SlideShare a Scribd company logo
Instancing at the
Gate
Part II of Interpolation
Brij
Consulting,
Jean
Marshall
2/13/2021
MDIA Emulation Stage
V1: The Load Prospectus
Instances
Schema from
Interpolative
Scope brought
forward with
Design Element
2/13/2021 Brij Consulting, Jean Marshall 2
Instances
Stream
Mu Sic
2/12/2021 Brij Consulting, Jean Marshall
Our Load is not
configured for the
‘engineering’ of the
wall, but we have
decided to outline to
the Plait Instance in
order to describe its
ascendant properties
3
v1 v2
Angular Load
Work = 1, we don’t
anticipate force but
stress/friction perhaps…
and more than one kind of
load bearing is involved:
Glass load, compression
and bearing. No g’s are
involved. Foil up and Plait
for cascade down.
2/12/2021
Brij Consulting, Jean Marshall
O Map Ark Load
More engineering
definition is required:
the plait part units are
pinned without
gravity, but they must
carry a load value
Our original work is a theoretical starting point
to visualize notional conditions
Internet Instruction for Load Distribution
using gravity load bifurcates a type of
economy. Glass Practice will also bifurcate
but requires load balancing.
Ark Cloud
carries Force
4
Architectural Glass
Views that come out of the Church are important in the
moral comprehension of design for the support of life.
The Church itself has always made an impact on
Architecture and Design. Creation is God’s Domain.
But the system methodology of wave glass production
is a unique engineering complement to its portents.
The ability to predicate new design on predefined
instances is an exciting prospect of modeling.
2/12/2021 Brij Consulting, Jean Marshall 5
Behind the Wall
God’s Science
protects us
We need to add Production to Gate
There is no labor conversion or transformation process on the Wall yet to compare to the Ark
Product Metric Standard approach. Yet the data configured on the project appears to adhere well
to the basis of approximating the Data Plan. (404 -399.11 = 5.11 x2 = 1022 map)
2/12/2021 Brij Consulting, Jean Marshall
Time and Motion or Motion Standards have a different methodology in determining whether the
performance characteristics of the mechanics are appropriate. In looking into Materials Science, it is often
important that a Solid Standard is produced in that you don’t want the composition to be subject to slide or
variation. In Financial Engineering we are often trying to produce Conversion to a Plan, and the numbers do
not become firm until the project is reported. It may become important to have code method for difference
in practice standards. We may find the position of the Standard affirms its use.
See Slide 3
HERE
Conversion is @ Gate
Data Here configured
for Process the -399
is considered earn-
back from the churn
rate
Process layers carry the
mechanic application
See Slide 8
6
T&M
v1
Production
Plait Internal Selling Price
The Unit Price is
the product of:
Gate Plait Assets –
Equity = Financial
Cost / unit volume
= 35.78
Synergy/T&M
Plait = 8.3834
35.78 x 8.3834 =
300.00
It is necessary to reapply the
wall composition to foil and
plait in order to obtain these
standards SEE NEXT
2/12/2021 Brij Consulting, Jean Marshall 7
From Glass Wave ppt
Appendix III
Appendix I
Plait Wall
The Plait Wall foils to excess time
remaining in the clock but in this
case, it is used as a scalable object to
motivate the cascade. The additional
time built into the Wall covers the
investment. The Wall has more
synergy in it than the Gate.
Brij Consulting, Jean Marshall 2/13/2021
(404 -399.11 = 5.11 x2 = 1022 map)
Gap Transition
From Glass Wave
8
See Slide 6
72,623,576,946 - 72,393,239,544 =230,337,401.73
The motion-ability of the wall cascade
is used as a utility. Points are retained
in a glass application for later use.
T&M
Useful Scale Plait
Slide 3 Slide 7
See Appendix I
Wall Background Loading in Plait Glass
2/12/2021 Brij Consulting, Jean Marshall 9
Data
used for
Gate
The repetitive branching circuit rebuilds
and posts the PT or Pass Thru Gain
The substructure is always
rebuilt in a continuous
replacement process. It can
be changed but generally it
is what is arranged for the
surface of it that is altered.
T&M
Slide 8
Plait and Burden
Test for Drivers
2/13/2021
Brij Consulting, Jean Marshall
10
T&M
T&M
INK-UP
Slide
11
Integral
Lines
Slide
12
Wall Plait Markup
T&M
Plait data
Model
1+x
If we had use of Glass as we envision its use the lines and
integral relationships would be indicated through the layers
and the drivers apparent from the conveyances
Integral Markup
Z1
+33
Time dimensions Motion Processes
59.24
118.4
236+33
.535+.035
=.57
.414+.057
=.471
Drivers and
Other Data
2/13/2021 13
Synergy
Digital Load
When we add the
element to the process
and convey it, we will
have added the Equity
turn characteristic that
will generate ROI.
Then Time and Motion
will pick up the
remainder of the
burden and we can
book our asset into
production
System Burden
V1 Summary
What do Instances Do?
In V2 we will consider how
Instances can create various
detailed works on top of
architecture that is structurally
and repetitively supplied
2/12/2021 Brij Consulting, Jean Marshall 15
Patterned Elemental Construction
Covenant Guided Practice in Digital/Ark Model
These Practices are
I Defined Process, II Memory Retained and Recollected, III
Entrustment in accessible parts, IV Plan Comparative, V
Reconcilable, VI Accountable, VII Advancing Knowledge
1. Many of these methods are partially considered in industry
2. We are learning what has not been taught before and it is
documented in its strategic parts
3. We are enabled to reach new conclusions at a higher level of
design
4. These formulations can be tested and applied, with standards
R. O Lord, our God, how wonderful your name in all the earth!
You have made him little less than the angels,
and crowned him with glory and honor.
You have given him rule over the works of your hands,
putting all things under his feet.
Brij Consulting, Jean Marshall 2/12/2021
1. EQUITY is built and maintained
2. The ADVANCING PRACTICE retains the Covenant
Character
3. The Open format does not hide its attribute or
deploy a tendency that does not conform to the well-
known practice of it
4. The Evidence of the operative method is complete
and reconcilable
5. Virtue and its conduct is engaged in the process
Competent Signs of Discovery
16
Timeline of
Discoveries…
2/12/2021 BRIJ CONSULTING, JEAN MARSHALL 17
These discoveries and recent notes on Wave Glass
point to an energy conveyance theory. The use of a
light-based conveyance for energy could in effect
give us wireless energy, although we are not versed
in the construction, we do recognize that a threaded
"pipe" of light that is plait and conveyed in a ground
state could create an ambient energy when
transmitted with a seeded light- based plait that it
can activate and act upon using server- based
technology
Theory WE can
depict in graphics
is a few scientific
steps away
Appendix I
Reference • Useful time-oriented distribution for demand scale
8/4/2020 Brij Consulting, LLC 18
5 5
4
8
9
7
8 8
3
1
2
4
10
8
5
6
y = 0.0059x - 251.74
R² = 0.5743
y = 0.0092x - 395.63
R² = 0.4994
0
2
4
6
8
10
12
Timeline Ranking and Rating Discoveries
Rating Ranking Linear (Rating) Linear (Ranking)
Reference to Scientific Discovery
We wish to make a note about integral lines:
One line exceeds the other by the clock or timing of it and by a marginal
amount (.0092-.0059=.0033) graphically, and (395-251 = 144)
Pointer makes connective
associations in glass
We are not referring to quantum fields in
this paper, although our earlier work did
Appendix II
The STREAM changes the Landscape
Brij Consulting, Jean Marshall 19
PT
PT= Sales Differences are Pass Thru Gains from yield at Gate Slides 10 & 15
S.E.G.C SEGC: Subject to Engineering Change
Ratios were changed for incorrect labeling… the Asset: Equity is the Synergy element
Appendix III
Other Papers
https://www.slideshare.net/Marshallja/
presentations
2/5/2021 20
Brij Consulting, Jean Marshall
We hope to supply more papers of interest on the
topics related to Virtual Glass, Digital portal
development and Ark Sciences Our Methods changed
Be Aware!

More Related Content

PDF
Instancing at the Gate V1 The Load Prospectus
PDF
Instancing at the Gate v2 Building the Instance
PDF
Instancing at the Gate v3 Observation of Function
PDF
Plaxis bulletin 37 2015
PDF
The Dynamic Instance V2 Specifying the Instant
PDF
Converge: Remote Build, Phase III.pdf
PDF
Dimensional Building V1 Comparing Builds
PDF
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf
Instancing at the Gate V1 The Load Prospectus
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v3 Observation of Function
Plaxis bulletin 37 2015
The Dynamic Instance V2 Specifying the Instant
Converge: Remote Build, Phase III.pdf
Dimensional Building V1 Comparing Builds
Partners in T Pluribus Unum, Sea of Glass V1, V2, V3.pdf

Similar to Instancing at the Gate v1 The Load with Mark Up and Drivers (20)

PDF
Architectural Builds and Design V1 Yield to the Mix
PDF
Dimensional Building v2 Digital Strength in Z Properties
PDF
Converge, the Remote Build, Phase I
PDF
Dimensional Building V3 Interdimensional Positions
PDF
Crossover Conveyance V2 Threading the Needle
PDF
Pipes and Plaits in Ark Mode Design V2 and V3 Glass Warehouse and Title
PDF
Architectural Builds and Design V3 Land Fabrications
PDF
Scope of Glass Projects Part I Benchmarking.pdf
PDF
The Dynamic Instance V3 A Singular Moment
PDF
Crossover Conveyance V3 Continuous Site Management
PDF
Functional Glass v2 Stepping Up Plait Form Design
PDF
Crossover Conveyance V1 Glass Path
PDF
The Glass Wall v3 The Advancing Age in Glass
PDF
Dimensional Building in Ark Design.pdf
PDF
Cascading in Green Part I
PDF
The Glass Wall V1 The Plait of the Rose
PDF
Architectural Builds and Design V2 Number Theory
PDF
The Dynamic Instance v1 Holding the Instance
PDF
Ark in Glass V1 Schema in Ark Mode Simulation
PDF
Remote Build, Phase III V1,V2, V3.pdf
Architectural Builds and Design V1 Yield to the Mix
Dimensional Building v2 Digital Strength in Z Properties
Converge, the Remote Build, Phase I
Dimensional Building V3 Interdimensional Positions
Crossover Conveyance V2 Threading the Needle
Pipes and Plaits in Ark Mode Design V2 and V3 Glass Warehouse and Title
Architectural Builds and Design V3 Land Fabrications
Scope of Glass Projects Part I Benchmarking.pdf
The Dynamic Instance V3 A Singular Moment
Crossover Conveyance V3 Continuous Site Management
Functional Glass v2 Stepping Up Plait Form Design
Crossover Conveyance V1 Glass Path
The Glass Wall v3 The Advancing Age in Glass
Dimensional Building in Ark Design.pdf
Cascading in Green Part I
The Glass Wall V1 The Plait of the Rose
Architectural Builds and Design V2 Number Theory
The Dynamic Instance v1 Holding the Instance
Ark in Glass V1 Schema in Ark Mode Simulation
Remote Build, Phase III V1,V2, V3.pdf
Ad

More from Brij Consulting, LLC (20)

PDF
Crystal Cloud and Energy Star Performance.pdf
PDF
Comments on Crystal Cloud and Energy Star.pdf
PDF
How to Value Virtual Machines and other IP Stuff.pdf
PDF
Comments on How to Value Virtual Machines and other IP Stuff.pdf
PDF
Rise of the Build Division, Conquering the Curve.pdf
PDF
Comments on Rise of the Build Division.pdf
PDF
Concept Topology in Architectural Build Addendum.pdf
PDF
Comments on Concept Topology in Architectural Build Addendum.pdf
PDF
Comments on Concept Topology- Architectural Build Design.pdf
PDF
Concept topology- Architectural Build Design.pdf
PDF
Comments on Writing the House Addendum.pdf
PDF
Summary of Comments on Writing the House, Parts I & II.pdf
PDF
Comments on Architecture that Advances Parts I and II Review and Lab Curricul...
PDF
Architecture that Advances Parts I and II Review and Lab Curriculum.pdf
PDF
Comments on Architecture that Advances Part I.pdf
PDF
Architecture that Advances Part I Review.pdf
PDF
Conference 2 notes for Car and Home Show Parts I & II.pdf
PDF
Comments on Conference 2 notes for Car and Home Show Parts I & II.pdf
PDF
Summary of Comments on Conference 2 Notes for Car and Home Show.pdf
PDF
Conference 2 Notes for Car and Home Show.pdf
Crystal Cloud and Energy Star Performance.pdf
Comments on Crystal Cloud and Energy Star.pdf
How to Value Virtual Machines and other IP Stuff.pdf
Comments on How to Value Virtual Machines and other IP Stuff.pdf
Rise of the Build Division, Conquering the Curve.pdf
Comments on Rise of the Build Division.pdf
Concept Topology in Architectural Build Addendum.pdf
Comments on Concept Topology in Architectural Build Addendum.pdf
Comments on Concept Topology- Architectural Build Design.pdf
Concept topology- Architectural Build Design.pdf
Comments on Writing the House Addendum.pdf
Summary of Comments on Writing the House, Parts I & II.pdf
Comments on Architecture that Advances Parts I and II Review and Lab Curricul...
Architecture that Advances Parts I and II Review and Lab Curriculum.pdf
Comments on Architecture that Advances Part I.pdf
Architecture that Advances Part I Review.pdf
Conference 2 notes for Car and Home Show Parts I & II.pdf
Comments on Conference 2 notes for Car and Home Show Parts I & II.pdf
Summary of Comments on Conference 2 Notes for Car and Home Show.pdf
Conference 2 Notes for Car and Home Show.pdf
Ad

Recently uploaded (20)

PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Types of control:Qualitative vs Quantitative
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PPTX
Amazon (Business Studies) management studies
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
Reconciliation AND MEMORANDUM RECONCILATION
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Types of control:Qualitative vs Quantitative
340036916-American-Literature-Literary-Period-Overview.ppt
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Amazon (Business Studies) management studies
Laughter Yoga Basic Learning Workshop Manual
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Tata consultancy services case study shri Sharda college, basrur
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
ICG2025_ICG 6th steering committee 30-8-24.pptx
MSPs in 10 Words - Created by US MSP Network
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
unit 1 COST ACCOUNTING AND COST SHEET
Belch_12e_PPT_Ch18_Accessible_university.pptx
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Lecture (1)-Introduction.pptx business communication
Reconciliation AND MEMORANDUM RECONCILATION

Instancing at the Gate v1 The Load with Mark Up and Drivers

  • 1. Instancing at the Gate Part II of Interpolation Brij Consulting, Jean Marshall 2/13/2021 MDIA Emulation Stage V1: The Load Prospectus Instances
  • 2. Schema from Interpolative Scope brought forward with Design Element 2/13/2021 Brij Consulting, Jean Marshall 2 Instances
  • 3. Stream Mu Sic 2/12/2021 Brij Consulting, Jean Marshall Our Load is not configured for the ‘engineering’ of the wall, but we have decided to outline to the Plait Instance in order to describe its ascendant properties 3 v1 v2
  • 4. Angular Load Work = 1, we don’t anticipate force but stress/friction perhaps… and more than one kind of load bearing is involved: Glass load, compression and bearing. No g’s are involved. Foil up and Plait for cascade down. 2/12/2021 Brij Consulting, Jean Marshall O Map Ark Load More engineering definition is required: the plait part units are pinned without gravity, but they must carry a load value Our original work is a theoretical starting point to visualize notional conditions Internet Instruction for Load Distribution using gravity load bifurcates a type of economy. Glass Practice will also bifurcate but requires load balancing. Ark Cloud carries Force 4
  • 5. Architectural Glass Views that come out of the Church are important in the moral comprehension of design for the support of life. The Church itself has always made an impact on Architecture and Design. Creation is God’s Domain. But the system methodology of wave glass production is a unique engineering complement to its portents. The ability to predicate new design on predefined instances is an exciting prospect of modeling. 2/12/2021 Brij Consulting, Jean Marshall 5 Behind the Wall God’s Science protects us
  • 6. We need to add Production to Gate There is no labor conversion or transformation process on the Wall yet to compare to the Ark Product Metric Standard approach. Yet the data configured on the project appears to adhere well to the basis of approximating the Data Plan. (404 -399.11 = 5.11 x2 = 1022 map) 2/12/2021 Brij Consulting, Jean Marshall Time and Motion or Motion Standards have a different methodology in determining whether the performance characteristics of the mechanics are appropriate. In looking into Materials Science, it is often important that a Solid Standard is produced in that you don’t want the composition to be subject to slide or variation. In Financial Engineering we are often trying to produce Conversion to a Plan, and the numbers do not become firm until the project is reported. It may become important to have code method for difference in practice standards. We may find the position of the Standard affirms its use. See Slide 3 HERE Conversion is @ Gate Data Here configured for Process the -399 is considered earn- back from the churn rate Process layers carry the mechanic application See Slide 8 6 T&M v1 Production
  • 7. Plait Internal Selling Price The Unit Price is the product of: Gate Plait Assets – Equity = Financial Cost / unit volume = 35.78 Synergy/T&M Plait = 8.3834 35.78 x 8.3834 = 300.00 It is necessary to reapply the wall composition to foil and plait in order to obtain these standards SEE NEXT 2/12/2021 Brij Consulting, Jean Marshall 7 From Glass Wave ppt Appendix III Appendix I
  • 8. Plait Wall The Plait Wall foils to excess time remaining in the clock but in this case, it is used as a scalable object to motivate the cascade. The additional time built into the Wall covers the investment. The Wall has more synergy in it than the Gate. Brij Consulting, Jean Marshall 2/13/2021 (404 -399.11 = 5.11 x2 = 1022 map) Gap Transition From Glass Wave 8 See Slide 6 72,623,576,946 - 72,393,239,544 =230,337,401.73 The motion-ability of the wall cascade is used as a utility. Points are retained in a glass application for later use. T&M Useful Scale Plait Slide 3 Slide 7 See Appendix I
  • 9. Wall Background Loading in Plait Glass 2/12/2021 Brij Consulting, Jean Marshall 9 Data used for Gate The repetitive branching circuit rebuilds and posts the PT or Pass Thru Gain The substructure is always rebuilt in a continuous replacement process. It can be changed but generally it is what is arranged for the surface of it that is altered. T&M Slide 8
  • 10. Plait and Burden Test for Drivers 2/13/2021 Brij Consulting, Jean Marshall 10 T&M T&M INK-UP Slide 11 Integral Lines Slide 12
  • 11. Wall Plait Markup T&M Plait data Model 1+x
  • 12. If we had use of Glass as we envision its use the lines and integral relationships would be indicated through the layers and the drivers apparent from the conveyances Integral Markup Z1 +33 Time dimensions Motion Processes 59.24 118.4 236+33 .535+.035 =.57 .414+.057 =.471
  • 13. Drivers and Other Data 2/13/2021 13 Synergy Digital Load When we add the element to the process and convey it, we will have added the Equity turn characteristic that will generate ROI. Then Time and Motion will pick up the remainder of the burden and we can book our asset into production System Burden
  • 15. What do Instances Do? In V2 we will consider how Instances can create various detailed works on top of architecture that is structurally and repetitively supplied 2/12/2021 Brij Consulting, Jean Marshall 15 Patterned Elemental Construction
  • 16. Covenant Guided Practice in Digital/Ark Model These Practices are I Defined Process, II Memory Retained and Recollected, III Entrustment in accessible parts, IV Plan Comparative, V Reconcilable, VI Accountable, VII Advancing Knowledge 1. Many of these methods are partially considered in industry 2. We are learning what has not been taught before and it is documented in its strategic parts 3. We are enabled to reach new conclusions at a higher level of design 4. These formulations can be tested and applied, with standards R. O Lord, our God, how wonderful your name in all the earth! You have made him little less than the angels, and crowned him with glory and honor. You have given him rule over the works of your hands, putting all things under his feet. Brij Consulting, Jean Marshall 2/12/2021 1. EQUITY is built and maintained 2. The ADVANCING PRACTICE retains the Covenant Character 3. The Open format does not hide its attribute or deploy a tendency that does not conform to the well- known practice of it 4. The Evidence of the operative method is complete and reconcilable 5. Virtue and its conduct is engaged in the process Competent Signs of Discovery 16
  • 17. Timeline of Discoveries… 2/12/2021 BRIJ CONSULTING, JEAN MARSHALL 17 These discoveries and recent notes on Wave Glass point to an energy conveyance theory. The use of a light-based conveyance for energy could in effect give us wireless energy, although we are not versed in the construction, we do recognize that a threaded "pipe" of light that is plait and conveyed in a ground state could create an ambient energy when transmitted with a seeded light- based plait that it can activate and act upon using server- based technology Theory WE can depict in graphics is a few scientific steps away Appendix I
  • 18. Reference • Useful time-oriented distribution for demand scale 8/4/2020 Brij Consulting, LLC 18 5 5 4 8 9 7 8 8 3 1 2 4 10 8 5 6 y = 0.0059x - 251.74 R² = 0.5743 y = 0.0092x - 395.63 R² = 0.4994 0 2 4 6 8 10 12 Timeline Ranking and Rating Discoveries Rating Ranking Linear (Rating) Linear (Ranking) Reference to Scientific Discovery We wish to make a note about integral lines: One line exceeds the other by the clock or timing of it and by a marginal amount (.0092-.0059=.0033) graphically, and (395-251 = 144) Pointer makes connective associations in glass We are not referring to quantum fields in this paper, although our earlier work did Appendix II
  • 19. The STREAM changes the Landscape Brij Consulting, Jean Marshall 19 PT PT= Sales Differences are Pass Thru Gains from yield at Gate Slides 10 & 15 S.E.G.C SEGC: Subject to Engineering Change Ratios were changed for incorrect labeling… the Asset: Equity is the Synergy element Appendix III
  • 20. Other Papers https://www.slideshare.net/Marshallja/ presentations 2/5/2021 20 Brij Consulting, Jean Marshall We hope to supply more papers of interest on the topics related to Virtual Glass, Digital portal development and Ark Sciences Our Methods changed Be Aware!