training organised and community mobilisation done. 4. Community mobilisation (SATGANA, VC, CBATs, communities) 28 (35) 4 7 Socialization was done for local leaders, PMI staff, board members; Formation of village committees (VDMC) and CBATs were done as per the standard process 3. Rapport building, social capital building, Form village committees and CBATs 3 (5) 3 1 PMI volunteers were involved 2. Baseline survey/KAP 6 (10) 3 2 Detailed pre-HVCA was done but was used for proposal writing and not for area selection. 1. Area selection, Pre-HVCA, comprehensive assessment Total score (Wi*Rj) Value (1-5)(Rj) Weight (Rank) (Wi) Status Process indicators (steps)
  • 21. Output indicators 30 (50) 3 5*2=10 3. Level of participation of vulnerable groups in the risk assessment 15 (25) 3 5*1=5 2. Knowledge of risk and risk reduction system among CBATs, community and local governments 60 (75) 4 5*3=15 1. Conduct of baseline survey, risk assessment (HVCA), establishment of disaster database. Risk Assessment (5) 3 (5) 3 1*1=1 6. Popular participation (linkage with PMI, private sector, NGOs, civil society and other agencies. 20 (25) 4 1*5=5 5. Capacity of CBATs and CDMC in disaster response and risk mitigation 16 (20) 4 1*4=4 4. Ownership of risk community reduction plans by local government planning 6 (10) 3 1*2=2 3. Linkage with the local government agencies, Private sectors and other NGOs/stakeholders 6 (15) 2 1*3=3 2. Access or influence of vulnerable groups to policy making and programming 30 (30) 5 1*6=6 1. A community organisation Governance (1) Score (Wi*Rj) Value (Rj) Weight (Wi) Standards/Indicators Thematic areas as per HFA
  • 22. Output indicators (cont’d) 48 (120) 2 4*6=24 7. Social protection (health, livelihoods etc) provisions 12 (20) 3 4*1=4 6. Environment and natural resources management 24 (40) 3 4*2=8 5. Diversified local economy (livelihoods) 24 (60) 2 4*3=12 4. Quality of houses, physical location 84 (140) 3 4*7=28 3. Monitoring and evaluation system in place 80 (100) 4 4*5=20 2. Implementation of RR plans 80 (80) 5 4*4=16 1. A DRR and disaster preparedness plan Risk management and vulnerability reduction (4) 8 (10) 4 2*1=2 5. Documentation of traditional, existing DRR practices and early warning systems in the community 16 (40) 2 2*4=8 4. DRR activities in schools 16 (20) 4 2*2=4 3. Formulation of SOP for early warning system and emergency communications 12 (30) 2 2*3=6 2. Awareness raising materials and activities 40 (50) 4 2*5=10 1. Trained volunteers and community members Knowledge and Education (2)
  • 23. Output indicators (cont’d) 717 (1165) (62% of the maximum attainable score) 5 233 Total score 24 (30) 4 3*2=6 4. PMI (SATGANA) and CBAT capacity 36 (40) 4 3*3=9 3. Volunteerism/Participation 9 (15) 3 3*1=3 2. Contingency plans 48 (60) 4 3*4=12 1. An effective community early warning system Disaster preparedness and response (3)
  • 24. The overall score 62% should not be loosely used and generalised. The score is contextual, and values mentioned in the tables are program and site specific. However, this can be used for comparing the status of any programs and measuring the outcomes in line with building disaster resilient communities. Conclusions (1)
  • 25. Process standards are important for the community understanding, ownership and sustainability of the Program; where as outcome standards are important for the real achievements in terms of community empowerment and capacity building. Conclusion (2)
  • 26. The ICBRR program was aimed at increasing community resilience through enhancing disaster preparedness and response capacities of PMI. A close link between CBATs, local government and PMI Branch with the support from Chapter is necessary for sustaining the outcomes of the program. Conclusions (3)