Improving Planning Services
PAS Spring Conference 2015
Martin Hutchings, Toby Hamilton
Date: March 2015 www.pas.gov.uk
this session
“the pre-requisites for improvement”
1. Understand what is happening
2. Use a sensible approach to changing
things
3. Measure the things that help you
understand and act
Presentation and discussion
• Part 1 – Understanding what’s really happening
in our planning services?
Tea / Coffee
• Part 2 – Rethinking Planning
(revolutionising ways of working for our customers)
Part 1
What is really happening
in planning services?
Benchmark roundup – why
bother?
• Benchmarking since 2009
– 276 councils participated, many more
than once
– Confidential, but valuable dataset
• Publish aggregate as a “state of the
nation”
– Before we forget
– for future benefit
What we’ll cover
• Costs and subsidy of planning
• Fees
• Productivity
• Customer survey
• Planning Quality Framework
What do councils spend the
money on?
Improving planning services
Percentage of LPA cost not
covered by fees and income
• Each vertical line represents a different LPA
• Average subsidy = almost 70% (at the time)
Cost per hour
Average cost per person per productive hour
Work type 2011 2012/13 Combined
Planning applications (direct) £48 £48 £48
Planning applications (other) £40 £40 £40
Compliance work - enforcement etc. £41 £41 £41
Strategic Planning £51 £55 £52
All planning activities £46 £46 £46
- Productive hourly rate = £46
- Compare this with pre-app charges (!)
Majors = profit. Avoid
conditions!
Application
count
Cost of
processing per
app
Fee per app at
time of
benchmark
% not covered
by fee
Major non residential 2170 2886 6251 -117%
All dwellings 14166 1668 1294 22%
Minor non residential 21288 794 410 48%
Householders 48020 408 131 68%
Heritage 12006 450 2 100%
All waste 210 6292 2604 59%
All minerals 191 2411 2248 7%
All others 48817 392 158 60%
Conditions 12781 270 92 66%
All app types 159649 602 356 41%
Productivity
• “We are not updating the 150 cases per
officer thing”
Productivity
• “We are not updating the 150 cases per
officer thing”
– In the end, we have (sort of)
Caseload = 144 / case officer
Productivity revisited
• In 2002, it was professional case officer +
admin types. Now less differentiation.
• Not cases per DC officer, but cases per
person
– Derives total head count
– In the ODPM study, this was “less than 100”
All-in figure is 88 cases per
person
All-in figure is 88 cases per
person
Why is there such a difference?
Work mix
– high numbers of simple applications. Fast
track.
Size seems to make some difference
Large authorities = often higher productivity
Customers
• In aggregate there were clear messages
– Talk to us, generally. It’s just manners.
– Talk to us *especially* when there are issues
– Let us amend
– Councils (generally) fail on customer care
• We fail because we don’t communicate
and follow a target culture
Reflections on the old
benchmark results
• One size does not fit all
• National indicators hide almost everything
about performance
• Subsidy represents a risk to development
• Communication is often weak
http://qualityframework.net/
The real performance ‘story’
• Facts; real-time data on planning
applications.
• Opinion; what customers say about the
planning service
• Practice: how the service is delivered and
goes about negotiating the best
developments and outcomes
The real performance story
• More focused on customers
• Internal management tool / external
‘declaration’
• Not annual snapshot, but a continuous
process
• Benchmark and compare
• No ‘start’ date – just get going
• External ‘badge’ of quality
Your work profile
Council 1 Council 2 Council 3
Council 4 Council 5 Council 6
• Variety
• Benchmarking
• Data integrity
Your fee profile
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
• Variety
• Income
• Improvement focus
• Risk
Outcomes – approvals
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
• Trends
• Messages
• Differences
Withdrawn applications
Value Vs Non-value
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
• Waste
• Trend – positive/negative
• Cost: work + free go
• Message to community
No fee (exc. heritage & trees)
Value Vs Non-value
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
Process performance
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
Valid on receipt
• Avoidable time/cost
• Is it you or them?
• Application type
Customer or Target-driven?
Process performance
Box Plots
Most (50%) of the data
median
Upper 25%
Lower 25%
Average
Customer or Target-driven?
Process performance
GOOD
Decisions asap
BAD
Last minute
More to come
• Resources
• Investment
[need more testing]
Is it getting busier ? [yes]
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
Development value in our place =
£60m/yr
Council 1
Council 2
Council 3
Council 4
Council 5
Council 6
Customer Surveys
• Agents, Applicants, Neighbours, Peers
• Staff, councillors, amenities
• Tied to an individual application
• Help, Time, Information, Straightforward.
Customer Surveys
• “We may be slow, but we offer a quality
service”
– This allows you to test, prove
• Same questions nation-wide
• Early days
survey results
Application Ref: HA/FUL/4456/14
Q: how many expensive process reviews
focus on speeding things up but fail to notice
that the service says ‘yes’ more often than
its peers, creates less waste and has
happier customers?
PQF = the real performance story
“PAS Planning Quality
Framework = consistent, relevant
information to benchmark
performance” (p12):
Solution in search of a problem ?
• Purpose
• Routine
• Value
• Or do something else …
• Use it or lose it ?
Part 2
Rethinking Planning
(revolutionising ways of
working for our customers)
Improving planning services
Improving planning services
EVERY GROUP YOU’VE EVER WORKED WITH
Time with peers
Away from the
day job
Easy-to-implement
ideas
Time with peers
Away from the
day job
Easy-to-implement
ideas
Project plans
Wide ranging
Big bang
Project plans
Wide ranging
Big bang
Start here
Improving planning services
What we’re learning from other
disciplines
• Start with the customer, purpose
• Understand how everything relates
• Re-think the ‘why?’ not just ‘what?’ & ‘how?’
• Experiment ‘in the work’
• Avoid too much change at once
• Test, learn, change as you go (forever)
A Revolution in Planning
Nick Smith
Cheshire West & Cheshire
 Performing well against the national targets but felt we could do
better for customers.
 We had seen Case Studies of how some authorities had
improved their planning service by designing it around their
customers.
 Volunteered for the Planning Advisory Service project pilot in
July 2014.
 The purpose of this presentation is to show you what we have
achieved since that time and see what you think.
Introduction
Planning decisions by number of days
(March 2014-September 2014)
8 weeks
Time – March 2014 to September 2014
Numberofdays
Current case load
(per Officer at any one time)
‘As is’ process
‘As is’ process
Pre-app phone
Formal pre-app
Consultations
Planning
application
Discharge of conditions Committee?
Appeals?
 Systems thinking diagrams
To enable the
best development
without delay
Purpose
Improving planning services
Improving planning services
Improving planning services
Improving planning services
1. Can I build?
2. Appraise it
3. Get the information you need (to make a decision)
4. Tell the customer they can do it (or why they can’t)
Method
Value adding steps that help us to enable the best
development without delay
 Tested 77 householder applications (as of 23/2/2015)
 Issued 30 householder planning permissions
 Average number of days from first contact to decision
being issued for householder applications was 59
days (2014) and with experiment is now 29 days
 Agents/applicants are more open to negotiation to
improve schemes
Results so far…
“From submitting the application via the Planning Portal
to registration with the LPA, the process was quick and
efficient.
It was refreshing to receive feedback on the application at
the start of the planning process and not the end which is
usually the case with other LPA's, leaving little or no time
to make any required amendments.
Overall, we could not be happier with the process”
“It gives us as agents maximum
chance to help resolve queries or
respond to suggestions”
This is absolutely fabulous - my Client will
be extremely pleased at the speed and
efficiency with which this has been dealt
with.
I can't believe you are calling so
quickly - you are obviously not
Cheshire East!
Direct quote from Michael Gore (MEG Design)
I wish a few more local
authorities were as helpful and
informative as yours, I was very
impressed. (I submit applications
across the UK).
Next steps
 Test more applications of different type and size
 Introduce more Officers to the method (whilst
minimising the disruption to the old system)
 Keep learning!
 Looking at opportunities for integration with the Joint
Venture project over the coming months
 Shorter end-to-end times
 Happier customers
 Staff morale
 Focusing on one application at a time means
improved quality of decision making
Benefits
 Freeing up capacity to support you
 Having a named Planning Officer who is aware of the
application and the issues from the start
 Happier constituents means fewer complaints
 Better quality decision making – improves local
environment
Benefits for Members
There is nothing so useless as doing efficiently
that which should not be done at all
Peter Drucker
Any questions?

More Related Content

PPTX
Benchmark roundup – why bother
PPTX
Rethinking planning
PPTX
A Revolution in Planning (Cheshire West & Cheshire)
PDF
Transformative HR Technology For Nonprofits
PPTX
Richard Crawley - Pre-app costings June 2014
PPTX
Are you ready to rethink planning?
PDF
Accounting for the Future: Encompass Webinar
PDF
Success Secrets for Real World Digital Transformations: Optimizing Business P...
Benchmark roundup – why bother
Rethinking planning
A Revolution in Planning (Cheshire West & Cheshire)
Transformative HR Technology For Nonprofits
Richard Crawley - Pre-app costings June 2014
Are you ready to rethink planning?
Accounting for the Future: Encompass Webinar
Success Secrets for Real World Digital Transformations: Optimizing Business P...

What's hot (20)

PPT
Stephen Alexander, Wolverhampton CC - A Revolution in Planning
PPTX
The Lean Enterprise
PPT
Tapping Your Inner CEO: Management Tips to Stay on Budget and Deadline
PDF
The Stages of MSP Maturity
PDF
Gemba Walks Helping Management to See
PDF
Make Your Payroll Selection and Implementation a Success
KEY
Estimating Cost of Delay
PPTX
Increasing End User Adoption
PPTX
PQF Overview
PDF
Using Cost of Delay to de-scale your organisation through decentralised decis...
PDF
High Volume Hiring The Need For Speed and Scale
PDF
From SLAs to XLAs | Shift to pro-active service delivery
PDF
How to Leverage Lean for Long-Term Success (Under Short-Term Pressures)
PPTX
Andew Marks Agile Business Analytics How A New Generation Bi Is Reducing ...
PDF
Why Organizational Change Management is Critical to Digital Transformation
PPTX
Leadership beyond Agile XP2015
PPTX
Working beyond boundaries
PDF
Managing through growth
PPTX
POS Presentation - Stuart Minty
PDF
Cost of Delay, measurements and parallel vs. sequential project processing
Stephen Alexander, Wolverhampton CC - A Revolution in Planning
The Lean Enterprise
Tapping Your Inner CEO: Management Tips to Stay on Budget and Deadline
The Stages of MSP Maturity
Gemba Walks Helping Management to See
Make Your Payroll Selection and Implementation a Success
Estimating Cost of Delay
Increasing End User Adoption
PQF Overview
Using Cost of Delay to de-scale your organisation through decentralised decis...
High Volume Hiring The Need For Speed and Scale
From SLAs to XLAs | Shift to pro-active service delivery
How to Leverage Lean for Long-Term Success (Under Short-Term Pressures)
Andew Marks Agile Business Analytics How A New Generation Bi Is Reducing ...
Why Organizational Change Management is Critical to Digital Transformation
Leadership beyond Agile XP2015
Working beyond boundaries
Managing through growth
POS Presentation - Stuart Minty
Cost of Delay, measurements and parallel vs. sequential project processing
Ad

Viewers also liked (10)

PPTX
Local government – in 5 years time
PPT
The economic value of planning
PPT
Raising the bar
PPT
How to talk to the public about controversial planning issues
PPTX
Understanding viability
PPT
Officer-member relations
PPT
Planning and growth
PPT
Delivering Transformation - Place Making in North Lincolnshire
PPTX
Objectively assessed need and housing targets
PPT
Planning and development viability
Local government – in 5 years time
The economic value of planning
Raising the bar
How to talk to the public about controversial planning issues
Understanding viability
Officer-member relations
Planning and growth
Delivering Transformation - Place Making in North Lincolnshire
Objectively assessed need and housing targets
Planning and development viability
Ad

Similar to Improving planning services (20)

PPTX
Richard Crawley, PAS - What happens in planning authorities?
PPTX
PAS: The Planning Quality Framework
PPTX
Positive Planning Martin Toby
PPTX
The Next Generation of Legal Metrics: How Hewlett-Packard Enterprise Uses Dat...
PPTX
Ina Gjikondi & Sheryl Vogt: Lean Six Sigma & the Balanced Scorecard
PPTX
Agile metrics - Agile KC Meeting 9/26/13
PPTX
Knowledge management and me
PPTX
Making the case webinar
PPT
LoCC Measurable Improvement in Your Development Process
PDF
Optimizing Legal Service Delivery
PDF
Managing benefits from projects - the NHS way
PDF
Salesforce Case Management with Canadian Cancer Society, Salesforce.org, and ...
PDF
Customer Centricity Master.pdf
PPT
Lean Thinking in Government Services
PPTX
Operationalisng SROI
 
PDF
Building Bridges between Data and Business Value
PPTX
Re-Planning of project Portfolio in crisis (ENG)
PDF
TRI RBM Change Management Approach
PPT
Workshop 1 presentation
PDF
1.8 Data and Performance Simplified (De Jong)
Richard Crawley, PAS - What happens in planning authorities?
PAS: The Planning Quality Framework
Positive Planning Martin Toby
The Next Generation of Legal Metrics: How Hewlett-Packard Enterprise Uses Dat...
Ina Gjikondi & Sheryl Vogt: Lean Six Sigma & the Balanced Scorecard
Agile metrics - Agile KC Meeting 9/26/13
Knowledge management and me
Making the case webinar
LoCC Measurable Improvement in Your Development Process
Optimizing Legal Service Delivery
Managing benefits from projects - the NHS way
Salesforce Case Management with Canadian Cancer Society, Salesforce.org, and ...
Customer Centricity Master.pdf
Lean Thinking in Government Services
Operationalisng SROI
 
Building Bridges between Data and Business Value
Re-Planning of project Portfolio in crisis (ENG)
TRI RBM Change Management Approach
Workshop 1 presentation
1.8 Data and Performance Simplified (De Jong)

More from PAS_Team (20)

PPTX
Training Local Plan Examinations 2025 PCPA - Copy (1).pptx
PPTX
Presentation_Value of Local Plans Cllr and Corp Leadership Teams New Plan Sys...
PPTX
PAS nature emergency event for councillors
PPTX
MHCLG Presentation Green Belt PPG_PAS_18MAR25.pptx
PPTX
Dec 24 NPPF Webinar 19 March Golden Rules.pptx
PPTX
Day 2 Seminar_Innovation and Bold Leadership_web.pptx
PPTX
NPPF Dec 24 - Housing Numbers Webinar PAS FINAL Version.pptx
PPTX
NPPF Deep Dive: Infrastructure September 2024
PPTX
NPPF Deep Dive: Green Belt September 2024
PPTX
NPPF Deep Dive: Housing Numbers, Delivery, and Land Supply
PPTX
PAS Developer Contributions Deep Dive Online Slides
PPTX
NPPF Roadshow 2024 In-Person Presentation
PPTX
PAS NPPF Consultation Local Plan and Strategic Plg Workshop SLIDES 16 09 24.pptx
PPTX
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PDF
231121 SP slides - PAS workshop November 2023.pdf
PPTX
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
PPTX
PAS BNG in Local Plans slides June 2023
PDF
Guildford BC BNG Policy June 2023.pdf
PDF
BNG at Salford City Council_June 2023.pdf
PPTX
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
Training Local Plan Examinations 2025 PCPA - Copy (1).pptx
Presentation_Value of Local Plans Cllr and Corp Leadership Teams New Plan Sys...
PAS nature emergency event for councillors
MHCLG Presentation Green Belt PPG_PAS_18MAR25.pptx
Dec 24 NPPF Webinar 19 March Golden Rules.pptx
Day 2 Seminar_Innovation and Bold Leadership_web.pptx
NPPF Dec 24 - Housing Numbers Webinar PAS FINAL Version.pptx
NPPF Deep Dive: Infrastructure September 2024
NPPF Deep Dive: Green Belt September 2024
NPPF Deep Dive: Housing Numbers, Delivery, and Land Supply
PAS Developer Contributions Deep Dive Online Slides
NPPF Roadshow 2024 In-Person Presentation
PAS NPPF Consultation Local Plan and Strategic Plg Workshop SLIDES 16 09 24.pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
231121 SP slides - PAS workshop November 2023.pdf
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
PAS BNG in Local Plans slides June 2023
Guildford BC BNG Policy June 2023.pdf
BNG at Salford City Council_June 2023.pdf
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx

Recently uploaded (20)

PPTX
True Fruits_ reportcccccccccccccccc.pptx
PDF
The Detrimental Impacts of Hydraulic Fracturing for Oil and Gas_ A Researched...
PDF
4_Key Concepts Structure and Governance plus UN.pdf okay
PDF
UNEP/ UNEA Plastic Treaty Negotiations Report of Inc 5.2 Geneva
PDF
Item # 8 - 218 Primrose Place variance req.
PDF
The GDP double bind- Anders Wijkman Honorary President Club of Rome
PDF
PPT Item # 5 - 5307 Broadway St (Final Review).pdf
PPTX
Developing_An_Advocacy_Agenda_by_Kevin_Karuga.pptx
PPTX
Chapter 1: Philippines constitution laws
PPTX
Core Humanitarian Standard Presentation by Abraham Lebeza
PPTX
SOMANJAN PRAMANIK_3500032 2042.pptx
PPT
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
PPTX
ANALYSIS OF THE PROCLAMATION OF THE PHILIPPHINE INDEPENDENCE.pptx
PDF
Items # 6&7 - 900 Cambridge Oval Right-of-Way
PPTX
Empowering Teens with Essential Life Skills 🚀
PPTX
DFARS Part 252 - Clauses - Defense Regulations
PPTX
Part II LGU Accreditation of CSOs and Selection of Reps to LSBs ver2.pptx
PDF
eVerify Overview and Detailed Instructions to Set up an account
PDF
Concept_Note_-_GoAP_Primary_Sector_-_The_Great_Rural_Reset_-_Updated_18_June_...
PDF
Item # 5 - 5307 Broadway St final review
True Fruits_ reportcccccccccccccccc.pptx
The Detrimental Impacts of Hydraulic Fracturing for Oil and Gas_ A Researched...
4_Key Concepts Structure and Governance plus UN.pdf okay
UNEP/ UNEA Plastic Treaty Negotiations Report of Inc 5.2 Geneva
Item # 8 - 218 Primrose Place variance req.
The GDP double bind- Anders Wijkman Honorary President Club of Rome
PPT Item # 5 - 5307 Broadway St (Final Review).pdf
Developing_An_Advocacy_Agenda_by_Kevin_Karuga.pptx
Chapter 1: Philippines constitution laws
Core Humanitarian Standard Presentation by Abraham Lebeza
SOMANJAN PRAMANIK_3500032 2042.pptx
The Central Civil Services (Leave Travel Concession) Rules, 1988, govern the ...
ANALYSIS OF THE PROCLAMATION OF THE PHILIPPHINE INDEPENDENCE.pptx
Items # 6&7 - 900 Cambridge Oval Right-of-Way
Empowering Teens with Essential Life Skills 🚀
DFARS Part 252 - Clauses - Defense Regulations
Part II LGU Accreditation of CSOs and Selection of Reps to LSBs ver2.pptx
eVerify Overview and Detailed Instructions to Set up an account
Concept_Note_-_GoAP_Primary_Sector_-_The_Great_Rural_Reset_-_Updated_18_June_...
Item # 5 - 5307 Broadway St final review

Improving planning services

  • 1. Improving Planning Services PAS Spring Conference 2015 Martin Hutchings, Toby Hamilton Date: March 2015 www.pas.gov.uk
  • 2. this session “the pre-requisites for improvement” 1. Understand what is happening 2. Use a sensible approach to changing things 3. Measure the things that help you understand and act
  • 3. Presentation and discussion • Part 1 – Understanding what’s really happening in our planning services? Tea / Coffee • Part 2 – Rethinking Planning (revolutionising ways of working for our customers)
  • 4. Part 1 What is really happening in planning services?
  • 5. Benchmark roundup – why bother? • Benchmarking since 2009 – 276 councils participated, many more than once – Confidential, but valuable dataset • Publish aggregate as a “state of the nation” – Before we forget – for future benefit
  • 6. What we’ll cover • Costs and subsidy of planning • Fees • Productivity • Customer survey • Planning Quality Framework
  • 7. What do councils spend the money on?
  • 9. Percentage of LPA cost not covered by fees and income • Each vertical line represents a different LPA • Average subsidy = almost 70% (at the time)
  • 10. Cost per hour Average cost per person per productive hour Work type 2011 2012/13 Combined Planning applications (direct) £48 £48 £48 Planning applications (other) £40 £40 £40 Compliance work - enforcement etc. £41 £41 £41 Strategic Planning £51 £55 £52 All planning activities £46 £46 £46 - Productive hourly rate = £46 - Compare this with pre-app charges (!)
  • 11. Majors = profit. Avoid conditions! Application count Cost of processing per app Fee per app at time of benchmark % not covered by fee Major non residential 2170 2886 6251 -117% All dwellings 14166 1668 1294 22% Minor non residential 21288 794 410 48% Householders 48020 408 131 68% Heritage 12006 450 2 100% All waste 210 6292 2604 59% All minerals 191 2411 2248 7% All others 48817 392 158 60% Conditions 12781 270 92 66% All app types 159649 602 356 41%
  • 12. Productivity • “We are not updating the 150 cases per officer thing”
  • 13. Productivity • “We are not updating the 150 cases per officer thing” – In the end, we have (sort of)
  • 14. Caseload = 144 / case officer
  • 15. Productivity revisited • In 2002, it was professional case officer + admin types. Now less differentiation. • Not cases per DC officer, but cases per person – Derives total head count – In the ODPM study, this was “less than 100”
  • 16. All-in figure is 88 cases per person
  • 17. All-in figure is 88 cases per person
  • 18. Why is there such a difference?
  • 19. Work mix – high numbers of simple applications. Fast track.
  • 20. Size seems to make some difference Large authorities = often higher productivity
  • 21. Customers • In aggregate there were clear messages – Talk to us, generally. It’s just manners. – Talk to us *especially* when there are issues – Let us amend – Councils (generally) fail on customer care • We fail because we don’t communicate and follow a target culture
  • 22. Reflections on the old benchmark results • One size does not fit all • National indicators hide almost everything about performance • Subsidy represents a risk to development • Communication is often weak
  • 24. The real performance ‘story’ • Facts; real-time data on planning applications. • Opinion; what customers say about the planning service • Practice: how the service is delivered and goes about negotiating the best developments and outcomes
  • 25. The real performance story • More focused on customers • Internal management tool / external ‘declaration’ • Not annual snapshot, but a continuous process • Benchmark and compare • No ‘start’ date – just get going • External ‘badge’ of quality
  • 26. Your work profile Council 1 Council 2 Council 3 Council 4 Council 5 Council 6 • Variety • Benchmarking • Data integrity
  • 27. Your fee profile Council 1 Council 2 Council 3 Council 4 Council 5 Council 6 Council 1 Council 2 Council 3 Council 4 Council 5 Council 6 • Variety • Income • Improvement focus • Risk
  • 28. Outcomes – approvals Council 1 Council 2 Council 3 Council 4 Council 5 Council 6 • Trends • Messages • Differences
  • 29. Withdrawn applications Value Vs Non-value Council 1 Council 2 Council 3 Council 4 Council 5 Council 6 • Waste • Trend – positive/negative • Cost: work + free go • Message to community
  • 30. No fee (exc. heritage & trees) Value Vs Non-value Council 1 Council 2 Council 3 Council 4 Council 5 Council 6
  • 31. Process performance Council 1 Council 2 Council 3 Council 4 Council 5 Council 6 Valid on receipt • Avoidable time/cost • Is it you or them? • Application type
  • 33. Box Plots Most (50%) of the data median Upper 25% Lower 25% Average
  • 34. Customer or Target-driven? Process performance GOOD Decisions asap BAD Last minute
  • 35. More to come • Resources • Investment [need more testing]
  • 36. Is it getting busier ? [yes] Council 1 Council 2 Council 3 Council 4 Council 5 Council 6
  • 37. Development value in our place = £60m/yr Council 1 Council 2 Council 3 Council 4 Council 5 Council 6
  • 38. Customer Surveys • Agents, Applicants, Neighbours, Peers • Staff, councillors, amenities • Tied to an individual application • Help, Time, Information, Straightforward.
  • 39. Customer Surveys • “We may be slow, but we offer a quality service” – This allows you to test, prove • Same questions nation-wide • Early days
  • 41. Q: how many expensive process reviews focus on speeding things up but fail to notice that the service says ‘yes’ more often than its peers, creates less waste and has happier customers? PQF = the real performance story
  • 42. “PAS Planning Quality Framework = consistent, relevant information to benchmark performance” (p12):
  • 43. Solution in search of a problem ? • Purpose • Routine • Value • Or do something else … • Use it or lose it ?
  • 44. Part 2 Rethinking Planning (revolutionising ways of working for our customers)
  • 47. EVERY GROUP YOU’VE EVER WORKED WITH Time with peers Away from the day job Easy-to-implement ideas Time with peers Away from the day job Easy-to-implement ideas
  • 48. Project plans Wide ranging Big bang Project plans Wide ranging Big bang
  • 51. What we’re learning from other disciplines • Start with the customer, purpose • Understand how everything relates • Re-think the ‘why?’ not just ‘what?’ & ‘how?’ • Experiment ‘in the work’ • Avoid too much change at once • Test, learn, change as you go (forever)
  • 52. A Revolution in Planning Nick Smith Cheshire West & Cheshire
  • 53.  Performing well against the national targets but felt we could do better for customers.  We had seen Case Studies of how some authorities had improved their planning service by designing it around their customers.  Volunteered for the Planning Advisory Service project pilot in July 2014.  The purpose of this presentation is to show you what we have achieved since that time and see what you think. Introduction
  • 54. Planning decisions by number of days (March 2014-September 2014) 8 weeks Time – March 2014 to September 2014 Numberofdays
  • 55. Current case load (per Officer at any one time)
  • 57. ‘As is’ process Pre-app phone Formal pre-app Consultations Planning application Discharge of conditions Committee? Appeals?
  • 59. To enable the best development without delay Purpose
  • 64. 1. Can I build? 2. Appraise it 3. Get the information you need (to make a decision) 4. Tell the customer they can do it (or why they can’t) Method Value adding steps that help us to enable the best development without delay
  • 65.  Tested 77 householder applications (as of 23/2/2015)  Issued 30 householder planning permissions  Average number of days from first contact to decision being issued for householder applications was 59 days (2014) and with experiment is now 29 days  Agents/applicants are more open to negotiation to improve schemes Results so far…
  • 66. “From submitting the application via the Planning Portal to registration with the LPA, the process was quick and efficient. It was refreshing to receive feedback on the application at the start of the planning process and not the end which is usually the case with other LPA's, leaving little or no time to make any required amendments. Overall, we could not be happier with the process”
  • 67. “It gives us as agents maximum chance to help resolve queries or respond to suggestions”
  • 68. This is absolutely fabulous - my Client will be extremely pleased at the speed and efficiency with which this has been dealt with.
  • 69. I can't believe you are calling so quickly - you are obviously not Cheshire East! Direct quote from Michael Gore (MEG Design)
  • 70. I wish a few more local authorities were as helpful and informative as yours, I was very impressed. (I submit applications across the UK).
  • 71. Next steps  Test more applications of different type and size  Introduce more Officers to the method (whilst minimising the disruption to the old system)  Keep learning!  Looking at opportunities for integration with the Joint Venture project over the coming months
  • 72.  Shorter end-to-end times  Happier customers  Staff morale  Focusing on one application at a time means improved quality of decision making Benefits
  • 73.  Freeing up capacity to support you  Having a named Planning Officer who is aware of the application and the issues from the start  Happier constituents means fewer complaints  Better quality decision making – improves local environment Benefits for Members
  • 74. There is nothing so useless as doing efficiently that which should not be done at all Peter Drucker Any questions?