The information systems lifecycle Far more boring than you ever dreamed possible!
What prompts a new system? The current system may no longer be suitable for its purpose Technological developments may have made the current system redundant or outdated The current system may be too inflexible or expensive to maintain
The lifecycle model
Systems development life cycle  (the ‘Waterfall model’)
Feasibility study Technical feasibility  Economic feasibility  Legal feasibility  Operational feasibility  are the current work practices and procedures adequate to support the new system?  Schedule feasibility  how long will the system take to develop, or can it be done in a desired time-frame?
Requirements analysis Interviewing staff at different levels  from end-users to senior management Examining current business and systems documents and output may include current order documents, computer systems procedures and reports used by operations and senior management Sending out questionnaires  Observation of current procedures by spending time in various departments; a time and motion study can show where procedures could be more efficient, or to detect bottlenecks
System design  The hardware platform  which type of computer, network capabilities, input, storage and output devices The software programming language, package or database The outputs report layouts and screen designs The inputs documents, screen layouts, validation procedures The user interface  how users will interact with the computer system The modular design of each program in the application The test plan and test data Conversion plan how the new system is to be implemented Documentation  User Technical
Implementation Coding and testing of the system Acquisition of hardware and software  Installation of the new system  Installing the new hardware, which may involve extensive recabling and changes in office layouts; Training the users on the new system; Conversion of master files to the new system, or creation of new master files.
Methods of conversion Direct changeover The user stops using the old system one day and starts using the new system the next  Parallel conversion The old system continues alongside the new system for a few weeks or months  Phased conversion Used with larger systems that can be broken down into individual modules that can be implemented separately at different times Pilot conversion New system will first be used by only a portion of the organisation, for example at one branch or factory
System maintenance Perfective maintenance implies that while the system runs satisfactorily, there is still room for improvement Adaptive maintenance All systems will need to adapt to changing needs within a company Corrective maintenance Problems frequently surface after a system has been in use for a short time, however thoroughly it was tested
Prototyping
Benefits of prototyping  Misunderstandings between software developers and users can be identified; Missing functions may be detected; Incomplete or inconsistent user requirements may be detected; A prototype version will be quickly available to demonstrate the feasibility to management; The prototype can sometimes be used for training before the final system is delivered

More Related Content

PPT
The information systems life cycle
PPT
Information Systems Lifecycle
PPT
Information Systems Life Cycle
PPTX
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
PPTX
Systems Life Cycle
PPTX
Introduction to system life cycle
PPTX
System development phases
PPTX
System life cycle
The information systems life cycle
Information Systems Lifecycle
Information Systems Life Cycle
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
Systems Life Cycle
Introduction to system life cycle
System development phases
System life cycle

What's hot (19)

PDF
System Life Cycle
PPTX
Management information system
PPTX
System Development Life Cycle
PPTX
Sdlc process
PDF
System Development Life Cycle & Implementation of MIS
PPT
Information systems lifecycle
PPTX
Systems development cycle
PPTX
System Development Life Cycle
PPT
Different Approaches To Sys Bldg
PPTX
Information system implementation, change management and control
PDF
ITFT - System development life cycle models
PPT
Chapter17 system implementation
PPTX
A2 ICT Methods of Installation and Conversion
PPT
Gd 11 systems life cycle
PPT
The system development life cycle (SDLC)
PPT
Lesson 9 system develpment life cycle
PPTX
2 approaches to system development
PPTX
PPTX
system development life cycle
System Life Cycle
Management information system
System Development Life Cycle
Sdlc process
System Development Life Cycle & Implementation of MIS
Information systems lifecycle
Systems development cycle
System Development Life Cycle
Different Approaches To Sys Bldg
Information system implementation, change management and control
ITFT - System development life cycle models
Chapter17 system implementation
A2 ICT Methods of Installation and Conversion
Gd 11 systems life cycle
The system development life cycle (SDLC)
Lesson 9 system develpment life cycle
2 approaches to system development
system development life cycle
Ad

Viewers also liked (7)

PPT
PPTX
Dentin bonding agents
PPTX
Dentin bonding agents sneha
PPTX
Sterilization disinfection in oral and maxillofacial surgery
PPT
Composite and acid etching
PPTX
Acid Etching of Enamel and Bond Strength
PDF
Etchant in dentistry
Dentin bonding agents
Dentin bonding agents sneha
Sterilization disinfection in oral and maxillofacial surgery
Composite and acid etching
Acid Etching of Enamel and Bond Strength
Etchant in dentistry
Ad

Similar to Information systems lifecycle (20)

PPTX
Systems Life Cycle
PDF
L10 system implementation
PPT
PPT
SA Chapter 13
PPT
Ch21
PPTX
Software Development Life Cycle (SDLC).pptx
PPTX
Accounting System Design and Development - System Planning and Development
PPTX
AN INTRODUCTION TO SYSTEM ANALYSIS OVERVIEW.pptx
PPTX
Transform Legacy Systems with Modern Development Expertise
PDF
Transform Legacy Systems with Modern Development Expertise
DOCX
Online auction system srs riport
DOCX
Online auction system srs riport
PPT
Phase Two: What’s Next for Life Sciences and Enterprise Content Management
PDF
Information system
PDF
Systems Analysis Midterm Lesson
PPTX
SELECTION OF AN APPROPRIATE PROJECT APPROACH.pptx
PPTX
How to implement an enterprise system
PPT
Chap12 Developing Business It Solutions[1]
PPT
BIS Ch 4.ppt
PPTX
Systems Life Cycle
L10 system implementation
SA Chapter 13
Ch21
Software Development Life Cycle (SDLC).pptx
Accounting System Design and Development - System Planning and Development
AN INTRODUCTION TO SYSTEM ANALYSIS OVERVIEW.pptx
Transform Legacy Systems with Modern Development Expertise
Transform Legacy Systems with Modern Development Expertise
Online auction system srs riport
Online auction system srs riport
Phase Two: What’s Next for Life Sciences and Enterprise Content Management
Information system
Systems Analysis Midterm Lesson
SELECTION OF AN APPROPRIATE PROJECT APPROACH.pptx
How to implement an enterprise system
Chap12 Developing Business It Solutions[1]
BIS Ch 4.ppt

Recently uploaded (20)

PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
IGGE1 Understanding the Self1234567891011
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Hazard Identification & Risk Assessment .pdf
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
RMMM.pdf make it easy to upload and study
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PDF
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
Classroom Observation Tools for Teachers
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
202450812 BayCHI UCSC-SV 20250812 v17.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
IGGE1 Understanding the Self1234567891011
Final Presentation General Medicine 03-08-2024.pptx
Hazard Identification & Risk Assessment .pdf
A systematic review of self-coping strategies used by university students to ...
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
RMMM.pdf make it easy to upload and study
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Orientation - ARALprogram of Deped to the Parents.pptx
UNIT III MENTAL HEALTH NURSING ASSESSMENT
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Classroom Observation Tools for Teachers

Information systems lifecycle

  • 1. The information systems lifecycle Far more boring than you ever dreamed possible!
  • 2. What prompts a new system? The current system may no longer be suitable for its purpose Technological developments may have made the current system redundant or outdated The current system may be too inflexible or expensive to maintain
  • 4. Systems development life cycle (the ‘Waterfall model’)
  • 5. Feasibility study Technical feasibility Economic feasibility Legal feasibility Operational feasibility are the current work practices and procedures adequate to support the new system? Schedule feasibility how long will the system take to develop, or can it be done in a desired time-frame?
  • 6. Requirements analysis Interviewing staff at different levels from end-users to senior management Examining current business and systems documents and output may include current order documents, computer systems procedures and reports used by operations and senior management Sending out questionnaires Observation of current procedures by spending time in various departments; a time and motion study can show where procedures could be more efficient, or to detect bottlenecks
  • 7. System design The hardware platform which type of computer, network capabilities, input, storage and output devices The software programming language, package or database The outputs report layouts and screen designs The inputs documents, screen layouts, validation procedures The user interface how users will interact with the computer system The modular design of each program in the application The test plan and test data Conversion plan how the new system is to be implemented Documentation User Technical
  • 8. Implementation Coding and testing of the system Acquisition of hardware and software Installation of the new system Installing the new hardware, which may involve extensive recabling and changes in office layouts; Training the users on the new system; Conversion of master files to the new system, or creation of new master files.
  • 9. Methods of conversion Direct changeover The user stops using the old system one day and starts using the new system the next Parallel conversion The old system continues alongside the new system for a few weeks or months Phased conversion Used with larger systems that can be broken down into individual modules that can be implemented separately at different times Pilot conversion New system will first be used by only a portion of the organisation, for example at one branch or factory
  • 10. System maintenance Perfective maintenance implies that while the system runs satisfactorily, there is still room for improvement Adaptive maintenance All systems will need to adapt to changing needs within a company Corrective maintenance Problems frequently surface after a system has been in use for a short time, however thoroughly it was tested
  • 12. Benefits of prototyping Misunderstandings between software developers and users can be identified; Missing functions may be detected; Incomplete or inconsistent user requirements may be detected; A prototype version will be quickly available to demonstrate the feasibility to management; The prototype can sometimes be used for training before the final system is delivered